Engineering Services Committee Meeting
Regular MeetingAugusta, GA · July 11, 2011
Agenda
Engineering Services Committee Commission Chamber- 7/11/2011- 1:10 PM
Meeting
ENGINEERING SERVICES
1. Award the contract for the Bid Item 11-111, Real Estate Attachments
Brokerage Services for the City of Augusta to the Sherman and
Hemstreet. (Referred from June 30 Commission meeting)
2. Receive as information the paving of Woodbluff Circle from Attachments
Woodbluff Way to Woodbluff Way. Awarding of the contract to
Robertson Grading, Inc., in the amount of $15,000.00; funded
from SPLOST Phase IV Resurfacing account, upon receipt of
signed contract and proper bonds as requested by AED.
3. Authorize amendment to existing engineering contract with Attachments
Zimmerman, Evans and Leopold to provide engineering services
for the Goodrich St. Raw Water Pumping Station Rehabilitation
of Turbine Unit # 1 in the amount of $49,987.61.
4. Approve award of Construction Contract to Sitec, LLC in the Attachments
amount of $39,714.50 for the Goshen Lake Drive South
Drainage Management Project, Capital Project Budget 324-
041110-201824041, subject to receipt of signed contracts and
proper bonds as requested by AED. Funding is available in the
project account.
5. Discuss traffic calming for Highland Avenue. (Requested by Attachments
Commissioner Bowles) (Referred from June 13 Engineering
Services Committee meeting)
6. Approve and authorize Augusta Engineering Department (AED) Attachments
to proceed with the process to enter into a Memorandum of
Agreement (MOA) with the Briar Creek Water Conservation
District and the Georgia Soil and Water Conservation
Commission (GSWCC) to review the erosion and sedimentation
control plans by the AED. Also authorize Augusta Georgia
Mayor to sign and execute the MOA upon completion of the
process.
7. Motion to authorize condemnation to acquire title of property for Attachments
right of way for the Youngblood Lane Paving Project (Paving
Various Roads, Ph IX) - Tax Map 252, Parcel 015; 2085
Youngblood Lane.
8. Approve Capital Project Budget 324-041110-201824333 and Attachments
Supplemental Agreement Number Two for Cranston
Engineering Group, PC, in the amount of $40,925.00 to provide
additional concept for the Wrightsboro Road Widening, Phase I
project. Funding is available in the project engineering account
for the Engineering Department.
www.augustaga.gov
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Award Contract for Brokerage Services
Department: Recreation, Parks and Facilities - Facilities Management
Caption: Award the contract for the Bid Item 11-111, Real Estate
Brokerage Services for the City of Augusta to the Sherman and
Hemstreet. (Referred from June 30 Commission meeting)
Background: The Commission has expressed a desire to engage a Real Estate
Brokerage firm to assist in the marketing and sale of surplus real
property for the City of Augusta. RFP 11-111 was issued to solicit
Statements of Proposals to provide these services.
Analysis: Three firms submitted Statements of Proposal. The Selection
Committee evaluated all three packages and elected to have all
three firms make a presentation elaborating on their capabilities,
qualifications, approach and fee structure. The Committee
determined that the best value considering the combination of
skills, qualification, marketing approach and fee schedule was
submitted by Sherman and Hemstreet. This is a commission based
agreement so there is no cost to Augusta until the property is sold.
The firm is to provide regular reports on progress toward sale of
the properties.
Financial Impact: This is a commission based agreement so there is no cost to
Augusta until the property is sold.
Alternatives: Award the contract for the Bid Item 11-111, Real Estate
Brokerage Services for the City of Augusta to the Sherman and
Hemstreet. 2. Do not approve the award.
Recommendation: Award the contract for the Bid Item 11-111, Real Estate
Brokerage Services for the City of Augusta to the Sherman and
Hemstreet.
Funds are Available
This is a commission based agreement so there is no cost to
in the Following
Augusta until the property is sold.
Accounts:
Cover Memo
Item # 1
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 1
Attachment number 1
Page 1 of 4
Item # 1
Attachment number 1
Page 2 of 4
Item # 1
Attachment number 1
Page 3 of 4
Item # 1
Attachment number 1
Page 4 of 4
Item # 1
Attachment number 2
Page 1 of 1
REQUEST FOR PROPOSALS
Request for Proposals will be received at this office until Tuesday, April 26, 2011 @ 3:00 p.m. for furnishing:
RFP Item #11-111 Real Estate Brokerage Services for Public Services Department
RFPs will be received by: The Augusta Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams, Director
Augusta Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
RFP documents may be viewed on the Augusta Richmond County web site under the Procurement Department
ARCbid. RFP documents may be obtained at the office of the Augusta, GA Procurement Department, 530
Greene Street – Room 605, Augusta, GA 30901. A Mandatory Pre-Proposal Meeting will be held on Friday,
April 1, 2011 @ 10:00 a.m. in the Procurement Department 530 Greene Street, Room 605. All questions must
be submitted by fax at 706 821-2811 or by email to procbidandcontract@augustaga.gov by Monday,
April 11, 2011 @ 5:00 p.m. No RFP will be accepted by fax, all must be received by mail or hand delivered.
The local bidder preference program is applicable to this project. To be approved as a local bidder and
receive bid preference on an eligible local project, the certification statement as a local bidder and all
supporting documents must be submitted to the Procurement Department with your bonafide bid
package.
No RFP may be withdrawn for a period of 90 days after time has been called on the date of opening.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to the
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number
of copies needed, the timing of the submission, the required financial data, and any other requirements
designated by the Procurement Department are considered material conditions of the bid which are not
waiveable or modifiable by the Procurement Director. Please mark RFP number on the outside of the envelope.
Bidders are cautioned that sequestration of RFP documents through any source other than the office of the
Procurement Department is not advisable. Acquisition of RFP documents from unauthorized sources places the
bidder at the risk of receiving incomplete or inaccurate information upon which to base his qualifications.
Funding for this project may include federal funds provided by the U. S. Department of Transportation (DOT)
and/or other federal agencies. All DOT funded projects are subject to the requirements of 49 CFR Part 26.
These requirements are mandatory and non-negotiable. Augusta enforces Disadvantage Business Enterprise
(DBE) requirements and/or DBE goals set by Federal and/or State Agencies in accordance with State and
Federal laws. Please be advised that the U. S. District Court for the Southern District of Georgia has entered
on Order enjoining the Race-Based portion of Augusta, Georgia’s DBE Program. Thus, Augusta, Georgia
does not have or operate a DBE, MBE or WBE Program for projects (or portions of projects) having Augusta,
Georgia s the source of funding.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 10, 17, 24, 31, 2011
Metro Courier March 16, 2011
cc: Tameka Allen Interim Deputy Administrator
Mike Greene Public Services
Rick Acree Public Services
Item # 1
Attachment number 3
Page 1 of 1
RFP Item #11-111
Real Estate Brokerage Services
for the City of Augusta - Public Services Department
RFP Due: Tuesday, April 26, 2011 @ 3:00 p.m.
Bidders
VENDORS Attachment B Addendum Original 6 Copies Fee Proposal
Form
Blanchard & Calhoun Commercial
2743 Perimeter Parkway
Building 100, Suite 370
YES YES YES YES YES YES
Augusta, GA 30909
Prime Commercial Properties
753 Broad Street, Ste 504 YES YES YES YES YES YES
Augusta, GA 30901
Sherman & Hemstreet
3523 Walton Way Ext. YES YES YES YES YES YES
Augusta, GA 30909
James E Harrison & Co
200 Pleasant Home Road
Augusta GA 30909
Item # 1
Page 1 of 1
Attachment number 4
Page 1 of 1
Cumulative RFP Item #11-111
Real Estate Brokerage Services
for the City of Augusta - Recreation, Parks, Facilities Department
Blanchard & Calhoun
Prime Commercial
Commercial Sherman & Hemstreet
Properties
PTS 2743 Perimeter Parkway 3523 Walton Way Ext.
753 Broad Street, Ste 504
Building 100, Suite 370 Augusta, GA 30909
Augusta, GA 30901
Augusta, GA 30909
Evaluation Criteria
1. Suitability of the proposer’s plan 25 24.3 20.5 21.5
2. Demonstrated ability to satisfy SCOPE of
15 15.0 13.8 14.0
SERVICES
3. Demonstrated ability to sell Real Property 10 10.0 10.0 10.0
4. Commission fee requested as listing Broker
for each sale based on a percentage of the
10 5.5 8.0 9.8
sale price and a flat rate fee of for sales less
than $17,500
5. Professional qualifications of individuals to
15 15.0 13.0 13.0
be assigned to the project.
6. Financial Stability of Company 10 10.0 9.5 9.5
7. References 10 10.0 9.7 10.0
6. Proximity to Augusta
Within Augusta Richmond County - 5 pts
Within the CSRA - 4 pts
5 5.0 5.0 5.0
Within Georgia - 3 pts
Within SE United States - 2 pt
All Others - 1pt
TOTAL 100 94.8 89.4 92.8
Presentation 2 3 1
Comments:
Item # 1
Attachment number 5
Page 1 of 1
Item # 1
Attachment number 6
Page 1 of 3
Item # 1
Attachment number 6
Page 2 of 3
Item # 1
Attachment number 6
Page 3 of 3
Item # 1
Attachment number 7
Page 1 of 2
Item # 1
Attachment number 7
Page 2 of 2
Item # 1
Attachment number 8
Page 1 of 2
Item # 1
Attachment number 8
Page 2 of 2
Item # 1
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Emergency Projects - Paving of Woodbluff Circle
Department: Abie L. Ladson, PE, CPESC, Director
Caption: Receive as information the paving of Woodbluff Circle from
Woodbluff Way to Woodbluff Way. Awarding of the contract to
Robertson Grading, Inc., in the amount of $15,000.00; funded
from SPLOST Phase IV Resurfacing account, upon receipt of
signed contract and proper bonds as requested by AED.
Background: There is currently an on-going GDOT Resurfacing project that
includes Woodbluff Subdivision. All streets in the subdivision are
being paved except Woodbluff Circle, which is due to the City’s
oversight. Woodbluff Circle is in more of a dire need to be paved
than the other streets in the subdivision. The current GDOT
contract does not allow Woodbluff Circle to be added to the
contract. The Engineering Department is recommending using the
existing contractor that is currently paving the subdivision to
complete Woodbluff Circle.
Analysis: The additional cost to pave the road will not exceed $15,000.
Financial Impact: Funding is available in the SPLOST Phase IV Resurfacing
Account for this request.
Alternatives: 1) Receive as information the paving of Woodbluff Circle from
Woodbluff Way to Woodbluff Way. Awarding of the contract to
Robertson Grading, Inc., in the amount of $15,000.00; funded
from SPLOST Phase IV Resurfacing account, upon receipt of
signed contract and proper bonds as requested by AED. 2) Do not
approve.
Recommendation: Approve Alternative Number One.
Funds are Available
in the Following 324-041110-5414110/201824044-5414110
Accounts:
Cover Memo
Item # 2
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 2
Attachment number 1
Page 1 of 2
Item # 2
Attachment number 1
Page 2 of 2
Item # 2
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Goodrich St. Raw Water Pumping Station
Department: Utilities
Caption: Authorize amendment to existing engineering contract with
Zimmerman, Evans and Leopold to provide engineering services
for the Goodrich St. Raw Water Pumping Station Rehabilitation of
Turbine Unit # 1 in the amount of $49,987.61.
Background: The Augusta Utilities Department recently had the periodic
inspection preformed on the horizontal turbine of Unit #1 at the
Goodrich St Raw Water Pumping Station. This inspection
revealed a number of cracks in the blades of the runner of the
turbine. These cracks are a sign of metal fatigue due to the
working conditions and the age of the runner. Appropriate repairs
were made however, in considering the long term reliability of the
unit, a comprehensive rehabilitation of the turbine needs to be
undertaken. The engineering services being recommended are to
prepare the plans and specifications for the rehabilitation work. In
addition, the proposal included investigating the possibility of
replacing the 1952 vintage, in series split casing pumps with
newer, more efficient models. Due to the specialized nature of
the rehabilitation work of the turbine and the critical selection for
the contractor, Augusta Utilities intends to work thru the
Procurement Department to issue Request for Qualifications from
selected firms.
Analysis: The Unit # 1 turbine and pump at the Raw Water Pumping Station
is a critical component in ensuring the reliable supply of raw water
to the reservoirs on Highland Ave. While we have short duration
redundancy in the system, the comprehensive rehabilitation of the
turbine needs to be undertaken.
Financial Impact: The Engineering funds for the project are to be funded from the
2002 Bond Issue, under account number 510043410-5212115
80110250-5212115.
Alternatives: No alternatives are recommended.
Cover Memo
Item # 3
Recommendation: We recommend the Commission authorize the execution of an
Amendment to an existing Engineering contract with Zimmerman,
Evans and Leopold to provide Engineering Services for the
Goodrich St. Raw Water Pumping Station Rehabilitation of
Turbine Unit # 1 in the amount of $49,987.61.
Funds are Available
in the Following 510043410-5212115 80110250-5212115.
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 3
Attachment number 1
Page 1 of 1
UTILITIES DEPARTME T
Change Order umber: 1 Date: July 5, 2011
Project Title: Engineering Services at Goodrich St. Raw Water Pumping Station
Original Contract Date: March 26, 2004 Project umber:
Owner: P.O. umber: P88674
Contractor: Zimmerman, Evans, and Leopold, Inc.
The following change order is hereby made to the proposal for the above project:
This change includes modifies the Engineering Services as described in proposal dated
April 8, 2011.
TOTAL AMOU T OF THIS CHA GE ORDER $ 49,987.61
The Contract time will be Increased/Decreased by N/A calendar days as a result of
this change. The date of completion including this change order is .
Original Contract Amount $ 183,580.00
Previous Change Order
(Increased / Decreased) $ -0-
This Change Order
(Increased / Decreased) $ 49,987.61
TOTAL CO TRACT WITH CHA GE ORDER(S) $ 233,567.61
*************
Funding Source/Account Number: 510043410-5212115 80110250-5212115.
Requested By: Date:
Engineer
Submitted By: Date:
Department Head
Finance Endorsement: Date:
Comptroller
Recommended By: Date:
Administrator
Approved By: Date:
Mayor
Accepted By: Date:
Contractor
Item # 3
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Goshen Lake Drive South Drainage (Bid Item 11-121)
Department: Abie L. Ladson, PE, CPESC, Director
Caption: Approve award of Construction Contract to Sitec, LLC in the
amount of $39,714.50 for the Goshen Lake Drive South Drainage
Management Project, Capital Project Budget 324-041110-
201824041, subject to receipt of signed contracts and proper
bonds as requested by AED. Funding is available in the project
account.
Background: Goshen Lake Drive South is located in Goshen Subdivision. Off
road ground and surface drainage is creating hazardous condition
at the roadway. It warrants construction of storm sewer system to
capture this surface water and discharge at nearby existing storm
drainage inlet.
Analysis: Bids were received on May 25, 2011 with Sitec, LLC being the
low bidder. The bid results are as follow: CONTRACTORS BID
1. Sitec, LLC $39,714.50 2. Blair Construction $64,773.89 3.
Paveway of Augusta $76,083.72 4. Beams Contracting $85,533.87
5. Mabus Brothers $93,232.50 6. Eagle Utility $98,317.00 It is the
recommendation of the Engineering Department to award this
project to Sitec, LLC
Financial Impact: Funds are available in CPB 324-041110-201824041 to be
transferred to the project storm drainage account.
Alternatives: 1) Approve award of Construction Contract to Sitec, LLC in the
amount of $39,714.50 for the Goshen Lake Drive South Drainage
Management Project, Capital Project Budget 324-041110-
201824041, subject to receipt of signed contracts and proper
bonds as requested by AED. Funding is available in the project
account. 2) Do not approve.
Recommendation: Approve Alternative Number One.
Funds are Available
Cover Memo
Item # 4
in the Following
324-041110-5414710/201824041-5414710
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 4
Attachment number 1
Page 1 of 2
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Commission for execution. For information reference
this request, contact Engineering at ext 5070. Thanks
Augusta-Richmond County, Georgia CPB#324-041110-201824041
CAPITAL PROJECT BUDGET
GOSHEN LAKE DRIVE SOUTH DRAINAGE (BID ITEM 11-121)
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County, Georgia that the
following Capital Project Budget is hereby amended:
Section 1: This project is authorized to approve award of construction contract to Sitec, LLC in the
amount of $39,714.50 for the Goshen Lake Drive South Drainage Management project
subject to receipt of signed contracts and proper bonds. Funding is available in the
project account for the Engineering Department to be transferred to the
project storm drainage account.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase IV $ 39,750
Section 3: The following amounts are appropriated for the project:
By Basin By District
Spirit Creek $39,750 8th $ 39,750
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Deke Copenhaver, Mayor
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
Item # 4
6.27.2011
Attachment number 1
Page 2 of 2
Augusta-Richmond County, Georgia CPB#324-041110-201824041
CAPITAL PROJECT BUDGET
GOSHEN LAKE DRIVE SOUTH DRAINAGE (BID ITEM 11-121)
CPB AMOUNT NEW
SOURCE OF FUNDS CPB CPB
SPECIAL 1% SALES TAX, PHASE IV
324-041110-6011110-201824041 ($39,750) ($39,750)
TOTAL SOURCES: ($39,750) ($39,750)
USE OF FUNDS
CONSTRUCTION
323-041110-5414710 $39,750 $39,750
TOTAL USES: $39,750 $39,750
Item # 4
6.27.2011
Attachment number 2
Page 1 of 1
Invitation To Bid
Sealed bids will be received at this office until 3:00 p.m. Wednesday, May 18, 2011 for furnishing:
Bid Item #11-119 Paving Various Roads, Phase 9 – Youngblood Drive & Youngblood Lane for
Engineering Department
Bid Item #11-121 Goshen Lake Drive South Drainage Project for Engineering Department
Bids will be received by Augusta, GA Commission hereinafter referred to as the OWNER at the offices of:
Geri A. Sams
Procurement Department
530 Greene Street - Room 605
Augusta, Georgia 30901
706-821-2422
Bid documents may be examined at the office of the Augusta, GA Procurement Department, 530 Greene Street – Room
605, Augusta, GA 30901. Plans and specifications for the project shall be obtained by all prime, subcontractors
and suppliers exclusively from Augusta Blue Print. The fees for the plans and specifications which are non-
refundable for Paving Various Roads, Phase 9 – Youngblood Drive & Youngblood Lane is $100.00 and for
Goshen Lake Drive South Drainage Project is $50.00.
Documents may also be examined during regular business hours at the F. W. Dodge Plan Room, 1281 Broad Street,
Augusta, GA 30901. It is the wish of the Owner that all businesses are given the opportunity to submit on this project.
To facilitate this policy the Owner is providing the opportunity to view plans online (www.augustablueprint.com) at no
charge through Augusta Blue Print (706 722-6488) beginning Thursday, March 31, 2011. Bidders are cautioned that
submitting a package without Procurement of a complete set are likely to overlook issues of construction phasing,
delivery of goods or services, or coordination with other work that is material to the successful completion of the project.
Bidders are cautioned that sequestration of documents through any other source is not advisable. Acquisition of
documents from unauthorized sources places the bidder at the risk of receiving incomplete or inaccurate information
upon which to base his qualifications.
A Mandatory Pre Bid Conference will be held on Tuesday, April 26, 2011 @ 11:00 a.m. in the Procurement
Department, 530 Greene Street, Room 605. A mandatory site visit will follow. All questions must be
submitted in writing by fax to 706 821-2811 or by email to procbidandcontract@augustaga.gov to the office of the
Procurement Department by Friday, April 29, 2011 @ 5:00 P.M. No bid will be accepted by fax, all must be
received by mail or hand delivered.
No Bid may be withdrawn for a period of 90 days after time has been called on the date of opening. A 10% bid
bond is required to be submitted along with the bidders’ qualifications; a 100% performance bond and a
100% payment bond will be required for award.
An invitation for bids shall be issued by the Procurement Office and shall include specifications prepared in
accordance with Article 4 (Product Specifications), and all contractual terms and conditions, applicable to
procurement. All specific requirements contained in the invitation to bid including, but not limited to, the number of
copies needed, the timing of the submission, the required financial data, and any other requirements designated by
the Procurement Department are considered material conditions of the bid which are not waiveable or modifiable by
the Procurement Director. Please mark BID number on the outside of the envelope.
Funding for this project may include federal funds provided by the U. S. Department of Transportation (DOT)
and/or other federal agencies. All DOT funded projects are subject to the requirements of 49 CFR Part 26. These
requirements are mandatory and non-negotiable. Augusta enforces Disadvantage Business Enterprise (DBE)
requirements and/or DBE goals set by Federal and/or State Agencies in accordance with State and Federal laws.
Please be advised that the U. S. District Court for the Southern District of Georgia has entered on Order enjoining
the Race-Based portion of Augusta, Georgia’s DBE Program. Thus, Augusta, Georgia does not have or operate a
DBE, MBE or WBE Program for projects (or portions of projects) having Augusta, Georgia as the source of
funding.
GERI A. SAMS, Procurement Director
Publish:
Augusta Chronicle March 31, April 7, 14, 21, 2011
Metro Courier April 6, 2011
cc: Tameka Allen Interim Deputy Administrator
Abie Ladson Engineering Department
Hameed Malik Engineering Department
Item # 4
Bid Item #11-121
Goshen Lake Drive South Drainage
For the City of Augusta - Public Services-Maintenance Division
Bid Opening Date: Wednesday, May 25, 2011 at 3:00 p.m.
Beams Contracting
Sitec, LLC Blair Construction Paveway of Augusta Mabus Brothers Eagle Utility
2335 Atomic Rd.
Vendors: 217 Fairfield St. P. O. Box 770 306 Silver Bluff Rd 920 Molly Pond Rd 1350 Branch Rd
Beech Island, SC
Aiken, SC 29801 Evans, GA 30809 Aiken, SC 29803 Augusta, GA 30901 Bishop, GA 30621
29842
Attachment B YES YES YES YES YES YES
CASHIERS
Bid Bond YES YES YES YES YES
CHECK
Addendum 1-2 YES YES YES YES YES YES
Bid Amount $39,714.50 $64,773.89 $76,083.72 $85,533.87 $93,232.50 $98,317.00
Attachment number 3
Item # 4
Page 1 of 1
Page 1 of 1
Attachment number 4
Page 1 of 2
Item # 4
Attachment number 4
Page 2 of 2
Item # 4
Attachment number 5
Page 1 of 1
Item # 4
Attachment number 6
Page 1 of 1
Item # 4
Attachment number 7
Page 1 of 2
Item # 4
Attachment number 7
Page 2 of 2
Item # 4
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Highland Avenue Traffic Calming
Department: Clerk of Commission
Caption: Discuss traffic calming for Highland Avenue. (Requested by
Commissioner Bowles) (Referred from June 13 Engineering
Services Committee meeting)
Background:
Analysis:
Financial Impact:
Alternatives:
Recommendation:
Funds are Available
in the Following
Accounts:
REVIEWED AND APPROVED BY:
Cover Memo
Item # 5
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Memorandum of Agreement between Georgia Soil and Water Conservation Commission and Augusta,
Georgia
Department: Abie L. Ladson, PE, CPESC, Director
Caption: Approve and authorize Augusta Engineering Department (AED)
to proceed with the process to enter into a Memorandum of
Agreement (MOA) with the Briar Creek Water Conservation
District and the Georgia Soil and Water Conservation
Commission (GSWCC) to review the erosion and sedimentation
control plans by the AED. Also authorize Augusta Georgia Mayor
to sign and execute the MOA upon completion of the process.
Background: Augusta, Georgia Soil Erosion, Sedimentation and Pollution
Control (ES&PC) Ordinance requires that ES&PC plan shall be
developed and submitted to Local Issuing Authority (LIA) for
review and approval if land disturbing activity is one acre or
greater. At present, these ES&PC plans are reviewed and
approved by the NRCS and reviewer salary is partially funded by
the Augusta, Georgia. NRCS has 45 days to complete the review
and transmit comments back to LIA and review cycle is reset.
However, Augusta Engineering Department is tasked to enforce
ES&PC ordinance and monitor implementation of approved
ES&PC plan at a construction site. GSWCC conducted an
overview of AED ES&PC program in 2009 and again in 2010.
Both reviews resulted in a range of good to excellent rating and
qualify AED to proceed with MOA process.
Analysis: The subject MOA has multiple advantages for variety of end users
such as area developers, builders, AED. It will shorten ES&PC
plan review process, provide faster resolution to construction sites
erosion matters and provide additional tool to AED in
management and compliance of Augusta Area-Wide NPDES MS4
permit. E&SC plan review process will be integrated into AED
existing engineering plan review process.
Financial Impact: No direct financial impact. No additional funds are needed
Alternatives: 1) Approve and authorize Augusta Engineering Department
Coverof
(AED) to proceed with the process to enter into a Memorandum Memo
Item # 6
Agreement (MOA) with the Briar Creek Water Conservation
District and the Georgia Soil and Water Conservation
Commission (GSWCC) to review the erosion and sedimentation
control plans by the AED. Also authorized Augusta Georgia
Mayor to sign and execute the MOA upon completion of the
process. 2) Do not approve and NRCS continues reviewing the
plans.
Recommendation: Approve Alternative Number One.
Funds are Available
in the Following n/a
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 6
Attachment number 1
Page 1 of 3
Item # 6
Attachment number 1
Page 2 of 3
Item # 6
Attachment number 1
Page 3 of 3
Item # 6
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Property Condemnation- Right of Way and Easement
Department: Engineering Services Committee
Caption: Motion to authorize condemnation to acquire title of property for
right of way for the Youngblood Lane Paving Project (Paving
Various Roads, Ph IX) - Tax Map 252, Parcel 015; 2085 Youngblood
Lane.
Background: Despite repeated efforts, the City has been unable to locate the
property owner and therefore seeks to acquire title through
condemnation. In order to proceed and avoid further project delays, it
is necessary to condemn subject property. The required property
consists of 5,372.79 square feet of right of way, 2,889.13 square feet
of permanent easement, and 1,155.65 square feet of temporary
easement. The appraised value is $1,248.00.
Analysis: Condemnation is necessary in order to acquire the required property.
Financial Impact: The necessary costs will be covered under the project budget.
Alternatives: Deny condemnation.
Recommendation: Approve condemnation.
Funds are Available
FUNDS ARE AVAILABLE IN THE FOLLOWING
in the Following
ACCOUNT:G/L 324-04-1110-54.11120 J/L 208824001-54.11120
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 7
Attachment number 1
Page 1 of 2
Item # 7
Attachment number 1
Page 2 of 2
Item # 7
Engineering Services Committee Meeting
7/11/2011 1:10 PM
Wrightsboro Road Widening, Phase I - Bid Item–09-170 - SA2
Department: Abie L. Ladson, PE, CPESC, Director
Caption: Approve Capital Project Budget 324-041110-201824333 and
Supplemental Agreement Number Two for Cranston Engineering
Group, PC, in the amount of $40,925.00 to provide additional
concept for the Wrightsboro Road Widening, Phase I project.
Funding is available in the project engineering account for the
Engineering Department.
Background: Phase I of the Wrightsboro Road Widening Project was part of
SPLOST Phase IV and called for traffic operational improvements
along Wrightsboro Road between Augusta West Parkway and
Marks Church Road. The area covered by this project is adjacent
to Augusta Mall, and I-520 and is essential to the regional
mobility of this area. As the project has progressed, some
elements have required more complex design than originally
anticipated, especially around the interchange. For instance, small
retaining walls have become necessary as well as a sub-surface
utility evaluation and a more complex signal design.
Analysis: Due to the complexity of the design associated with the proposed
interchange modification, funding is requested to cover the change
in scope and direction.
Financial Impact: Funds are available in the project engineering 324-041110-
5212115-201824333 upon Commission’s approval.
Alternatives: 1) Approve Capital Project Budget 324-041110-201824333 and
Supplemental Agreement Number Two for Cranston Engineering
Group, PC, in the amount of $40,925.00 to provide additional
concept for the Wrightsboro Road Widening, Phase I project.
Funding is available in the project engineering account for the
Engineering Department. 2) Do not approve and cancel project.
Recommendation: Approve Alternative Number One.
Cover Memo
Item # 8
Funds are Available
in the Following 324-041110-5212115/201824333-5212115
Accounts:
REVIEWED AND APPROVED BY:
Finance.
Procurement.
Law.
Administrator.
Clerk of Commission
Cover Memo
Item # 8
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of Attachment number 1
Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks Page 1 of 1
AUGUSTA, GEORGIA
ENGINEERING DEPARTMENT
SUPPLEMENTAL AGREEMENT
Augusta Richmond County Project umber(s): 324-041110-201824333
Supplemental Agreement umber: 2
Purchase Order umber: 179102
WHEREAS, We, “Cranston Engineering Group” Consultant, entered into a contract with
Augusta-Richmond County on “April 1, 2010”, for engineering design services associated with
the “Wrightsboro Rd. Widening Phase I ”, Project No. 324-041110-201824333, File Reference
No. 10-014 (A), and
WHEREAS, certain revisions to the design requested by Augusta-Richmond County are not
covered by the scope of the original contract, we desire to submit the following Supplemental
Agreement to-wit:
Engineering Services to provide additional concept and presentation
Materials for the Wrightsboro Road Widening, Phase I
It is agreed that as a result of the above described modification the contract amount is
increased by $40,925.00 from $221,775.00 to a new total of $262,700.00
Any modifications to submittal dates shall be as identified in the attached proposal. This
agreement in no way modifies or changes the original contract of which it becomes a part,
except as specifically stated herein.
NOW, THEREFORE, We, “Cranston Engineering Group”, Consultant, hereby agree to said
Supplemental Agreement consisting of the above mentioned items and prices, and agree that
this Supplemental Agreement is hereby made a part of the original contract to be performed
under the specifications thereof, and that the original contract is in full force and effect,
except insofar as it might be modified by this Supplemental Agreement.
This day of , 2011.
RECOMMED FOR APPROVAL:
CITY OF AUGUSTA-RICHMOND COUNTY
AUGUSTA, GEORGIA
Honorable Mayor, Deke Copenhaver
Approved: Date Approved: Date
[ATTACHED CORPORATE SEAL] [ATTACHED CORPORATE SEAL]
ATTEST: ATTEST:
Title: Title:
Item # 8
(SA01 – For changes more than $20,000) September 2010
Attachment number 2
Page 1 of 2
Please do not process this document. Once approved by the Commission the original will be sent to the Clerk of CPB# 324-041110-201824333
Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD WIDENING, PHASE I
(Augusta West Parkway to Marks Church Road)
BE IT ORDAINED by the Commission-Council of Augusta-Richmond County,
Georgia that the following Capital Project Budget is hereby authorized:
Section 1: The project is authorized for CPB# 324-041110-201824333. This project is
for Wrightsboro Road Widening, Phase I design cost associated with the
preparation of additional concept and presentation materials on the project
for Supplemental Agreement Number Two for Cranston Engineering Group in
the amount of $40,925.00. Funds are available in the project engineering account.
Section 2: The following revenues are anticipated to be available to the Consolidated
Government to complete the project.
Special 1% Sales Tax, Phase IV $ 2,782,000
Section 3: The following amounts are appropriated for the project:
By Basin By District
Raes Creek $2,782,000 7th $2,782,000
Section 4: Copies of this Capital Project Budget shall be made available to the
Comptroller for direction in carrying out this project.
Adopted this ____________________ day of ______________________.
Approved
_________________________________________________
Honorable Deke Copenhaver, Mayor
Original-Commission Council Office
Copy-Engineering Department
Copy-Finance Department
Copy-Procurement Department
1 of 2 Item # 8
9.16.2010
Attachment number 2
Page 2 of 2
Commission for execution. For information reference this request, contact Engineering at ext 5070. Thanks
CPB# 324-041110-201824333
Augusta-Richmond County, Georgia
CAPITAL PROJECT BUDGET
WRIGHTSBORO ROAD WIDENING, PHASE I
(Augusta West Parkway to Marks Church Road)
CPB AMOUNT CPB NEW
SOURCE OF FUNDS CPB CHANGE CPB
SPECIAL 1% SALES TAX, PHASE IV
324-04-1110-201824333 $2,782,000 $0 $2,782,000
TOTAL SOURCES: $2,782,000 $0 $2,782,000
USE OF FUNDS
ENGINEERING
324-04-1110-5212115-201824333 $398,000 $0 $398,000
SA #2: Cranston Eng $40,925
ADVERTISING
324-04-1110-5233119-201824333 $2,000 $0 $2,000
CONTINGENCY
324-04-1110-6011110-201824333 $2,382,000 $0 $2,382,000
TOTAL USES: $2,782,000 $0 $2,782,000