Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · January 5, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Monday, January 12, 2015 at 09:05 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2014-09-30 2015-01-05 Single- and Two-family Renovation 140930-50ChapelSt-1 Renovations to existing residence to include elevating house and new BAR Staff Final stubble construction of rear addition Approval 2014-11-24 2015-01-05 Single- and Two Family New 141124--5 Single Family New Construction BAR Staff Final stubble Construction Approval 2014-11-24 2015-01-05 Single- and Two Family New 141124--9 Single Family New Construction BAR Staff Final stubble Construction Approval 2014-11-24 2015-01-05 Single- and Two Family New 141124--6 Single Family New Construction BAR Staff Final stubble Construction Approval 2014-11-24 2015-01-05 Single- and Two Family New 141124--7 Single Family New Construction BAR Staff Final stubble Construction Approval 2014-11-24 2015-01-05 Single- and Two Family New 141124--8 Single Family New Construction/ Foundation Only BAR Staff Final stubble Construction Approval 2015-01-05 2015-01-05 Single- and Two-family Renovation 150105-5AikenSt-2 relocate electrical meters from front of house to side of house. BAR Staff Final risse Approval 2015-01-05 2015-01-05 Single- and Two-family Renovation 150105-37MorrisSt-1 Repaint exterior to match existing BAR Staff Final risse Approval 2015-01-05 2015-01-05 Single- and Two-family Renovation 150105-4ComingSt-1 reroofing to match existing shingles BAR Staff Final hopkins Approval 2015-01-05 2015-01-05 Multi-family Renovations 150105-18LimehouseSt-2 Removal of only nonhistoric aluminum siding. BAR Staff Final risse Approval 2015-01-06 2015-01-06 Single- and Two-family Renovation 150106-35CalhounSt-1 Repainting- no changes BAR Staff Final stubble Approval 2014-12-15 2015-01-06 Demolition - Complete 141215-188 1/2LineSt-1 approval for a complete demolition BAR/DRB stubble Commercial/Mult.Fam. DEMO Approval 2015-01-06 2015-01-06 Single- and Two-family Renovation 150106-80PittSt-1 Repaint exterior to match existing. BAR Staff Final risse Approval 2015-01-06 2015-01-06 Single- and Two-family Renovation 150106-3AshtonSt-1 hvac platform, 3' setback as shown on plans. BAR Staff Final risse Approval BAR-DRB Approval Report --- Monday, January 12, 2015 at 09:05 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-01-06 2015-01-06 Sign Project 150106-85 1/2SpringSt-1 9sqft round sign with illumination tied to the hours of business operation BAR Staff Final risse Approval 2015-01-06 2015-01-06 Single- and Two-family Renovation 150106-186SmithSt-1 rot repairs and painting to match existing BAR Staff Final hopkins Approval 2015-01-07 2015-01-07 Single- and Two-family Renovation 150107-190SmithSt-1 Minor rot repair and repainting in kind BAR Staff Final stubble Approval 2015-01-07 2015-01-07 Uninhabitable Structures 150107-34AshleyAve-1 5 x 10 storage shed. BAR Staff Final risse Approval 2015-01-07 2015-01-07 Commercial Renovation 150107-186ConcordSt-1 Touch up painting BAR Staff Final stubble Approval 2015-01-07 2015-01-07 Commercial Renovation 150107-231KingSt-1 approval for recovering flat roof no changes BAR Staff Final trodglen Approval 2015-01-08 2015-01-08 Sign Project 150108-174ChurchSt-1 1 wall mounted identifier sign 6sqft BAR Staff Final risse Approval 2015-01-08 2015-01-08 Single- and Two-family Renovation 150108-131BroadSt-1 Remove 2 windows, replace with 1 centered window. Approval based on the BAR Staff Final risse project area not being visible from ROW. Approval 2015-01-08 2015-01-08 Sign Project 150108-280RutledgeAve-1Pin mounted facade sign 22.5 sqft BAR Staff Final risse Approval 2015-01-09 2015-01-09 Single- and Two-family Renovation 150109-13WentworthSt-1 Changes to piazza screen and front fence. BAR Staff Final risse Approval 2015-01-09 2015-01-09 Multi-family Renovations 150109-44CharlotteSt-1 Minor rot repair to siding; replacement of one window sash. all in kind repairs. BAR Staff Final stubble Approval 2015-01-09 2015-01-09 Fence Project 150109-73RutledgeAve-1 New columns (4), wall, walk gate (91") drive gate and side gate. revisions to plans BAR Staff Final risse approved 12/6/13 Approval 2015-01-09 2015-01-09 Single- and Two-family Renovation 150109-38NAdgersWhf-1 Repaint exterior elements to match existing (not the brick) BAR Staff Final risse Approval 2015-01-09 2015-01-09 Single- and Two-family Renovation 150109-130BroadSt-1 Paint color change BAR Staff Final stubble Approval BAR-DRB Approval Report --- Monday, January 12, 2015 at 09:05 AM Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff Received 2015-01-09 2015-01-09 Single- and Two-family Renovation 150109-57BogardSt-1 Patch roof and seal up eave on rear of house. Remove loose portions of front BAR Staff Final risse picket fence. If scope graows come back for additional approvals. Approval Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Report an issue with this meeting