Board of Architectural Review
Regular MeetingCharleston, SC · May 18, 2015
Agenda
BAR-DRB Approval Report --- Tuesday, May 26, 2015 at 10:23 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2015-03-26 2015-05-22 Single- and Two-family Addition 150326-111thAve-1 BZAZ approval on 3-17-15. Add 2nd floor, new electric, HVAC, plumbing, BAR Staff Final Approval risse
siding, roof, demo, wood rot repair, and add new porches
2015-05-07 2015-05-22 Single- and Two Family New 150507-37SouthSt-1 New Duplex Residential Construction BAR Final Approval risse
Construction
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-148SpringSt-1 repaint exterior to match existing. BAR Staff Final Approval risse
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-48SavageSt-1 Repaint exterior with color change (quail ridge) BAR Staff Final Approval risse
2015-05-18 2015-05-18 Commercial Renovation 150518-2137SavannahHwy-1
minor exterior renovations to an existing comercial building. DRB Staff Final Approval turner
2015-05-18 2015-05-18 Single- and Two-family Addition 150518-128TraddSt-1 minor siding and trim repairs and touchup painting. If scope graow BAR Final Approval risse
addational approval is required
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-85LoganSt-1 Repaint exterior with color change (custom tan) BAR Staff Final Approval risse
2014-04-07 2015-05-18 BAR 140407-63SpringSt-1 new construction of one story restauraunt BAR Staff Final Approval turner
2015-05-18 2015-05-18 Sign Project 150518-3201HartwellSt-1 11' tall monument sign with 13.5 sqft of signage. DRB Staff Final Approval risse
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-8JasperSt-1 repaint exterior with color change. BAR Staff Final Approval risse
2015-05-18 2015-05-18 Fence Project 150518-15PoulnotLn-1 6' picket fence as shown on plans BAR Staff Final Approval risse
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-390AshleyAve-2 Not under BAR perview for renovations. BAR Staff Final Approval risse
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-9KennedyCt-1 repaint exteror with color change (williamsburg wythe blue) BAR Staff Final Approval risse
2015-05-18 2015-05-18 Single- and Two-family Renovation 150518-262ComingSt-1 Repaint exterior with color change (muskoka trail) BAR Staff Final Approval risse
2015-05-19 2015-05-19 Multi-family Renovations 150519-110AshleyAve-1 Add new hand rails to existing masonry stairs in from of rear structure. BAR Staff Final Approval risse
2015-05-19 2015-05-19 Single- and Two-family Renovation 150519-82LegareSt-1 Reroof to match existing BAR Staff Final Approval risse
2015-05-19 2015-05-19 Commercial Renovation 150519-46JohnSt-1 Exterior maintenence incluging crack repair, repairs to doors and repaint BAR Staff Final Approval risse
to match existing.
2015-05-19 2015-05-19 Commercial Addition 150519-2085Henry new medical imaging vault addition to match existing DRB Staff Final Approval risse
TecklenburgDr-1
2015-05-19 2015-05-19 Sign Project 150519-525FollyRd-1 reface existing sign for nationwide insurance DRB Staff Final Approval turner
2015-05-19 2015-05-19 Multi-family Renovations 150519-1KingSt-1 replace missing metl flashing over terra cotta brow on roof. BAR Staff Final Approval risse
2015-05-19 2015-05-19 Single- and Two-family Renovation 150519-24CouncilSt-1 New copper gutters, copper railing cap, repaint trim, reseal exposed BAR Staff Final Approval stubble
wood; no color changes
BAR-DRB Approval Report --- Tuesday, May 26, 2015 at 10:23 AM
Date Reviewed Project Type Project ID and Address Description of Work Proposed Action Taken Staff
Received
2015-05-19 2015-05-19 Single- and Two-family Renovation 150519-127AshleyAve-1 3 coat stucco over new piers/wall around front yard. No change to BAR Staff Final Approval stubble
existing brick foundation of house
2015-05-19 2015-05-19 Multi-family Renovations 150519-182EBaySt-1 Replacement of existing windows with new aluminum clad windows BAR Staff Final Approval stubble
2015-05-20 2015-05-20 Single- and Two-family Renovation 150520-24BarreSt-1 repaint- no color change and minor rot repairs BAR Staff Final Approval turner
2015-05-20 2015-05-20 Single- and Two-family Renovation 150520-116QueenSt-1 minor rot repairs and touch up paint BAR Staff Final Approval turner
2015-05-20 2015-05-20 Single- and Two-family Renovation 150520-35LegareSt-1 clean, prep and paint north facade BAR Staff Final Approval turner
2015-05-20 2015-05-20 Single- and Two-family Renovation 150520-55SBatterySt-1 HVAC change out- same location BAR Staff Final Approval turner
2015-05-20 2015-05-20 Demolition - Complete 150520-3351MaybankHwy-1demolition DRB Staff Final Approval trodglen
Commercial/Mult.Fam.
2015-05-21 2015-05-21 Single- and Two-family Renovation 150521-46SBatterySt-1 minor rot repairs on siding and piazza limited to 125 linear feet. BAR Staff Final Approval risse
2015-05-21 2015-05-21 Single- and Two-family Renovation 150521-138SBatterySt-1 replace and repaint 15 pickets and repair small amount of fascia on north BAR Staff Final Approval risse
side.
2015-05-21 2015-05-21 Multi-family Renovations 150521-55AshleyAve-1 Replace exterior door to match existing. BAR Staff Final Approval risse
2015-05-21 2015-05-21 Multi-family Renovations 150521-25MontaguSt-1 Repaint exterior (excluding unpainted brick, to match existing. BAR Staff Final Approval risse
2015-05-21 2015-05-21 Single- and Two-family Renovation 150521-28MurrayBlvd-1 repair wood rot on rear porch eve, and ad metal plates to the exterior, BAR Staff Final Approval risse
and strapping on the interior to brace rear brick wall.
2015-05-21 2015-05-21 Single- and Two-family Renovation 150521-59TraddSt-1 install 2 gas fixtures and 1 electric fixture BAR Staff Final Approval turner
2015-05-21 2015-05-21 Multi-family Renovations 150521-18BroadSt-1 HVAC change out on 10th floor. Not visible from ROW. BAR Staff Final Approval risse
2015-05-21 2015-05-21 Single- and Two-family Renovation 150521-46SocietySt-1 replace garage doors and refinish with wood stain BAR Staff Final Approval turner
2015-05-21 2015-05-21 Sign Project 150521-62SpringSt-1 install right angle sign for tokyo crepes BAR Staff Final Approval turner
2015-05-22 2015-05-22 Single- and Two-family Renovation 150522-7DoughtySt-1 Replace heating and air unit in rear of building with one of similar size. BAR Staff Final Approval keane
2015-05-22 2015-05-22 Sign Project 150522-763MeetingSt-1 install multi tenant right angle sign BAR Staff Final Approval turner
2015-05-22 2015-05-22 Fence Project 150522-1AshtonSt-1 New 6' wood fence stained charleston green. BAR Staff Final Approval risse
2015-05-22 2015-05-22 Single- and Two-family Renovation 150522-20CouncilSt-1 replace existing shingle roof with new shingle roof. BAR Staff Final Approval risse
Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Get email alerts for Charleston
A daily email when new agendas and minutes are posted.