Mayor & Commission Meetings
Regular MeetingAthens-Clarke County, GA · January 12, 2023
Agenda
The meeting will be streamed and broadcast live. Interested members of the public can watch live
online via YouTube at www.youtube.com/accgov or the YouTube app, via www.accgov.com/videos,
via Facebook at www.facebook.com/accgov, or on ACTV Cable Channel 180 or at
www.accgov.com/actvlive
WORK SESSION AGENDA
UNIFIED GOVERNMENT OF ATHENS-CLARKE COUNTY, GEORGIA
Thursday, January 12, 2023 – 5:30 PM
City Hall Commission Chamber
I. Call to Order (5:30 p.m.) Mayor Kelly Girtz
II. Items for Future Consideration
A. TSPLOST 2018 Project 11 – Barber Street -....................................... Rani Katreeb
Project Concept Transportation & Public Works Dept. Assist. Director
B. Mall TAD Overview ................................................................................. Caitlin Dye
Business Development & Incentive Coordinator
C. SPLOST 2020 Project 06 – Fire Station #5 ...................................... Daniel Garren
Replacement – Project Concept SPLOST Project Administrator
D. Strategically Addressing the Gang Crisis in ............................... Deborah Gonzalez
Athens-Clarke County District Attorney
E. Health Services for In-Custody Residents of the ........................... John Q. Williams
Clarke County Jail Contract Sheriff
III. Adjourn
NOTE: All reports are draft. No final action is taken at this work session.
The Work Session is open to the public; however, public comments are not received.
February 14, 2023 Work Session
• Presentation from External Financial Auditors
• Neighborhood Traffic Management Program Update
• SPLOST 2020 Project #22 – Broadband Connectivity Enhancement Project –
Proposed Preliminary Plan
• Classic Center Arena
• SPLOST 2020 Project 06 – Fire Station #5 Replacement – Project Site Criteria
• HOME-ARP Allocation Plan
Final ‐ Published 1/9/2023 3:34:45 PM
Athens in Motion
Barber Street
Bike and Pedestrian
Design Concept: Segment 4 Update
Athens-Clarke County
Transportation & Public Works Department
January 12, 2023
Presented by:
Rani Katreeb, T&PW Assistant Director
Daniel Sizemore, T&PW Bike, Ped, and Safety Coordinator
Lauren Blais, AiMC Chairperson
Sarah Johnson, TDG Designer (On-Call Sub Consultant)
1
Overview
• Review Project Extents & Background
• Segments 1-3 Recommended Design Recap
• Discussion of Segment 4 Advanced Design & Public Engagement
• Next Steps
2
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 1
Final ‐ Published 1/9/2023 3:34:45 PM
Project Extents & Background
3
Presented 6/1/2021
Project Extents
4
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 2
Final ‐ Published 1/9/2023 3:34:45 PM
Background
Athens in Motion (AiM) Plan
• October 2, 2018: Mayor & Commission (M&C) accepted the AiM Plan, and
authorized staff to develop concepts for the first 5 bicycle projects and 5
pedestrian projects including Barber Street Bike & Ped Project (Dairy Pak Rd. to
Boulevard).
• AiM Plan initially called for separated bikeway on Barber Street
Barber Street Bike & Pedestrian Project
1. February 23, 2021: AiM Commission (AiMC) reviewed alternatives using a
matrix of tradeoffs to decide on preferred concept for schematic design
2. March 3, 2021: On a special called session, AiMC voted unanimously to:
• Recommend a 10’ two-way separated bike lane and 5’ sidewalk for segments 1-3 (Dairy
Pak Rd. to Boulevard)
• Explore extending facilities, at a later date, on Segment 4 (Boulevard to Prince Ave.)
• Move forward per Capital Improvement Process
Background
Barber Street Bike & Pedestrian Project
3. March 9, 2021 M&C Work Session: TPW staff presented AiMC recommended alternative
and was directed to include Segment 4 in project and:
• Provide more information on cost saving options (e.g., lane reduction on Segment 1 from
Dairy Pak Rd. to Loop 10)
• Provide additional cost estimates
• Rank segments in terms of priority for construction
4. April 6, 2021: on a Special Called Session, AiMC voted to:
• Move the entire project from N. Chase St. to Prince Ave. into preliminary design phase
• Design a 10’ two-way separated bike facility and 5’ sidewalk on east side of Barber for
segments 1-3 (Dairy Pak Rd. to Boulevard), except with sidewalk on the west side due to
constraints through the poultry plant
• Reduce Segment 1 (Dairy Pak Rd. to Loop 10) from 4 to 3 vehicle lanes
• Design sharrows and curb bump-outs for Segment 4 (Boulevard to Prince Ave.)
• Allocate funding for final design, ROW acquisition, and construction in the amount of
$6,112,500 to be funded by Bike and Ped TSPLOST Programs at a 50/50 split.
• Recommend that, IF construction funding is limited, build the segments in the following
prioritized order (from highest to lowest priority):
• Segment 4 > Segment 3 > Segment 2 > Segment 1
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 3
Final ‐ Published 1/9/2023 3:34:45 PM
Background
Barber Street Bike & Pedestrian Project
5. From April 28 through May 19, public input on all segments was completed and shared with
M&C.
6. June 1, 2021 M&C Regular Session: M&C voted to table the project concept to Tuesday
August 3, 2021.
7. June 8, 2021 M&C Work Session: M&C reviewed shared lane marking and multiuse path
alternatives for Segment 4 (Boulevard to Prince Ave.) and sent the project back to AiMC for
in-depth consideration of all ages/abilities facilities and property impacts after discussing:
• Support for AiMC recommended alternative of two-way separated bike lane and sidewalk for
Segments 1-3 (Dairy Pak Rd. to Boulevard)
• Concern that the AiMC recommended alternative of shared lane markings was not an all ages and
abilities facility in what is seen as the most important section of this transformative project
• Removal of on-street parking
8. July 17, 2021, based on feedback from M&C and discussions with the Manager’s Office,
T&PW staff pulled the project concept agenda and began advance concept scoping efforts
with the design consultant.
9. On October 19, 2021, T&PW staff and Benesch consultants met on Barber Street with
District Commissioner Russell Edwards, Mayor Kelly Girtz, and Manager Blaine Williams, and
discussed current progress and next steps.
Segments 1-3:
Recommended Design Recap
8
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 4
Final ‐ Published 1/9/2023 3:34:45 PM
Alternatives Development and Evaluation
• 25+ alternatives considered for segments
and intersections
• Evaluated for comfort, balancing needs
of all, and property/utility impacts
• Separated bike lane (SBL) with sidewalk
identified as preferred alternative:
• Highest comfort with smallest footprint
• Barber Street is an AiM Plan Tier 1
project for bicycles and for pedestrians
• Accommodates preference of bicyclists
to ride side-by-side, unless passing
• Best option for a continuous facility
• Multiuse path not appropriate for:
• Urban settings (Segment 4)
• Long, continuous downhills (Segment 3)
• High pedestrian activity areas
(Segments 2 & 4)
9
Segment 1: Dairy Pak Rd. – Loop 10
Presented 3/9/2021
• Existing ROW: 100-105’ typical
• Existing roadway: 45’ typical; 58’ at widest
10
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 5
Final ‐ Published 1/9/2023 3:34:45 PM
Segment 2: Loop 10 – Oneta St.
Presented 3/9/2021
• Existing ROW: 50’ typical
• Existing roadway: 25-35’ typical
• Requires removal of 9 marked “off-street” parking
spaces, all of which were partially in ROW
• Sidewalk will shift to the east side of the street
adjacent to the two-way separated bike lane where
feasible for Segment 2
11
Segment 3: Oneta St. - Boulevard
Presented 3/9/2021
• Existing ROW: 40’ typical
• Existing roadway: 30-33’ typical
• Requires removal of 3 on-street parking spaces (of
those that met regulatory and safety standards)
12
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 6
Final ‐ Published 1/9/2023 3:34:45 PM
Intersection: Dairy Pak Rd.
Presented 3/9/2021
• 4 to 3 lane road diet
• Shared use path crossings
• Transition from shared
use path to separated
bike lanes and sidewalk
• Formalized crosswalks
• Truck aprons to reduce
turning speeds
13
Segment 1: Dairy Pak Rd. – Loop 10
Presented 3/9/2021
14
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 7
Final ‐ Published 1/9/2023 3:34:45 PM
Segment 2: Loop 10 – Oneta St.
Presented 3/9/2021
NOTE: sidewalk will be shifted to the east side of Barber Street where feasible for Segment 2 15
Intersection: Oneta St.
Presented 3/9/2021
• Shortened bicycle/pedestrian
crossings
• Separate crossings
• Mountable truck aprons to
reduce turning speeds
16
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 8
Final ‐ Published 1/9/2023 3:34:45 PM
Segment 3: Oneta St. - Boulevard
Presented 3/9/2021
Partial view of segment
17
Intersection: Boulevard
Presented 3/9/2021
• Raised intersection
• Shortened crossing
distances
• Unique color and texture
• Wide crossing on
southern approach for
bicycle transition to
street
18
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 9
Final ‐ Published 1/9/2023 3:34:45 PM
Segment 4: Boulevard – Prince Ave.
Presented 6/1/2021
Previously Recommended Alternative by AiMC – Option 1: Shared Lane Markings & Sidewalk with Parking
• Maintain existing sidewalks
• Existing ROW: 40-45’ typical
• Existing roadway: 28-32’ typical
• Requires removing 3 on-street parking spaces
(of those that met regulatory and safety
standards) 19
Segments 4:
Advanced Design & Public Engagement
20
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 10
Final ‐ Published 1/9/2023 3:34:45 PM
Segment 4: Boulevard – Prince Ave.
Revised Recommended Alternative by AiMC - Option 3B: Two-Way Separated Bike Lane & Sidewalk without Parking
21
Segment 4 Advanced Design
Work Since June 2021
• Progressed alternatives for multiuse
path and two-way separated bike
lane with sidewalk both with and
without parking through schematic
design, property impacts, and cost
estimates
• Assessed alternatives through matrix
of tradeoffs
• AiMC voted to recommend two-way
separated bike lane and sidewalk
with removal of on-street parking
• Conducted public engagement to
gather feedback on all alternatives
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 11
Final ‐ Published 1/9/2023 3:34:45 PM
Alternatives to Sharrows
Option 2A: Multiuse Path with Parking Option 2B: Multiuse Path without Parking
• Differs from segments 1-3 • Differs from segments 1-3
• No separation of • No separation of
nonmotorized modes nonmotorized modes
• Multiuse path not • Multiuse path not
recommended by AiMC recommended by AiMC
• Street parking can offer • Shifted curb offers
traffic calming, when permanent traffic calming
present • Minor impact to a couple
• 2nd greatest impact to parcels
private property
Option 3A: Two-Way Separated Bike Lane & Sidewalk with Parking Option 3B: Two-Way Separated Bike Lane & Sidewalk without Parking
• Same as segments 1-3 AiMC Recommendation
• Separation for all users • Same as segments 1-3
• Street parking can • Separation for all users
offer traffic calming, • Concrete buffer offers
when present permanent traffic calming
• Greatest impact to
• Less property impacts
private property
than Option 2A
23
Public Engagement Summary
• Interactive and educational StoryMap + online survey 10/5/2022-06/25/2022
• 103 survey responses (37 from residents) + direct email feedback
• Opportunity to select preferred design. Illustrated options included:
• Option 1: Shared Lane Markings &
Existing Sidewalk with Parking
• Option 2A: Multiuse Path with Parking
• Option 2B: Multiuse Path without Parking
• Option 3A: Two-Way Separated Bike
Lane & Sidewalk with Parking
• Option 3B: Two-Way Separated Bike
Lane & Sidewalk without Parking
• Parking preference
• Open-ended feedback
24
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 12
Final ‐ Published 1/9/2023 3:34:45 PM
Bike/Pedestrian Facility Preference
45%
• First question asked about 40%
preference for separation 35%
between modes 30%
• Question 1: Based on the 25%
options below, what is 20%
your preferred design? 15% Two-Way
10% Shared Lane Separated
Markings & Multiuse Bike Lane &
5% Sidewalk Path Sidewalk
21% 37% 42%
0%
25
Bike/Pedestrian Facility Preference: Filtered Response
• People who use bicycle infrastructure in Athens (70% of respondents)
45%
40%
43%
35%
39%
30%
25%
20%
15%
18%
10%
5%
0%
Shared Lane Markings & Multiuse Path Two-Way Separated Bike Lane
Sidewalk & Sidewalk
26
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 13
Final ‐ Published 1/9/2023 3:34:45 PM
Parking Preference
45%
40%
• Question 2: What is your 35%
preference for on-street 30%
parking? 25%
20%
• Only for those that 15% Keep On- Remove On-
selected multiuse path or 10% Street Street No Parking
Preference
Parking Parking
separated bike lane 5%
38% 43% 19%
0%
27
Parking Preference: Filtered Response
• For Residents & Business Staff (27% of respondents)
• Only for those that selected multiuse path or separated bike lane a preferred facility
45%
40%
43%
35% 39%
30%
25%
20%
15%
18%
10%
5%
0%
Keep On-Street Parking Remove On-Street Parking No Parking Preference
28
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 14
Final ‐ Published 1/9/2023 3:34:45 PM
Highest Ranked Consideration for Segment 4
• Asked to rank options in order of most to least important
55%
50% 54%
45%
40%
35%
30%
25%
20%
15%
22%
10%
5% 10% 9%
0%
5%
Bicycles & Cars Bicycles & On-Street Parking Property Impacts Traffic Calming
Separated Pedestrians
Separated
29
Key Themes from Open-Ended Feedback
• Existing on-street parking feels dangerous for both bicyclists and motorists.
• Parking is perceived as a right. A couple homes may not have off-street parking.
• Separation of modes is the most common concern. Property/parking impacts are
highest for those who feel there aren’t enough bicyclists to warrant the investment
or that this segment is already safe for bicyclists.
• Safety at the Barrow St. intersection is a concern; desire for an all-way stop.
• For many bicyclists, sharrows do not provide sufficient level of comfort.
• Integration into nearby bike/ped projects is a must. Enthusiasm for Barber Street
being part of overall network development.
• Perception that vehicle congestion is already an issue on Barber Street.
• Direct email feedback was primarily from property owners opposed to any change,
especially property/parking impacts even when properties have private parking
areas. This includes one person who owns multiple lots on the corridor.
30
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 15
Final ‐ Published 1/9/2023 3:34:45 PM
AiMC Recommendation
Option 3B: 12’ Two-way Separated Bike Lane & Sidewalk without Parking
• Repurposes existing parking for a
12’ two-way separated bike lane
and 5’ sidewalk.
• Two-way separated bike lanes
provide an exclusive space for
bicycles along the roadway that is
separated from vehicles and
pedestrians.
• Includes a 2’ buffer between
vehicles and the two-way
separated bike lane.
• Cost estimate: $1,158,900
31
AiMC Recommendation
Option 3B: 12’ Two-way Separated Bike Lane & Sidewalk without Parking
32
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 16
Final ‐ Published 1/9/2023 3:34:45 PM
Connection to Prince Ave.
Option 3B: 12’ Two-way Separated Bike Lane & Sidewalk without Parking
Without Prince St. Separated Bike Lanes With Prince St. Separated Bike Lanes
(design slightly differs from Pilot to show
options to consider if permanent)
33
Summarized Probable Cost
• Based on historical cost data from ACC and GDOT
• Does not include ROW and easement acquisition services, permitting fees, inspection services,
construction management services, escalation, or ongoing maintenance
• Includes 20% increase for inflation on top of 30% contingency and estimated ROW & easement cost
# Segment Cost Intersection Cost
1 Dairy Pak Rd. – Loop 10 $1,067,500 $1,281,000 Dairy Pak Rd. $509,250 $611,100
2 Loop 10 – Oneta St. $1,140,500 $1,368,600 Oneta St. $323,000 $387,600
3 Oneta St. - Boulevard $2,496,500 $2,995,800 Boulevard $306,500 $367,800
Prince Ave.
4 Boulevard – Prince Ave. $269,250 $1,158,900 (Not included previously; Prince Ave.
has separate funding. Estimate reflects $681,500
robust full-build of directional
separated bike lanes on Prince Ave.)
Segment Total $4,973,750 $6,804,300
$1,138,750
Intersection Total
GRAND TOTAL: $8,852,300 $2,048,000
W/O Prince Ave Intersection: $8,170,800 34
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 17
Final ‐ Published 1/9/2023 3:34:45 PM
Funding Strategy
TSPLOST 2018 Project #12 Pedestrian Improvement Program Budget $ 10,207,391
Additional non ACC Funds UGA Contribution to Riverbend Rd Project $ 125,000
Expensed & Encumbered: Completed Sidewalk Gaps and Projects in Design Phase below $ (1,196,873)
Designated: Cherokee Road Multiuse Path ‐ ROW & Constuction $ ‐
Jefferson River Road (70/30) ‐ ROW & Construction $ (1,637,419)
Riverbend Multi‐use Path (50/50) ‐ ROW & Construction $ (1,405,500)
Available $ 6,092,599
Barber Street Bike & Ped Improvements with 50/50 split funding Concept Cost Estimate $ 4,085,400
Remaining funds for Tier I Ped Projects $ 2,007,199
TSPLOST 2018 Project #11 Bicycle Improvement Program Budget $ 5,790,600
SPLOST 2011 Project #6 Remaining 2011 Bicycle funds $ 820,300
Expensed & Encumbered: Conceptual Designs $ (404,060)
Designated: Cherokee Road Multiuse Path ‐ ROW & Constuction $ ‐
Jefferson River Road (70/30) ‐ ROW & Construction $ (715,940)
Riverbend Multi‐use Path (50/50) ‐ ROW & Construction $ (1,405,500)
Available $ 4,085,400
Barber Street Bike & Ped Improvements with 50/50 split funding Concept Cost Estimate $ 4,085,400
Remaining funds for Tier I Bike Projects $ ‐
Note:
As we approach M&C preliminary engineering aproval and ROW authorization for Jefferson River Road, T&PW staff shall add
TSPLOST 2023 Bicycle and Pedestrian Program funding to maintain project delivery for Jefferson River Road Multiuse Path Project.
Next Steps
36
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 18
Final ‐ Published 1/9/2023 3:34:45 PM
Barber Street Bike & Ped Project Next Steps
Concept Approval Agenda February 7, 2023 including:
I. Approve project concept and advance the proposed project into
preliminary design phase for 2-way separated bike lane with
sidewalks from Chase St to Prince Ave, with removed on-street
parking.
II. Authorize staff to begin scoping efforts with the on-call
consultant Alfred Benesch & Company to complete the
preliminary engineering phase for a cost not to exceed
$799,350.
III. Authorize staff to execute a Preliminary Engineering (PE)
Agreement with CSX Transportation, Inc. for an estimated cost
of $35,000.
37
Questions / Comments
• StoryMap: https://arcg.is/1CGWbf
38
Athens‐Clarke County ‐ Mayor and Commission
Work Session January 12, 2023 19
Overview of TADs and Current
Mall TAD Application Timeline
History of TADs in ACC
• Sept 1, 2020: Mayor & Commission vote to approve 6 redevelopment areas, associated tax
allocation district boundaries, and TAD funding goals. Those goals included:
• Public Infrastructure Needs;
• Housing Opportunities;
• Economic Development Partnership Opportunities;
• CCSD and Youth Development
• Nov 4, 2020: Manager Williams and Attorney Dan McRae present draft redevelopment plans to
the Mayor & Commission
• Nov 9, 2020: Public hearing held pursuant to O.C.G.A. Section 36-44-7(b) to obtain citizen input
and comments regarding formulation and adoption of the 6 redevelopment plans.
• Nov 10, 2020: Mayor & Commission adopt 6 redevelopment plans
• Dec 10, 2020: Clarke County Board of Education vote to approve participation in Mall Area TAD
• Feb 2021: GA Dept. of Revenue certifies tax allocation increment base for each of 6 TADs
General TAD Application Process
2. Submittal of Completed
1. Pre-Submittal Consultation
Application, Application Fee,
& Preliminary Staff Review
and Affidavit (If Applicable)
4. TAD Advisory Committee
3. Third Party Conducts
Reviews, Discusses, and
Financial Evaluation of
Documents Recommendation
Application
Regarding Application
5. Recommendation and 6. Mayor & Commission
7. If in Mall Area TAD, Steps
Financial Evaluation Sent to (MARC for Mall Area TAD)
5 & 6 repeat for Mayor and
Mayor & Commission Vote on Community
Commission
(MARC for Mall Area TAD) Benefits Agreement
Mall TAD Application Timeline
Date
1/12/23 Mayor & Commission Work Session Briefing
1/23/23
Mall Area TAD Advisory Committee Meets to Discuss Application
1/25/23
& Make Recommendation
1/27/23
1/30/23
Mall Area Redevelopment Committee (MARC) Meets to Discuss
2/1/23
Application & Vote on Application
2/3/23
Detailed Information Session for Mayor & Commission on
2/7/23
Application and Community Benefits Agreement
2/14/23 Mayor & Commission Vote on Community Benefits Agreement
SPLOST 2020 Project 06
Fire Station #5 Replacement
Proposed Project Concept
Mayor & Commission Work Session
January 12, 2023
Presented by:
• Daniel Garren, SPLOST Project Manager
• Jeff Scarbrough/Mark Melvin, Fire Chief
• Matt Klebosky, Design Architect
Presentation Agenda
Purpose: To present the Proposed Project Concept for the Fire
Station #5 Replacement to provide the necessary fire protection
services for the residents located on the eastside of Athens, Georgia.
• Initial Project Statement
• Project History
• Proposed Project Concept
• Budget
• Next Steps & Schedule
• Questions
2
SPLOST 2020 Project 06
Initial Project Statement
Project 06, Fire Station #5
Replacement, This project will provide funding
for the construction of a replacement fire station for
the current Fire Station #5 located at 1090 Whit Davis
Road. This project includes land acquisition, design,
construction, fueling station, station equipment, and
other related costs to meet facility standards for a
suburban design comparable to previous design
prototypes that provides adequate space for current
and future expansion. Additionally, to the extent
allowed by law, funds may be used as matching funds
for leveraging grant opportunities.
3
Project History
• In 1974, Fire Station #5 was constructed and commissioned into service. The
station operates 24/7/365 and is located at 1090 Whit Davis Road. The station
served as the headquarters for Clarke County. ~49 years old
• On August 6, 2019, M&C approved the SPLOST 2020 project and budget;
adopted a resolution calling for a referendum on November 5, 2019.
• On November 5, 2019, Athens-Clarke County (ACC) voters approved the SPLOST
2020 Program Referendum. This Referendum included the Fire Station #5
Replacement (SPLOST 2020 Project 06).
• On May 12, 2021, ACAC recommended that SPLOST 2020 Project 06 Fire Station
#5 Replacement be designated as appropriate for public art with a budget
amount of 1% of the proposed construction budget.
• In May 2022, ACCGov Manager Williams selected the User Group Members to
help ensure ACCGov long term goals are promoted during the Project
Development process.
• On December 7, 2022, the User Group agreed to proceed forward in presenting
the Project Concept to SPLOST 2020 Oversight Committee.
4
Current Fire Station #5 Condition
In 1974, Fire Station #5 was constructed to provide a facility for firefighters and to
be operational 24/7/365. The current station is 7,036 SF and has two apparatus bays.
There are some deficiencies with this station which are as follows:
Fire Station needs to be relocated to provide better coverage on the eastside.
Space isn’t adequate for the number of personnel assigned.
No exercise room and gear space is inadequate.
Lack of male/female living design. (Restrooms & Bedrooms)
Facility is not ADA compliant.
Lacks fire safety prevention systems and bay door safety sensors.
Currently slide pole opening is a safety hazard.
Two-story facility
Abandoned fueling station that needs to be remediated.
Facility HVAC, electrical, and appliances are not considered energy efficient
due to age.
5
Proposed Project Concept – Must Haves
• Male/Female living accommodations (8 personnel minimum)
• Separate Male/Female restrooms with Showers
• Meet ACCGov Sustainability Policy requirements
• Address firefighter health/fitness & cancer prevention best practices through design
• Exhaust ventilation system for extractor and apparatus bay
• Separated gear cleaning quarters
• Industrial extractor and laundry equipment
• Dedicated fitness room
• 3 – Pull through apparatus bays with horizontal doors
• Back-up emergency power
• 15 Parking Spaces
• Single Level Building
• Commercial Kitchen (with separate pantries and refrigerators for each shift)
• Dayroom, Dining Room, & Outdoor Patio (similar to existing prototype)
• Watch Office adjacent to Living Quarters.
• Residential Laundry separate from turn-out gear to limit cross-contamination
• Minimum Storage
• Cascade Room & System
6
Proposed Project Concept – Highly Wanted
• Upgrade standard living conditions to 8 – Single Occupancy Bedrooms
• Upgrade to 4 - Single Occupancy Restrooms with Showers
• Community/training room with 15 parking spaces with separate restroom
facility
• Additional office/storage spaces
Proposed Project Concept – Nice to Have
• Additional parking spaces for community room
• Exterior design to compliment the neighborhood
• *Rooftop photovoltaic solar and EV charging stations
• Rainwater harvesting and reuse system
• Fueling station
*Potentially to be funded from SPLOST 2020 Project #11 - Renewable Energy.
7
Fire Station Prototype Previously Approved for Stations 2, 4, 7, 8, & 9)
• Project Statement envisioned using Prototype
design
• Budget supports construction of 60-70% of
Prototype square footage
• Propose to use Prototype for site selection to
acquire adequate land for full build now or in
the future, as additional funding becomes
available
• Cost of land and site development cost will
impact amount of funding available for
construction
• Floor plans and building types that can be built
for the available budget and meet the
Proposed Project Concept will be brought back
to M&C for consideration at the Schematic 8
Design Phase
Proposed Project Concept - Project Budget
Proposed Project Funding
Original SPLOST 2020 Project 06 Budget $ 6,063,260
Total Proposed Project Funding $ 6,063,260
Proposed Project Budget
Expensed & Encumbered (Design Fees) $ 446,341
Land Acquisition $ 500,000
Testing, Misc., Permitting, Utilities, PM Fees $ 379,209
Public Art $ 31,500
Furniture, Fixtures, & Equipment $ 525,000
Project Contingency $ 1,031,210
Construction $ 3,150,000
9
Next Steps & Project Schedule
SPLOST Oversight Comm. Review of Project Concept January 23, 2023
M&C Consideration of Project Concept February 4, 2023
Staff and Site Selection Committee (SSC)
to review draft Site Selection Criteria February 2023
Release Site Criteria for Public Input March 2023
Review Public Input with SSC March 2023
M&C Consideration of Site Selection Criteria April 4, 2023
Potential Project Sites to SSC Spring/Summer 2023
Candidate Project Sites Spring Fall 2023
Site Acquisition 2023/2024
10
Questions?
11
Building a Safer Athens
Western Judicial Circuit District Attorney Deborah Gonzalez
Community Mandates
Individual and Community Safety are always the
number one priority in the Western Judicial Circuit
District Attorney’s Office
Safety Reform
2
Physical
Holistic Safety
Basic
Emotional
Needs
Safety
Financial Mental
3
Gang Law
Gang
Member
Crime
Committed
Crime in
Furtherance
of Gang
Gang Charge
4
GunViolence InGeorgia
2018-2021
80% of
Homicides in
Georgia involve a
33% Increase in gun
illegal guns
recovered on
Georgia Crime
scenes
23% Increase in
homicides in
Georgia
5
Two Fold Strategies
Find
Immediate
Now
Create
Solutions
Implement Future
Now
6
Our responses thus far
Trainings
Witness Program Research
Witness Protection Program Bill w/Senator Ossoff
District Attorney’s Association of Georgia Committee
NDAA Model based strategic planning
7
Assessment
Mechanisms for Action
NDAA Organizational Change
Model to Collaboration
Address Community Outreach/Mobilization of Resources
Gangs Multidisciplinary Interactive Programming
Evaluation
8
Immediate Now & Future Now
9
Our Ask:
•ADA
•Investigator
Gang Unit •Victim Advocate
•Yearly cost: $250,000
Community •Commitment to invest
in a community justice
Justice center for our
Center community
10
Building a Safer Athens,Together
Western Judicial Circuit District Attorney Deborah Gonzalez
Get email alerts for Athens-Clarke County