Anoka City Council
Regular MeetingAnoka, MN · October 7, 2024
Minutes
October 7, 2024 (Regular)
Page 1 of 13
REGULAR MEETING OF THE ANOKA CITY COUNCIL
ANOKA CITY HALL
CITY COUNCIL CHAMBERS
OCTOBER 7, 2024
1. CALL TO ORDER
Mayor Rice called the regular meeting of the City Council to order at 7:00 p.m., followed
by the Pledge of Allegiance.
2. ROLL CALL
Present at roll call: Mayor Rice, Councilmembers Scott, Skogquist, Weaver, and Wesp
(participating remotely from 338 East Whitehorse Pike, Absecon New Jersey).
Also present: City Manager Greg Lee; Public Works Director Mark Anderson; Assistant
City Engineer Ben Nelson; Community Development Director Doug Borglund; City
Assessor Ryan Kirby; Senior City Planner Clark Palmer; and Utility Director Del
Vancura.
Absent at roll call: None.
3. COUNCIL MINUTES
3.1 August 19, 2024, Budget Worksession.
August 26, 2024, Budget and Regular Worksession.
September 3, 2024, Special Worksession.
September 16, 2024, Regular Meeting.
Councilmember Skogquist said a correction was needed on the August 19
worksession minutes, Page 4, to state John Ward Park.
Motion by Councilmember Skogquist, seconded by Councilmember Scott, to
approve the minutes of the August 19, 2024, Budget Worksession as corrected,
August 26, 2024, Budget and Regular Worksession, September 3, 2024, Special
Worksession, September 16, 2024, Regular Meeting as presented.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver,
and Wesp voted in favor. Motion carried.
4. OPEN FORUM
4.1 Police Activity Update.
Police Chief Eric Peterson shared about the recent Vintage Fest event and
Pumpkin Expo that both went well with no concerns. He shared that on October 6
October 7, 2024 (Regular)
Page 2 of 13
officers responded to a motorcycle accident on Green Haven Parkway where the
driver unfortunately did not survive and that the accident was still under
investigation. He spoke about the recent firearm certification class for youth to
learn about safe handling of firearms that included hunting and other scenarios.
Chief Peterson provided an update on golf cart/UTV permits and shared that
currently the City has issued 58 permits, 32 for golf carts and 26 for UTVs, and
have received very few complaints outside of two operating on the trail system
with underage drivers which was against ordinance. He outlined the corrections
made that included warnings, citations, and revocation then spoke about the
signage and bollard installation at trail entrances as well and that staff will
continue to monitor. He shared about the upcoming annual Anti-Crime
Commission Fundraiser then shared the 2023/2024 Police Department Annual
Review report.
Councilmember Weaver said he was thrilled the gun range was being used by the
public and asked if gun safety courses could be taken by adults. Chief Peterson
said there is an adult version of the course online where after participants can join
the in-person field day.
Councilmember Scott spoke about grant-enhanced enforcement on 5th Avenue
and with school starting asked about expectations, adding his appreciation for the
department’s extra work in this area. Chief Peterson said he was not sure of the
number of citations issued so far but stated they have completed the first quarter
of the grant which focused on speeding and other unsafe acts and that the public
will continue to see officers doing heavy enforcement at times.
Assistant City Engineer Ben Nelson said staff was still working on funding for the
signage as the other part of this grant that will include dynamic speed signs.
OTHER INFORMATION UNDER OPEN FORUM
Marlin Fillipi, 331 Dunham Drive, shared he was a resident of Anoka for 55 years
then asked for an update on street plans for Highway 47 from McKinley to
Wilson Avenue. He shared concerns regarding Wilson Avenue, waiting to turn
east, how a truck passed him on the right but not the person behind him, and how
they were almost rear-ended.
Ben Nelson shared that as part of the proposed project in 2028 there will be a
signal and cul-de-sacs on the east side and how the project has been funded and
was currently in the process of being engineered.
Mr. Fillipi spoke about the ugly jersey barriers used and asked if there were other
barriers that could be used. Mr. Nelson stated jersey barriers are required to be
left in place while the temporary signal was in place.
October 7, 2024 (Regular)
Page 3 of 13
Chief Peterson said the department was aware of drivers passing on the right
which causes accidents and said they looked forward to the re-design.
City Manager Greg Lee spoke about the plan for community engagement that
would include an open house and other ways to share the proposed reconstruction
plan.
Vickie Violet, Anoka Lions, thanked the Council and Chief Peterson for the golf
cart permit ordinance then spoke about the Lions events and the funds they raise
as part of Anoka Halloween. She shared about the tent party costs of $25,000-
$27,000 then thanked the officers who work to de-escalate situations that do occur
during any events. She shared they hold 11 events over nine days, eight of which
benefit other groups and not Anoka Lions. She shared further about the different
events that included Taste of Anoka with Discover Anoka and others. Ms. Violet
shared the reason for this information was not about the cost but to show how
they represent community spaces for all other organizations such as the All Class
Reunion, Better Value Liquor tasting, and others and that the tent was a gift in
kind of approximately $18,000. She shared how the Tasting Event has changed
over time and that when managed only by Better Value Liquor there was a loss of
$1,500 and how since they have partnered with them have managed the event
better and in 2022 wrote a check for $3,831 and in 2023 over $4,000. She said
the Lions have a huge impact just in Anoka in both giving and volunteering and
thanked everyone for the partnerships.
Councilmember Skogquist said it has been great to have the tent for the many
different events and thanked the Lions for their work.
Mayor Rice Lions shared a quote from former resident Jim Goodrich that said
Lions do good things and thanked them for their work.
Utility Director Del Vancura shared that MMUA received a request from Florida
to organize and send 14 crews to assist with Hurricane Milton. He said 28 line
personnel and 19 trucks were currently enroute then shared about storm surge
estimates and impacts that could include 170 miles per hour wind.
Councilmember Weaver spoke about how quickly mutual aid was used to respond
when Anoka had a significant storm recently and said he can’t imagine how long
this event cleanup will take. Mr. Vancura said they estimate a 2-3-week
deployment.
Resident at 326 4th Ave, Anoka (inaudible, did not sign in), shared about a nearby
church and how the pastor places cones in front of his driveway to prevent
attendees from parking in front of his home but how he recently painted areas in
front of his driveway instead and how the pastor shared concerns about the paint.
He said no one should be parking in 20-foot alleys anyway and requested the City
address the concern.
October 7, 2024 (Regular)
Page 4 of 13
Councilmember Weaver suggested staff work to address the concern such as
posting no parking allowed on Franklin Lane.
Mr. Nelson alleys are 20 feet and only for fire access and should not be parking
allowed and are posted in many places.
Jerry Boettcher, Coon Rapids, shared concerns about garbage being thrown in his
father’s home then shared the address of the home.
Bill Fouces, Coon Rapids, said he owned a business in Bridge Square and
attended a workshop on September 23 to learn about the survey done by the
Economic Development Commission and the results of the City survey because
he felt we need to discuss the current parking ordinance. He said he asked in May
because he’s heard from business owners on Main Street about parking concerns
and shared their support for the ordinance going away. He shared how the
ordinance refers to congested areas and outlined criteria but that staff has said no
such measure exists and that tickets are being issued to people who aren’t aware
they are in a congested area.
Councilmember Skogquist said he supported opening parking more as parking has
changed since the 1990s but noted many elements are involved including different
businesses as well as the Anoka County Government Center employees and
visitors, not to mention the proposed jail expansion. He said he agreed about the
need to review however now may not be the time until we know about the
proposed jail building.
Chief Peterson said the Parking Advisory Board has reviewed permit parking and
extending hourly parking and is prepared to bring forward their recommendations
to Council in an upcoming meeting but they aren’t recommending changing at
this time without other condition changes outside of permits and time zone
changes.
5. PUBLIC HEARING(S)
5.1 Public Hearing – Assessment for Services Against Property with Delinquent
Accounts.
RES/Adopting Assessment for Services Against Property with Delinquent
Accounts.
RESOLUTION
City Assessor Ryan Kirby shared a background report stating Anoka City
ordinances and Statute allow for the certification of unpaid service billings which
may include costs associated with weed and diseased tree removal, false alarms,
delinquent utility accounts, and other miscellaneous services to the public
including removal of public health hazards from private property. City of Anoka
October 7, 2024 (Regular)
Page 5 of 13
utility accounts that are delinquent as of August 1 and remain unpaid as of
September 1, 2024 will be collected utilizing special assessments. An
administrative fee ($35.00) plus interest (4%) will be charged. Property owners
have been notified via regular mail. Upon application, Council may defer the
payment of this special assessment for any homestead property owned by a person
65 years of age or older, or retired by virtue of a permanent or total disability, for
whom it would be a hardship to make the payments. Certification of the
assessment for services will allow the City to collect for services it has provided.
Deferment delays collection but provides for eventual collection with accrued
interest. Mr. Varner shared as of today the list was down to 61 properties with
unpaid bills and that after November 15 interest will accrue and be certified for
collection on 2025 real estate taxes.
Mayor Rice opened the public hearing at 7:59 p.m.
Being no comments Mayor Rice closed the public hearing at 8:00 p.m.
Councilmember Weaver asked how many delinquent utilities were apartment
properties that can’t be assessed. Mr. Kirby explained the property owners of
apartments are assessed but not the tenant, adding he is not sure if we have
individual meters per unit, but if so, the notice is sent to them.
Councilmember Weaver asked how many of these delinquent accounts are
received by the City. Mr. Kirby confirmed the City receives all delinquent funds
once assessed through property taxes in 2025.
Councilmember Skogquist said we typically get the vast majority of delinquent
funds prior to assessment which is beneficial to the City.
Councilmember Weaver referred to the cold weather shut-off rule and how
delinquent accounts just continue to accumulate. Mr. Vancura clarified the
accounts keep compounding until paid off and at the end of the cold weather rule
the City can shut off the property completely to stop the accumulation of charges.
NOTE: By motion from Councilmember Weaver, which was seconded by Councilmember
Skogquist, and by a unanimous vote of the Council, agenda item 9.1 was moved up on the
agenda and acted upon at this point.
Motion by Councilmember Skogquist, seconded by Councilmember Scott, to
adopt a resolution certifying the 2024 assessment for services against property
with delinquent accounts.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver,
and Wesp voted in favor. Motion carried.
6. CONSENT AGENDA
October 7, 2024 (Regular)
Page 6 of 13
Motion by Councilmember Weaver, seconded by Councilmember Scott, to approve the
Consent Agenda as amended, removing Item 6.4 due to a potential conflict of interest as
the applicant was a client of Councilmember Weaver’s.
6.1 Approve Verified Bills.
6.2 Revising and Setting Council Calendars.
6.3 West Rum Riverwalk Trailway – Phase I; Approve Change Order Number 1.
6.4 Issuance of a Massage Business License for Unison Chiropractic Center, 2006 1st
Avenue, Suite 209, Anoka.
6.5 Approval of a (1) Year Temporary Site License Agreement for New Cingular
Wireless PCS, LLC, and its Affiliates.
6.6 Issuance of a Massage Therapist License for Jianyun Lin of Lin Health Care,
LLC, dba; Better Life Wellness Massage and Reflexology, 3841 St. Francis
Boulevard, Suite 102.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver, and Wesp
voted in favor. Motion carried.
Motion by Councilmember Scott, seconded by Councilmember Skogquist, to approve
Issuance of a Massage Business License for Unison Chiropractic Center, 2006 1st
Avenue, Suite 209, Anoka.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, and Wesp voted in
favor. Councilmember Weaver abstained. Motion carried.
7. REPORTS OF OFFICERS, BOARDS AND COMMISSIONS
None.
8. PETITIONS, REQUESTS AND COMMUNICATION
None.
9. ORDINANCES AND RESOLUTIONS
9.1 RES/Adopting Assessment for Services Against Property with Delinquent
Accounts.
ACTED UPON AFTER THE PUBLIC HEARING
October 7, 2024 (Regular)
Page 7 of 13
9.2 RES/Anoka Rum River Trail 4th Avenue BNSF Railroad Crossing and Trail
Connection Project; Order Project, Waive Public Improvement Hearing,
Authorize Plans and Specifications, and Authorize Execution of Agreements with
Burlington Northern Santa Fe (BNSF).
RESOLUTION
Mr. Nelson shared a background report stating as pursuant to a resolution adopted
by City Council on July 2, 2018, the City applied for the Metropolitan Council
TAB Grant. On January 25, 2023, the Transportation Advisory Board of the
Metropolitan Council awarded $556,000 to the City of Anoka for construction of
the Anoka Rum River Regional Trail 4th Ave BNSF Railroad Crossing and Trail
Connection Project, slated for program year 2025. The grant request was for
$706,000 which included a City local commitment of 20 percent or $150,000.
Today, there is no sidewalk or trail along the west side of 4th Avenue (CSAH 31)
between Pierce Street (CSAH 30) and Johnson Street and just north of Pierce
Street, there is an existing at-grade Burlington Northern Santa Fe (BNSF)
Railroad Crossing (BNSF Crossing DOT# 082923X) with no pedestrian
accommodations. This gap in the Rum River Regional trail creates unsafe
conditions for pedestrian/bicyclists. The proposed improvements will help safely
channel pedestrians/bicyclists along 4th Avenue (CSAH 31) and reduce
pedestrian/bicyclists exposure while improving access and mobility, safely
channelizing pedestrians/bicyclists across the BNSR railroad line. The proposed
project is for the construction of a new multi-use 10-foot bituminous trail
approximately 0.17 miles on the west side of 4th Avenue (CSAH 31) and the
installation of pedestrian crossing gates at the at-grade railroad crossing. It shall
be understood, due to BNSF Railroad Company as the owner and operator of this
railroad line in the City, the railroad will require the City of Anoka to enter into
agreements to permit the work, make payment and deposits for the work,
construct the project, and for the right of entry onto the railroad’s property. As
always, the work and conditions shall be agreeable between agencies and subject
to the terms/conditions of the agreements. City Council shall be aware, 4th
Avenue is a County State Aid Highway (CSAH) from Grant Street (CSAH 31) to
East Main Street, and by the City delivering this project, a portion of CSAH 31
between Grant Street (CSAH 31) and Pierce Street (CSAH 30) shall be turned
back to the City of Anoka. City staff have been in preliminary conversation with
Anoka County Highway Department about this proposed turnback. It’s worth
mentioning, this turnback is part of the Memorandum of Agreement (Anoka
County Contract No. C0006402) approved by the Anoka City Council on May 21,
2018. The agreement was for the transfer of County property to the City of Anoka
and at the time that Anoka County revokes the status of CSAH 31 on 4th Avenue
or Grant Street, the County has a $110,000 credit for cost associated with
roadway improvements. Further discussion on the proposed turnback of 4th
Avenue will be on a future worksession and official approval of this item would
require the City Council to adopt a resolution. The estimated total construction
cost of the Anoka Rum River Regional Trail 4th Avenue BNSF Railroad Crossing
October 7, 2024 (Regular)
Page 8 of 13
and Trail Connection Project is $748,360, which includes 6% for property
acquisition (easements). Mr. Nelson shared the project schedule and
recommended that City Council adopt the proposed resolution ordering the
project, waive the public improvement hearing, authorize preparation of plans and
specifications, authorize execution of agreements with BNSF Railroad Company,
and acquisition of easements for the Anoka Rum River Regional Trail 4th Ave
BNSF Railroad Crossing and Trail Connection Project.
Councilmember Weaver noted this is part of the Anoka County Rum River
Regional Trail project and that’s why they are participating in the project which is
laid out now and coming up along the 4th Avenue bridge and crossing Pleasant
then back over the un-signed crossing. He said this will be critical link to the
entire regional trail and will be heavily used and that he looked forward to its
completion.
Councilmember Scott agreed, adding having to cross over uncontrolled streets is a
safety issue and it will be important to have a path on this side of the street as it
will improve livability of the residents.
Councilmember Skogquist said this is a great project then shared a recent
conversation with Anoka County Chair Mike Gamache regarding non-marked
intersections and noted many don’t take the east side and how this is not a good
scenario then spoke about possible turnback discussions between 4th Avenue and
Grant Street.
Motion by Councilmember Skogquist, seconded by Councilmember Weaver, to
adopt a resolution Anoka Rum River Trail 4th Avenue BNSF Railroad Crossing
and Trail Connection Project; Order Project, Waive Public Improvement Hearing,
Authorize Plans and Specifications, and Authorize Execution of Agreements with
Burlington Northern Santa Fe (BNSF) Railroad Company.
Mayor Rice said while this is an expensive project half is the railroad crossing and
we know the need for safety and was pleased to see this happening.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver,
and Wesp voted in favor. Motion carried.
9.3 RES/2024 Street Renewal Project – Franklin Area Phase II; Approve Revised
Assessment.
RESOLUTION
Mr. Nelson shared a background report stating on January 16, 2024, City Council
held an assessment hearing and adopted a resolution approving the assessment
roll for the 2024 Street Renewal Project - Franklin Area Phase II. Common with
street renewal projects, staff may have to make an assumption for the locations of
October 7, 2024 (Regular)
Page 9 of 13
existing service connections. During the development of the project, existing curb
stops for the water services are surveyed and the sanitary sewer lines were
televised. This information, along with the old construction plans and service tie
cards, are used to best determine the location of the existing services. During
construction, these services are verified and installed if part of the project. In the
case a service is not found and replaced, this service will be removed from the
assessment roll. Typically, these parcels are located on a corner lot or are double-
fronted by two roads. Also, based on the Street Reconstruction Assessment
Policy, to keep the fairness and equity to property owners when a service on the
project has been replaced within the past 10 years and outlined the service unit
assessments fees. The subject commercial property of 2321 Branch Avenue is
located within the construction limits of the project and was included in the
adopted assessment roll in anticipation the parcel had a commercial water service.
As the project progressed, no existing water service was located and therefor the
contractor did not install a new water service as part of the project. The property
with PID 01-31-25-41-0138 will have the water unit assessment ($3,500.00)
removed, given the service was not installed. The subject residential property with
PID 01-31-25-41-0139 (2219 Branch Avenue) is located within the construction
limits of the project or was included in the adopted assessment roll in anticipation
the parcel did not have a new water service installed to the mains. As the services
were installed, it was verified that the water Page 103 of 126 service was new to
the mains. The property with PID 01-31-25-41-0139 will have the water service
unit assessment ($1,750.00) removed, given the service was replaced within the
past 5 years. The subject property with PID 01-31-25-43-0091 (215 West Main
Street) is located within the construction limits of the project and was included in
the adopted assessment roll in anticipation the parcel had a sanitary sewer service.
As the project progressed, no existing sanitary sewer service was located and
therefore the contractor did not install a new sanitary sewer service as part of the
project. The property with PID 01-31-25- 43-0091 will have the sanitary sewer
unit assessment ($1,610.00) removed, given the service was not installed. In
addition to the above assessment adjustment, the ownership of some parcels
located within the construction limits have changed.
Motion by Councilmember Skogquist, seconded by Councilmember Scott, to
adopt a resolution adopting the 2024 Street Renewal Project – Franklin Area
Phase II; Adopt a Revised Assessment Roll.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver,
and Wesp voted in favor. Motion carried.
9.4 RES/Supporting Pursuit FY2024 for the Safe Routes to School (SRTS)
Infrastructure Program Funding for Safety Improvements in the City of Anoka.
RESOLUTION
October 7, 2024 (Regular)
Page 10 of 13
Mr. Nelson shared a background report stating the Minnesota Safe Routes to
School (SRTS) Infrastructure Program was established by the Minnesota
Legislature in 2012 which started to enable children to walk and bicycle to school
in a safe built environment and to encourage them to make active and healthy
lifestyle choices from an early age. The SRTS Program also improves safety,
reduces traffic, and improves air quality near schools. MnDOT Office of State
Aid for Local Transportation (SALT) is responsible for the administration and
oversight of the SRTS Program on local roads. For this 2024 SRTS infrastructure
solicitation, grant requests must be between $50,000 and $1,000,000 and the
intent is to award grants totaling up to $8.9 million. An excellent candidate for the
SRTS Grant Program is the area around Wilson Elementary School. The
recommended safety and mobility improvements at Wilson Elementary include
the following: sidewalk extensions along Sunny Lane between the existing mid-
block school crosswalk to Colfax Avenue; advance LED intelligent flashing
pedestrian crossing signs along Sunny Lane and Colfax Avenue; and LED vehicle
dynamic speed limit feedback signs along Sunny Lane and Colfax Avenue. City
staff are currently working with the Anoka-Hennepin School District to review
these recommendations and gather supporting information for the grant
application. Students at this school will benefit through improved safety,
walkability, access, mobility, and upgraded ADA pedestrian accommodations.
The next steps in the process will be submitting the Letter of Intent (LOI) for the
Safe Routes to School Program. Then the City of Anoka will submit a detailed
application describing the specific improvements proposed to be implemented,
which requires a resolution of support from the City of Anoka. The deadline for
the letter of intent is Friday, October 18, 2024. The full application opens on
Monday, November 4, 2024, with an application deadline of Friday, January 17,
2025. Successful grant application will be announced by April 30, 205 and, if
successful, the city will be required to enter into a grant agreement with MnDOT
to utilize the SRTS funds. Improvements could take place as early as the summer
of 2025. Total estimated construction costs for all proposed improvements under
the grant application is approximately $310,000. Most all of the construction cost
is expected to be paid by the SRTS Grant and is expected to be a minor cost for
the City.
Councilmember Skogquist confirmed the project was in consultation with the
school district, then shared how schools were cautious regarding drop-off areas
which at Lincoln is the senior center lot, and a with sidewalk added in 2020. He
referred to concerns with the crossings and how they drop off on the wide part of
Sunny Lane on the south side and then run across and that he liked the addition as
this will be easier for the crossing guards instead of cutting across side roads and
driving fast.
Councilmember Weaver said the close of Franklin School led to a shift to Lincoln
with more kids in the schools and more parents driving with less busing so it is
important to have these safe routes to schools.
October 7, 2024 (Regular)
Page 11 of 13
Motion by Councilmember Scott, seconded by Councilmember Skogquist, to
adopt a resolution supporting pursuit for FY Safe Routes to School (SRTS)
Infrastructure Program Funding for Safety Improvements in the City of Anoka.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver,
and Wesp voted in favor. Motion carried.
10. UNFINISHED BUSINESS
None.
11. NEW BUSINESS
11.1 Approval of City Mailer; Information Related to Solid Waste, Yard Waste, and
Recycling Collection.
Mr. Lee shared a background report stating on September 26, 2024, the City
Council directed that a City-wide informational mailer pertaining to options
related to Solid Waste, Yard Waste, and Recycling Collection be created and sent
to the citizens of Anoka then presented a draft mailer to Council for their review
and consideration of approval.
Councilmember Skogquist referred to a typo regarding reference to service
changes being down from nine to two trucks then suggested including adding
information about finding your polling place through MNVotes.org.
Councilmember Weaver said he did not support government-organized hauling
but agreed to supporting reducing trucks through attrition. He shared he was a
customer of Ace Solid Waste and will respect the vote outcome then shared
that while Ace came up with a good price it doesn’t refer to how the City will be
taking on billing for garbage service as an added cost. He noted there will be
delinquent garbage accounts next year and referred to the costs for staff to
manage those then shared concerns regarding public data requests and how utility
customer data was private but garbage data would be public. Mr. Baumgartner
shared the differences between public and private data, how redactions would be
allowed, and how the City would err on garbage data being private unless directed
differently by the Attorney General.
Mayor Rice disagreed with the classification between public and private data. Mr.
Baumgartner agreed there are nuances but that it depended on how the data was
classified.
Councilmember Scott said Ace Solid Waste was already licensed as a single
hauler and that he was unsure of the differentiation between recycling and solid
waste but noted the City already collects that data.
October 7, 2024 (Regular)
Page 12 of 13
Councilmember Skogquist noted the flyer does include how that data is handled
as well as efficiencies for single hauling as private because we can put it on the
tax rolls. He said the flyer addresses efficiencies and how the $1 surcharge will
go to the City to cover expenses which is not very much but that citizens will be
voting on this question then said he liked the information regarding impacts
between a yes and no vote.
Councilmember Wesp said his concern is the mailer infers the residents are voting
on a contract which they aren’t because the City is already in negotiation. He said
this really is about government-organized hauling and overtaking private business
and that we have to make a choice for ourselves. He said this is an intrusion that
is being labeled as a utility but is not as it is actually a contract. He said Council
could change their minds in the future and did not support the action. He said this
is very one-sided and noted government doesn’t always do better, adding this is
not a utility.
Mayor Rice said cities with organized hauling live up to the mailer and said he
wouldn’t be opposed to removing the specific company in the mailer as an option.
He said he liked the process where we ask residents to weigh in on the final
decision and said the City was not taking away from businesses but establishing
an organized contract which would be a better choice and inevitable.
Motion by Councilmember Wesp, seconded by Councilmember Weaver, to
approve the mailer as presented.
Mr. Baumgartner said the Council could approve the mailer subject to
confirmation of data practices impacts.
Mayor Rice said he didn’t anticipate a problem but if so, agreed the data could be
redacted.
Councilmember Scott noted garbage and recycling are alike according to his
County tax statement.
Councilmember Skogquist said he was comfortable with the City Attorney’s
opinion regarding data practices.
Motion by Councilmember Skogquist, seconded by Councilmember Scott, to
adopt approval of City Mailer; Information Related to Solid Waste, Yard Waste,
and Recycling Collection.
Upon a roll call vote: Mayor Rice, Councilmembers Scott and Skogquist voted in
favor. Councilmembers Weaver and Wesp voted nay. Motion carried.
12. UPDATES AND REPORTS
October 7, 2024 (Regular)
Page 13 of 13
12.1 Tentative Agenda(s).
The Council reviewed the tentative agendas of the upcoming Council meetings.
12.2 Staff and Council Input.
Councilmember Weaver shared about the second annual Waterfowl for Warriors
event at the Anoka Nature Preserve and said it will be a great day with great
sponsors.
Mr. Nelson shared an update on the Rum River dredging project which was now
complete from Phase II, with Phase I in November, and that all material removed
will be relocated. He said the silt curtain downstream is now gone and that boaters
can freely navigate the river.
Councilmember Skogquist asked more about dredging out to the channel. Mr.
Nelson explained that would require a separate permit for dredging from the
docking area for the length of the dock system.
Councilmember Weaver said the channel runs fairly close to the back side of
Aikin Park and that it would be easy to get to the channel.
Mayor Rice cautioned boaters due to the low water and added he was amazed to
see the number of buckets of sand removed from the area.
ADJOURNMENT
Councilmember Scott made a motion to adjourn the Regular Council meeting
Councilmember Skogquist seconded the motion.
Upon a roll call vote: Mayor Rice, Councilmembers Scott, Skogquist, Weaver, and Wesp
voted in favor. Motion carried.
Time of adjournment: 9:01 p.m.
Submitted by: Cathy Sorensen, TimeSaver Off Site Secretarial, Inc.
Approval Attestation:
Amy T. Oehlers, City Clerk