Committee of the Whole

Regular Meeting

Amery, WI · June 21, 2022

AgendaMinutes

Minutes

CITY OF AMERY COMMITTEE OF THE WHOLE PROCEEDINGS June 21st, 2022 The Committee of the Whole of the City of Amery met on Tuesday – June 21st, 2022 at City Hall. Council President, Sarah Flanum called the meeting to order at 5:55 P.M. Present: Council President, Flanum; Mayor, Chad Leonard; and Alderpersons, Tim Strohbusch; Rick Van Blaricom; Mykaela Thompson; Mike Manor and Eric Elkin. Absent: None Staff Present: City Administrator, Patty Bjorklund; City Clerk-Treasurer, Ben Jansen; Deputy Clerk, Taylor Larson; Police Chief, Tom Marson; Interim Fire Chief, Chuck Frohn; Library Director, Rachel Thomas. Staff Absent: None Others Present: Erik Henningsgard and Jeremiah Wendt – S.E.H. Department Head Reports – Reports were heard from Administrator, Bjorklund; Clerk-Treasurer, Jansen; Deputy Clerk, Larson; Chief, Marson; Interim Chief, Frohn; Director, Thomas. Waste Water Treatment Plant Upgrade Discussion – Jeremiah Wendt of S.E.H. had a Powerpoint prepared to show the Council the current state of the Sewer Plant and the proposed upgrade including costs and design specifics. Most of the funding would be through the Clean Water Fund Loan Program where it is anticipated additional infrastructure funding from the Feds will be coming. Motion by Strohbusch; seconded by Elkin; to table the discussion of the Waste Water Treatment Plant until the next Committee of the Whole Meeting. Ayes – 6 Nays – 0 Motion Carried. Discussion of Budget Priorities/ARPA Funding – Administrator Bjorklund began the discussion with suggestions of where the City could use some of its ARPA funding from the Feds. She stated that she believed the installation of a bathroom at Soo Line Park and the repair of the bathrooms at Michael Park to make them ADA compliant. Clerk-Treasurer Jansen then took the time to ask the Council to start thinking about what priorities they would like to stress in the Budget for next year. Van Blaricom stated he would like to see a warning siren installed downtown. Administrator Bjorklund said that one project she will have done is wayfinding signs throughout the City. Public Transportation Discussion – Van Blaricom asked for this to be on the agenda as he has been approached by many people regarding the lack of public transportation within the City. He did not expect the City to fill the void but rather is hoping that by putting this discussion in the public forum that some interested parties will hopefully step forward to fill this need. Pay Application 3 for S. Industrial Park Project – S.E.H. has brought this forward and recommended that it be paid. This application is for additional water and sewer lines and other materials that have gone into the project. Motion by Leonard; seconded by Manor; to recommend Pay Application 3 to Council as presented. Ayes – 6 Nays – 0 Motion Carried. Strategic Planning Discussion – Strohbusch requested that this be put on the agenda as he feels like it would be a good thing for Department Heads and Elected officials to start thinking about. Several years ago the City did a similar training which helped facilitate discussion and identified everyone’s role within the City. City staff was instructed to set up the training with the same group who did the previous training. Fire Department Capital Expenses – Several large potential expenses have come forward from the last Fire Committee meeting. Fire Chief Frohn spoke at length during his report about the condition of Tender 2 and that he recommends taking it completely out of service. Engine 2 will also be going in for refurbishment soon but Chief Frohn does not have solid numbers on the cost at this time but the estimate is in excess of $100,000. Chief Frohn also informed the Council that the generator at the Fire Hall is not functioning like it is supposed to at this time. He has an estimate from Hunt Electric of $15,000 to fix the generator and bring it up to code. Van Blaricom stressed that the City needs to authorize the Fire Committee to make a purchase IMMEDIATELY rather than wait a month for the next meeting as the inventory that the Fire Department needs is very fluid and sells fast. 1 Motion by Van Blaricom; seconded by Strohbusch; to recommend to Council that the Fire Committee be given the authority to purchase a tanker truck up to a cost of $200,000. City staff will also need to start the process to get borrowing done. Ayes – 6 Nays – 0 Motion Carried. Public Comment – The only comment heard was from Van Blaricom stating that residents on the south end of town need to keep up with their lawn mowing because it is extremely long. Motion by Leonard; seconded by Strohbusch to go into Closed Session at 7:33 P.M. under Wis. Stat. §19.85(1)(c) – Potential Police Lieutenant Position; Potential Police Administration Position; Fire Chief; Deputy Clerk-Treasurer. Considering employment, promotion, compensation or performance evaluation data of any public employee over which the governmental body has jurisdiction or exercises responsibility. Roll Call Vote Ayes – Strohbusch; Van Blaricom; Thompson, Flanum; Leonard; Manor; Elkin Nays – None Motion Carried. Motion by Leonard; seconded by Thompson to reconvene into Open Session at 8:05 P.M. Roll Call Vote Ayes – Strohbusch; Van Blaricom; Thompson; Flanum; Leonard; Manor; Elkin. Nays – None Motion Carried. Motion by Strohbusch; seconded by Van Blaricom; to name Taylor Larson as the Deputy Clerk-Treasurer. Ayes – 6 Nays – 0 Motion Carried. Motion by Elkin; seconded by Strohbusch; to adjourn at 8:07 P.M. Ayes – 6 Nays – 0 Motion Carried Respectfully Submitted, Ben Jansen Clerk-Treasurer June 23rd, 2022 2

Agenda

City of Amery COMMITTEE OF THE WHOLE AGENDA Pursuant to Wisconsin Statutes 19.84, Notice is hereby given to the public that a meeting of the Committee of the Whole of the City of Amery will be held on Tuesday-June 21st, 2022 at 104 Maple St. W, Amery, WI IMMEDIATELY FOLLOWING SPECIAL COUNCIL. �� 188 8 co Call to Order Roll Call Order of AGENDA ITEMS Items 1 Department Head Reports - City Administrator, Clerk-Treasurer, Police Chief, Fire Chief, Library Director, Director of Public Works, Deputy Clerk-Treasurer. 2 Wastewater Treatment Plant Upgrade Discussion - S.E.H. 3 Discussion of Budget Priorities/ARPA Funding 4 Public Transportation Discussion 5 Pay Application 3 for S. Industrial Park Project 6 Strategic Planning Discussion 7 Fire Department Capital Expenses 8 Public Comment** Closed Session - Wis. Stat. §19.85(1)(c) - Potential Police Lieutenant Position; Potential Police Administration Position; Fire Chief; Deputy Clerk-Treasurer. Considering employment, promotion, compensation or performance evaluation data of any public employee over which the governmental body has jurisdiction or exercises responsibility. 10 Adjournment ** Although the public may speak on any item that is not included on this agenda as a "Public Hearing or Forum". In accordance with open meeting laws, the Committee may not respond or discuss the issue brought forward at this time. In accordance with open meeting laws the Committee must notice an item on the agenda to allow discussion on that matter. Your comments will be considered and may be placed on a future agenda for further discussion. Any person wishing to submit a public comment digitally may email them to cityhall@amerywi.gov until noon of the day of the meeting. Although your comments will be presented to the Committee they may or may not be read aloud or discussed during the meeting. The Public Comment Portion will be limited to 10 minutes total for speakers present at the meeting. Respectfully Submitted; Ben Jansen, MPA City Clerk-Treasurer **Posted: Thursday-June 16th, 2022, on the City Website (www.amerywi.gov); and at Amery City Hall, Amery Public Library, and the Amery Police Department. The City of Amery docs not discriminate on the basis of race, color, national origin, sex, religion, age or disability in employment or provision of services, programs or activities. NOTE: Upon reasonable notice, the City of Amery will accommodate the needs of disabled individuals through aids or services. For additional information or to request this service, contact the Clerk-Treasurer's office at (715) 268-7486 by Noon the previous day so that arrangements can be made. Patty Bjorklund City City Administrator/WCMC, CMC, CMTW Administrator 104 South Maple St., Suite A ·���· c.,�L./7/(11 Amery, WI 54001 patty.bjorklund@amerywi.gov s · ✓ 1s87 �" · www.amery.gov Co� 715-268-3411 Monthly Report - June 21, 2022 2023 Budget: Ben and I are working on the Budget for 2023. We would like to start Budget Meetings in July. I will keep everyone on Council apprised on this. South Industrial Park: I heard from Erik Henningsgard that South Industrial Park progress is moving along. Curb and gutter will go in shortly. The area needs to dry up and preparation will begin for that process. Cell Tower Decommission: Removal of all infrastructure relative to the cell service on the Water Tower is moving along and should be complete by months' end. There is a cage located on the ground that was agreed upon years ago to stay which belonged to Nextel/Sprint. I am working with SEH to complete all processes and T-Mobile/Sprint will pay the lease to cover the expense to decommission the site and bring it back to its prior state per the lease. Street Pole Banners: I have been working with Signation who did all of our signs inside of the Amery City Center. They are putting together very attractive Street Pole Banners that will go through the permitting process and will be approved shortly. The Amery Community Club has offered to pay for½ the cost of the banners which will cost approximately $3,000. This is the start of the process of doing Wayfinding Signs that will be prominent throughout the City. Bowmar Appraisal: The push to finish the valuations of all property is happening with the City Assessors. The focus is on Residential properties in the city. This is our final year for valuations of property and we will have costs for that ready at Board of Review which is moved out to October. If anyone sees vehicles looking at their property, these are most likely the City Assessors. Developers in the City: I have been working closely with a few prospective Developers who are interested in doing projects within the city and its outskirts. When the projects materialize, I will keep everyone posted. Wisconsin Department of Revenue: American Rescue Plan Act (ARPA) - Local Fiscal Recovery Funds (LFRF): Tonight, I would like to discuss potential uses of the ARPA funds that the City of Amery received dating back to last year with the first installment. The 2 nd installment is set to arrive next Monday. Airport Manager: Public Works Director, Jeff Mahoney and myself will be sharing duties as Airport Manager. The day-to-day operations of the airport grounds, (fuel, maintenance, courtesy car, etc.) will fall to Jeff. The Administration portion (grants, filings, payments, etc.) will fall to me. We had an Airport Commission Meeting last week, and we will continue to keep council informed with status updates regarding the Amery Municipal Airport. Lieutenant Position: Police Chief, Tom Marson as well as myself and outside agency Police staff will start the interview process for Lieutenant on: Monday - June 27, 2022. Wisconsin City/County Manager Association (WCMA) & International City/County Management Association (ICMA) Summer Conference: I attended the Summer Conference held in Fontana, WI for combined training from the WCMA and ICMA. The training is beneficial for City Administrators like myself. It's a good way for all of us to share thoughts and ideas as well as help each other face challenges relative to the job. We also walk away learning something new. Upcoming Events: July 4, 2022- Monday- Independence Day (City Offices Closed) July 6, 2022 - Council Meeting@ 5:00 PM July 11, 2022 - July 15, 2022 - Clerk/Treasurer & Deputy Clerk/Treasurer Training July 13, 2022 - Coffee with the Mayor (City Center) @ 4:00 PM July 19, 2022 - Committee of the Whole Meeting @ 5:00 PM C Executive Summary The City of Amery's Wastewater Treatment Plant (WWTP) currently consists of fine screening, grit .._ removal, an anaerobic selector tank, a two-ring oxidation ditch, one final clarifier, ultraviolet (UV) disinfection, sludge storage, centrate storage, and sludge thickening. Most of the WWTP was constructed in the mid-1940s to late 1960s with significant upgrades occurring in 1995, and still achieves good treatment. The influent flow and biochemical oxygen demand (BOD) loading to the plant is approaching design conditions. As discussed in Section 5, the Amery WWTP has several unit processes that have either exceeded their useful life, are operating over design capacity, or experience operational issues. Alternatives for ensuring reliable treatment into the future are developed in this section. Multiple options for WWTP Improvements were analyzed, including a no-improvement alternative, relocating to new site, and upgrading at the existing location. It is recommended, based on the monetary and non-monetary evaluations and owner preference, that the City of Amery select Alternative 4a: Upgrading the Existing WWTP utilizing a Sequencing Batch Reactor (SBR). This alternative will provide reliable treatment and allow for future growth. The new WWTP would consist of similar unit processes as the existing plant, including a new fine screen and grit removal, an SBR, rehabilitation of the existing UV disinfection system, and retrofit of existing tankage for sludge and centrate storage. A new preliminary treatment building will also be constructed to house the new fine screen and grit removal The preliminary layout of the proposed SBR is composed of two square basins, each having a length -- and width of 40 feet, where equalization, primary clarification, biological treatment and clarification can all be achieved in a single reactor vessel, eliminating the need for clarifiers. Details of the SBR design will be further developed during the design phase. The opinion of probable construction cost for Alternative 4a is $7,689,000.00. This includes construction costs with 25 percent construction contingency, and design and construction engineering. A setback distance of 500 feet is required for any mechanical treatment facility, per Wisconsin Administrative Code Section NR 110.15. The City of Amery's current WWTP site does not meet this requirement, so the waiver provisions within NR 110.15(3)(d)2 would need to be utilized. The City will make reasonable attempts to execute agreements with property owners within 500 feet of the WWTP, indicating their consent to the construction and operation of the WWTP on the current site. The City will also enact a zoning ordinance which prohibits future construction within the applicable separation distances to prevent future encroachment. The City of Amery intends to apply for funding from the Clean Water Fund Program to finance these upgrades. This program allows municipalities to receive financial assistance in the form of subsidized loans, additional subsidy to reduce the size of a loan or a combination of the two to keep project costs low. Initial sampling indicates that the current WWTP (and the proposed WWTP) is capable of meeting the proposed E. Coli limits that are outlined in the current WPDES permit. As such, no additional compliance schedule milestones should be necessary for that specific requirement. - SEH is a registered trademark of Short Elliott Hendrickson Inc. FACILITY PLAN AMERY 160422 - �- SEH Building a Better World for All of us� June 16, 2022 RE: City of Amery South Industrial Park Road-Application for Payment SEH No. AMERY 153333 14.00 Patty Bjorklund - WCMC, CMC, CMTW City Administrator City of Amery 104 Maple Street W. - Suite A Amery, WI 54001 Dear Mrs. Bjorklund: Albrightson Excavating Inc. (Albrightson) has submitted an application for payment for the work completed on the South Industrial Park Road project. The application for payment includes water and sewer main extensions, storm sewer installation, and other miscellaneous items. The contract price for the project is $1,508,152.30. The contract is paid by unit price, therefore Albrightson is paid at a unit price for the total units of bid items installed/completed. Albrightson has completed $927,610.29 of the project, less 5% in retainage and previous payment, and is requesting payment of $234,442.81. Contract Amount $1,508,152.30 Work Completed to Date $927,610.29 Less 5% Retainage $46,380.51 Less Previous Pavment $646,786.97 Payment Request $234,442.81 We have reviewed Application for Payment No. 3 and would recommend authorization of payment. If you have any questions please let us know. Sincerely, SHORT ELLIOTT HENDRICKSON INC. �t_, ( ::::::> Erik Henningsgard, PE Project Manager (Lie. MN, WI) Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc., 156 High Street, Suite 300, New Richmond, WI 54017-1128 715.246.9906 I 888.881.4281 I 888.908.8166 fax. I sehinc.com SEH is 100% employee-owned I Affirmative Action-Equal Opportunity Employer Patty Bjorklund - WCMC, CMC, CMTW June 16, 2022 Page 2 Attachment: Application for Payment No. 3 c: Ben Jansen, City Clerk-Treasurer, Zoning Administrator Jeff Mahoney, Director of Public Works Adam Hensel, Albrightson Excavating Inc. l\sehnr\projects\aela\amery\15333317-const-svcsl73-app-pymtlafp312022.0616_amery153333_ap3.docx Application for Payment � (Unit Price Contract) SEH No. 3 Eng. Project No.: AMERY 153333 Location: Amery, Wisconsin Contractor Albrightson Excavating Inc. Contract Date November 5, 2021 345 Southside Drive Woodville, WI 54028 Contract Amount $ 1,508,152.30 Contract for South Industrial Park Road Application Date 6/8/22 For Period Ending 6/5/22 Quantity Item No. 01 21 00 I Item Contingency ($25,000) I Unit LS I au��\itv I 1 to Date I Unit Price I $25,000.00 Total Price 01 55 25.1 Maintenance of Traffic LS 1 0.5 1,800.00 $900.00 01 71 13.1 Mobilization LS 1 0.55 20,425.00 $11,233.75 02 41 33.1 Remove and Salvage Hydrant and Valve Each 1 1 550.00 $550.00 02 41 33.2 Remove Culvert LS 1 1 600.00 $600.00 02 41 33.3 Remove Existing Asphalt Pavement SY 71 71 3.00 $213.00 02 41 33.4 Remove Existing Culvert Each 2 1 500.00 $500.00 02 41 33.5 Remove and Replace Storm Sewer Each 3 3 800.00 $2,400.00 31 11 00.1 Clearing & Grubbing Acre 5.9 3 3,500.00 $10,500.00 31 23 10.1 Common Excavation - Roadway (P) CY 10873 5436.5 6.85 $37,240.03 31 23 10.2 Common Excavation - Stormwater Pond (P) CY 7494 7494 7.85 $58,827.90 30 23 10.3 Excavation Below Subgrade CY 100 200 38.00 $7,600.00 31 23 19.1 Dewatering LS 1 0.5 1,600.00 $800.00 31 23 30.1 Granular Backfill, Grade 1, WisDOT 209 CY 6390 395 12.60 $4,977.00 31 25 10.1 Silt Fence Delivered, Maintained and Installed LF 3497 4170 1.40 $5,838.00 31 25 10.2 Erosion Mat Class I, Type B SY 5857 1.10 31 25 10.3 Erosion Mat Class II, Type C SY 280 4.00 31 25 10.4 Inlet Protection Each 9 0 50.00 31 25 10.5 Sediment Control Log LF 96 6.00 31 25 10.6 Tracking Pad Each 1 1 800.00 $800.00 31 34 15.1 Geotextile Fabric, Type SAS SY 9585 555 1.75 $971.25 31 37 00.1 Riprap, Light Ton 4 65.00 31 37 00.2 Riprap, Medium Ton 578 725.4 53.45 $38,772.63 32 11 14.1 Testing Rolling STA 14.5 25.00 32 11 26.1 Crushed Aggregate Base Course Ton 9090 60.44 13.75 $831.05 32 11 26.2 Gravel Road Base Ton 214 232.15 13.75 $3,192.06 32 12 18.1 Asphaltic Pavement, 4 MT 58-34 S Ton 927 90.35 32 12 18.2 Asphaltic Pavement, 3 MT 58-28 S Ton 1622 85.65 32 12 18.3 Asphaltic Surface (Driveway Mix) (3- inch) SY 68 46.75 32 12 18.3 Adjust Manhole Casting Each 6 250.00 32 12 18.4 Adjust Valve Box Each 13 180.00 Short Elliott Hendrickson Inc. Page 1 of 4 Est. Quantity Item No. I Item Unit Quanti Unit Price Total Price to Date 32 12 50.1 Saw Cut Pavement LF 721 181 3.30 $597.30 32 16 30.1 Concrete Curb and Gutter, 30-inch Type D LF 2765 12.25 32 16 30.2 Concrete Flume Each 2 400.00 32 17 23.1 Pavement Marking Line Epoxy, 4-inch Yellow LF 352 1.65 32 17 23.2 Pavement Marking Line Epoxy, 4-inch White LF 1056 1.65 32 17 23.3 Pavement Marking Arrow Epoxy, White Each 4 225.00 32 17 23.4 Pavement Marking Line Epoxy, 18-inch White LF 36 10.00 32 17 23.5 Remove Pavement Marking LF 409 1.50 32 92 12.1 Turf Establishment SY 15590 8000 1.70 $13,600.00 32 92 12.2 Wetland Seed Mix, MNDOT Mix 34- 171 SY 3270 3270 1.70 $5,559.00 33 11 00.1 Connect to Existing Water Main Each 2 2 1,200.00 $2,400.00 33 11 00.2 6-inch DIP Water Service LF 211 167.5 57.65 $9,656.38 33 11 00.3 8-inch DIP Water Main LF 2175 2198.5 57.10 $125,534.35 33 11 00.4 10-inch DIP Water Main LF 2462 2462 66.90 $164,707.80 33 11 00.5 6-inch Gate Valve with Box Each 12 12 1,615.00 $19,380.00 33 11 00.6 8-inch Gate Valve with Box Each 15 15 2,135.00 $32,025.00 33 11 00.7 10-inch Gate Valve with Box Each 10 9 2,980.00 $26,820.00 33 11 00.8 Fire Hydrant Each 14 13 4,835.00 $62,855.00 33 11 00.9 Insulation, 2-inch SF 2800 6400 4.10 $26,240.00 33 31 00.1 Connect to Existing Sanitary Manhole Each 1 1 1,420.00 $1,420.00 33 31 00.2 6-inch Sanitary Service Pipe LF 245 253 35.50 $8,981.50 33 31 00.3 8-inch PVC Sanitary Sewer LF 2513 2462 34.05 $83,831.10 33 31 00.4 48-inch Sanitary Manhole - 8-foot depth Each 9 9 3,900.00 $35,100.00 33 31 00.5 Excess Manhole Depth VF 22 11 147.00 $1,617.00 33 31 00.6 Sanitary Sewer 8-inch by 6-inch Wye Each 6 5 365.00 $1,825.00 33 31 00.7 Sanitary Sewer Termination Box Each 6 3 250.00 $750.00 33 41 00.1 Class Ill RCP Storm Sewer, 18-inch LF 1053 1044 46.05 $48,076.20 33 41 00.2 Class Ill RCP Storm Sewer, 30-inch LF 8 6 108.00 $648.00 33 41 00.3 Class Ill RCP Storm Sewer, 36-inch LF 65 64 116.00 $7,424.00 33 41 00.4 Class Ill RCP Endwall, 18-inch Each 4 4 1,440.00 $5,760.00 33 41 00.5 Class Ill RCP Endwall, 30-inch Each 1 1 2,940.00 $2,940.00 33 41 00.6 Class Ill RCP Endwall, 36-inch Each 1 1 3,920.00 $3,920.00 33 41 00.7 2-foot by 3-foot Catch Basin with Casting Each 3 3 2,290.00 $6,870.00 33 41 00.8 Storm Sewer Manhole, 48-inch Diameter with Casting Each 4 4 2,900.00 $11,600.00 33 41 00.9 Storm Sewer Manhole, 72-inch Diameter with Casting Each 2 2 5,600.00 $11,200.00 33 41 00.10 Pond Outlet Structure LS 1 1 6,730.00 $6,730.00 33 41 00.11 Storm Sewer Bulkhead, 18-inch Each 2 2 600.00 $1,200.00 33 42 20.1 CMP Culvert, 15-inch LF 40 40 57.00 $2,280.00 33 42 20.2 CMP Culvert, 24-inch LF 5 5 200.00 $1,000.00 33 42 20.3 CMP AEW, 15-inch Each 2 2 225.00 $450.00 33 42 20.4 Connect to Existing Culvert Each 1 1 835.00 $835.00 33 42 20.5 Remove and Reinstall AEW Each 1 0.5 750.00 $375.00 Short Elliott Hendrickson Inc. Page 2 of 4 Est. Quantity Item No. I Item I Unit I Unit Price Total Price Quanti to Date 33 42 20.6 18-inch RCP Culvert, Class IV LF 123 128 52.00 $6,656.00 34 41 40.1 Signs SF 26.75 75.00 34 41 40.2 Street Name Sign Each 1 400.00 Total Contract Amount $927,610.29 Short Elliott Hendrickson Inc. Page 3 of 4 Application for Payment (continued) Total Contract Amount $ 1,508,152.30 Total Amount Earned $ 927,610.29 Material Suitably Stored on Site, Not Incorporated into Work Contract Change Order No. ---- Percent Complete Contract Change Order No. ---- Percent Complete Contract Change Order No. ____ Percent Complete _ Less Previous Applications: GROSS AMOUNT DUE $ 927,610.29 AFP No. 1: 333,562.82 AFP No. 6: ---- LESS 5 % RETAINAGE $ 46,380.51 AFP No. 2: 313,224.15 AFP No. 7: ---- AMOUNT DUE TO DATE $ 881,229.78 AFP No. 3: _____ AFP No. 8: ____ LESS PREVIOUS APPLICATIONS $ 646,786.97 AFP No. 4: _____ AFP No. 9: ____ AMOUNT DUE THIS APPLICATION $ 234,442.81 AFP No. 5: CONTRACTOR'S AFFIDAVIT The undersigned Contractor hereby swears under penalty of perjury that (1)all previous progress payments received from the Owner on account of work performed under the Contract referred to above have been applied by the undersigned to discharge in full all obligations of the undersigned incurred in connection with work covered by prior Payment under said contract, South Industrial Park Road, Amery, Wisconsin, and (2)all material and equipment incorporated in said Project or otherwise listed in or covered by this Application for Payment and free and clear of all liens, claims, security interests and encumbrances. Date ------------ , 20 Albrightson Excavating Inc. (Contractor) COUNTY OF ___________ ) By ________ STATE OF _ __________ )SS (Name and Title) Before me on this ___ day of _____________� 20_ .__, personally appeared _________________________ known to be, who being duly sworn did depose and say that he is the ______________ (office)of the Contractor above mentioned that he executed the above Application for Payment and Affidavit on behalf of said Contractor; and that all of the statements contained therein are true, correct and complete. My Commission expires (Notary Public) The undersigned has checked the Contractor's Application for Payment shown above. A part of this Application is the Contractor's Affidavit stating that all previous payments to him under this contract have been applied by him to discharge in full all of his obligations in connecting with the work by all prior Applications for Payment. In accordance with the Contract, the undersigned recommends approval of payment to the Contractor for the Amount due. Short Elliott Hendrickson Inc. By Date _________________ City of Amery By ____ ___ ___ __ ______ Date Page 4 of4

Get email alerts for Amery

A daily email when new agendas and minutes are posted.

Report an issue with this meeting