AMATS (Anchorage Metropolitan Area Transportation Solutions) Policy Committee
Regular MeetingAnchorage, AK · November 18, 2021
Minutes
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
POLICY COMMITTEE MEETING
Mayor’s Conference Room, 8th Floor
632 W. 6th Avenue
Anchorage, Alaska
November 18, 2021
1:30 PM
Policy Committee Members Present:
Name Representing
Wolfgang Junge Alaska Dept. of Transportation & Public Facilities (DOT&PF)
Adam Trombley Director, MOA Community Development
Emma Pokon Alaska Dept. of Environmental Conservation (ADEC), Air Quality
John Weddleton MOA/Municipal Assembly
Meg Zaletel MOA/Municipal Assembly
Also in attendance:
Name Representing
Craig Lyon MOA/Planning Department
Aaron Jongenelen MOA/Planning Department
Christine Schuette MOA/Planning Department
Joni Wilm MOA/Planning Department
Jon Cecil MOA/Planning Department
Cindy Heil* ADEC
Chris Constant** MOA/Municipal Assembly
David Gamez Lounsbury & Associates
Jason Kewin Lounsbury & Associates
Sean Baski DOT&PF
Travis Holmes DOT&PF
Kelly Summer DOT&PF
Josie Wilson HDR
Taylor Horne HDR
Brad Coy* MOA/Traffic Engineering Department
Todd VanHove* DOT&PF
James Starzec DOT&PF
Tom Davis MOA/Long-Range Planning Division
Elizabeth Appleby MOA/Planning Department
Robert Bravo
Van Le R&M Consultants
Max Kohn
Morgan McCammon
Laurie Cummings HDR
Bart Rudolph MOA/Public Transportation Department (PTD)
Ben Coleman R&M Consultants
LaQuita Chmielowski DOWL
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 2 of 13
John McPherson
Tristan Walsh
Adam Moser DOT&PF
Luke Bowland* DOT&PF
Douglas Campbell DOT&PF
John Linnell DOT&PF
Nancy Pease
Jim Amundsen DOT&PF
*AMATS Technical Advisory Committee Member
**Designated Assembly Alternate
1. CALL TO ORDER / ROLL CALL
CHAIR JUNGE called the meeting to order at 1:31 p.m. Adam Trombley, Community
Development Director, represented Mayor Bronson. Cindy Heil represented Emma Pokon
until her arrival at 1:46 p.m. Assembly Member Constant acted as Designated Assembly
Alternate until Assembly Member Zaletel’s arrival at 1:46 p.m. A quorum was established
prior to Assembly Member Weddleton’s arrival at 1:37 p.m.
2. PUBLIC INVOLVEMENT ANNOUNCEMENT
CRAIG LYON encouraged public involvement in this meeting of the AMATS Policy
Committee. He explained staff would first make their presentation, followed by any
comments from Committee members, and the floor would then be open to public comment.
As a result of the virtual meetings, the public has been asked to submit an email request
providing their name, phone number, and agenda item to AMATS by 6:30 p.m. the day
prior to the meeting but can also participate via Teams and provide testimony when the
item is opened to the public for comments.
3. APPROVAL OF AGENDA
ASSEMBLY MEMBER CONSTANT moved to approve the agenda. MR. TROMBLEY
seconded.
ASSEMBLY MEMBER CONSTANT requested to reorder the agenda to hear Item 7.d. prior
to Item 7.a.
Hearing no objections, the agenda was approved, as amended.
4. APPROVAL OF MEETING MINUTES – None
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 3 of 13
5. ACTION ITEMS
a. Metropolitan Transportation Plan (MTP) 2050 Draft Technical Report 1:
Goals and Objectives
BACKGROUND:
The AMATS 2050 Metropolitan Transportation Plan Goals and Objectives were based on the
2040 MTP and have been refined to reflect comments heard during the 2040 MTP that were
not addressed during that update, the 2040 Land Use Plan, the AMATS Non-Motorized
Plan, the AMATS Spenard Corridor Plan, the MOA Climate Action Plan, and to ensure
conformance with the FAST Act.
MR. JONGENELEN introduced the project team and the consultants and provided a Power
Point Presentation.
Project Team:
AMATS Planners - Mr. Lyon, Ms. Schuette, Mr. Cecil, Ms. Wilm, and Mr. Jongenelen
James Starzec, DOT&PF and Bart Rudolph, Public Transportation Department
Consultants:
Van Le and Ben Coleman with R&M Consultants, McKinley Research Group, and
RSG, Inc.
• Goal 2 and objectives were refined to be more achievable and measurable. One
objective was removed as it was redundant.
• Goal 3 and objectives were refined to emphasize connectivity, mobility, equitability,
and to strengthen the connection between land use and transportation. Five
objectives were removed as they were redundant and/or difficult for AMATS to
affect.
• Goal 4 and objectives were refined to be more achievable and measurable.
• Goal 5 was split into two goals (5&6) and the objectives were refined to focus on
health, environment, and climate change. Two objectives were moved to Goal 4, one
was removed due to redundancy, and two were moved to the new Goal 6.
• Goal 6 is a new goal with three objectives that focus on providing equity throughout
the transportation planning process.
• Removal of Goal 7 and objectives as they were redundant with other goals and
objectives and did not help to support the new goal of Equitability.
Assembly Member Weddleton arrived at 1:37 p.m.
The following are questions and comments by the Committee with responses noted in Italic.
(AT) Referred to Goal 3 that shows in the left column “improving travel
conditions” and the right column shows “improve mobility options” and asked
for clarification that there were not two separate Goal 3s.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 4 of 13
(AJ) Replied, no, the left column was for the 2040. We did change the name from
“travel options” to “mobility” because we felt it was more encompassing and
more inclusive of all travel options and would do a much better job connecting
us with the land use.
Assembly Member Zaletel and Ms. Pokon arrived at 1:46 p.m.
(WJ) With regard to Goal 5, he asked if this one contains resiliency?
(AJ) Yes, this is one part of resiliency, but it is spread throughout.
(WJ) He had forwarded the Washington State DOT study on equity assessment to
staff and asked if they had reviewed it to see if there might be anything
major we could be missing in our equity comparisons?
(AJ) At the TAC meeting, we received several comments asking for changes. One of
the things the TAC did recommend was that the comments heard be
incorporated as part of our Comment/Response Summary. He had not yet had
a chance to review the Washington DOT equity analysis, but it is included in
our process to respond to in the Comment/Response Summary
(WJ) Some of what Washington discusses are equitable compensation and property
acquisition, but he was not sure that is an area AMATS would focus on.
AMATS is most likely more focused on equity or highway construction
program investments, and where we are putting the resources.
(AJ) Investments is one aspect of equity that we would connect with. That does also
include our policy in place of percentages towards different modes, like
roadway gets the highest and non-motorized gets less. We should be looking to
see if those percentages require changes.
(MZ) She appreciated the comment that equity be overlaid throughout this, but the
slide that called out equity said it was for vulnerable populations. Where does
that language come from and exactly what does it mean because she can see
it raising some concerns in the public? That slide is the one time it is
explicitly talking about equity and seems to limit it to vulnerable
populations.
(AJ) This is a standard term throughout our industry on what it is. We do have a
definition of it in the technical memorandum, which reads, “Generally,
vulnerable populations are EJ (Environmental Justice) populations, minority
populations, age (children or elderly), and anyone with a disability. Low
income is encompassed in EJ.
(MZ) If that definition were available somehow as this goes out for public
comment, it will be helpful in getting more responsive comments.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 5 of 13
(AJ) We can add it in as a footnote to the table itself or when we determine how we
will display the Goals and Objectives in an easy manner for people to follow,
we can include it in that.
There were no public comments.
ASSEMBLY MEMBER WEDDLETON moved to release for a 30-day public comment period
in December. MS. POKON seconded.
Hearing no objections, this motion passed.
6. PROJECT/PLAN UPDATES - None
7. GENERAL INFORMATION
The agenda was reordered to hear Item 7.d. before Item 7.a.
d. Seward/Glenn Mobility Project
KELLY SUMMERS with DOT&PF, TAYLOR HORNE and JOSIE WILSON with HDR
provided a PowerPoint Presentation.
The following are questions and comments by the Committee with responses noted in Italic.
(JW) Have the tribal committees been met with and who are the members because
it can be tricky to get them involved?
(J. Wilson) All the people on these committees are listed on the website. Focus was only on
the tribes that have jurisdiction in the project area, not everyone. One-on-one
phone conversations were held to see if they were interested and available, and
to engage them at their convenience.
(JW) How does this fit with the Midtown Congestion Relief PEL?
(TH) He referred to the project area slide noting that the Midtown Congestion
Relief ended, essentially, one year ago. The recommended alternative
identified during that plan would be assumed to be part of the future
condition and we would look at that as incoming data.
(JW) Is there any implication of timing? Have you done that first and this one
second? Could this project end up being done before Midtown?
(TH) By projects, you mean ultimately. There is nothing dictating the timing of
programming of any results that come out of the PEL study. This goes through
a planning process and is put into the MTP or the STIP, so, again, there is
nothing dictating which one comes before or after. Part of any PEL study
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 6 of 13
process is identifying implementation and could be staged implementation
also, so you could look at what is existing in the plans and say that it fits in
the component and take that into consideration. Part of our scope of work is to
look at implementation of the recommended alternative.
(JW) When does this study go stale?
(TH) There is a provision in the statutes that set up a PEL study that talks about a
five-year limit. In practice, that just means you have five years to directly
incorporate the products made during a PEL process into that subsequent
NEPA and design process for construction projects. Guidance that the Federal
Highway Administration has given, kind of broadly, is that it does not mean
you have to throw away the whole study and the product after five years, but it
does mean you have to look at it for changed conditions; and you might have
to provide a memorandum and update. There is no definite stale date as it is
based on the change of conditions.
(AT) Asked for clarification that this has been studied for approximately 60 years?
Is there any reason to believe that now it is going to happen? The PEL is
being funded, but he is assuming this is not the first go around for something
like this. Is there confidence that now this is going to happen, or can we
assume it is going to get derailed? We will not be here in 2063, but someone
will be here discussing the history of this project.
(WJ) This lays out a vision for a corridor.
(AT) He is just trying to understand the history and asked if there had ever been a
vision prior to now.
(TH) This is the first Planning Environmental Linkage process, and the list shows
not only the plans that have focused on making that highway connection, but
also the long-range plans, and MTPs that had included that idea in it. What
is novel about this effort is that this is a tool that is being applied to a
corridor, particularly, the connection bit. The Highway-to-Highway looked at
options that went far east of town covering a wide area. This is the first effort
that is using a tool that is geared by regulations and statutes to move that
from planning into implementation, and is why it was created.
(AT) What you are doing now has never been done?
(TH) The Planning Environmental Linkage Study has not been done on this
section. Midtown, the one that happened recently, was part of this eighth
corridor, but we were looking at making the turn to connect. The plan is to
design, implement, and get this funded. This is a component of the plan.
(MZ) With regard to the Midtown PEL, how are those work groups going to
interact with the affected community council areas?
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 7 of 13
(J. Wilson) All the community councils in the area are serving in one of the committees
one way or another. We have scope, as well, to engage with the community
councils individually and have two to three different ways ensuring the
community councils are engaged in this process. If you have specific
suggestions or ideas of what you would like to see, please contact her. She
wants to engage them in an appropriate way that they feel like they are being
heard and their input is involved. At the same time, she did not want to attend
every community council to talk about this, if it is not helpful to them. Those
councils that are serving on the Community Advisory Committees are
available on the website. We have met with Airport Heights, Fairview,
Downtown, and three or four others that are part of the committees, and we
are also going to be engaging with the councils directly.
(MZ) A lot of community councils with projects this large happening in their areas
create their own committees. You may want to query them to see if they do
plan to make their own committees. She saw Midtown in particular and
noted that they will only need occasional updates, not regular. Midtown
Community Councils are still getting updates on PEL projects as they move
from that contractor. Any significant dates since the two projects, while
independent, are part of an entire corridor.
(JW) This is so significant to Midtown with where people drive and why. This will
draw people off Muldoon Road and Tudor Road, but he did not think it was
quite in their area. It is interesting because we have troubles on Tudor with
pedestrians killed while crossing the street and a variety of other things. But
to justify this project, you could say that what it does is solve other problems
elsewhere, and it is hard to look at the whole city, but that is an important
piece. Maybe that will jump out when you do your destination study and see
all the people that will use Muldoon Road. If we do this project, it will pull an
“x” number away. He did not know if they have quantitative information on
that.
(WJ) There were traffic studies on Midtown and, similarly, those traffic studies
will feed into this?
(TH) Absolutely. Those origin and destination studies and traffic studies that are
ongoing right now are not just focusing on that outlined area. The study area,
shown on the screen, was just to give people an idea of where we are looking in
the problem area. The traffic and destination study and travel demand model
are an outbirth of the AMATS model, of which we are updating and looking at
travel on those routes. We have a team working on it that will look at the
different zones where people are traveling from, and part of the products that
will come out of that will be brought before this Committee to review.
(AT) Can you tell me the main reason why this has never happened? Why has
there never been a Highway-to-Highway? What has been the resistance? Has
it been funding or just no desire for it? It has been consistently studied but
has never gone beyond the study phase.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 8 of 13
(J. Wilson) We, as the project team, asked the same question. The answer is more complex
than just simply going in and doing something. Just in the community
advisory meetings, we have people that say, “do this” and others that say, “do
not do this”. We have a lot of good data that we are going to be able to use to
move the project forward. This process will come up with recommendations
that can be actionable and supported by the community.
(AT) It would be important to identify what those consistent impediments are to
possibly avoid them and deal with them early on so that we are not sitting
here in 2063 talking about a Highway-to-Highway.
(JW) Since he has been tracking this for many years, he explained that part of it is
money because the AMATS allocation is approximately $30 million, but not
close to the billion this will take. It also includes a huge amount of the State’s
federal funds. We really need to justify what it solves in other areas, instead of
just moving more cars faster through this corridor. If it was only that, he
would not be that interested in it because what is the benefit for Anchorage
and for the people in Wasilla to get to Kenai quicker? He is not going to use his
road money for that. If it is pulling off too much traffic from other parts of
town and we can focus on this area and quiet down traffic in other places; and
get people where they want to go more efficiently and safely, that is what he
wants to see us do. He did not see that in previous iterations, but he knows
more than he did eight or nine years ago with the Highway-to-Highway. It is
opportunity costs and lack of money.
There were no public comments.
a. Northern Lights Boulevard – Minnesota Drive to Seward Highway
Sidewalks Project – DOT&PF
SEAN BASKI with DOT&PF provided a PowerPoint Presentation. TRAVIS HOLMES with
DOT&PF and DAVE GAMEZ with Lounsbury and Associates were also present.
The following are questions and comments by the Committee with responses noted in Italic.
(WJ) When speaking to repairs, that means bringing them up to ADA standards?
The project total is $4.1 million, and you have $800,000? Are there any right-
of-way acquisition pieces to that or is that all within the existing right-of-
way?
(SB) Yes, it would bring them up to ADA standards. The project total is in that
neighborhood, and that is a rough order of magnitude depending on cost
escalations happening all over in two to three years from now. Regarding
right-of-way acquisitions, the features shown in the presentation are within
the existing right-of-way. The problem becomes that as soon as we start
driveway repairs and such, we might need interests from the adjacent property
owners, so we would need to talk to the property owner of each driveway and
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 9 of 13
get something signed allowing us access to their property and, potentially,
redo parking and other things because the regrading would have to go well
back onto each of the properties.
(AT) How was this project identified? Who came up with the $800,000 and how did
it get allocated? Why are we here with this when common sense would say
the project requires way more than $800,000?
(AJ) When we built the TIP, this project was not specifically called out of the TIP.
We put a preservation project into the TIP and similar to what is in Pavement
Preservation is what we did for non-motorized. We recognized there were a lot
of places around town that need this type of help, so we put in kind of a catch-
all and assigned money based on the information available to us at the time.
This particular one was not something we had thought about at the time, so
we did not say this one was only going to cost $800,000.
(AT) From a process standpoint, if we say we have $800,000, can we change and
find a project that is more reasonable for that amount of money, or are we
stuck with this because we have made it to this point?
(SB) From the project standpoint, we are still working on the environmental
document. If a no-build selection was made, then we would likely be
reimbursed for all our costs.
(CL) As Aaron mentioned, this project was listed as Pavement Preservation for a
non-motorized facility, so it was not saying we were doing this project. We
have a couple of possibilities to add additional funding to it either through
some of the COVID-19 relief funds or some of the projects in the current TIP
that did not take quite as much money as expected, and some projects that
might slip. There is an opportunity to add funds to this project and $800,000
is not all we have.
(WJ) It is important to know that Oregon was penalized quite heavily for lack of
corrective actions to ADA compliant facilities to the point where the Federal
Highway Administration came in and forced quite a large additional
percentage of their program that had to be allocated only to ADA related
things. In other words, you would not want to ignore it.
(CL) Right now in AMATS programming, we say we are going to allocate between
10 and 15 percent of our total allocation to non-motorized type projects. We do
not have one that says ADA compliance.
(AT) Now that it has been identified that so much of Northern Lights is not ADA
compliant, is there some sort of obligation that kicks in to fix it, since it has
been identified as grossly out of compliance?
(CL) There is not from AMATS, but there may be from the owner of the facility.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 10 of 13
(SB) We have ADA transition plans at high level and are trying to address non-
compliance and are program-wide that looks at those things, so this would
just be included. The DOT&PF has sent out interns to document every single
curb ramp intersection in the entire city of Anchorage and we know where all
our non-compliances are at specific curb ramps, and that is what we are
driven to have to replace when doing normal pavement preservation projects
on roadways.
(WJ) Formula funds will most likely increase as a result of the formula fund
increases, so that will be an additional opportunity to apply for new funding.
(JW) He recollected walking this sort of thing with Anne Brooks. Kevin Jackson
was also there at that time and, for a guy in a wheelchair he was amazingly
mobile, but the objects right in the middle of the sidewalk were the deal
killer. Mr. Jackson could deal with the slants, the bumps, and the cracks, but
when there is a hole in the middle of the sidewalk, then where do you go? Are
there some alternatives to go around power poles or do you have to go onto
private property?
(SB) It has happened but would be dependent on the specific situation. For
example, we have overhead utility poles carrying overhead wires that have an
alignment associated with them. As soon as you start addressing one, then you
are out of alignment with the pole line creating a cascade affect down the line.
We are just talking about a luminaire, which is an easier fix by just moving it
to the back of the sidewalk or pathway, but we might have to buy additional
right-of-way for that space. To provide the minimum four-foot-wide ADA
facility, we would have to buy right-of-way onto private property and reroute
the power poles, if we were to go with that type of application.
(JW) Have we done that in Anchorage?
(SB) Engineers use a lot of tools and you might not notice that we divert around the
utilities, but we do to try to reduce costs for projects.
(WJ) Utility companies have undergrounding funds and plans. Has there been any
attempt to coordinate with utilities and utilize their funds in conjunction
with undergrounding some of these?
(SB) We have not engaged in that yet as we are at a very preliminary level.
(MZ) Can this project be looked at in the context of other projects in the area
coming up because it feels like it is an expensive and very important
standalone project? The disability lawyer in her feels the ADA compliance
should be done quickly. What she does not get with this project is how it fits
into the overall vision for the area and the corridor as a general matter. It is
her understanding that there are some other planned projects in this area,
and she would hate to see work done at this cost if there are others
forthcoming. She did not know if that investigation had been done at all.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 11 of 13
(SB) There is at least one project in the LRTP (Long-Range Transportation Plan)
for reworking Northern Lights, given that DOT&PF just resurfaced Northern
Lights in 2015. We expect a few more years out it, but, typically for us, a
reconstruction project or rehabilitation of this entire corridor is astronomically
expensive. Certainly, it does need it at some point in time because we cannot
continue resurfacing the roadway.
(MZ) It would make sense to think about synchronizing these projects in other
areas. This is just a suggestion and, maybe not with this project, just as a
general matter.
CHAIR JUNGE asked for public comments.
ROBERT BRAVO also commented on synchronizing projects and having a calendar. He
wondered what that would be if there was a limited pot of money from a work perspective
and how you would do that job, because if you do the sidewalk at the same time as the
adjacent asphalt reclamation, it will require a lot less money to the job. Money could be
spread further.
BART RUDOLPH, Public Transportation Department, noted that our bus stops are on the
north side of Northern Lights, so if this is going to be done, he would strongly recommend
focusing on the north side. Some of them are most used by stops averaging 100 people per
day using one bus stop, on and off. There is significant pedestrian traffic on the north side.
These facilities are mostly inadequate as you can imagine, and if you try to walk them
multiple days or every day, it is incredibly difficult. It gives a strong, unsafe feeling.
VisionZero identifies this corridor as a high crash corridor for all pedestrian, bicycle, and
vehicle user groups. We strongly recommend funding this at the highest level to get some of
this work done. In speaking to Assembly Member Zaletel’s point regarding the vision in the
MTP, it is to three-lane this section and add the appropriate, adequate sidewalks needed,
which is a much larger project, but he thinks that should be expedited. If you do not fund
this completely, then maybe you can start on the data and engineering for the project
knowing there are significant questions from DOT&PF and others as to whether or not that
is feasible. That is the real solution here and he hoped this project does not get spotfunded.
If you want to talk about equity in transportation planning and putting it into action, this
is it. If this were a road project that was underscoped and underfunded, it would have come
back to AMATS to get more money. A prime example of that is O’Malley Road.
CHAIR JUNGE pointed out that this must be a really old aerial photograph because there
is a lot that no longer exists, such as what was torn down on Northern Lights 10 years ago.
Was your assessment based on an aerial review? He suggested providing updated aerial
photography.
MR. BASKI replied, no, the assessment was not based on aerial reviews as we had people in
the field walking every inch of it.
ASSEMBLY MEMBER WEDDLETON asked for clarification that tying this in with the
pavement replacement project was already done.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 12 of 13
MR. BASKI explained that DOT&PF has its own program for replacing the pavement on
these facilities. We are well behind on nearly all our pavement preservation projects. There
is not one on the books at this moment, which means it is at least three to four years out,
but we did complete one in 2015.
Assembly Member Zaletel left the meeting at 2:57 p.m.
b. Chugach Way Study – DOWL
LAQUITA CHMIELOWSKI with DOWL provided a PowerPoint Presentation.
ASSEMBLY MEMBER WEDDLETON disclosed that he owns a four-plex in the area.
There were no further comments.
c. Title 21 Parking Amendment – Public Release Draft – MOA
TOM DAVIS and ELIZABETH APPLEBY with the MOA Planning Department provided a
PowerPoint Presentation.
There were no comments.
8. COMMITTEE COMMENTS
CHAIR JUNGE announced the Infrastructure Investment and JOBS Act was signed by
President Biden this last week. Our Planning section is quickly dissecting and assessing at
a broad level as we are looking at anywhere between a 20 and 40 percent increase in
formula funds across the board. That will also be reflected in the AMATS allocation as well.
Also, significant amounts of funds in discretionary grants have become available. DOT&PF
is predominantly a formula driven organization and have not been in the grant business
much, so we, along with the city and other Boroughs and Townships within the state will
need to learn the process. A lot of money is available. Our Congressional Delegation did a
great job putting Alaska specific language in some of those grants, so we have some real
good opportunities to garner in taking care of our checklists whether it is ADA related, Port
related, or other related projects. Ryan Anderson, Northern Region Director, was recently
appointed as our new Commissioner, but still must complete the confirmation hearings
during the Legislative cycle. CHAIR JUNGE thanked AMATS for their assistance in
helping the Mat-Su Borough view what an MPO looks like and how they will start up. His
understanding is that it will go live April 2023 with the Governor signing the Operational
Agreement and they will draw from the same pot of money as Fairbanks (FMATS). He also
expressed condolences for Eugene Carl Haberman having passed away last month. Mr.
Haberman had a real passion for public involvement and was an advocate for transparency.
His heart was in the right place.
ANCHORAGE METROPOLITAN AREA TRANSPORTATION SOLUTIONS
Policy Committee
November 18, 2021
Page 13 of 13
9. PUBLIC COMMENTS - None
10. ADJOURNMENT
MR. TROMBLEY moved to adjourn. ASSEMBLY MEMBER WEDDLETON seconded.
Hearing no objections, the meeting adjourned at 3:27 p.m.
Agenda
POLICY COMMITTEE
Thursday, November 18, 2021
1:30-3:30p
Hybrid/Mayor’s Conference Room, 8th Floor
632 W. 6th Avenue, Anchorage, 99501
PC AGENDA: 18 November 2021
1. Call to Order/ Roll Call
2. Public Involvement Announcement:
AMATS committee meetings are open to the public and the public is provided an opportunity to
comment at each meeting. Business items are presented by staff or consultant. After the committee
discusses the business item, the public is invited to formally comment.
3. Approval of Agenda
4. Approve Meeting Minutes: NONE
5. Action Items:
A. MTP 2050: Draft Technical Report 1: Goals & Objectives Memo
6. Project and Plan Updates:
7. General Information:
A. Northern Lights Blvd – Minnesota Drive to Seward Hwy Sidewalks Project – DOT&PF
B. Chugach Way Study – Dowl
C. Title-21 Parking Amendment – Public Release Draft - MOA
D. Seward / Glenn Mobility Project – HDR
8. Committee Comments
9. Public Comments
10. Adjourn
AMATS does not discriminate on the basis of age, race, sex, color, national origin, religion or disability in
access to, or operation of its programs, services, activities or in its hiring or employment practices. ADA
and Title VI inquiries should be forwarded to Craig Lyon, lyonch@muni.org or 907.343.7996. AMATS Policy
Committee and TAC meetings are audio recorded. The Municipality of Anchorage’s Transportation
Improvement Program (TIP) process is used to satisfy the public participation process of the Program of
Projects (POP) that is required in U.S.C. Section 5307.