Business & Industrial Development Authority
Regular MeetingNashua, NH · May 16, 2014
Minutes
Nashua Business and Industrial Development Authority
Meeting Minutes
May 16, 2014
1. Call to Order and Welcome
The regular meeting of the Nashua Business and Industrial Development Authority was called to order at
8:16 a.m. on May 16, 2014 in Room 208, Nashua City Hall by Vice Chairman Don Zizzi.
Present: Vice -Chairman Don Zizzi, Heath Gaffney, John Stabile, David Fredette, Jason Haviland, Bradley
Vear, Camille Pattison, and Mark Prolman
Other Attendees: Tom Galligani, George Durante, Barbara Pressly, Alderman Ken Siegel, James Vayo, State
Representative Mary Gorman.
2. Approval of Meeting Minutes from April 25, 2014.
MOTION TO APPROVE THE MINUTES FROM THE APRIL 25, 2014 MEETING MADE BY J HAVILAND.
MOTION WAS SECONDED BY C PATTISON AND APPROVED UNANIMOUSLY.
3. Bridge Street Project Update:
o T Galligani explained that Ryan Porter of Renaissance Developments was scheduled to speak at the BIDA
meeting, but would not be in attendance due to a delayed flight. However, Mr. Porter would be
available later in the day if members of the BIDA wished to schedule a meeting independently. J Vayo
proceeded to provide a summary of the Bridge Street Project’s progress over the course of the past six
months. The summary followed a document that was distributed by J Vayo. D Zizzi requested that J
Vayo speak to the note at the base of the summary regarding the storm water basin. J Vayo explained
that the existing development model for Phase I consists of three buildings, but at this time, there is
only room enough for two buildings until the storm water basin is resolved. D Fredette asked for
additional clarification. T Galligani added that the issues surrounding the storm water basin have not
been resolved yet and until they are, on-site parking and the third building cannot be constructed. J
Vayo reminded the BIDA that the City has issued an RFP for a consultant to devise a solution to resolve
the storm water basin issues. T Galligani estimated that a consultant would be selected soon and plan
of action would be adopted by December. D Fredette asked about the situation regarding tax
abatements. T Galligani explained that one of the City’s primary goals for pursuing this project is to get
the property back on the tax rolls, which is why Renaissance is now exploring the potential of financing
some of the project through Low Income Housing Tax Credits. J Stabile offered J Vayo some additional
information about applying for Low Income Housing Tax Credits. T Galligani stated that he requested
the six month project summary from Renaissance in order to refresh the BIDA’s memory of what has
been accomplished so far with the Bridge Street project.
4. East Hollis Street/Crown Street Update:
o T Galligani provided an update, which included the City’s release of an RFP for a concept study that will
hopefully integrate the roundabout and drainage issues so that they can be resolved while construction
is occurring. The City is in the process of choosing a firm for that study. The City and the selected firm
will have to work together with the Army Corps of Engineers in order to develop a plan that will clearly
exhibit that a solution has been devised that eliminates the need for the storm water basin. The study is
expected to be completed by the end of October. Tom Continued that there should be some important
answers by this fall about the storm water basin piece and the financing for the Bridge Street
Waterfront Development project. M Prolman inquired about the scoring process for LIGHTEC funding. J
Stabile replied that Renaissance would receive some additional points because they have site control
and a city partnership, but they would be awarded more points if they owned the property Bridge Street
Waterfront Development site. However the largest point allocation in this category is awarded for
support from the local community. J Vayo requested a letter of support from BIDA. D Zizzi asked if J
Vayo intended to make a similar request to the Board of Alderman, to which J Vayo replied that he did.
MOTION TO APPROVE THE DRAFTING AND SENDING OF A LETTER OF SUPPORT TO SUPPLEMENT
RENAISSANCE DOWNTOWN’S APPLICATION FOR LOW INCOME HOUSING TAX CREDITS MADE BY B
VEAR. MOTION WAS SECONDED BY J HAVILAND AND APPROVED UNANIMOUSLY.
5. R-14-003 Regarding Downtown Residential Development – High Street Parking Lot
o D Zizzi recommended that the next BIDA meeting be a working session. T Galligani suggested that the
BIDA walk around the area in question. D Zizzi agreed that this was a sound approach and reminded the
BIDA that they were going to begin identifying parcels, uses, and ownership throughout the
development area so that they could begin to engage with community stakeholders. H Gaffney asked
about the results of the circulation study. T Galligani provided an overview and stated that there were a
few areas of the study that were part of the development area and would affect a development on High
Street. He noted the most impactful pieces would be the redesign of the Walnut Street Oval and the
reconfiguration of W Pearl Street, as well as Factory Street and Water Street. However, he noted that
most tenants and owners on W Pearl Street did not support any changes and results were expected
from VHB within the month. D Zizzi noted that the value of even a preliminary look at the results would
be good for the BIDA. Tom remarked that he expected to have more information by next month.
6. Other
o J Stabile asked if the BIDA could send a letter of condolences to Chairman Tulley regarding his father’s
passing. D Zizzi agreed that he would send the letter as Vice Chair
7. Next Meeting Date
Meeting was adjourned at 8:52 a.m. The next general meeting will be at 8:15 a.m. on June 20, 2014 in City
Hall Room 208.
Minutes submitted by: G Durante
Agenda
Nashua Business Industrial Development Authority
Mayor’s Conference Room, City Hall
Friday, May 16, 2014
8:15 a.m.
Agenda
1. Call to Order and Welcome Don Zizzi, Vice-Chair
2. Approval of Meeting Minutes from April 25, 2014 Don Zizzi, Vice-Chair
3. Bridge Street Project Update Don Zizzi, Vice-Chair
Renaissance Downtowns status report
Review of pro-forma development budget
4. East Hollis Street / Crown Street Update Tom Galligani
Roundabout status update
East Hollis St Area Planning update
5. R-14-003 Regarding Downtown Residential Don Zizzi, Vice-Chair
Development – High Street Parking Lot
Referral from PEDC
6. Next Meeting Date: June 20, 2014