Administrative Services Committee Meeting
Regular MeetingAugusta, GA · December 10, 2019
Agenda
Administrative Services Committee Commission Chamber- 12/10/2019- 1:20 PM
Meeting
ADMINISTRATIVE SERVICES
1. Motion to approve Housing and Community Development
Department’s (HCD's) request to provide additional funds Attachments
($25,000) the Community Development Collaborative to assist
with rehabilitation cost of 1233 Perry Avenue.
2. Approve the revision of Ordinance 7271 to expand and
strengthen the Local Small Business Opportunity Program. The Attachments
current ordinance is insufficient for a city the size of Augusta
Georgia.
3. Motion to approve Housing and Community Development
Department’s (HCD's) contract procedural process (as presented Attachments
for calendar year 2020).
4. Motion to approve HCD's Laney Walker/Bethlehem
Revitalization Project contract procedural process (as presented Attachments
for calendar year 2020).
5. Discuss the usage of the former JLEC, 401 Walton Way
building. (Requested by Commissioner Marion Williams) Attachments
6. Motion to approve the minutes of the Administrative Services
Committee held on November 12, 2019. Attachments
7. Protest Discussion – A request by William J. Keogh, III, attorney
with Hull Barrett representing Jackson Demolition to protest the Attachments
decision of deeming their Request for Proposal as Non-
Compliant in reference to RFP 19-273 401 Walton Way
Demolition Augusta Central Services Department.
8.
Protest Discussion – A request by Flint Equipment Co. (Chuck
Atkins) to protest the decision of the Environmental Services Attachments
recommendation of the award of Bid Item 19-226 Waste Handler
Dozer to Yancey Brothers.
www.augustaga.gov
Administrative Services Committee Meeting
12/10/2019 1:20 PM
HCD _ Community Development Collaborative Agreement Amendment Request
Department: HCD
Presenter: Hawthorne Welcher Jr. and/or HCD Staff
Caption: Motion to approve Housing and Community Development
Department’s (HCD's) request to provide additional funds
($25,000) the Community Development Collaborative to assist
with rehabilitation cost of 1233 Perry Avenue.
Background: Housing and Community Development (HCD) and the
Community Development Collaborative is working in
collaboration to construct five (5) single family homes and
rehabilitate one (1) duplex on Perry Avenue. The original
contract was awarded to the organization with an emphasis to
construct units within the range of $140K prior to acquisition
and procurement of contractor. Once this duplex was bided out,
the rehabilitation cost came in greater than the original estimated
amount. Requesting Additional $25,000.00 for rehabilitation.
Original Agreement: $140,084.00 New Agreement
Amount: $165,084.00
Analysis: The approval of funding will allow the Community
Development Collaborative to rehabilitate the duplex units to be
used as rental property for Augusta, Georgia.
Financial Impact: HCD will utilize Home Investment Partnership (HOME)
funding received through its annual allocation from Housing and
Urban Development in the amount of $ 165,084.00 to assist in
the rehabilitation of a duplex to be used as rental property.
Alternatives: Do not approve the funding to Community Development
Collaborative, LLC.
Recommendation: Motion to approve Housing and Community Development Cover Memo
Department’s (HCD's) request to provide additional funds
Item # 1
($25,000) the Community Development Collaborative to assist
with rehabilitation cost of 1233 Perry Avenue.
Funds are
U. S. Department of Housing and Urban Development (HUD)
Available in the
Funds: - Home Investment Partnership Program (HOME) funds.
Following
- Org key/object code = 221073211 – 5211119
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1 \nPage 1
FIRST AMENDMENT
TO
AGREEMENT BETWEEN
AUGUSTA, GEORGIA
&
COMMUNITY DEVELOPMENT COLLABORATIVE, LLC
FOR
2017/2018 HOME INVESTMENT PARTNERSHIPS PROGRAM
1233 Perry Avenue
This First Amendment to the agreement executed by and between the Parties on
December 21, 2018, is made and entered into on the _____ day of _____________, 2019, by and
between AUGUSTA, GEORGIA, (hereafter referred to as “Augusta”), and THE COMMUNITY
DEVELOPMENT COLLABORATIVE, LLC. (hereinafter referred to as the “Collaborative”).
WHEREAS, AUGUSTA desires to amend the original agreement to allow the
Collaborative to effectively administer its HOME eligible affordable housing development
activities;
WHEREAS, the Collaborative has determined that this Amendment is in its best interest
and has agreed to the said Amendment;
NOW THEREFORE, in exchange for their mutual good and valuable consideration, the
receipt and sufficiency of which each PARTY acknowledges, and intending to be legally bound,
AUGUSTA and Antioch agree to amend said agreement as follows:
(1)
Article I Section B . Use of Funds. Construction shall be revised to provide additional
funding in the amount of $ 25,000.00 of HOME funding to support the construction of a single
family unit located at 1233 Perry Avenue.
B. Use of Funds
HOME Program funds shall be used by the Collaborative for the purposes and objectives
stated in Article I, Scope of Services, and Exhibit “A” of this Agreement. The use of HOME
funds for any other purpose(s) is not permitted. The following summarizes the proposed uses of
funds under this agreement:
b. Construction
An amount not to exceed $ 165,000.00 in a grant shall be expended by the Collaborative
to support the rehabilitation of an affordable single-family rental housing units to be
made available for rent by HOME program eligible low and moderate home buyers.
Item # 1
Attachment number 1 \nPage 2
Augusta Housing and Community Development
HOME Investment Partnership Program Agreement Amendment
The Collaborative- 1233 Perry Avenue
Original contract states not to exceed $ 140,000.00 whereas amendment adds an
additional $ 25,000.00 to support construction cost.
Article II Section D shall be revised to show the additional funding with the following:
D. Project Budget: Limitations
Collaborative shall be paid a total consideration of $165,000.00 for full performance
of the services specified under this Agreement. Any cost above this amount shall be
the sole responsibility of Collaborative. It is also understood by both parties to this
contract that the funding provided under this contract for this specific project shall be
the only funds provided by Augusta- unless otherwise agreed to by Augusta and
Collaborative.
The Collaborative shall adhere to the following budget in the performance of this
contract:
Acquisition & Rehabilitation $ 160,000.00
Management $ 5,000.00
_______________________________________________
Total Project Activity Cost $ 165,000.00
Except for the modifications made by this Amendment, the terms and conditions of the
Agreement, as previously amended, shall remain in full force and effect.
Item # 1
2
Attachment number 1 \nPage 3
Augusta Housing and Community Development
HOME Investment Partnership Program Agreement Amendment
The Collaborative- 1233 Perry Avenue
IN WITNESS WHEREOF, the undersigned have set as of the date first written above.
_________________________________ _________
The Community Development Collaborative, LLC Date
IN WITNESS WHEREOF, the parties have set their hands and seals as of the date first written
above:
ATTEST: AUGUSTA, GEORGIA
(The City)
Approved as to form: _________________________ Date:______________
Augusta, GA Law Department
By: ___________________________________ Date: __________________
Hardie Davis
As its Mayor
By: ___________________________________ Date: _________________
Jarvis Sims
As its Interim Administrator
By: ___________________________________ Date:_________________
Hawthorne Welcher, Jr.
As its Director, HCD
SEAL
____________________________
Lena Bonner
As its Clerk
Item # 1
3
Administrative Services Committee Meeting
12/10/2019 1:20 PM
Permission to request Law Department to Revise Ordinance 7271 Local Small Business Opportunity
Program
Department: Compliance
Presenter: Treza Edwards
Caption: Approve the revision of Ordinance 7271 to expand and
strengthen the Local Small Business Opportunity Program. The
current ordinance is insufficient for a city the size of Augusta
Georgia.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 2
Local Small Business
Opportunity Program
Ordinance Revision
(Ordinance 7271)
Item # 2
Attachment number 1 \nPage 1
Three Reasons the Ordinance Needs to be
Revised:
1. Geographic & size expansion needed.
2. Lacks appropriate protests, appeals, and remedies
section. (Issue discussed 9/18/18 Commission
Meeting with previous compliance director
& Comm. Hasan, per that conversation issue
had been identified 1.5 years ago= appx
March 2017)
3. Lacks contract compliance process.
Item # 2
Attachment number 1 \nPage 2
Geographic & size expansion needed
§ Current Geographic and Size Limits are too restrictive.
§ Current Geographic Limit: Augusta, Richmond County
§ Suggested Geographic Limit: Richmond County, Columbia County, Aiken
County, and Burke County
§ Current Size Limit: 1.5 million in annual receipts, $750,000 personal net
worth
§ Suggested Size Limit: adopt federal Small Business Administration size
guidelines CFR 13 Part 121 (attached in your packets), personal net
worth will remain $750,000
Item # 2
Attachment number 1 \nPage 3
Augusta’s LSBOP Top NAICS codes
1. 561730- Landscaping (14 certified businesses)- Size Standard per
SBA: $8million- Augusta, appx. 8 times less=(pg.25)
2. 237310- Highway, Street, Bridge Construction (8 certified
businesses) Size Standard per SBA: $39.5million- Augusta, appx.
39 times less=(pg.13)
3. 238990- Other Specialty Trades (8 certified businesses) Size Standard
per SBA: $16.5million-Augusta, appx. 16 times less=(pg.14)
Item # 2
Attachment number 1 \nPage 4
Other Jurisdictions Size Limits
Atlanta Savannah
Follows SBA Size Standards Limits Small Business program
to 3 categories: Construction
Memphis (2nd largest city Services ($5 million); Contract
in Tennessee) Services ($1 million); and
Professional Services
Follows SBA Size Standards ($500,000). Can’t exceed 25
employees
Item # 2
Attachment number 1 \nPage 5
Lacks appropriate protests, appeals, and
remedies section
Ordinance defines expected behavior, but only provides
a process to follow when local small businesses are
denied registration. A process is needed for the other
(3) major areas where possible compliance violations
may occur (1. Responsive or Non-responsive bidder pre-
award; 2. Contract Compliance post-award; and 3.
Prompt payment provision for subcontractors to protest
untimely payments).
Item # 2
Attachment number 1 \nPage 6
Lacks a Responsive/Non-Responsive Bidder Pre Award Compliance/Post Award
Contract Compliance Process and Prompt Payment Provision process
Not having a formal contract compliance monitoring section
that clearly defines administrative remedies and procedures in
the LSBOP Ordinance leaves only breach of contract as a
remedy=no enforcement power!
Item # 2
Attachment number 1 \nPage 7
Expansion will Hurt Small Businesses
Not True!
1. Expanding the LSBOP will create opportunities to set goals on projects that we
could not set goals on before.
2. Having larger and diverse companies in the program will allow for mentoring
opportunities for smaller/less developed companies.
3. Capacity building/matching with unskilled labor and companies can take place
to grow the workforce and small businesses.
4. Expanding the LSBOP will aid Augusta Georgia’s major user departments to
have ready, willing, and able subcontractors for their projects (specifically
Engineering, Central Services , and Utilities).
Item # 2
Attachment number 1 \nPage 8
Attachment number 1 \nPage 9
Item # 2
Attachment number 2 \nPage 1
Item # 2
Attachment number 2 \nPage 2
Item # 2
Attachment number 2 \nPage 3
Item # 2
Attachment number 2 \nPage 4
Item # 2
Attachment number 2 \nPage 5
Item # 2
Attachment number 2 \nPage 6
Item # 2
Attachment number 2 \nPage 7
Item # 2
Attachment number 2 \nPage 8
Item # 2
Attachment number 2 \nPage 9
Item # 2
Attachment number 2 \nPage 10
Item # 2
Attachment number 3 \nPage 1
Item # 2
Attachment number 3 \nPage 2
Item # 2
Attachment number 3 \nPage 3
Item # 2
Attachment number 3 \nPage 4
Item # 2
Attachment number 3 \nPage 5
Item # 2
Attachment number 3 \nPage 6
Item # 2
Attachment number 3 \nPage 7
Item # 2
Attachment number 3 \nPage 8
Item # 2
Attachment number 3 \nPage 9
Item # 2
Attachment number 3 \nPage 10
Item # 2
Attachment number 3 \nPage 11
Item # 2
Attachment number 3 \nPage 12
Item # 2
Attachment number 3 \nPage 13
Item # 2
Attachment number 3 \nPage 14
Item # 2
Attachment number 3 \nPage 15
Item # 2
Attachment number 3 \nPage 16
Item # 2
Attachment number 3 \nPage 17
Item # 2
Attachment number 3 \nPage 18
Item # 2
Administrative Services Committee Meeting
12/10/2019 1:20 PM
HCD_ Request to Approve HCD’s FY 2020 Contract Procedural Process
Department: HCD
Presenter:
Caption: Motion to approve Housing and Community Development
Department’s (HCD's) contract procedural process (as presented
for calendar year 2020).
Background: Each year the Augusta, Georgia receives Community
Development Block Grant (CDBG), Emergency Solutions Grant
(ESG), HOME Investment Partnerships (HOME) and Housing
Opportunities for Persons with AIDS (HOPWA) funds from the
U.S. Department of Housing & Urban Development
(HUD). These funds are used to fund agencies and projects to
assist low-income persons and revitalize low-income
neighborhoods. The Housing and Community Development
(HCD) Department annually solicits for proposals from agencies
and develops CDBG, ESG, HOME and HOPWA budgets which
are incorporated into the City’s Annual Action Plan. To carry
out these projects, HUD requires the City to have agreements
with the agencies carrying out the activities described in the
Annual Action Plan. Furthermore, there are a couple HUD
forms /Banking Documents that only require a single authorized
official signature. These documents, specifically a) Forms HUD-
7082, and b) HUD-40093 shall be authorized for execution by
the Mayor (as Augusta, GA’s HUD Certified Official). To
facilitate the execution of agreements/contract process, we
propose the utilization of our attached Agreement/Contract
procedural process (see attached).
Analysis: The submitted procedural process provides fluency and keeps
the Augusta, GA Commission engaged of Housing and
Community Development’s (HCDs) progress and projects.
Financial Impact: The City receives funding from the US Housing and Urban Cover Memo
Development Department on an annual basis. Last year's HUD
agreements granted the City the use of CDBG funds in the Item # 3
amount of $1,773,043, HOME Investment Partnership funds in
the amount of $992,568, Emergency Solutions Grant funds in
the amount of $148,479, and Housing Opportunities for Persons
with AIDS funds in the amount of $1,059,712.
Alternatives: Do not approve HCD's agreement/contract procedural process
ask.
Recommendation: Motion to approve Housing and Community Development
Department’s (HCD's) contract procedural process (as presented
for calendar year 2020).
Funds are Housing and Urban Development (HUD) Funds: - Community
Available in the Development Block Grant (CDBG), Emergency Solutions Grant
Following (ESG), HOME Investment Partnership Grant (HOME) and,
Accounts: Housing Opportunities for Persons with AIDS (HOPWA) funds.
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1 \nPage 1
Housing and Community Development Department
Hawthorne E. Welcher, Jr. Shauntia Lewis
Director Deputy Director
HOUSING AND COMMUNITY DEVELOPMENT (HCD) CONTRACT
PROCEDURAL PROCESS
Recommended Motion:
Motion to approve Housing and Community Development Department’s (HCDs) contract procedural
process (as presented for calendar year 2020)
1. Annually, Augusta, GA is notified of receipt of a direct allocation of federal funds, Community
Development Block Grant (CDBG), Emergency Solutions Grant (ESG), HOME Investment Partnerships
(HOME) and Housing Opportunities for Persons with AIDS (HOPWA), from the U.S. Department of
Housing and Urban Development (HUD).
a. Augusta, GA (through HCD via Commission approval) also applies for HUD funding on behalf of local
nonprofit community partners under the Continuum of Care competitive grant process. These funds are used
to provide services to local citizens experiencing homelessness.
2. Housing and Community Development (HCD) holds an annual HUD Application Workshop.
3. HCD solicits applications from agencies, reviews these applications and recommends eligible agencies for
funding that are in accordance with the Consolidated Plan’s Goals and Priorities. These recommendations
are then incorporated into CDBG, ESG, HOME and HOPWA budgets; and constitutes Augusta GA’s Annual
Action Plan.
4. HCD engages local citizens through our HUD-approved Citizen Participation process to present the Annual
Action Plan for a 30-Day Public Comment Period.
5. HCD presents to the Augusta, GA Commission (Committee-Commission cycle) the Annual Action Plan for
review, approval/denial and requests that the Mayor be granted the authority to execute documents required
for submission as Augusta, GA’s Certifying Official (Federal statutory submission deadline: November 15th).
6. HUD notifies Augusta, GA that the submitted Annual Action Plan is approved.
a. For Fiscal Year 2019, the Action Plan contains thirty-two (32) projects. To carry out these projects, HUD
requires Augusta, GA to have agreements with each agency carrying out the activities described in the
Annual Action Plan (see Step 8-9).
7. City of Augusta receives Annual Grant Agreements from HUD for review and execution by Law Department,
and Mayor as Augusta, GA’s HUD Certifying Official.
Housing and Community Development
510 Fenwick Street - Augusta, GA 30901
(706) 821-1797 – Fax (706) 821-1784 www.augustaga.gov
Item # 3
Attachment number 1 \nPage 2
HCD_ Contract Procedural Approval Process Page 2
8. Upon Augusta, GA Commission approval, the sub-recipient non-profit partners move to execute their
Agreements; the Agreements are signed by the HCD Director, and then submitted to Law Department for
review and approval as to form; the Agreements are then forwarded to the Administrator and Mayor for
execution on behalf of Augusta, GA.
9. Sub-recipient non-profit partners move to carry out the activities described in their agreement and report
performance to HCD on an on-going basis, and are monitored for compliance periodically throughout the
Program Year.
10. HCD compiles the Consolidated Annual Performance and Evaluation Report (CAPER) of all outcomes /
results and financial expenditures of activities carried out under that Program Year’s Annual Action Plan.
The CAPER is then presented to the Augusta, GA Commission for review and HCD requests permission to
submit to HUD after a 15-Day Public Notification Period (March 15 Federal statutory submission deadline).
Recommended Motion:
Motion to approve Housing and Community Development Department’s (HCDs) contract
procedural process (as presented for calendar year 2020)
Item # 3
HCD CONTRACT PROCEDURAL PROCESS FLOW CHART
1. Augusta, GA notified 8. HCD moves to enter 8 (b). All other Annual
of Federal Awards into Agreement with Action Plan activities
under CDBG, ESG, Public Service / ESG performed by area non-
HOME, HOPWA and non-profit partners profits reviewed and
applies under CoC with identified in Annual approved by
HUD Action Plan Committee/Commission
Cycle
11(c). HCD submits
7. Augusta, GA recieves annual CAPER to HUD
2. HCD hosts Annual Grant Agreements from
Application Workshop HUD - reviewed / 9. HCD executes
executed by Legal, subrecipient
Mayor Agreements with
approved area non- 11 (b). HCD submits
profits and forwards to CAPER to Committee /
3. HCD solicits Legal, Mayor, Commission Approval
applications for funding 6. HCD submits Annual Adminstrator for cycle prior to
from local non-profit Action Plan to HUD / Review and Execution submission (including
partners HUD notifies Augusta, 15-Day Comment
GA of Annual Action Period)
Plan Approval
10. Fully executed
Agreements returned
4. HCD engages local to HCD and Non-profit
citizens through HUD- 11 (a). HCD compiles
5. HCD presents Annual partners carry out
approved Citizen annual CAPER
Action Plan to activities described in
Participation Process Committee/Commission Annual Action Plan
including 30-Day Submission Approval
Comment Period Process
10 (b). Non-profits 10(c). HCD monitors
report results and sub-recipient non-profit
expenditures to HCD performance
Item # 3
*See Procedural Process Memorandum for detailed explanation of steps *Green boxes denote ARC Commission Action 26 Nov. 2019
Administrative Services Committee Meeting
12/10/2019 1:20 PM
HCD_ Request to Approve HCD’s LW/B 2020 Contract Approval Process
Department: HCD
Presenter: Hawthorne Welcher Jr. and/or HCD Staff
Caption: Motion to approve HCD's Laney Walker/Bethlehem
Revitalization Project contract procedural process (as presented
for calendar year 2020).
Background: In 2008, the Augusta Commission passed legislation supporting
community development in Laney Walker/Bethlehem. Since that
time, the Augusta Housing & Community Development
Department has developed a master plan and development
guidelines for the area, set up financial incentive programs for
developers and homebuyers, selected a team of development
partners to focus on catalytic change, and created a marketing
strategy to promote the overall effort. To date, HCD (via
partnership) continues impactful community developmental
activities in seven (7) developmental nodes with continued focus
on a Community Economic Development strategy centered
around housing, commercial, retail, job creation, and a
wraparound supportive service network. To facilitate the
execution of our agreements/contract process, we propose the
utilization of our attached Agreement/Contract procedural
process (see attached).
Analysis: The submitted procedural process provides fluency and keeps
the Augusta, GA Commission engaged of Housing and
Community Development’s (HCDs) progress and projects.
Approval of the proposed procedural process will enable
continued redevelopment within the Laney Walker/Bethlehem
neighborhoods.
Financial Impact: Not Applicable
Alternatives: Do not approve HCD’s LW/B Agreement/Contract procedural
Cover Memo
process ask. Item # 4
Recommendation: Motion to approve HCD's Laney Walker/Bethlehem
Revitalization Project contract procedural process (as presented
for calendar year 2020).
Funds are
Available in the Laney Walker/Bethlehem Project Funding. - BOND Fund
Following 298000000
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1 \nPage 1
Housing and Community Development Department
Hawthorne E. Welcher, Jr. Shauntia Lewis
Director Deputy Director
LANEY WALKER/BETHLEHEM
CONTRACT PROCEDURAL PROCESS
Recommended Motion:
Motion to approve the Laney Walker/Bethlehem Revitalization Project contract procedural process (as
presented for calendar year 2020)
1. Laney Walker/Bethlehem Revitalization Bond Issuance Commenced
a. First Bond Issuance ($8M)_2010 (approved by Augusta, GA Commission/URA)
b. Second Bond Issuance ($2M)_2015 (approved by Augusta, GA Commission/URA)
c. Bond funds are expended to a)facilitate commercial and residential development, b)maintenance and
marketing incentives, c)construction & construction related activities, d)other
2. HCD presented to the Augusta, GA Commission (Committee-Commission cycle), the Laney
Walker/Bethlehem Redevelopment Plan for review, approval/denial
a. Approved by Augusta, GA Commission_2009
3. HCD engaged local citizens through a Citizen Participation process to present and provide annual updates to
the Laney Walker/Bethlehem Redevelopment Plan (continued annually)
4. HCD submitted RFQ/RFP/ITB solicitation (via the Augusta, GA Procurement Office) to procure a certifiable
service (development, construction, A&E, marketing, real estate services, property management, etc.) within
the LW/B Area. If RESIDENTIAL, HCD (through partnerships) strategically implements Community
Economic Development developmental activities in accordance with the Laney Walker/Bethlehem
Redevelopment
Plan
a. HCD/Procured Developer identify potential projects, funding and set budgets
b. Procured Developer submit bids for specified projects of interest (via defined project task order)
c. Lowest/Best Bid is reviewed/vetted appropriately (internally)
d. If Augusta, GA Commission approved, HCD moves forward with entering into a contract agreement for
residential development/construction
5. If COMMERCIAL/RETAIL, HCD (through partnerships) strategically implements Community Economic
Development commercial/retail/small business activities in accordance with the Laney Walker/Bethlehem
Redevelopment Plan,
a. HCD/Procured Developer/Real Estate Brokerage Services Company identify potential project(s)
b. Potential Project is reviewed/vetted appropriately (internally)
Housing and Community Development
510 Fenwick St - Augusta, GA 30901
(706) 821-1797 – Fax (706) 821-1784 www.augustaga.gov
Item # 4
Attachment number 1 \nPage 2
LW/B_ Contract Procedural Approval Process Page 2
i. HCD invites procured developers to bid on specified project (via defined project task order), or
ii. HCD begins negotiations (sole source) with procured developer that has project concept expertise
e. HCD moves forward with the lowest/best bid/sole sourced developer and enters into a contract agreement
for commercial/retail/small business development
7. If OTHER, HCD strategically implements RFQs/RFPs/ITBs (via Augusta, GA Procurement Department) in
accordance with the Laney Walker/Bethlehem Redevelopment Plan
a. If respective RFQ/RFP/ITB is Augusta, GA Commission approved, HCD moves forward with proper
execution of the contract agreement, led by the RFQs/RFPs/ITBs Scope of Service
b. Other: A&E, Marketing Services, Real Estate Brokerage Services, Property Management, etc.
8. Once the LW/B Procured Developer/Partner has executed their Agreement, the Agreement is returned/signed
by HCD Director, then submitted to Law Department for review and approval as to form; then forwarded to
the Administrator and Mayor for execution on behalf of Augusta, GA
9. The fully executed agreement is then returned to HCD and a copy is provided to the procured
developer/partner
10. The procured developer/partner will schedule a NTP and pre-development meeting with HCD before
beginning
11. Procured Developer/Partner moves to carry out the activities described in their agreement, reports
performance to HCD on an on-going basis, and is monitored for compliance periodically throughout the
project.
Recommendation Motion:
Motion to approve the Laney Walker/Bethlehem Revitalization Project contract procedural process (as
presented for calendar year 2020)
Item # 4
HCD LW/B CONTRACT PROCEDURAL PROCESS FLOW CHART
6(a). HCD moves to 7. If other, HCD
procure developers for strategically
approved projects implements
through bidding on RFQs/RFPs/ITBs
defined task orders or through procurement in
sol source negotiation, accordance with LW/B
1. Augusta, GA LW/B Redevelopment Plan
as appropriate
Revitialization Bond
Issuance Commenced
8. HCD executes
6. If Commercial / Agreements with
Retail, potential project approved Procured
2. HCD presented presented to
Commission LW/B Developer/Partner 11. Procured
Commission for Developer / Partner
Redevelopment Plan - review/approval/denial
Approved by moves to carry out the
Commission in 2009 activities described in
Agreement, reports
8(b). HCD forwards
performance to HCD
executed
5. If Residential, (on-going) and is
Developer/Partner
3. HCD engage local Lowest/Best Bid monitored for
Agreement to Legal,
constituents through submitted to compliance periodically
Mayor and
Citizen Participation Commission for Adminstrator for throughout the project.
process review/approval/denial review/execution
10. Procured Developer
4(b). HCD presents / Partner schedules NTP
4. HCD submitted successful RGQ/RFP/ITB 9. Fully executed and predevelopment
RFQ/FRP/ITB solicitation solicitations to Agreement returned to meeting with HCD
through Procurement Commission for HCD before beginning
review/approval/denial project
Item # 4
*See LW/B Procedural Process Memorandum for detailed explanation of steps *Green boxes denote ARC Commission Action 26 Nov. 2019
Administrative Services Committee Meeting
12/10/2019 1:20 PM
401 Walton Way
Department:
Presenter: Commissioner Marion Williams
Caption: Discuss the usage of the former JLEC, 401 Walton Way
building. (Requested by Commissioner Marion Williams)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 5
Administrative Services Committee Meeting
12/10/2019 1:20 PM
Minutes
Department:
Presenter:
Caption: Motion to approve the minutes of the Administrative Services
Committee held on November 12, 2019.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 6
Attachment number 1 \nPage 1
-fr
.t
Administrative Services Committee Meeting Commission Chamber - lllT2l20l9
ATTENDANCE:
Present: Hons. Sias, Chairman; Clarke, Vice Chairman; Davis and B.
Williams, members.
Absent: Hon. Hardie Davis, Jr., Mayor.
ADMINISTRATIVE SERVICES
1. The Engineering Department-Maintenance Division requests the purchase of Item
one new Compact, All-Wheel Steer Loader at a cost of $68,038.50 from Action:
Bobcat of Augusta, GA. Bid Item 19-207 Approved
Motions
f#:'" Motion Text Made By seconded By
Motion
Result
Motion to
Approve approve. Commissioner Commissioner
Passes
Bobby williams John clarke
Motion Passes 4-0.
2. The Utilities Department-Facilities Maintenance Division requests the ltem
purchase of one replacement truck, with a utility service body, at a cost of Action:
$105,764.00 from Nextran Truck Center, Macon, Georgia. Bid Item 19-260 Approved
Motions
Motion Motion Text Made By
Motion
Seconded By
Iype Result
Motion to
Approve approve. Commissioner Commissioner
Passes
Bobby Williams Mary Davis
Motion Passes 4-0.
3. Motion to approve the purchase of Caterpillar model D-8T WFVW GPS Item
Dozer, bid item #19-266, from Yancey Brothers as the compliant bidder with Action:
no exceptions. (No recommendation from Engineering Services Approved
Item # 6
Attachment number 1 \nPage 2
Committee October 29, 2019 - referred from November 5 Commission
meeting)
Motions
ryJ:" Motion rext Made By seconded By ffJil
Motion to delete this
Commissioner
Delete item from the agenda. uommlssloner
John clarke Mary Davis Passes
tvtotion pa;;;r il."-
4. Discuss with CVB and Film Augusta and other film industry experts about Item
401 Walton Way importance to the filming industry. (Requested by Action:
Commissioner Brandon Garrett) Approved
Motions
f#:" Motion rext Made By Seconded By Motion
Result
Motion to refer this item
to the full Commission
Commissioner
with no Commissioner
Defer
recommendation. Mr. Mary Davis
Bobby Passes
Williams
Clarke abstains.
Motion Passes 3-0 -1.
5. Mr. Donald E. D'Antignac regarding employee pension benefits and Item
other issues as stated on the attached AIRF. Action:
None
Motions
Motion rext
Made Seconded Motion
ryJ:"' By By Result
Presentation was made by Mr.
D'Antignac.
6. Motion to give the Administrator permission to approve and sign off on all Item
Homebuyer Assistance Program (DPA, Homebuyer Subsidy, Employee Action:
Incentive, and Next Door program) funding requests from Housing and Approved
Community Development Department. These requests will provide
downpayment assistance, closing cost and gap finance to individuals that
purchases homes in Augusta, Georgia. This will provide residents within
Augusta, Georgia to become apart of the American Dream.
Item # 6
Attachment number 1 \nPage 3
Motions
Motion
Motion rext
f#:" Made By Seconded By
Result
Motion to delete this
commissioner commissioner
Delete item from the agenda, John Passes
Motion passes 4-0.
clarke Mary Davis
7. Motion to authorlze amending the 2018 Community Development Block Item
Grant (CDBG) Agreement between Augusta, Georgia and the Boys and Girls Action:
Club of the CSRA - Heritage Academy site, specifically $3,700 in expenses Approved
from the Training line item to the Personnel line item in the Agreement.
Motions
Motion rext Motion
X:l:"'
rype
Made By Seconded By
Result
Motion to
Approve approve. Commissioner Commissioner
rasses
Mary Davis Bobby Williams
Motion Passes 4-0.
8. Motion to approve Housing and Community Development Department's ltem
(HCD's) request to provide Laney Walker/Bethlehem Revitalization Funding Action:
to contract with J. Lovett Homes & Construction for the reconstruction of Approved
driveway at 1246 Pine Street.
Motions
f#:" Motion Text Made By seconded By
Motion
Result
Motion to
Approve approve. Commissioner Commissioner
Passes
Mary Davis Bobby williams
Motion Passes 4-0.
9. Motion to approve Housing and Community Development Department's Item
(HCD's) request to provide contract with Antioch Ministries to construct three Action:
(3) affordable, residential units on Perry Avenue (within Laney Walker Approved
Bethlehem) Warrick Dunn $fD) Communities.
Motions
Motion
f#:" Motion rext Made By Seconded By
Result
Approve Passes
Item # 6
Attachment number 1 \nPage 4
Motion to Commissioner Commissioner
approve. Mary Davis Bobby Williams
Motion Passes 4-0.
10. Motion to approve the minutes of the Administrative Services Committee Item
held on October 29,2019. Action:
Approved
Motions
f#:" Motion Text Made By seconded By Hiii
Motion to
commissioner commissioner
Approve approve. .-;;::.;^^^-'
MutY Davis ;:;:;,;;,,;*^
Passes
Bobby williams
Motion passes 4-0.
www.ausustasa.sov
Item # 6
Administrative Services Committee Meeting
12/10/2019 1:20 PM
Protest for RFP 19-273 - 401 Walton Way Demolition
Department: Procurement
Presenter: Geri Sams
Caption: Protest Discussion – A request by William J. Keogh, III,
attorney with Hull Barrett representing Jackson Demolition to
protest the decision of deeming their Request for Proposal as
Non-Compliant in reference to RFP 19-273 401 Walton Way
Demolition Augusta Central Services Department.
Background: On Thursday, September 12, 2019, 3:00 p.m., the Procurement
Department opened all RFPs received on RFP 19-273. The
department received seven (7) responses. Five (5) of the
responses were received as compliant. Two (2) vendors
submitted packages, which were deemed as non-compliant for
not including the correct number of copies. Each vendor was
required to submit one (1) original and seven (7) copies of their
proposal. Due to the lack of the required number of copies being
submitted the vendor was deemed as non-compliant. After
review of the RFP process and review of the specifications, RFP
19-273 clearly state on the cover page, page 10, page 14 and
page 16 that vendors were required to submit an original and
seven copies. A mandatory pre-proposal conference was also
held on Friday, August 16, 2019 where this requirement was
reiterated by the Procurement Department’s representative
during the pre-proposal conference.
Analysis: The RFP documents were reviewed by the Procurement
Department for completeness. The RFP package received from
Jackson Demolition was reviewed and deemed as non-compliant
because they did not submit the correct number of copies as
required.
Financial Impact: None
Cover Memo
Alternatives: Waiver his non-compliant status as a technicality and acceptItem
the # 7
RFP to be included in the evaluation process.
Recommendation: Deem the RFP submittal from Jackson Demolition as non-
compliant and resume the RFP process for the five (5) submittals
that were considered compliant for evaluation and
recommendation of award to the Commission.
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 7
Attachment number 1 \nPage 1
Item # 7
Attachment number 1 \nPage 2
Item # 7
Attachment number 1 \nPage 3
Item # 7
Attachment number 1 \nPage 4
Item # 7
Attachment number 2 \nPage 1
Item # 7
Attachment number 2 \nPage 2
Item # 7
Attachment number 2 \nPage 3
Item # 7
Attachment number 2 \nPage 4
Item # 7
Attachment number 2 \nPage 5
Item # 7
Administrative Services Committee Meeting
12/10/2019 1:20 PM
Request to deny the protest from Flint Equipment Co.
Department: Procurement
Presenter: Geri A. Sams
Caption: Protest Discussion – A request by Flint Equipment Co. (Chuck
Atkins) to protest the decision of the Environmental Services
recommendation of the award of Bid Item 19-226 Waste
Handler Dozer to Yancey Brothers.
Background: On Thursday, May 17, 2019 11:00 a.m., the Procurement
Department opened all bids received on Bid 19-226. The
department received two (2) responses and one (1) no bid
response. The two (2) responses were received as compliant
bids. Flint Equipment Company took twelve (12) exceptions to
the dozer bid specifications. The Procurement Department
received a protest letter from Flint Equipment on October 25,
2019 protesting the award recommendation. Procurement
denied the protest on November 7, 2019. An appeal request was
received by Flint on November 11, 2019.
Analysis: The bid documents were reviewed by the Procurement
Department for completeness. The responsive bid packages
received was sent to the Environmental Services for review and
recommendation of award. After review, the Environmental
Services made a recommendation that the award be to Yancey
Brothers.
Financial Impact: None
Alternatives: None
Recommendation: Deny the bid protest and move forward with the department
recommendation of award of Bid Item 19-226 Waste Handler
Dozer to Yancey Bros. Cover Memo
Item # 8
Funds are
Available in the
Following
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 8
Attachment number 1 \nPage 1
Item # 8
Attachment number 1 \nPage 2
Item # 8
Attachment number 1 \nPage 3
Item # 8
Attachment number 2 \nPage 1
Item # 8
Attachment number 2 \nPage 2
Item # 8
Attachment number 2 \nPage 3
Item # 8
Attachment number 2 \nPage 4
Item # 8
Attachment number 2 \nPage 5
Item # 8
Attachment number 2 \nPage 6
Item # 8
Attachment number 2 \nPage 7
Item # 8
Attachment number 2 \nPage 8
Item # 8
Attachment number 2 \nPage 9
Item # 8
Attachment number 2 \nPage 10
Item # 8
Attachment number 2 \nPage 11
Item # 8
Attachment number 2 \nPage 12
Item # 8
Attachment number 2 \nPage 13
Item # 8
Attachment number 2 \nPage 14
Item # 8
Attachment number 2 \nPage 15
Item # 8
Attachment number 2 \nPage 16
Item # 8
Attachment number 2 \nPage 17
Item # 8
Attachment number 3 \nPage 1
Item # 8
Attachment number 3 \nPage 2
Item # 8
Attachment number 3 \nPage 3
Item # 8
Attachment number 3 \nPage 4
Item # 8
Attachment number 3 \nPage 5
Item # 8
Attachment number 3 \nPage 6
Item # 8
Attachment number 3 \nPage 7
Item # 8
Attachment number 3 \nPage 8
Item # 8
Attachment number 3 \nPage 9
Item # 8
Attachment number 3 \nPage 10
Item # 8
Attachment number 3 \nPage 11
Item # 8
Attachment number 3 \nPage 12
Item # 8
Attachment number 3 \nPage 13
Item # 8
Attachment number 3 \nPage 14
Item # 8
Attachment number 3 \nPage 15
Item # 8
Attachment number 4 \nPage 1
Item # 8
Attachment number 4 \nPage 2
Item # 8
Attachment number 4 \nPage 3
Item # 8
Attachment number 4 \nPage 4
Item # 8
Get email alerts for Augusta
A daily email when new agendas and minutes are posted.