Muyni
← Back to Charleston

Board of Architectural Review

Regular Meeting

Charleston, SC · May 25, 2015

Agenda

Agenda

BAR-DRB Approval Report --- Monday, June 1, 2015 at 09:06 AM Date Reviewed Project Type Project ID and Description of Work Proposed Action Taken Staff Received Address 2015-05-20 2015-05-26 Uninhabitable Structures 150520-1085MorrisonDr-1Temp Shipping Contatiner to house Coffec Cart ( six months only) BAR Staff Final Approval stubble 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-8BeeSt-1 Rot repair, iron repair and repainting to match existing BAR Staff Final Approval stubble 2015-05-26 2015-05-26 Commercial Renovation 150526-185EBaySt-1 reroof front half of building. Flat roof is not visible from ROW BAR Staff Final Approval risse 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-13AnsonSt-1 Repainting to match existing BAR Staff Final Approval stubble 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-77PittSt-1 removal of non historic fence. BAR Staff Final Approval risse 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-23LoganSt-1 Installation of Solar panels on porch roof. Panels, mounts, and any associated BAR Staff Final Approval risse equipment must not be visible from ROW 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-789RutledgeAve-1 renovation of single family building. Building is outside of the BAR jurisdiction for BAR Staff Final Approval risse renovations. Bar perview is only over demo of building 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-26BogardSt-1 Repaint exterior to match existing. BAR Staff Final Approval risse 2015-05-26 2015-05-26 Single- and Two-family Renovation 150526-65LenwoodBlvd-1Repaint exterior to match existing. BAR Staff Final Approval risse 2015-05-26 2015-05-26 Multi-family Renovations 150526-12LineSt-1 replace siding. (Building in not in BAR jurisdiction for renovations. Currently BAR Staff Final Approval risse siding replacement is not considered to be demo of structure, therefore this project is not under BAR's perview) 2015-05-26 2015-05-26 Commercial Renovation 150526-44MorrisSt-1 Siding trim removal and replacement due to termites BAR Staff Final Approval stubble 2015-05-26 2015-05-26 Commercial Renovation 150526-46BroadSt-1 coating inside ledge and gutter on flat roof not visible from ROW BAR Staff Final Approval risse 2015-05-27 2015-05-27 Single- and Two-family Renovation 150527-105KingSt-1 replace driveway runners BAR Staff Final Approval turner 2015-05-27 2015-05-27 Single- and Two-family Renovation 150527-3GibbesSt-1 new hand crimped roof to replace existing turne metal roof. (not to be BAR Staff Final Approval risse premanufactured roofing as per information provided to applicant) 2015-05-27 2015-05-27 Single- and Two-family Renovation 150527-69AshleyAve-1 Replace existing rotting garage door with new grage door that matches the BAR Staff Final Approval turner existing 2015-05-28 2015-05-28 Multi-family Renovations 150528-114BeaufainSt-1 repaint front and rear stairs and porch flooring to match existing. BAR Staff Final Approval risse 2015-05-28 2015-05-28 Multi-family Renovations 150528-278KingSt-1 Repairs to stairwell and recoat stairwell roof to match existing. BAR Staff Final Approval risse 2015-05-28 2015-05-28 Sign Project 150528-616MeetingSt-1 New signage and color change for Cortaditos BAR Staff Final Approval stubble 2015-05-28 2015-05-28 Commercial Renovation 150528-90BullSt-1 repaint building to match existing and minor rot repair ion the eves BAR Staff Final Approval risse 2015-05-28 2015-05-28 Single- and Two-family Renovation 150528-5AtlanticSt-1 Repaint exterior to match existing. BAR Staff Final Approval risse 2015-05-29 2015-05-29 Commercial Renovation 150529-105MeetingSt-1 repairs to sofit and gutter BAR Staff Final Approval risse BAR-DRB Approval Report --- Monday, June 1, 2015 at 09:06 AM Date Reviewed Project Type Project ID and Description of Work Proposed Action Taken Staff Received Address 2015-05-29 2015-05-29 Commercial Renovation 150529-170ChurchSt-1 replace hvac on roof. not visible from row BAR Staff Final Approval risse 2015-05-29 2015-05-29 Single- and Two-family Renovation 150529-14MenottiSt-1 rReplace existing shingle roof with new shingle roof BAR Staff Final Approval risse 2015-05-29 2015-05-29 Single- and Two-family Renovation 150529-13JacobsAly-1 repair roof on front left dormer and reflash to match existing. BAR Staff Final Approval risse 2015-05-29 2015-05-29 Single- and Two-family Renovation 150529-40RutledgeAve-1repair and replace porch decking BAR Staff Final Approval risse 2015-05-29 2015-05-29 Commercial Renovation 150529-30Vendue expand the brick paving at the entry 48sqft on each side of the walk BAR Staff Final Approval risse Range-1 Total Projects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Get email alerts for Charleston

A daily email when new agendas and minutes are posted.

Report an issue with this meeting