Muyni
← Back to Bastrop

Planning and Zoning Commission Meeting

Regular Meeting

Bastrop, TX · September 24, 2020

Minutes

Minutes

m, ill WIMI111111aI 11Ustal ptember zozo dft bstaining. Meeting Mionuto It 9 1IN 11 1 111; 111 11 1mr 11 III• • • • • • 11111- •. -• Street, HoustonBastrop, online Texas and 78602. Boulevard withinlocated thsr in the Council Chambers• -• at 1311 Chestnut west of FM 969, at the west extension of Sam as shown in Exhibit A. Statutory ExtraIIIIIIITerritorial Jurisdiction of Bastrop, Texas, a" IaMNIFEWWo Aft " OW M6,911710WOMEN NO I- I- -- • • •- • 11 • vc • •- • - • • - • - f FM r - ' • • - • the 169, at the west presentation stating extension of Sam Houston Boulevard. She concluded IN 3taff was recommending approval at this time. the overaF Discussion connectivi commenced of between Staff and the Commission re(garding 1• • • i i i • _ i - Page Bastrop Planning Toning of 3 Commission Minutes September 24, Zozo ortion of - 11MINI. IIII = ETJ) ocated of the west of City of F. M. 20, within the Statutory Extraterritorial Jurisdiction ( the motion the astrop, and Texas,• motio Exhibit A. Glenn Johnson seconded 3) to subdivision4A. Discussion authority, Bastrop Building on Block ( Code, related Jose Manuel Bangs including, MUD olony Survey, 1B, but not Section limited 5 & to: 67 being 31. 583 acres out of the If 1 i - •' within located the - ••• Why is it important extension • • • O% IN Regulations oftatutory ExtraiiiiiiiiiTerritorial• Subdivisions Local • Government of Bastrop, Code Chapter Texas, 212 — Municipal as shown• . • the motionand and Propertythe motiond Developmentunanimously. for Extraterritorial Jurisdiction 1445 Interlocal Agreement with Bastrop County III ii udvison Review Plat,otconsisting of 25. 557 acres out of the Nancy Blakey Survey It No. 98, located west Platting Exemptions and Exception of ". FwMw Cityof Bastrop, ' within the Statutory• • • Major Thoroughfare Map and Grid System as A shownTexas, 3 Direction for B Code Updates Commission a r Bills and Matt Lewis, of Simplecity Design, presented to the PowerPoint 1 ommission 1, Section 1 Preliminary Agenda Plat, packet for the West Bastrop Village, Phase located west ofonsisting F. M. 20. of She25. 557 acres out of the Nancy Blakey Survey No. 98, at this time, oncluded the presentation stating Staff was recommending approval Bastrop Planning Page development thatIcare vested, toning 2 of 3 CommlS lon Minutes September 2q., ZOZo E) in place when the project originally began, parts of the ow this current utility plans for the plat is focused on the residential portion of the development, drainage, overall connectivit total•' • evelopment, the development at full build out, in this fire protection, and the proposed alley loaded product or the project, to be constructed ZIF/.• - I CIL IT CI % asPO I I U IFIF 11111911 1W I 1191• C 11 r -• • - CLII I le 11 1 ommission Planning Technician in the Planning Department would be hiring an additional the uture, and the launch of MyGov was going ptember 2zon s ecting M inutes seconded the motion, and e a motion to adjourn at 7: 10 p. m. Ishmael Harris nimously. TJ, t nvelopments, platting exemptions/exceptions in the ETJ, street G idopted thoroughfare and grid system. 1 - mile drainage/ septic regulations, and statutory) that would tie into Bastrop County' s stormwater/ oad cross platting exemptions sections for IlC rural lll developments in the ETJ, adopting appropriate the ETJ, by thoroughfaren corridors and encouraging a diversity of uses along outlying drivewayesignating standardsscenic in corridors to encourage specific development patterns, standards he ETJ, d block standards• • development Bastrop Planning loningCommiS ion Minute Cot ncil.

Get email alerts for Bastrop

A daily email when new agendas and minutes are posted.

Report an issue with this meeting