CAPITAL IMPROVEMENTS COMMITTEE
Regular MeetingMilwaukee, WI · March 4, 2015
Minutes
200 E. Wells Street
City of Milwaukee Milwaukee, Wisconsin
53202
Meeting Minutes
CAPITAL IMPROVEMENTS COMMITTEE
ALD. ROBERT BAUMAN, CHAIR
Ald. Nik Kovac, Ald. Michael Murphy, Ghassan Korban,
Martin Matson, Mark Nicolini, and Mariano Schifalacqua
Staff Assistant: Linda Elmer, 286-2231
Fax: 286-3456, lelmer@milwaukee.gov
Fiscal Planning Specialist: Kathleen Brengosz, 286-3926,
kbreng@milwaukee.gov
Wednesday, March 4, 2015 9:00 AM Room 301-B, City Hall
1. Review and approval of the minutes of the February 11, 2015 meeting.
Meeting convened: 9:04 A.M.
All members present with Toni Biscobing present for Mr. Matson.
Mr. Froh moved for approval of the minutes. There were no objections.
2. Presentation of the Bridges Condition Report.
Mr. Craig Liberto discussed the City’s bridge inventory. He said there are currently
187 City owned and maintained bridges; 135 fixed bridges over rivers railroads and
streets, 19 pedestrian bridges, 12 viaducts, and 12 movable bridges. He said that 9
bridges have been added since 2012 and that most of them were pedestrian bridges.
He said the Granville Road bridge has been removed.
Mr. Liberto said the bridge inventory is managed through an inspection program
which is conducted by DPW personnel in accordance with Federal Highway
Administration (FHWA) and WisDOT standards. Each inspector is certified by the
FHWA. He said that most bridges are inspected at least every 24 months. He said
movable bridges structurally deficient bridges are inspected annually. Movable
bridge inspections are done at the beginning of the year to make sure that they are
operational when boating season starts. He said that 156 formalized bridge
inspections were performed in 2014. Mr. Liberto discussed the various types of
bridge inspections which include initial, routine, fracture critical, in-depth with
non-destructive testing, interim, and three types of underwater inspections (survey,
visual probe and dive). Underwater dive inspections which are required once every
five years were last performed in 2013 on 31 bridges.
Mr. Liberto discussed the sufficiency rating system (SR) which is the FHWA rating for
service condition. He said that the inspection information is entered into a database
which generates a sufficiency rating. The SR has a 100 point scale and three main
components, structural adequacy (55 pts), service ability and obsolescence (30 pts),
and essentiality for public use (15 pts). He said that bridges are scored using current
design standards. He said the SR is not a measure of safe versus unsafe and that
some bridges may have a low SR because of narrow roadway widths or clearances.
He said the formula for calculating the SR may be updated soon. It was last updated
in 1995.
Mr. Liberto discussed the condition of the City’s bridges. He said that an SR of 80 is
a threshold for determining eligibility for federal/state rehabilitation funding. Bridges
with an SR less than 50 are eligible for rehabilitation or reconstruction funding. He
said that in 2014 67% of our bridges had a sufficiency rating greater than 80 and 94%
had an SR greater than 50. In 1995 only 81% of bridges had a SR greater than 50.
In 2014 17% of the City’s bridges were classified as structurally deficient an
City of Milwaukee Page 1
CAPITAL IMPROVEMENTS Meeting Minutes March 4, 2015
COMMITTEE
improvement from 2008 when 25% of the bridges were classified as deficient. Mr.
Schifalacqua asked why the SR for the 51st Blvd bridge over Lincoln Creek had
declined so much since last year. Mr. Liberto said the bridge was originally
scheduled for rehab. An in depth inspection revealed higher levels of corrosion than
were expected. The bridge had to be posted causing the SR to decline significantly.
The bridge is now scheduled for reconstruction.
Mr. Liberto described how bridges are selected for rehabilitation or reconstruction.
He said the department evaluates the SR, the deck, the superstructure and the
substructure of the bridges. A prioritized list is created and potential funding sources
are identified. Mr. Liberto discussed the federal state bridge program. He said it is a
competitive program for limited state wide dollars. Last year (fiscal 2014-2015) the
state has $32.9 million per year. He said from 1997 through 2001, it has averaged
$32.2 million. The program has a two year funding cycle. The next application will
be spring of 2015. Funding is generally for 80% of the project with a 20% local share.
He said that with the exception of the TIGER ARRA funding received in 2011, state
and federal funding received by the City has declined significantly in the last 10
years. He said that historically there have been other low points in grant funding
when Milwaukee County has negative allocation balances, such as the mid 1990’s,
and that the downward trend may be nearing the end. Mr. Schifalacqua said that the
state does not allocate funds to the areas that have the most needs. Mr.
Schifalacqua said that the reason the ratings have improved is because the City has
increased local funding to replace the federal and state funding.
Mr. Liberto said that the department is focusing on maintenance to extend the life of
bridges. He said that painting bridges to protect the steel from corrosive elements is
one of the most effective maintenance strategies. He said concrete repairs can also
extend bridge life. He said that new movable bridges are constructed from
galvanized steel which reduces corrosion and saves money over the life of the
bridge. Mr. Nicolini asked if there were concerns about succession planning in the
department. Mr. Liberto said no. Mr. Liberto said that most design work in done
in-house but that that depending on the number and type of projects, some design
work may be done by consultants.
3. Presentation of the Underground Conduit and Communications Condition
Report.
Mr. Robert Bryson discussed the Underground Conduit and Electrical Manhole
system. He said there are 571 miles of conduit in the City streets. He said that the
fiber duct that was installed from the 1930s through the 1980s is deteriorating and the
City is currently using PVC. He said a lot of conduit has been replaced in conjunction
with the WisDOT interchange upgrades and other major street paving projects. Mr.
Bryson presented a list of projects that are currently being designed.
Mr. Bryson discussed the lease of conduit space. He said that total revenue for 2014
was $775,000. He said Chapter 98 of the City’s Code of Ordinances governs the
lease of City conduit space and is being revised. He said the telecommunications
industry has changed and some of the categories and special rates are no longer
applicable. Mr. Bryson said that he was not involved in establishing the rates. Ald.
Bauman asked what the effect of doubling the rates would be. Mr. Nicolini said that
rates may have been reduced in the past because they were too high. Mr. Froh said
that the rates were restructured for bridges to more closely match the cost of putting
conduit on bridges. Ald. Bauman asked how much the City charges a private entity
to put their own conduit on bridges. Mr. Froh said there was a permitting process,
but there was no ongoing charge to the utility. Ald. Bauman asked if anyone has
done an analysis of what the economic tipping point for the rates is. Mr. Bryson was
not aware of an analysis. Mr. Froh said that in the past, the rates were reviewed
periodically and may have been submitted as part of the budget process. Mr. Korban
said the department would review the rates.
City of Milwaukee Page 2
CAPITAL IMPROVEMENTS Meeting Minutes March 4, 2015
COMMITTEE
Mr. Bryson discussed the electrical manhole system. He said there are nearly 7,600
active manholes in the system. He said about 2,000 manholes are more than 75
years old. There are three main material types, brick, block and pre-cast. He said
the block manholes are failing at a faster rate because they were constructed without
reinforcing. Mr. Bryson said the department began an assessment of the manholes
in 2013 at the request of this committee. He said the City was divided into five areas.
One area will be inspected each year. Area 2 was inspected in 2013 and Area 3 was
inspected in 2014. Area 4 is currently under contract for 2015. In Area 3, 1,540
manholes were inspected; 95 manholes need to be replaced or require major repairs,
57 require deck roof replacement, and 347 require chimney or corbel repair. The
combined repair needs for Area 2 and Area 3 are as follows; 202 manholes need to
be replaced or have major repairs, 79 require deck roof replacement and 585 require
chimney or corbel repair.
Mr. Bryson said that there was a significant increase in the number of emergency
repairs in 2014. He said the cost for emergency repairs on 13 manholes repaired by
contractors was almost $200,000. He said the department now has a crew in service
to make manhole repairs. The new crew should reduce emergency repair costs and
improve response times.
4. Presentation of the Public Safety Communications Condition Report.
Mr. David Henke discussed the Public Safety Communications system. He said that
the name of the program has been changed to Public Facility Communications to
better reflect that it is not just for public safety but for all City communications.
Mr. Henke said that the phone system was last upgraded in 2012 and that the voice
mail system would be upgraded in 2015. Mr. Henke discussed some of the paving
and construction impacts on the City’s network including work on S 27th Street, the
Zoo Interchange Project, the Stadium Freeway, and I-43 from Howard Avenue. He
said 7.1 miles of fiber were installed last year. He said the system was expanded to
the new Concordia Substation for the Police Department. Mr. Henke discussed a
new project that will upgrade communications to the City’s traffic control cabinets.
The project is federally funded. He said the City may be able to piggyback funding by
extending the fiber from the traffic control cabinets to nearby City facilities. The City
would be responsible for the marginal cost of the fiber from the cabinet to the
building.
Mr. Henke said there are currently over 550 active copper repair tickets. He said
fewer were added and fewer were closed in 2014 than in previous years. He said the
number will continue to decline as the City utilizes the copper less and migrates more
services onto fiber cabling. He said the goal is to move off of copper cable. He said
there are far fewer repair tickets on fiber. The fiber repair tickets have been stable for
the last two years and are largely related to planned construction where fiber will be
impacted.
Mr. Henke discussed the impact of the City Hall Foundation project. He said the
current design of the foundation work will impact the existing copper and fiber lines
and require their relocation. There are 650 pairs that service City Hall for phone
lines, alarm lines and data lines. An additional 2,000 pairs service other locations.
He said the department will try to reduce the number of pairs to under 1,000. There
are approximately 144 strands servicing City Hall and 82 strands that service other
locations.
Mr. Henke said that there are approximately 175 miles of fiber in the system. He said
that 2 or 3 miles of new fiber (not replacement) were installed in 2014. Mr.
Schifalacqua asked what the expected life of the fiber was and if there should be a
program to replace it. Mr. Henke said that the fiber has a long life span. He said the
technology itself is relatively new and that the system is still performing well. He said
the department has switched to single mode fiber because it has a higher capacity
than multi-mode fiber.
City of Milwaukee Page 3
CAPITAL IMPROVEMENTS Meeting Minutes March 4, 2015
COMMITTEE
Mr. Froh asked if it was possible to lease out fiber capacity or bandwidth. Mr. Henke
said recent FCC ruling might affect the City’s ability to lease fiber capacity. He said
the department has not explored it in depth.
5. Presentation of the Bicycle and Pedestrian Facilities Condition Report.
Ms. Kristin Bennett discussed the City’s pedestrian facilities. She said that key
challenges are aging concrete infrastructure, Forestry related sidewalk issues,
accessibility, winter maintenance and driver culture.
Ms. Bennett discussed accessible pedestrian signals. She said they are generally
installed by request. She said changes have been made to the department’s process
to increase coordination with the aldermanic office and improving notification to
property owners and residents. She said two signals were installed on the UWM
campus. (Kenwood & Maryland and Hartford & Maryland) and one was installed at
the intersection of Humboldt and Wright. Ms. Bennett said equipment is chosen
based on the characteristics of the location and the available technology. She said
most of the signals have a locator tone for someone to find the button. When the
button is pushed, the signal announces that the walk light is on. Ald. Kovac said that
is preferable to having a signal that announces all the time. Ms. Bennett said the
department has been working with the manufacturer and an accessibility specialist to
make sure that DPW staff knows how to set up and maintain the signals.
Ms. Bennett discussed pedestrian actuated rapid flashing beacons (RFBs). She said
the department has been testing different styles, light patterns shapes of lights. She
said an RFB will be installed in partnership with UWM for a mid-block crossing near
an on-site day care facility. She said the department is seeking grant funding to
install RFBs for mid-block Riverwalk crossings.
Ms. Bennett discussed several small pedestrian projects including accessibility
improvements for a school near 43rd & Montana, relocating a mid-block crossing
near Sijan Field, the realignment of the intersection near the Swing Park, the creation
of a mid-block crossing to connect to the KK River Trail, a realignment at Erie and
Menomonee for the MIAD dormitory, and curb extensions at Clement school. Ald.
Bauman asked if all the projects were in response to requests or complaints. Ms.
Bennett said that most of the projects she listed were responsive. She said she has
a list of potential locations but that funding is limited and the department focuses
efforts on locations where there have been complaints or incidents or where there is
an outside funding source. Ald. Bauman inquired about the status of traffic calming
near 33rd & State. Ms. Bennett said the department is working on data collection
including a gap study to determine the most effective treatment. Ald. Bauman
suggested that if the Potawatomi were willing to pay for the improvements there
should be no reason to delay the project. Ms. Bennett said she was not aware that
funding might be available from the Potawatomi.
Ms. Bennett discussed the activities for 2015 and 2016. She said the City received a
federal grant to fund a pedestrian plan. A consultant will be hired early this year.
She said the project has a limited budget and will focus on public input to get a broad
range of citizens and stakeholders involved. Ms. Bennett said the department is
identifying median obstructions in crosswalks throughout the City. Ms. Bennett said
the department received a Safe Routes to School grant which will be available to in
2016.
Ms. Bennett discussed the City’s bicycle facilities. She said that Milwaukee was
again awarded bronze designation by the League of American Bicyclists as a bike
friendly city. Ms. Bennett said the City currently has 85 centerline miles of bicycle
lanes on city streets, 2,000 publicly funded bicycles parking racks, 16 bike lockers
and 3.5 miles of city owned paved trails. She said there are other paved trails within
the city limits which are owned and maintain by others including the Hank Aaron
State Trail and the Oak Leaf Trail. Ms. Bennett said the bike lockers are in various
locations around the city. She said they are available for lease on an annual basis.
City of Milwaukee Page 4
CAPITAL IMPROVEMENTS Meeting Minutes March 4, 2015
COMMITTEE
She said they are underutilized and the location and marketing of the lockers is being
re-evaluated.
Ms. Bennett discussed the Bay View to Downtown bike corridor. She described it as
a multi-year project. Phase 1 which included a raised bike lane was completed
between 2011 and 2013. Phase 2 which included the trail section between
Washington and National was completed in 2014. The project also included skid
resistant plates on the Young Street and S. Kinnickinnic Avenue bridges. Ald.
Bauman asked if the trail was plowed in the winter. Ms. Bennett said that a
contractor had been hired to do snow removal on the Beerline and the KK river Trail.
She said the department has received positive feedback on the contractor’s
performance.
Ald. Bauman said that the Milwaukee metro area has the 3rd highest rate of bike
commuters in the Midwest behind Chicago and Minneapolis. He said that excluding
big cities like New York and Boston, Milwaukee ranks 3rd nationally. He said
Milwaukee also ranks 3rd in pedestrian commuting both in the Midwest and
nationally.
Mr. Bennett discussed the Beerline Trail. She said that the existing trail is
approximately 2 miles long. She said the design for the Keefe to Capitol section is
largely complete and that the City is in the process of acquiring the right of way.
Construction should begin this summer or fall depending on when the right of way is
finalized. She said that the Beerline is being coordinated with the ARTery efforts.
Ms. Bennett discussed bridge plating efforts. She said the Young Street and S.
Kinnickinnic Avenue bridges have been completed. Plating has been designed for the
Cherry Street and Water Street bridges. The department is seeking grant funding for
the construction. Plating on the Wells Street Bridge will be done with the
rehabilitation bridge. She said a federal grant ($540,000) will be used to complete
the Plankinton Avenue and the Emmber Lane bridges. Mr. Schifalacqua asked if a
portion of the deck is removed to install the plates. Mr. Korban said no, the plate
goes on top of the deck.
Ms. Bennett said the department added about 4 centerline miles in 2014 and is
scheduled to add at least 10 centerline miles in 2015. She said most of the lanes are
added through existing paving projects. (local, state/federal and high impact) She
said the department is trying to incorporate these project elements into whatever
level of project is being done. She said staff will be developing a complete streets
policy starting this spring to codify the policies and procedures for project
development and delivery.
Ald. Bauman asked if the department was considering bike lanes with separation.
Ms. Bennett said that separated bike lanes were considered on S. 2nd Street. She
said major considerations when evaluating the feasibility of separated bike lanes
include the space available, demand for on street parking, accommodations for public
transit, and maintenance including snow removal and sweeping. She said buffered
bike lanes could be a good interim solution if there is not support for a separated bike
lane at the present time. Mr. Korban said that cities which construct separated bike
lanes don’t plow the snow, they remove it. Ald. Kovac said the bike lanes on
Humboldt that were added with the High Impact paving project have been popular.
Ms. Bennett briefly discussed bike parking saying that the City received a federal
grant to substantially improve bike parking. She said the City received a coordinated
signage grant with the County create a seamless sign system for way finding and
safety. She also said that the department will be using grant funding to upgrade web
content and develop interactive bicycle mapping and a new paper map.
Ms. Bennett discussed Midwest Bike Share and Bublr Bikes. She said they installed
10 stations in 2014 and had over 5,100 trips between August and December. She
said the City received a CMAQ grant for the design of additional stations. She said
that Wauwatosa, Shorewood, West Allis and UWM are participating.
City of Milwaukee Page 5
CAPITAL IMPROVEMENTS Meeting Minutes March 4, 2015
COMMITTEE
Meeting adjourned: 10:34 A.M.
This meeting can be viewed in its entirety through the City's Legislative Research
Center at http://milwaukee.legistar.com/calendar.
City of Milwaukee Page 6
Agenda
200 E. Wells Street
City of Milwaukee Milwaukee, Wisconsin
53202
Meeting Agenda
CAPITAL IMPROVEMENTS COMMITTEE
ALD. ROBERT BAUMAN, CHAIR
Ald. Nik Kovac, Ald. Michael Murphy, Ghassan Korban, Martin
Matson, Mark Nicolini, and Mariano Schifalacqua
Staff Assistant: Linda Elmer, 286-2231
Fax: 286-3456, lelmer@milwaukee.gov
Fiscal Planning Specialist: Kathleen Brengosz, 286-3926,
kbreng@milwaukee.gov
Wednesday, March 4, 2015 9:00 AM Room 301-B, City Hall
1. Review and approval of the minutes of the February 11, 2015 meeting.
2. Presentation of the Bridges Condition Report.
3. Presentation of the Underground Conduit and Communications Condition
Report.
4. Presentation of the Public Safety Communications Condition Report.
5. Presentation of the Bicycle and Pedestrian Facilities Condition Report.
This meeting will be webcast live at www.milwaukee.gov/channel25.
Members of the Common Council and its standing committees who are not members of this committee
may attend this meeting to participate or to gather information. Notice is given that this meeting may
constitute a meeting of the Common Council or any of its standing committees, although they will not
take any formal action at this meeting.
Upon reasonable notice, efforts will be made to accommodate the needs of persons with disabilities
through sign language interpreters or auxiliary aids. For additional information or to request this
service, contact the City Clerk's Office ADA Coordinator at 286-2998, (FAX)286-3456,
(TDD)286-2025 or by writing to the Coordinator at Room 205, City Hall, 200 E. Wells Street,
Milwaukee, WI 53202.
Limited parking for persons attending meetings in City Hall is available at reduced rates (5 hour limit)
at the Milwaukee Center on the southwest corner of East Kilbourn and North Water Street. Parking
tickets must be validated in the first floor Information Booth in City Hall.
City of Milwaukee Page 1 Printed on 2/23/2015
CAPITAL IMPROVEMENTS Meeting Agenda March 4, 2015
COMMITTEE
Persons engaged in lobbying as defined in s. 305-43-4 of the Milwaukee Code of Ordinances are
required to register with the City Clerk's Office License Division. Registered lobbyists appearing
before a Common Council committee are required to identify themselves as such. More information is
available at www.milwaukee.gov/lobby.
City of Milwaukee Page 2 Printed on 2/23/2015