Municipal Water Finance Authority
Regular MeetingAlbany, NY · March 28, 2019
Minutes
ALBANY MUNICIPAL WATER FINANCE AUTHORITY
MINUTES OF REGULAR MEETING
March 28, 2019
A regular meeting of the Albany Municipal Water Finance Authority was officially convened at 8:00
AM, in the Conference Room at the Albany Water Board, 10 North Enterprise Drive, Albany.
PRESENT: Jack McEneny, Chairman; Gary Overdorf, Secretary; Julia Cannizzaro, Treasurer; Calee Oas,
Member; Warren Abriel, member
STAFF PRESENT: Joseph Coffey, Jr., P.E., Commissioner (Attended second half of meeting only);
William Simcoe, P.E., Deputy Commissioner; Thomas Dufresne, Chief Fiscal Officer; Emily Lyons,
Confidential Assistant
BOARD ADVISORS PRESENT: William Kahn, UHY Advisors; Rick Gell, P.E., OBG Engineers
Approval of Meeting Minutes from the Meeting of December 21, 2018
A motion to waive the reading and approve the minutes of the December 21, 2018 meeting was
made, seconded, and passed unanimously.
Committee & Staff Reports
Report of Rate Consultant: William Kahn, UHY Advisors
The 2019 increase was implemented as of January. We will continue to look at the system and
anticipate another similar increase this year and future years.
Financial Report: Thomas Dufresne, Chief Fiscal Officer
So far this year revenues have been higher and we are in line with operating expenses compared to
last year. The debt service is slightly higher due to exceeding our overtime budget because of
multiple main breaks. We are meeting with the City’s treasurer’s office soon to establish a better
mechanism for us to pay large capital expenses. Unpaid large user’s cash will come in soon and we
are overall collecting cash better due to the availability of online payments.
Consultant Engineer’s Report: Rick Gell, P.E., OBG Engineers presented on the Comprehensive
Capital Improvement Plan Update. The PowerPoint slides are attached to the minutes.
Commissioner’s Report: Deputy Commissioner Simcoe
Sheridan/Hackett Project: We have received some DEC grant money; however we did not get any of
the Revitalization grant money for this project. Our options are to hold on the project for the
moment, look for more grant opportunities, and do more in regard to financing for next year.
Ramsey Place: We have created a final design that focuses on planting more trees and installing more
grass, as opposed to the original design of a bioswale. We have completed a lot of messaging and
outreach, however some residents are still opposed to the narrowing of the street. The project will
also replace lead services on the street.
2/19/2019
AGENDA
Purpose of plan
Overview of each project element
Estimated project costs
Priorities and phasing
Discussion on 2019 financing plan
General questions
Water Supply System-Comprehensive Capital Improvement
Plan Update, January 25, 2019
Replaces temporary system
Update plan developed in 2017
Improvement 2.1
Es tablish priorities and sequencing – Sodium
Provides reliable compliance with regulatory
requirement for natural organics removal
for i mplementation Permanganate
Purpose System at Alcove Also provides treatment of taste and odor,
Adva nce the implementation of Reservoir. iron, and manganese
i ndividual projects
Estimated project cost $730,000
Es tablish financing plan for 2019
Manages humidity within the building walls to
Facilitates replacement of two non operable prevent further deterioration of the building
isolation valves used for plant shutdowns structure and interior finishes
Improvement 2.3
Project 2.2-
– Aeration Basin Includes lead abatement
Decommission Facilitates re-establishment of a bypass
Ventilation and
hydroelectric around the Aeration Basin
Damp proofing
generator Protects recent investment in building exterior
upgrades.
Estimated Project Cost $800,000.
Estimated project cost $1,000,000
1
2/19/2019
Includes replacement of roof structure and
installation of automated sludge collection Includes 2 new blowers and wash
water pumps
Addresses significant employee safety issues
Project 2.4- with roof deterioration and fall protection Improvement 2.5 Improves reliability and energy
Sedimentation
– Energy saving efficiency of critical production
Basin Building
Upgrades. equipment
Upgrades Design authorized in 2018 and underway
Estimated project cost $425,000
Estimated Project Cost $4,520,000.
Complete rehabilitation of mixing, flocculation Includes engineering and
basin and filters construction costs for
Improvement 2.7 repairs to Lagoon No.2
– Upgrades to completed in 2018
Project 2.6- Filter Addresses deterioration of aging infrastructure
to reliably deliver high quality water Lagoons and
Upgrades
Residual Handling
Facilities.
Estimated project cost
Estimated Project Cost $10,254,000. $1,520,000
Includes replacement of 30 year old dry lime system Incudes major upgrade of aging
with a liquid lime system primary electrical gear in the plant
Addresses significant employee safety issues
Project 2.8 - Lime with dust and fall protection Improvement 2.9 Addresses arc flash safety concerns
Storage and Feed – Feura Bush
System Electrical
Improves ability to reliably and efficiently Recent breaker trips indicate this
Replacement deliver desired water quality
Upgrades
project may need to be accelerated
Estimated Project Cost $3,235,000. Estimated project cost $695,000
2
2/19/2019
Includes new maintenance building Includes inspection and allowance for
and renovation of existing garage renovation of critical production asset
Project 2.10 –
Project 2.11 -
Maintenance Scheduled to be constructed prior
Wash Water Tank No record of a previous inspection
Building at Feura to electrical upgrades
Rehabilitation
Bush
Estimated Project Cost $300,000. Estimated Project Cost $59,000.
Includes inspection, cleaning of Includes allowance for unforeseen
clear well and allowance for repairs projects identified during other upgrades
Improvement Project 2.13- Includes allowance for hazardous
2.12 – Clear well Known lime accumulation that Misc. Feura Bush
needs to be removed material abatement
Rehabilitation. Facility Upgrades
Estimated project cost $141,000 Estimated Project Cost $867,000.
Incudes system pressure monitors Existing coating system is over 25 years
and integration into existing
telemetry
old
Project 2.15 –
Improvement
Upper Service
2.14 – Pressure Aids in maintaining system Improvements to be completed after
Tank Coating,
Reducing Valve pressures and valve maintenance installation of Colonie Interconnection
Mixing and
Telemetry.
Repairs
Estimated project cost $114,000 Estimated Project Cost $496,000.
3
2/19/2019
Includes major renovation of 40 year old building
Incudes overdue maintenance of envelope
tank interior. Last painted in 2002
Improvement Addresses climate control for recently installed
Project 2.17 –
2.16 – Pine Bush VFDs
Colonie Interconnection will aid Pine Bush
Tank Interior
in completion of this work Pumping Station
Coating, Mixer, Includes general renewal of MEP systems and
Renovations interior finishes
and Repairs.
Estimated project cost $714,000 Estimated Project Cost $,583,000.
Improves consistency of water quality Adds elevator service to Third Floor
throughout the distribution system for equipment installation/removal
Project 2.18-
Improvement
Liquid Lime
Maintains consistent corrosion 2.19 – Feura Bush Addresses employee safety issue
System at
control treatment throughout system WFP Elevator with exposed electrical equipment
Loudonville
Replacement.
Reservoir
Estimated Project Cost $606,000. Estimated project cost $655,000
Includes replacement of deteriorated inlet
extension
TABLE 1 - PROJECT COST ESTIMATE
Item/Description Amount DWSRF Capital Expenditure
2019 2020 2021 2022 2023 2024
2.1 Sodium Permanganate System at Alcove Reservoir $ 730,000 $ 730,000
Project 2.20 – Provides a bridge for employee access to inlet 2.2
2.3
Decommission Hydroelectric Generator
Aeration Basin Ventilation and Damp Proofing Upgrades
$
$
800,000
1,000,000 $ 50,000 $ 950,000
$ 400,000 $ 400,000
2.4 Sedimentation Basin Building Upgrades $ 4,520,000 $ 2,260,000 $ 2,260,000
Loudonville Basin 2.5
2.6
Energy Saving Upgrades
Filter Upgrades
$
$
425,000
10,254,000
$
$
25,000 $
500,000 $
200,000 $
4,000,000 $
200,000
5,754,000
2.7 Upgrades to Lagoons and Residual Handling Facilities $ 1,520,000 $ 1,520,000
C Inlet 2.8 Lime Storage and Feed System Replacement $ 3,235,000 $ 150,000 $ 1,500,000 $ 1,585,000
Needs to be coordinated with extended outage 2.9
2.10
Feura Bush Electric Upgrades
Maintenance Building at Feura Bush
$
$
695,000
300,000
$ 40,000 $ 655,000
$ 25,000 $ 275,000
Modifications to dewater and clean basin
2.11
2.12
Washwater Tank Rehabilitation
Clearwell Rehabilitation
$
$
59,000
141,000
$
$
-
-
$
$
59,000
141,000
2.13 Miscellaneous Feura Bush Facility Upgrades $ 867,000 $ 50,000 $ 400,000 $ 417,000
2.14 Pressure Reducing Valve Telemetry $ 114,000 $ 10,000 $ 104,000
2.15 Upper Service Tank Interior and Exterior Coatings, Mixer and Repairs $ 496,000 $ 30,000 $ 466,000
2.16 Pine Bush Tank Interior Coating, Mixer, and Repairs $ 714,000 $ 40,000 $ 674,000
2.17 Pine Bush Pumping Station Renovations $ 583,000 $ 583,000
2.18 Liquid Lime System at Loudonville Reservoir $ 606,000 $ 606,000
Estimated Project Cost $165,000. 2.19
2.20
Feura Bush WFP elevator replacement
Loudonville Reservoir Basin C Inlet Modifications
$
$
655,000
165,000 $
$
10,000 $
30,000 $
155,000
625,000
$ 27,879,000 $ 3,599,000 $ 4,045,000 $ 6,954,000 $ 5,070,000 $ 7,936,000 $ 275,000