Engineering Services Committee Meeting
Regular MeetingAugusta, GA · March 8, 2010
Agenda
Engineering Services Committee Meeting Commission Chamber- 3/8/2010- 1:00 PM
ENGINEERING SERVICES
1. Motion to authorize condemnation to acquire fee simple purchase of 17,424 Attachments
sq. ft., 1,550 sq. ft. of permanent easement and 1,550 sq. ft. of temporary
easement of 2921 Willis Foreman Road - PIN: 164-0-003-05-0; and 5,987
sq. ft. of permanent easement of 2931 Willis Foreman Road - PIN: 164-0-
003-04-0.
2. Discussion of Solid Waste Collection Services for 2011. Attachments
3. Approve Capital Project Budget Change Number Three (324-041110- Attachments
201824110) and Supplemental Agreement Three with URS Corporation in
the amount of $65,000.00 to provide Georgia Department of Transportation
coordination for project letting for the Broad Street portion of the
downtown traffic signal and streetlight upgrade project. Funds are available
in the project contingency account for the Engineering Department.
4. Motion to approve an Option for the purposes of acquiring a Right-of-Way Attachments
between Lola L. Clark, as owner, and Augusta, Georgia, as optionee, in
connection with the Marvin Griffin Road Improvement Project, (1,951 sq.
ft.) in fee and (N/A sq. ft.) of permanent easement, more or less; and (1,972
sq. ft.) of temporary construction easement from property located at 1611
Marvin Griffin Road, private, at the purchase price of $1,500.00.
5. Approve CPB and award of Construction Contract to Blair Construction, Attachments
Inc. in the amount of $169,846.38 for the Paving Various Roads, Phase IX
– Contract 2, Lamar Road Project, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding is available in the project
account.
6. Consider a request from the Augusta Entertainment Complex to temporarily Attachments
rename Seventh Street in front of the James Brown Arena for ceremonial
purposes only as Ringling Way on March 18, 2010 with consideration for
an in-kind trade for the cost of producing the sign.
www.augustaga.gov
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Condemnation – Fort Gordon Gate 4 Water Main
Department: Engineering Services
Caption: Motion to authorize condemnation to acquire fee simple purchase of 17,424
sq. ft., 1,550 sq. ft. of permanent easement and 1,550 sq. ft. of temporary
easement of 2921 Willis Foreman Road - PIN: 164-0-003-05-0; and 5,987
sq. ft. of permanent easement of 2931 Willis Foreman Road - PIN: 164-0-
003-04-0.
Background: The City has been unable to ascertain clear title to these properties. In order
to proceed and avoid further delays, it is necessary to condemn the subject
property and purchase the real properties. The appraised value for the
properties is 5,550.00.
Analysis: Condemnation is necessary in order to acquire the required property.
Financial Impact: The necessary costs will be covered under the project budget.
Alternatives: Deny condemnation.
Recommendation: Approve condemnation.
Funds are Available in
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNT:_______
the Following
G/L 507043410-5212115 J/L 88880068-522115
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1
Page 1 of 1
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Discussion of Solid Waste Collection Services Contract for 2011
Department: Solid Waste
Caption: Discussion of Solid Waste Collection Services for 2011.
Background: The Augusta Solid Waste Collection Contract expires at the end of
2010. The contract has been in place since 2005 and provides for trash
collection services for the majority of Richmond County. The current
service level includes twice per week trash service and once per week
recycling, yard waste, and bulky item pickup. The service includes one 96-
gallon trash cart and one recycle cart
Analysis: Moving forward toward the close of the current collection contract, by early
2010 discussions on certain key points need to be held. These include but
are not limited to the level of service, pay as you throw, service areas, and
the fee system. Addressing the items above and having these discussions
now will allow the solid waste department and the commission the time
necessary to carefully consider each decision and the impact to the
residents/customers.
Financial Impact: none.
Alternatives: 1. Discuss the services and move forward with the process. 2. Table the
discussion and push the process at a later time.
Recommendation: alternative 1.
Funds are Available in
the Following discussion only. no funds needed.
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Solid Waste Disposal Contract
Decisions For 2011
Issue(s)
• Service levels exceed the needs of most
citizens in the area.
• Service levels do not support an effective
recycling/backyard composting program.
• Does not offer flexibility to small use
customers.
3/4/2010 2
Service Levels
Current Service Level Proposed Service
• Twice weekly garbage • Once per week garbage
• Once per week recycling • Once per week recycling
• Once per week yard waste • Once per week yard waste
• Once per week bulk waste (refined limits)
• Call in bulk waste (refined
limits)
3/4/2010 3
Refined Limits Recommendation
Yard Waste Bulk Waste
• Eliminate large piles from • Bulk waste would become a call
collection. in service.
• Consider limiting bulk waste to
• Citizen must bag or one call in per month, per parcel.
containerize all material for • Tires – eliminate tires from the
collection. collection program, and offer a
• We would establish a limit tire recycling program at the
landfill.
on bags and containers.
• Internalize the bulk waste
• Consider a cart system for collections.
yard waste.
3/4/2010 4
Issue(s)
• Customers have a variety of trash volume
needs where one standard program will not
fit every household.
• No incentive for customers to
recycle/backyard compost.
• No financial incentive to use less service.
3/4/2010 5
Pay as you throw
Garbage Yard Waste
• Offer a 35 gallon cart for a • All yard waste must be in kraft
discount. bags, or containerized, eliminating
• Offer additional 95 gallon cart(s) bulk yard waste collections.
for a premium. • Offer a reduced cost, backyard
composter program.
3/4/2010 6
Issue(s)
• Since consolidation, we have not offered
services to all citizens.
• In the last contract, we added some service
areas. We intended to go to the Hephzibah
and Blythe City Limits but did not get the
boundaries correct.
3/4/2010 7
Service Area Options
• Leave the service area the same.
• Include all areas up to the Hephzibah and Blythe city
limits.
• Include the entire county, excluding Hephzibah and
Blythe.
• Include the entire county.
• Recommend servicing all areas up to Hephzibah and
Blythe and make our services available to Hephzibah and
Blythe if they want to participate.
3/4/2010 8
Contractor Areas
Current Contractor Areas Options for Contractor Areas
• There are 3 contractor areas. • Have 2 or 3 contractor
• These areas are fragmented areas.
areas that intermingle with • Make all contractor areas
each other. contiguous, separated by a
major roadway, body of
water or other natural
divide.
3/4/2010 9
Fees
Issue Recommendation
• Augusta is inconsistent in • Charge all customers in the
how it charges for solid same manner.
waste services. • Charge vacant lots, vacant
• ¼ of our customers are houses, and unimproved
charged millage plus fees, property, a reduced fee.
and ¾ of our customers are • Any request for refunds
charged all fees. must be made by December
31st of each year.
3/4/2010 10
Residential Exemptions
Current Exemptions Proposed
• When both water and power • Power bill/usage is below a
are disconnected. determined monthly amount
• Home is in excess of 300 to allow for home sales,
feet from the right of way. security and renovation.
• Home is in excess of 300
feet from the right of way.
3/4/2010 11
CNG
Concept Benefits of CNG
• The landfill can produce • CNG vehicles produce up to 29% less
Compressed Natural Gas (CNG) greenhouse gas emissions than
to fuel trash trucks and other comparable gasoline vehicles and up
to 22% less than comparable diesel
assets.
vehicles.
• The landfill would charge the • About 98% of the natural gas we use
collection contractors at a comes from right here in North
predetermined contract rate. America. Conversely, 70% of the oil
• Contractor would supply trucks we use is imported.
that could run on CNG for
contract period.
3/4/2010 12
CNG
Contract Recommendations
• Extend the contract term to
a period that matches the
useful life of the CNG
vehicles.
3/4/2010 13
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Downtown Traffic Signal and Streetlight Upgrade - A
Department: Abie L. Ladson, PE, CPESC, Director, Engineering Department
Caption: Approve Capital Project Budget Change Number Three (324-041110-
201824110) and Supplemental Agreement Three with URS Corporation in
the amount of $65,000.00 to provide Georgia Department of Transportation
coordination for project letting for the Broad Street portion of the downtown
traffic signal and streetlight upgrade project. Funds are available in the
project contingency account for the Engineering Department.
Background: This was originally a SPLOST IV project to upgrade the traffic signals and
streetlights along Broad Street. In recent months, this project has been
approved to receive $2.9 million in funds from the American Recovery and
Reinvestment Act (ARRA) (a.k.a., “Stimulus”), which triggered additional
environmental, design, reporting, and inspection criteria.
Analysis: These funds are being requested to supplement the URS contract to cover
utility coordination, design revisions, as well as to provide coordination with
GDOT and the contractor during construction.
Financial Impact: URS has proposed a total cost of $65,000.00 and funds are available in the
project contingency account to be transferred to the project engineering
account.
Alternatives: 1. Approve Capital Project Budget Change Number Three (324-041110-
201824110) and Supplemental Agreement Three with URS Corporation in
the amount of $65,000.00 to provide Georgia Department of Transportation
coordination for project letting for the Broad Street portion of the downtown
traffic signal and streetlight upgrade project. Funds are available in the
project contingency account for the Engineering Department. 2. Do not
approve the request.
Recommendation: Approve Alternative Number One.
Funds are Available in
FUNDS ARE AVAILABLE IN THE FOLLOWING ACCOUNTS: 324-
the Following
041110-6011110/201824110-6011110
Accounts:
Cover Memo
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1
Page 1 of 2
Augusta-Richmond County, Georgia CPB# 324-041110-201824110
Please do not process this document.
Once approved by the Commission the
original will be sent to the Clerk of CAPITAL PROJECT BUDGET
Commission for execution. For
DOWNTOWN
information reference this request
TRAFFIC SIGNAL & STREET LIGHT UPGRADE (A)
contact engineering at ext 5070. CHANGE NUMBER THREE
Thanks
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby adopted:
Section 1: The project is authorized to CPB# 324-041110-201824110/SA#3. This project is necessary to
address additional Engineering Services to supplement the URS contract to cover utility
coordination with GDOT and the contractor during said construction. Funding will
come from Downtown Traffic Signal & Street Light Upgrade (A) SPLOST Ph. IV Contingency
Account Project Funds in the amount of $65,000.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase IV $ 300,000
Special 1% Sales Tax, Phase IV $ 2,023,000
$ 2,323,000
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies $ 2,323,000 2nd $ 2,323,000
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Deke Copenhaver , Mayor
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
1 of 2 2.19.09
Attachment number 1
Page 2 of 2
Augusta-Richmond County, Georgia CPB# 324-041110-201824110
Please do not process this document.
Once approved by the Commission the
original will be sent to the Clerk of CAPITAL PROJECT BUDGET
Commission for execution. For
DOWNTOWN
information reference this request
TRAFFIC SIGNAL & STREET LIGHT UPGRADE (A)
contact engineering at ext 5070. CHANGE NUMBER THREE
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE IV
324-04-1110-6011110-201824110 $2,323,000 $0 $2,323,000
TOTAL SOURCES: $2,323,000 $0 $2,323,000
USE OF FUNDS
ENGINEERING
324-04-1110-5212115-201824110 $898,003 $65,000 $963,003
CONTINGENCY
324-041110-6011110-201824110 $1,422,997 ($65,000) $1,357,997
ADVERTISMENT
324-041110-5233119-201824110 $2,000 $0 $2,000
TOTAL USES: $2,323,000 $0 $2,323,000
2 of 2 2.19.09
Attachment number 2
Page 1 of 1
AUGUSTA-RICHMOND COUNTY
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Please do not process this document. Once approved by the
Commission the original will be sent to the Clerk of Commission Project No. 324-041110-201824110
for execution. For information reference this request contact SUPPLEMENTAL AGREEMENT NO.3
engineering at ext 5070. Thanks P85641
WHEREAS, We, URS Corporation , entered into a contract with Augusta-Richmond County on “March 18,
2003”, for engineering design services associated with the “Downtown Traffic Signal & Street Light Upgrade A
Project”, Project No. 324-041110-201824110, File Reference No. 10-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not covered by the
scope of the original contract, we desire to submit the following Supplemental Agreement to-wit:
Additional Engineering services are needed to supplement the URS contract to
cover utility coordination, design revisions, as well as to provide coordination
with GDOT and the contractor during said construction.
It is agreed that as a result of the above described modification the contract amount is increased by
$65,000.00 from $717,402.58 to a new total of $782,402.58.
Any modifications to submittal dates shall be as identified in the attached proposal.
This agreement in no way modifies or changes the original contract of which it becomes a part, except as
specifically stated herein.
NOW, THEREFORE, We, URS Corporation, hereby agree to said Supplemental Agreement consisting of the
above mentioned items and prices, and agree that this Supplemental Agreement is hereby made a part of the
original contract to be performed under the specifications thereof, and that the original contract is in full force
and effect, except insofar as it might be modified by this Supplemental Agreement.
This day of , 2010.
RECOMMEND FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Honorable Deke Copenhaver, Mayor
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL]
ATTEST:
Title:
(SA03 – For changes more than $20,000)
Attachment number 3
Page 1 of 2
Attachment number 3
Page 2 of 2
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Option for Right of Way
Department: Law
Caption: Motion to approve an Option for the purposes of acquiring a Right-of-Way
between Lola L. Clark, as owner, and Augusta, Georgia, as optionee, in
connection with the Marvin Griffin Road Improvement Project, (1,951 sq.
ft.) in fee and (N/A sq. ft.) of permanent easement, more or less; and (1,972
sq. ft.) of temporary construction easement from property located at 1611
Marvin Griffin Road, private, at the purchase price of $1,500.00.
Background: The property owner has agreed to convey a certain right-of-way and
easement to Augusta, Georgia, for the Marvin Griffin Road Improvement
Project.
Analysis: The purchase of the referenced property is necessary for the project.
Financial Impact: The costs necessary for this purchase will be covered under the project
budget.
Alternatives: Deny the Motion
Recommendation: Approve the Motion
Funds are Available in
the Following 323041110-5411120 296823215-5411120
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Paving Various Roads, Phase Ix – Contract 2, Lamar Road (09-196)
Department: Abie L. Ladson, PE, CPESC, Director of Engineering
Caption: Approve CPB and award of Construction Contract to Blair Construction,
Inc. in the amount of $169,846.38 for the Paving Various Roads, Phase IX –
Contract 2, Lamar Road Project, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding is available in the project
account.
Background: Lamar Road is one of several dirt roads that have been approved for paving
in Paving Various Roads, Phase IX. This project will consist of improving
limited drainage and paving Lamar Road from the existing dirt roads. The
contract time is 120 calendar days.
Analysis: Bids were received on January 21, 2010 with Blair Construction, Inc., being
the low bidder. The bid results are as follow: CONTRACTORS BID 1. Blair
Construction, Inc. $169,846.38 2. Reeves Construction Company, Inc.
$169,881.00 3. Beam’s Contracting $176,638.20 4. Tran Construction
$177,095.45 5. Mabus Brothers Construction Co., Inc. $185,794.80 6.
TrakSouth Civil Contractors, LLC $219,914.01 It is the Engineering
Department recommendation to award this project to the low bidder, Blair
Construction, Inc. Subject to receipt of signed contract and proper bonds.
Financial Impact: Funds are available in the Paving Various Roads, Phase IX Engineering
Account to be transferred to the construction account.
Alternatives: 1) Approve CPB and award of Construction Contract to Blair Construction,
Inc. in the amount of $169,846.38 for the Paving Various Roads, Phase IX –
Contract 2, Lamar Road Project, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding is available in the project
account 2) Do not approve project.
Recommendation: Approve Alternative Number One.
Funds are Available in
the Following 324-041110-208824001/5414110-208824001
Accounts:
Cover Memo
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Attachment number 1
Page 1 of 2
CPB#324-04-000000000
AUGUSTA-RICHMOND COUNTY, GEORGIA
CAPITAL PROJECT BUDGET
PAVING VARIOUS RDS, PHASE IX
CONTRACT - 2
Please do not process this item ~ once approved by Commission the original will be forwarded to Clerk of Commission for
execution. Questions please call ext 5070.
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby adopted:
Section 1: This project is authorized CPB# 324-04-208824001. This project consist of
improving limited drainage and paving Lamar Road from the existing dirt
roads. Funding for this project is available in the Paving Various Roads
Ph. IX account.
Section 2: The following revenues are available to the Consolidated Government
to complete the project.
Special 1% Sales Tax, Phase IV $ 169,847
Section 3: The following amounts are appropriated for the project:
By Basin By District
Varies $169,847 Varies $169,847
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
______________________________________
Deke Copenhaver, Mayor
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
1 of 2
Attachment number 1
Page 2 of 2
CPB#324-04-000000000
AUGUSTA-RICHMOND COUNTY, GEORGIA
CAPITAL PROJECT BUDGET
PAVING VARIOUS RDS, PHASE IX
CONTRACT - 2
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE IV
324-04-1110-208824001 ($1,000,000) $0 ($1,000,000)
TOTAL SOURCES: ($1,000,000) $0 ($1,000,000)
USE OF FUNDS
ENGINEERING
324-04-1110-5212115-000000000 $340,163 ($169,847) $170,316
RIGHT OF WAY
324-04-1110-5411120-000000000 $500,000 $0 $500,000
ROADS
324-04-1110-5414110-000000000 $0 $169,847 $169,847
Contract - 1 ($159,837) 159837 0 159837
TOTAL USES: $1,000,000 $0 $1,000,000
2 of 2
Attachment number 2
Page 1 of 8
WINDSOR SPRING ROAD EXTENSION
UNIT
ITEM NO. DESCRIPTION UNIT QTY PRICE AMOUNT
150-1000 TRAFFIC CONTROL LS 1
150-XXXX RAILROAD FLAGGER LS 1
CONSTRUCT, MAINTAIN, AND REMOVE
163-2051 BALED STRAW EROSION CHECK LF 100
171-0010 TEMPORARY SILT FENCE (TYPE "A") LF 3030
228-1000 GRADING MODIFIED, INCL. HAUL MI 0.16
230-1000 LUMP SUM CONSTRUCTION LS 1
310-1101 GR AGGR BASE CRS, INCL MATL TN 900
318-3000 AGGREGATE SURFACE COURSE TN 100
ASPH CONC LEVELING, INCL BITUM
402-1812 MATL & H LIME
RECYCLED ASPH CONC 25 MM TN 200
SUPERPAVE, GP1 OR GP 2 ONLY, INCL
402-3121 BITUM MATL/
RECYCLED H LIME
ASPH CONC 12.5 MM TN 625
SUPERPAVE, GP 2 ONLY, INCL BITUM
402-3130 MATL/ H LIME TN 425
413-1000 BITUM TACK COAT GAL 300
441-0016 DRIVEWAY CONCRETE, 6 IN THICK SY 300
441-0104 CONC SIDEWALK, 4 IN SY 800
441-4020 CONC VALLEY GUTTER, 6 IN SY 240
441-6022 CONC CURB & GUTTER, 6 IN X 30 IN, TP2 LF 2750
500-3200 CLASS "B" CONCRETE CY 30
500-3200 CLASS "B" CONCRETE (MISCELLANEOUS)CY 10
550-1080 STORM DRAIN PIPE, 8 IN, H= 1-10 LF 200
550-1120 STORM DRAIN PIPE, 12 IN, H= 1-10 LF 200
550-1150 STORM DRAIN PIPE, 15 IN, H= 1-10 LF 200
550-1180 STORM DRAIN PIPE, 8 IN, H= 1-10 LF 1000
610-0200 REM CH LK FENCE, ALL SIZES & TYPES LF 743
P-9
Attachment number 2
Page 2 of 8
WINDSOR SPRING ROAD EXTENSION
UNIT
ITEM NO. DESCRIPTION UNIT QTY PRICE AMOUNT
610-0220 REM WOOD FENCE LF 565
611-4001 RECONSTRUCT MINOR DRAINAGE STRUCTURE
EA 1
611-5029 RESET CH LK FENCE, ALL SIZES & TYPESLF 743
611-5030 RESET WOOD FENCE LF 585
611-8050 ADJUST MANHOLE TO GRADE EA 3
611-8055 ADJUST MINOR STRUCTURE TO GRADE EA 3
611-8120 ADJUST WATER METER TO GRADE EA 1
611-8140 ADJUST WATER VALVE BOX TO GRADE EA 3
611-9000 CAPPING MINOR STRUCTURE EA 1
HIGHWAY SIGNS, TP1 MATL., REFL
636-1020 SHEETING, TP 3 SF 14
HIGHWAY SIGNS, TP1 MATL., REFL
636-1031 SHEETING, TP 6 SF 53
HIGHWAY SIGNS, TP2 MATL., REFL
636-1032 SHEETING, TP6 SF 9
636-2010 GALV STEEL POSTS, TP1 LF 200
THERMOPLASTIC PVMT MARKING,
653-0100 RR/HWY CROSSING SIGNAL EA 2
THERMOPLASTIC PVMT MARKING,
653-0120 ARROW, TP2 EA 4
THERMOPLASTIC SOLID TRAF STRIPE, 5
653-1501 IN, WHITE LF 140
THERMOPLASTIC SOLID TRAF STRIPE, 5
653-1502 IN, YELLOW LF 2400
THERMOPLASTIC SOLID TRAF STRIPE,
653-1704 24 IN, WHITE LF 200
THERMOPLASTIC SOLID TRAF STRIPE, 8
653-1804 IN, WHITE LF 250
654-1001 RAISED PAVEMENT MARKERS, TP1 EA 40
654-1003 RAISED PAVEMENT MARKERS, TP3 EA 4
668-1100 CATCH BASIN, GP1 LF 5
666-1110 CATCH BASIN, GP1, ADDL DEPTH LF 1
P-9
Attachment number 2
Page 3 of 8
WINDSOR SPRING ROAD EXTENSION
UNIT
ITEM NO. DESCRIPTION UNIT QTY PRICE AMOUNT
668-2200 DROP INLET, GP2 EA 1
668-2210 DROP INLET, GP2, ADDL DEPTH LF 7
668-4300 STORM SEWER MANHOLE, TP1 EA 2
668-7015 DRAIN INLET, 15 IN EA 11
670-1061 WATER MAIN, OFFSET, 6" COMPLETE EA 680
670-1161 WATER MAIN, OFFSET, 16" COMPLETE EA 120
670-1181 WATER MAIN, OFFSET, 18" COMPLETE EA 300
670-9710 RELOCATE EXIST FIRE HYDRANT EA 2
670-9720 RELOCATE EXIST WATER VALVE, INCL BOX
EA 2
700-5000 GRASSING, COMPLETE (1.5 AC.) LS 1
PROJECT COST
P-9
BID RESULTS SUMMARY
PAVING VARIOUS RD, PH 9 CONTRACT 1 - LAMAR ROAD
REEVES MABUS BROTHERS
BIDDER'S TABULATIONS CONSTRUCTION CONSTRUCTION BLAIR CONSTRUCTION , CONTRUCTION
ENGINEERING COMPANY COMPANY INC BEAMS CONTRACTING TRAKSOUTH PERFECTED INC. TRAN CONSTRUCTION
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT TOTAL UNIT PRICE TOTAL
001-1000 Force Account LS 1 $0.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ 18,000.00 $ - $ 18,000.00 $ 18,000.00
150-1000 Traffic Control LS 1 $0.00 $ 13,200.00 $ 13,200.00 $ 3,500.00 $ 3,500.00 $ 1,085.00 $ 1,085.00 $ 6,683.00 $ 6,683.00 $ 2,019.75 $ 2,019.75 $ - $ 5,400.00 $ 5,400.00
163-0232 Temporary Grassing AC 1 $0.00 $ 700.00 $ 700.00 $ 600.00 $ 600.00 $ 705.25 $ 705.25 $ 936.00 $ 936.00 $ 1,794.75 $ 1,794.75 $ - $ 912.60 $ 912.60
163-0240 Mulch/ Use Matting TN 1.5 $0.00 $ 200.00 $ 300.00 $ 8,390.00 $ 12,585.00 $ 271.25 $ 406.88 $ 254.80 $ 382.20 $ 97.46 $ 146.19 $ - $ 8,100.00 $ 12,150.00
163-0300 Construction Exit EA 2 $0.00 $ 1,200.00 $ 2,400.00 $ 1,000.00 $ 2,000.00 $ 850.00 $ 1,700.00 $ 1,047.70 $ 2,095.40 $ 1,529.99 $ 3,059.98 $ - $ 1,296.00 $ 2,592.00
165-0030 Maint, of Temp. Silt Fence, TP C LF 4,400 $0.00 $ 0.30 $ 1,320.00 $ 1.00 $ 4,400.00 $ 0.43 $ 1,892.00 $ 0.80 $ 3,520.00 $ 1.35 $ 5,940.00 $ - $ 0.32 $ 1,408.00
171-0030 Temp. Silt Fence, TP C LF 4,400 $0.00 $ 3.00 $ 13,200.00 $ 2.75 $ 12,100.00 $ 3.25 $ 14,300.00 $ 2.60 $ 11,440.00 $ 3.39 $ 14,916.00 $ - $ 1.62 $ 7,128.00
201-1500 Clearing and Grubbing LS 1 $0.00 $ 10,450.00 $ 10,450.00 $ 5,000.00 $ 5,000.00 $ 12,405.00 $ 12,405.00 $ 9,341.00 $ 9,341.00 $ 8,076.00 $ 8,076.00 $ - $ 27,000.00 $ 27,000.00
210-0100 Grading Complete LS 1 $0.00 $ 13,030.00 $ 13,030.00 $ 35,190.00 $ 35,190.00 $ 29,783.25 $ 29,783.25 $ 38,221.60 $ 38,221.60 $ 58,917.49 $ 58,917.49 $ - $ 3,531.60 $ 3,531.60
310-5080 Gr Aggr. Base Srs, 6 Inch, Incl. Matl. SY 5,870 $0.00 $ 8.15 $ 47,840.50 $ 7.31 $ 42,909.70 $ 7.01 $ 41,148.70 $ 6.45 $ 37,861.50 $ 7.65 $ 44,905.50 $ - $ 8.83 $ 51,832.10
402-3130 Recycled Asph. Conc. 12.5 MM Superpave SY 5,870 $0.00 $ 8.15 $ 47,840.50 $ 8.23 $ 48,310.10 $ 7.99 $ 46,901.30 $ 7.75 $ 45,492.50 $ 10.28 $ 60,343.60 $ - $ 7.78 $ 45,668.60
700-6910 Permanent Grassing AC 1 $0.00 $ 1,600.00 $ 1,600.00 $ 1,200.00 $ 1,200.00 $ 1,519.00 $ 1,519.00 $ 2,665.00 $ 2,665.00 $ 1,794.75 $ 1,794.75 $ - $ 1,452.60 $ 1,452.60
Reeves Mabus Bros Blair
Construction Construction Construction BEAMS Construction Tran
$0.00 Total $169,881.00 Total $ 185,794.80 Total $169,846.38 CONTRACTING $ 176,638.20 TrakSouth $ 219,914.01 Perfected, Inc $ - Construction $ 177,075.50
Attachment number 2
Page 4 of 8
4 of 8 Rev: 3/4/2010
Attachment number 2
Page 5 of 8
WARREN ROAD IMPROVEMENTS
Project Number: 324-04-296823314
BID TABULATIONS Engineer's List
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL
150-XXXX OFF DUTY POLICE OFFICER HR
150-1000 TRAFFIC CONTROL LS
171-0010 TEMPORARY SILT FENCE, TP A LF
171-0030 TEMPORARY SILT FENCE, TP C LF
207-0203 FOUNDATION, BACKFILL MATERIAL, TP2 CY
210-0200 GRADING MODIFIED INCLUDING HAULING LM
230-1000 LUMP SUM CONSTRUCTION LS
GRADED AGGREGATE BASE COURSE,
310-5060 INCLUDING MATERIAL 6 IN. THICK TN
RECYCLED ASPHALT CONCRETE 19 MM
402-0111 SUPERPAVE, GP 1 OR 2 TN
RECYCLED ASPHALT CONCRETE
LEVELING INCLUDING BITUMINOUS
402-1812 MATERIAL TN
RECYCLED ASPHALT CONCRETE, 9.5 MM,
SUPERPAVE, GP2 ONLY INCLUDING
402-3131 BITUM MATERIAL & H LIME TN
RECYCLED ASPHALT CONCRETE, 9.5 MM,
402-3141 SUPERPAVE GP2, ONLY TN
RECYCLED ASPHALT CONCRETE, 25 MM,
SUPERPAVE, GP1 OR GP2 INCLUDING
402-3250 BITUM MATERIAL & H LIME TN
413-1000 BITUM TACK COAT GAL
MILL ASPHALTIC CONCRETE PAVEMENT,
*432-5010 VARIABLE DEPTH SY
441-0014 DRIVEWAY CONCRETE, 6 IN. SY
441-0016 DRIVEWAY CONCRETE, 6 IN. SY
441-0104 CONCRETE SIDEWALK, 4 IN. SY
441-0300 CONCRETE FLUME, TP A EA
441-5002 CONCRETE HEADER CURB, 6 IN. TP2 LF
CONCRETE CURB & GUTTER, 6 IN. X 30
441-6022 IN., TP2 LF
500-3201 CLASS B CONCRETE, RETAINING WALL LF
CLASS A CONCRETE, INCLUDING
500-3800 REINFORCING STEEL CY
Attachment number 2
Page 6 of 8
WARREN ROAD IMPROVEMENTS
Project Number: 324-04-296823314
BID TABULATIONS Engineer's List
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL
CLASS B CONCRETE, BASE OR
500-9999 PAVEMENT WIDENING CY
550-1150 STORM DRAIN PIPE, 15 IN., H 1-10 LF
550-1180 STORM DRAIN PIPE, 18 IN., H 1-10 LF
550-1240 STORM DRAIN PIPE, 24 IN., H1-10 LF
550-1300 STORM DRAIN PIPE, 30 IN., H 1-10 LF
550-1360 STORM DRAIN PIPE, 36 IN., H1-10 LF
550-1480 STORM DRAIN PIPE, 48 IN., H1-10 LF
550-1600 STORM DRAIN PIPE, 60 IN., H1-10 LF
550-2150 SIDE DRAIN PIPE, 15 IN., H 1-10 LF
FLARED END SECTION 15 IN., STORM
550-4215 DRAIN EA
FLARED END SECTION 18 IN., STORM
550-4218 DRAIN EA
603-2018 STONE DUMPED RIP-RAP, TP1, 18 IN. SY
603-2997 FILTER BLANKET SY
HIGHWAY SIGN, TP1 MATERIAL
636-1014 REFLECTIVE SHEETING, TP1 SF
636-2010 GALVANIZED STEEL POSTS, TP1 LF
*647-1000 TRAFFIC SIGNAL INSTALLATION NO. 1 LS
**647-1000 TRAFFIC SIGNAL INSTALLATION NO. 2 LS
THERMO PAVEMENT MARKING, ARROW
653-0120 TP2 EA
THERMO PAVEMENT MARKING, ARROW
653-0130 TP3 EA
THERMO SOLID TRAFFIC STRIPE, 5 IN.,
653-1501 WHITE LF
THERMO SOLID TRAFFIC STRIPE, 5 IN.,
653-1502 YELLOW LF
THERMO SOLID TRAFFIC STRIPE, 24 IN.,
653-1704 WHITE LF
THERMO SOLID TRAFFIC STRIPE, 5 IN.,
653-1804 WHITE LF
THERMO SKIP TRAFFIC STRIPE, 5 IN.,
653-3502 YELLOW LF
Attachment number 2
Page 7 of 8
WARREN ROAD IMPROVEMENTS
Project Number: 324-04-296823314
BID TABULATIONS Engineer's List
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL
668-1100 CATCH BASIN, GP1 EA
668-1200 CATCH BASIN, GP2 EA
668-1210 CATCH BASIN, GP2, ADDITIONAL DEPTH LF
668-2100 DROP INLET, GP1 EA
668-2200 DROP INLET, GP1 EA
668-4300 STORM SEWER MANHOLE, TP1 EA
668-4400 STORM SEWER MANHOLE, TP2 EA
STORM SEWER MANHOLE, TP2,
668-4411 ADDITIONAL DEPTH, CL1 LF
668-5000 JUNCTION BOX EA
668-5005 JUNCTION BOX, SPECIAL DESIGN #1 EA
668-5005A JUNCTION BOX, SPECIAL DESIGN #2 EA
668-5005B JUNCTION BOX, SPECIAL DESIGN #3 EA
668-7015 DRAIN INLET, 15 IN. BOX TYPE EA
700-0200 GRASSING (3 ACRES) LS
ROADWAY SUB-TOTAL
230-1000 LUMP SUM CONSTRUCTION LS
611-8140 ADJUST WATER VALVE BOX TO GRADE EA
660-0006 SANITARY SEWER PIPE, 6", PVC LF
660-0008 SANITARY SEWER PIPE, 8", PVC LF
668-3300 SANITARY SEWER MANHOLE, TP1 EA
SANITARY SEWER MANHOLE, TP1,
668-3311 ADDITIONAL DEPTH, CL1, OVER 6' LF
670-1020 WATER MAIN, 2" LF
670-1100 WATER MAIN, 10" LF
670-2100 GATE VALVE, 10" EA
Attachment number 2
Page 8 of 8
WARREN ROAD IMPROVEMENTS
Project Number: 324-04-296823314
BID TABULATIONS Engineer's List
ITEM NO. DESCRIPTION UNIT QTY UNIT PRICE TOTAL
670-9710 RELOCATE EXISTING FIRE HYDRANT EA
RELOCATE EXISTING WATER VALVE,
670-9720 INCLUDING BOX EA
RELOCATE EXISTING METER VALVE,
670-9730 INCLUDING BOX EA
ADJUST EXISTING WATER METER,
670-9800 INCLUDING BOX EA
ADJUST EXISTING WATER LINE, 6"
670-9906 (HORIZONTAL AND/OR VERTICAL) LF
ADJUST EXISTING WATER LINE, 8"
670-9908 (HORIZONTAL AND/OR VERTICAL) LF
ADJUST EXISTING WATER LINE, 10"
670-9910 (HORIZONTAL AND/OR VERTICAL) LF
UTILITY WORK SUBTOTAL
PROJECT COST $ -
Attachment number 3
Page 1 of 1
Invitation To Bid
Sealed bids will be received at this office until 3:00 p.m. Thursday, January 21, 2010 for furnishing:
Bid Item #09-196 Paving Various Roads, Phase IX – Contract 2 Lamar Road
Engineering Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene
Street – Room 605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all
prime, subcontractors and suppliers exclusively from Digital Blue Print. The fees for the plans and
specifications which are non-refundable is $50.00.
Documents may be examined during regular business hours at the F. W. Dodge Plan Room; 1281 Broad
Street, Augusta, GA 30901. It is the wish of the Owner that all businesses are given the opportunity to submit
on this project. To facilitate this policy the Owner is providing the opportunity to view plans online
(www.digblueprint.com) at no charge through Digital Blue Print (706 821-0405) beginning Thursday,
December 10, 2009. Bidders are cautioned that submitting a package without Procurement of a complete set
are likely to overlook issues of construction phasing, delivery of goods or services, or coordination with other
work that is material to the successful completion of the project. Bidders are cautioned that sequestration of
documents through any other source is not advisable. Acquisition of documents from unauthorized sources
places the bidder at the risk of receiving incomplete or inaccurate information upon which to base his
qualifications.
A Mandatory Pre-Bid Conference will be held on Tuesday, January 5, 2010 @ 10:00 a.m. in the
Procurement Department – Room 605. All questions must be submitted in writing to the office of the
Procurement Department by fax at 706-821-2811 or by mail. No bid will be accepted by fax, all must be
received by mail or hand delivered. All questions are to be submitted in writing by Thursday, January
7, 2010 by 5:00 p.m.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. A 10%
Bid bond is required to be submitted in a separate envelope so marked along with the bidders’
qualifications; a 100% performance bond and a 100% payment bond will be required for award.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the
number of copies needed, the timing of the submission, the required financial data, and any other
requirements designated by the Procurement Department are considered material conditions of the bid which
are not waiveable or modifiable by the Procurement Director. Please mark BID number on the outside of the
envelope.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle December 10, 17, 24, 31, 2009
Metro Courier December 16, 2009
cc: Tameka Allen Interim Deputy Administrator
Abie Ladson Engineering Department
Hameed Malik Engineering Department
Attachment number 4
Page 1 of 1
Bid Item #09-196
Paving Various Roads, Phase IX - Contract 2 Lamar Road
For the City of Augusta - Engineering Department
Bid Opening Date: Thursday, January 21, 2010 at 3:00 p.m.
Proposal Form Pages 1 & 2
Vendors: Attachment B Bid Bond
Total Bid Amount
Beam's Contracting
2335 Atomic Road YES YES $176,638.20
Beech Island, SC 29842
Blair Construction
P. O. Box 770 YES YES $169,846.38
Evans, GA 30809
Mabus Brothers
920 Molly Pond Rd YES YES $185,794.80
Augusta, GA 30901
Reeves Construction
P. O. Box 1129 YES YES $169,881.00
Augusta, GA 30903
TrakSouth
1190 Interstate Pkwy YES YES $219,914.01
Augusta, GA 30907
Tran Construction
3855 Red Oak Ct. YES YES $177,095.45
Martinez, GA 30907
Construction Perfected Inc.
587 Cherry Avenue
North Augusta, SC 29841
Page 1 of 1
Attachment number 5
Page 1 of 2
Attachment number 5
Page 2 of 2
Attachment number 6
Page 1 of 1
Attachment number 7
Page 1 of 1
BLAIR CONSTRUCTION PAYNE CONSTRUCTION COMMERCIAL MABUS BROS. CONSTRUCTION
P.O. BOX 770 805 WINTERVILLE ROAD 920 MOLLY POND ROAD
EVANS, GA 30809 ATHENS, GA 30605 AUGUSTA, GA 30901
INTERNATIONAL CONSTRUCTION REEVES CONSTRUCTION MALPHRUS CONSTRUCTION
4205 HARD SCRABBLE ROAD P.O. BOX 1129 30 RED OAKS LANE
COLUMBIA, SC 29223 AUGUSTA, GA 30903 RIDGELAND, SC 29936
BEAM’S CONTRACTING CONSTRUCTION PERFECTED, INC. HORIZON CONSTRUCTION
2335 ATOMIC ROAD 587 CHERRY AVENUE PO BOX 798
BEECH ISLAND, SC 29842 NORTH AUGUSTA, SC 29841 EVANS GA 30809
SAVANNAH SITE & HWY CONTRAC T. B. BULLDOZING, INC JBC CONSTRUCTION
3039 COBHAM ROAD 1579 EDGEFIELD HIGHWAY 118 N BELAIR ROAD SUITE 1
THOMSON, GA 30824 AIKEN, SC 29801 EVANS GA 30809
LJ INC
AMMAR CONSTRUCTION 220 STONERIDGE DRIVE SUITE 405 J&B CONSTRUCTION & SRVC INC
P O BOX 1877 COLUMBIA SC 29210 3550 GORDON HIGHWAY
EVANS GA 30809 GROVETOWN GA 30813
PAVEWAY OF AUGUSTA CONTINENTAL CONSTRUCTION HARRIS CONSTRUCTION
1353 GORDON HIGHWAY 4190 CROSSTOWN COURT 1736 BARTON CHAPEL ROAD
PO BOX 660 EVANS GA 30809 AUGUSTA GA 30906
AUGUSTA GA 30903
Yvonne Gentry Abie Ladson
DBE Coordinator Engineering Administration
Hameed Malik 09-196 Bid Item #09-196
Engineering Administration Paving Various Roads, Phase IX –
MAILED THUR 12/10/09 Contract 2 Lamar Road
For Engineering Department
Bid Due: Thu 1/21/10 @3:00 p.m.
C&H PAVING INC TRAN CONSTRUCTION
ATTN CRAIG NORRIS ATTN BOB THATCHER
167 KNOX RIVERS ROAD 3855 RED OAK COURT
THOMSON GA 30824 MARTINEZ GA 30907
Engineering Services Committee Meeting
3/8/2010 1:00 PM
Temporary Renaming of Seventh Street
Department: Clerk of Commission
Caption: Consider a request from the Augusta Entertainment Complex to temporarily
rename Seventh Street in front of the James Brown Arena for ceremonial
purposes only as Ringling Way on March 18, 2010 with consideration for an
in-kind trade for the cost of producing the sign.
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available in
the Following
Accounts:
REVIEWED AND APPROVED BY:
Clerk of Commission
Cover Memo
Attachment number 1
Page 1 of 1
Get email alerts for Augusta