Historic Preservation Commission
Regular MeetingBatavia, IL · February 9, 2026
Agenda
City of Batavia
Historic Preservation Commission
Monday, February 9, 2026 at 5:00 PM
100 N. Island Ave, Batavia, IL 60510 in the City Council Chambers
Questions and comments regarding agenda items can be submitted prior to 4 PM the day of the meeting by
emailing Zach Ewoldt, Planner at zewoldt@bataviail.gov
Page
1. Meeting Call to Order
2. Roll Call
Jamie Saam, Chair Tom Connelly, Vice Chair
Phil Bus William Mahler
Mark Allen Jamie Koc
3. Approval of Minutes
3.1 January 12, 2026 3-9
Minutes
3.2 January 26, 2026 10 - 12
Minutes
4. Items Removed, Added or Changed
5. Matters from the Public: (For Items NOT on the Agenda)
6. Regular Agenda
6.1 Certificate of Appropriateness forBuilding Facade 13 - 21
Modifications at 101 South Batavia Avenue
Alex Teipel, Applicant
Staff Memo
6.2 Discussion: Certificate of Appropriateness Approval Matrix 22 - 28
Staff Memo
7. Updates
Page 1 of 28
7.1 RFP: Exterior Building Condition Assessments for Historic
District Properties
7.2 30 S Shumway "Old City Hall" New Property Owner
8. Other Business
9. Adjournment
Individuals with disabilities should notify the City Administrator’s office at 630-454-2053 if they
have a disability which will require special assistance or services and, if so, what services are
required. This notification should occur as far as possible before the City-sponsored function,
program, or meeting.
Page 2 of 28
MINUTES
January 12, 2026
Historic Preservation Commission
City of Batavia
PLEASE NOTE: These minutes are not a word-for-word transcription of the statements made at the meeting, nor
intended to be a comprehensive review of all discussions. They are intended to make an official record of the actions
taken by the Commission and to include some description of discussion points as understood by the minute-taker.
They may not reference some of the individual attendees’ comments, nor the complete comments if referenced.
1. Meeting Called to Order:
Chair Saam called the meeting to order at 5:00 P.M.
2. Roll Call:
Members Present: Chair Saam, Vice Chair Connelly, Commissioner Bus,
Commissioner Allen, Commissioner Mahler
Members Absent: Commissioner Koc
3. Approval of Minutes November 24, 2025:
Motion: To approve the minutes
Maker: Bus
Second: Connelly
Voice Vote: Motion carried.
4. Items Removed, Added or Changed:
None.
5. Matters from the Public for Items NOT on the agenda:
None.
6. Regular Agenda
6.1. Certificate of Appropriateness for Roof Replacement at 101 S. Batavia Avenue
A&J Roofing Corporation, Applicant
Zach Ewoldt stated the property at 101 South Batavia Avenue recently sold. The new property owner
is working with Staff on several improvements. The applicant would like to replace the cedar shaker
shingles with black onyx asphalt shingles. They are also proposing to replace the black flat roof with
a TPO white membrane, which would not be visible to the public. The existing empty sign cabinet
Page 3 of 28
Historic Preservation Commission
January 12, 2026, Page 2
will be removed. A sign application will be submitted in the future. The owner has intentions of
relocating a dry-cleaning business to this location.
Chair Saam confirmed this is a non-contributing structure.
Commissioner Bus stated this building is in disrepair and needs significant repair. Ewoldt noted that
while the exterior needs a lot of work, the interior of the building is where much of the work is
occurring. Albertson confirmed that a permit application and review will be required for the full
interior build out, which is necessary.
Commissioner Allen inquired if the proposed dry-cleaner is owned by the operator across the street.
Ewoldt confirmed the owner’s relationship with the current dry-cleaning business across the street.
Commissioner Bus stated approximately two years ago, the Historic Preservation Commission began
a review of the Full Moon Tavern, and requested cooperation as they removed the facade, if any
historic items were located during the process. Commissioner Bus requested in a similar way that it
be brought to the awareness of the Historic Preservation Commission as they move forward with the
project. Albertson confirmed the ability to accommodate this request.
Motion: To accept as read
Maker: Commissioner Allen
Second: Commissioner Mahler
Roll Call Vote:
AYE: Chair Saam, Commissioner Bus, Commissioner Allen, Vice Chair
Connelly, Commissioner Mahler
NAY: None
ABSENT: Koc
Motion approved.
6.2. Certificate of Appropriateness for a Wall Sign at 160 First Street
Andy Miller of BEI, Applicant
Zach Ewoldt stated that Andy from BEI is present on behalf of their tenant, Warehouse 55. Ewoldt
noted that the sign was accidentally installed without an approved Certificate of Appropriateness or
permit. The applicant is apologetic and has emphasized that this was not intentional, and was an error
made during the relocation of their business from Aurora. The sign was repurposed from this location.
Staff has reviewed the sign, which generally aligns with the Historic Preservation Commission
guidelines. This is a non-illuminated wall sign drilled into the mortar and safely secured. The
applicant is now seeking formal approval. Staff views this as an honest misunderstanding and an
unfortunate oversight.
Page 4 of 28
Historic Preservation Commission
January 12, 2026, Page 3
Commissioner Allen reminded The Historic Preservation Commission that there used to be a go cart
track at this location in the 1960’s.
Commissioner Bus cautioned the property owner to be more careful to follow procedures and avoid
putting The Historic Preservation Commission in this situation in the future.
Motion: To approve the COA as submitted
Maker: Vice Chair Connelly
Second: Commissioner Mahler
Roll Call Vote:
AYE: Commissioner Bus, Commissioner Allen, Vice Chair Connelly,
Commissioner Mahler, Chair Saam
NAY: None
ABSENT: Koc
Motion approved.
6.3. Amendments to Title 12: Historic Preservation of the City Code
City of Batavia, Applicant
Ewoldt gave the staff report, stating that staff performed a comprehensive review of the items
presented and proposed amendments including: updated language to reflect changes in title and
terminology, proposed amendment to extend the length of Chair and Vice Chair, modifications for
application requirements, modifications for Certificate of Appropriateness, establishment of meeting
requirements in the event of lack of quorum for applicants to be heard at City Council, modifications
to demolition process and review criteria for non-contributing structures, and updates to fees and
penalties. Any motion would be a recommendation to the City Council who would make the final
decision, with the Historic Preservation Commission serving as a recommending body on this item.
Chair Saam inquired about the cancellation of two consecutive meetings, and the ability for members
to phone into the meeting due to work. Ewoldt stated the City Council would need to adopt this as a
policy, which has not yet been granted or extended to this commission. A quorum must be present in
the room. The current BATV and Zoom process presents challenges for the Historic Preservation
Commission. Vice Chair Connelly stated they believed the Open Meetings Act allows for a
conference line if those attending can hear and speak. Ewoldt further explained the limitations of the
current meeting room. Chair Saam requested future conversations occur with the Information
Technology Department and the City Attorney. Ewoldt agreed to begin these discussions.
Commissioner Allen inquired about language pertaining to landmark surveys in Title 12. Ewoldt
explained there is one single historic district established and one landmark (The Campana building).
He confirmed he will provide formal documentation and additional information including the
Page 5 of 28
Historic Preservation Commission
January 12, 2026, Page 4
boundary lines, as requested by Commissioner Allen. Albertson also stated the boundary information
is on the city website. Commissioner Allen stated the Campana building needs attention. Albertson
and Ewoldt agreed, explaining that there have been three property owners in the last five years. The
current owners are focusing on major life safety issues first, which are the imminent and primary
concerns, prior to addressing aesthetic issues. The current owner intends to make further
improvements. Their current plan is to maintain a multitenant arrangement and bring in a fitness
training facility working with high school athletes for weightlifting and endurance training. Albertson
stated The State Historic Preservation Office (SHPO) typically manages the tax credits through the
National Park Service.
Commissioner Bus requested a definition of Minor Alternations or Other Changes under 12-6-1-B:
APPLICABILITY. Ewoldt and Albertson noted this was the next item on the agenda.
Commissioner Bus expressed support for the removal of the requirements for legal descriptions under
Section 12-6-3, stating that the address and Parcel Identification Number were appropriate enough.
Ewoldt informed staff that if an applicant did not have a survey available, the burden would be on the
applicant to hire a surveyor, which comes with a time delay and additional costs. Commissioner Bus
stated that is an unnecessary request of applicants.
Commissioner Mahler noted discrepancies regarding fifteen days/forty-five days, and additional
discrepancies in the overall language in the document and requested corrections. Ewoldt confirmed he
will investigate and can adjust these discrepancies accordingly prior to City Council approval with a
recommendation from the Historic Preservation Commission.
A member of the public approached the Commission and identified themselves as Al Watts,
Preservation Parters of the Fox Valley, 18 Deana Street St. Charles.
Al began by referencing Section 12-2-6: MEETINGS and suggested reducing meetings to once per
month instead of two, stating that over the last three years, the Historic Preservation Commission has
not had twelve meetings in a year. With the proposed Staff Approval Process, it would reduce the
overall load to the Historic Preservation Commission, further supporting a change to one meeting per
month. Al also encouraged the meeting time changed from 5:00 PM to 7:00 PM, which may allow
more members of the public to participate.
Al requested a definition for the term Secondary Structure under 12-6-3-C: PROCEDURE. Al
provided a sample definition according to AI as: something that is on the same property that serves as
an incidental or supportive role to a principle or primary structure (garage, shed or barn). Ewoldt
stated noncontributing buildings are being proposed to be removed from the expedited process, and
the Zoning Code definition will be used to define this. Commissioner Bus requested that as the
inventory is updated, attention is given to primary and secondary structure classification for accuracy.
Al noted that other minor changes needed to be made in the language changing Community
Development Committee to Community of the Whole.
Commissioner Allen requested confirmation that 12-6-2: CRITERIA is standard language. Ewoldt
confirmed the criteria for demolition is standard United States Secretary of Interior Standards of
Rehabilitation.
Page 6 of 28
Historic Preservation Commission
January 12, 2026, Page 5
Vice Chair Connelly inquired about the timeline for the Administrative Review approval. Ewoldt
explained the current structure: an application comes into the city and is reviewed by Albertson for a
building review and Ewoldt reviews the application for Historic Preservation and Zoning, prior to
being brought forth to the Historic Preservation Commission. Vice Chair Connelly requested
confirmation that the Historic Preservation Commission is supposed to be presented with the
application within fifteen days. Albertson and Ewoldt confirmed this is the intention, and more than a
fifteen-day timeline would be unusual.
Commissioner Allen inquired about grandfathered signs. Ewoldt stated these rights are granted by the
zoning code and would not be a Historic Preservation Commission issue.
Al stated that the Historic Preservation Commission could add a special meeting if needed, should the
Historic Preservation Commission agree to reduce meetings to once per month. Commissioner Bus
felt comfortable with the current meeting arrangement, and confirmed flexibility is an option, if
required by a special need. Chair Saam encouraged the public to reach out by email if they cannot
attend in person. Ewoldt believes it is the desire of Mayor Schielke to retain the current two meeting
per month arrangement, but the time of the meetings can certainly be discussed.
Motion: To recommend to City Council with comments as provided
Maker: Commissioner Bus
Second: Vice Chair Connelly
Roll Call Vote:
AYE: Commissioner Bus, Commissioner Allen, Commissioner Mahler, Vice
Chair Connelly, Chair Saam
NAY: None
ABSENT: Koc
Motion approved.
Zach Ewoldt stated he will make the necessary updates and bring them to Community of the Whole
and City Council.
6.4. Discussion: Certificate of Appropriateness Approval Matrix
City of Batavia, Applicant
Zach Ewoldt stated that historically there has been some discussion about what staff can and cannot
administratively approve. The adoption of a detailed matrix would provide a clear guideline for Staff.
The intention is for staff to not deny a Certificate of Appropriateness, rather to provide an expedited
Page 7 of 28
Historic Preservation Commission
January 12, 2026, Page 6
process for smaller projects within the Matrix. A denial would remain the right of the Historic
Preservation Commission.
Chair Saam requested confirmation that the exempt items are currently exempt, rather than new
suggestions. Ewoldt confirmed most of them are currently exempt and highlighted one new
recommended addition for the painting of unpainted materials. Commissioner Bus requested The
Historic Preservation Commission allow the Matrix the discussion it deserves during a future
meeting, after time to review.
Commissioner Mahler had several initial items he wished to discuss. He requested the addition of
“style and texture” to the language under Masonry Repointing. Ewoldt agreed to make this change.
Commissioner Mahler requested clarification of Decorative Glass on Page 2. Albertson explained that
items which do not require a permit are exempt. Ewoldt stated this exemption would be flagged for
further discussion. Commissioner Mahler suggested flat roofs, which are not in public view, could be
an Administrative Review. Commissioner Mahler further suggested a second line item for this,
instead of a single line item.
Commission Mahler inquired about the Mechanical and Electrical guidelines, and the relationship to
the Electric Vehicle Charging Stations. Ewoldt explained the code enables the Historic Preservation
Commission the right to review most site improvements. However, in the case of the EV Chargers,
City Council considered them a utility improvement, owned and operated by the electric utility. Al
stated he will send a list of items directly to Ewoldt to be shared at the next discussion.
Ewoldt stated the commission will need to decide how they wish to be notified of staff approvals, if
the matrix is approved.
Ewoldt inquired about the Historic Preservation Commission deadline for reviewing this item. Chair
Saam suggested the first meeting in February. Chair Saam also requested that comments and feedback
be sent to Zach Ewoldt. Commissioner Allen requested clarification on exempt work for chimney
repair, parking lots and satellite dishes. Ewoldt explained that chimney work such as tuck pointing
does not require a permit, making them exempt. Parking lots are not usually brought to the Historic
Preservation Commission and some satellites have limitations.
7. Updates:
Ewoldt stated the City has drafted the Request for Proposals for the exterior building conditions
assessment of significant structures. The outside consultant will provide a report to Staff on what is
deficient or in need of immediate and long-term repairs. The goal is to utilize this information to
encourage property owners to make improvements. Commissioner Bus requested confirmation that
the Historic Preservation Commission will be reviewing a draft report from the consultant. Ewoldt
explained the consultant would provide these reports to Staff and Staff would likely be providing the
reports to the Historic Preservation Commission. Commissioner Bus explained the Historic
Preservation Commission has been very involved over the last ten to fifteen years reviewing the
condition of existing structures and felt it is important for the Historic Preservation Commission to be
involved in the future.
Page 8 of 28
Historic Preservation Commission
January 12, 2026, Page 7
8. Other Business:
None
9. Adjournment: There being no other business to discuss, Chair Saam asked for a motion to adjourn
the meeting; there was a first by Vice Chair Tom Connelly and a second by Commissioner Bus. By
Voice Vote the motion carried, and the meeting was adjourned at 6:13 PM.
The minutes were transcribed and respectfully submitted by Sarah Cowan, Recording Secretary.
Page 9 of 28
MINUTES
January 26, 2026
Historic Preservation Commission
City of Batavia
PLEASE NOTE: These minutes are not a word-for-word transcription of the statements made at the meeting, nor
intended to be a comprehensive review of all discussions. They are intended to make an official record of the actions
taken by the Commission and to include some description of discussion points as understood by the minute-taker.
They may not reference some of the individual attendees’ comments, nor the complete comments if referenced.
1. Meeting Called to Order for the Historic Preservation Commission
Chair Saam called the meeting to order at 5:00 P.M.
2. Roll Call:
Members Present: Commissioner Allen, Commissioner Mahler, Vice Chair Connelly,
Chair Saam
Members Absent: Commissioner Bus, Commissioner Koc
Also Present: Zach Ewoldt (Planner), Jeff Albertson (Building Commissioner), Sarah
Cowan (Recording Secretary)
3. Items to be Removed, Added or Changed: None.
4. Matters From the Public (Not on the agenda): None.
5. Regular Agenda Items
5.1 Certificate of Appropriateness for the installation of a wall sign and the replacement of sign
panels for the existing freestanding sign at 336 East Wilson Street.
Batavia Patels 2 LLC, Applicant
Zach Ewoldt provided a staff report for a signage review for Windmill Market, taking the place of the
former 7-11 business at this location. Ewoldt stated this is a non-contributing structure. Ewoldt stated
the proposed sign is in conformance with the zoning code and generally aligns with the Historic
Preservation Commission guidelines and downtown district guidelines. Connelly believed the design
is consistent with the previous design and supports the proposed sign. Allen noted the need to support
small businesses, believes the sign is in good taste, and not obstructing traffic views. Saam
appreciated the property owners having recently elevated the standards of appearance.
Motion: To approve the COA as submitted
Maker: Connelly
Second: Mahler
Roll Call Vote: 4:0
Page 10 of 28
Plan Commission
January 21,2026, Page 2
5.2 Certificate of Appropriateness for a new wall sign at 160 First Street on North Building Elevation
Aubrey Sign Company, Applicant
Zach Ewoldt presented the staff report noting that this building is significant, primarily due to age and
the native materials, such as limestone, used to construct the building. The proposed Warehouse 55
sign would replace the previous Hearth and Hammer sign, which was larger in size. Allen noted the
history of the building, and stated that during the war, they made bomb cases and went to prison for
overcharging the government. Paul from Aubrey Sign Company noted the applicant’s budget
concerns contributed to the smaller size of the sign. The proposed sign is not backlit but would be
illuminated from the existing gooseneck lights. Mahler inquired about the hours of the business, and it
was determined that lighting is not critical due to the regular retail hours of the store. Allen inquired
about name Mark Allen. Ewoldt noted that Mark Allen is one of two owners, from Aurora. Ewoldt
stated they have a downtown Chicago location also, which is well established, providing antiques and
home improvement items. Saam noted there are multiple vendors inside of this location. Ewoldt
provided the dimensions of the Hearth and Hammer sign (36” x 342”) in comparison to the proposed
sign for Warehouse 55 (24” x 120”). Saam supported the sign especially because it fits into the
applicant’s budget, although a larger sign would have been preferred.
Motion: To approve the COA as submitted
Maker: Connelly
Second: Mahler
Roll Call Vote: 4:0
5.3 Certificate of Appropriateness for the installation of a wall sign at 40 North Island Avenue
Aubrey Sign Company, Applicant
Zach Ewoldt presented the staff report, noting one error in the memo regarding the square footage
(8.5 square feet should replace the 16 square feet listed in the memo). Ewoldt stated the sign generally
complies with the zoning code and the Historic Preservation Commission guidelines. The design
guidelines recommend consistent design dimensions and materials for commercial multi-tenant
buildings. The proposed sign is for non-illuminated, individual channel letters which generally aligns
with the downtown plan. A street view image of the building was reviewed, indicating multiple
iterations of font and style on the building already. Saam inquired about the relationship in size to the
previous Ziggy’s sign. Ewoldt stated it is smaller but still proportionate to the tenant space. Paul from
Aubrey Sign Company confirmed that the budgetary restrictions of the applicant prevented the
illumination of the sign. The potential repurposing of the old, illuminated Ziggy’s sign was discussed
with the customer, but was also outside of their budget. Saam inquired about the process of creating
uniformity in design types on buildings in the future. Ewoldt stated the Trader Joe’s shopping center
landlord has adopted more rigorous standards, in comparison to the Jewel shopping center. Ewoldt
stated the zoning code does not necessarily regulate font, but ensures the signs are proportionate in
size, placement is appropriate, and raceway color is consistent. Ewoldt noted the building is a non-
contributing structure. Connelly expressed support for the proposed sign because it is a non-
contributing building and the proposed sign is consistent with the previous nail salon.
Page 11 of 28
Plan Commission
January 21,2026, Page 3
Motion: To approve the COA as submitted
Maker: Mahler
Second: Connelly
Roll Call Vote: 4:0
6. Updates:
Zach Ewoldt reminded the commission that the discussion on the action matrix will occur during the
February 4, 2026 meeting. Ewoldt also stated the Request for Proposals for the exterior building
conditions assessment was issued, and there have been some interest from outside design firms and
inspection firms. This will close on February 13, 2026. Ewoldt stated that the exterior survey will
identify immediate and long-term deficiencies, allowing for positive recommendations and
constructive criticism to property owners. Albertson noted this process was started several years ago.
Ewoldt stated this is a necessary step to preserve these buildings. Commissioner Allen inquired about
the remaining chimneys and their inspection status. Ewoldt noted that a request to address several
deficiencies and have the chimney inspected was presented to the owner of the Challenge properties
chimney. While smaller in size, this chimney is considered more ornamental. Ewoldt stated that this
process was initiated in December with Spring deadlines, otherwise City Council has authorized
enforcement from code enforcement and property maintenance. Allen inquired about the dam. Ewoldt
noted that the river and the dam are not in the district. Mahler noted the base bid consists of seventy-
five structures, with an alternate bid for fifty more contributing structures. Chair Saam inquired about
the status of the Tin Shop. Ewoldt confirmed the building has been demolished, and Albertson noted
backfill is the next step. Samm inquired about the Tin Shop sign, which Ewoldt confirmed was saved.
Char Saam inquired about the status of Hubbard’s. Ewoldt noted that they have not gone to
Community of the Whole yet. Ewoldt stated that staff engaged the City Attorney regarding the
previous discussion of risk and liability, and it was determined that a hold harmless agreement would
be adequately documented and addressed. Chair Saam asked about the status of the demolition permit
for the other chimney. Albertson stated they are close to issuing the permit, after a few more details
are addressed. Ewoldt mentioned the upcoming property designation reviews. The Historic
Preservation Commission will review, and discuss any proposed changes at a later date, after all
properties are reviewed. The change must be approved by City Council, and property owners would
need to be notified.
7. Adjournment: There being no other business to discuss, Chair Saam asked for a motion to adjourn
the meeting; there was a first by Commissioner Mahler and a second by Vice Chair Connelly. By
voice vote the motion was carried and the meeting adjourned at 5:30 P.M.
The minutes were transcribed and respectfully submitted by Sarah Cowan, Recording Secretary.
Page 12 of 28
MEMO
To: Historic Preservation Commission
From: Zach Ewoldt AICP, Planner
Date: February 6, 2026
Re: Certificate of Appropriateness for Building Facade Modifications at 101 South Batavia
Avenue
Alex Teipel, Applicant
Summary: Alex Teipel, the architect for the property owner, has submitted a Certificate of
Appropriateness (COA) request for modifications to the building façade at 101 South Batavia Avenue.
The proposal includes installing two (2) pairs of new windows on the eastern building elevation.
Historic District Designation: Non-Contributing Structure
Background: Marberry Aurora LLC purchased 101 South Batavia Avenue in late 2025 with the intent to
establish a dry-cleaning facility at this location. According to Batavia Township records, the building was
constructed in 1940 and has historically served as a Texaco gas station and later a liquor store. The
structure has been vacant for approximately six (6) years, during which time it has deteriorated and now
requires significant repair. In January, the Commission approved the replacement of both the mansard
and flat roofs.
The applicant now proposes removing three (3) stone panels on the eastern façade and installing two (2)
pairs of dark bronze aluminum windows, each measuring six (6) feet eight (8) inches by seven (7) feet.
According to the applicant, these windows will occupy the former service door openings from when the
building’s use was a Texaco service station. The applicant also intends to repair the existing façade as
needed, with in-kind siding replacement. The plans note that the façade will be painted, although no
color selection has been provided, nor is it clear whether painting will occur on all elevations. While the
painting of non-masonry siding does not require a COA, the Commission may still review and provide
feedback.
Historic Preservation Commissions Design Guidelines Conformance: Staff reviewed the Commission’s
adopted design guidelines for windows and determined that the proposed materials and design meet
the applicable criteria. The guidelines specifically allow painted or anodized aluminum windows. As this
is a non-contributing structure, the proposed materials are consistent with previously approved window
installations within the district. The window dimensions are also appropriate in relation to the building’s
façade.
Downtown Plan Conformance: Staff reviewed the Downtown Plan and finds the proposed windows
consistent with the plan’s intent. The plan encourages the incorporation of large display windows in the
downtown area where appropriate and compatible with surrounding buildings. If approved, the new
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 13 of 28
windows will introduce natural light into the building and add architectural interest along the
streetscape, contributing positively to the overall pedestrian environment.
Staff Recommendation: Staff recommends that the Historic Preservation Commission approve the
Certificate of Appropriateness for 101 South Batavia Avenue as presented, for the modifications to the
building façade at 101 South Batavia Avenue to install two (2) pairs of new windows on the eastern
building elevation.
Attachments: Application and Plans
C: Mayor and City Council
Department Heads
Alex Teipel, Architect and Applicant
Marberry Aurora LLC, Property and Business Owner
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 14 of 28
REVISIONS BY:
1 TYP.
A1
EXISTING MANSARD ROOF w/ SHAKE SHINGLES; EXAMINE & REPAIR & REPLACE AS REQUIRED
W. Alex Teipel - Architect
1231 South 12th Street, St. Charles, Illinois 60174
DRYWALL
9'-0"
PICK-UP DROP-OFF
6'-8"
C W. Alex Teipel - Architect
PANEL BY PANEL BY
OTHERS OTHERS
4" VINYL BASE
EXISTING WINDOW
NO CHANGE
EXISTING WINDOW & DOORS
NO CHANGE
1 TYP.
(630) 803-8377 wateipel3@gmail.com
EXISTING SIDING NO CHANGE A1
DASHED LINES INDICATE O.H.DOOR OPENINGS TO BE
CLOSED w/ 2x4 WD STUDS @16" O.C & 5/8" DRYWALL PICK-UP DROP-OFF
PANEL PANEL
9'-2" 2'-6" 10'-3" 13'-0"
2'-9 1/2" 1'-6" 2'-7 1/2"
EXISTING VERIFY DIMENSIONS OF PICK-UP & DROP-OFF PANELS w/ SUPPLIER
3/0x7/0
EXISTING STONE PANELS
ELEVATION of NEW WALL
A
TO BE REMOVED & REPLACED w/
ALUM. FRAMED WINDOWS &
SIDING TO MATCH EXISTING
SCALE: 1/4" = 1'-0"
EXISTING EAST ELEVATION
SCALE: 1/4" = 1'-0"
TYPICAL WALL CONSTRUCTION
SIDING TO MATCH EXISTING ON
EXISTING MANSARD ROOF w/ SHAKE SHINGLES; EXAMINE & REPAIR & REPLACE AS REQUIRED MSD SHEATHING ON 2x4 WOOD
STUDS @ 24" O.C. w/ 5/8" DRYWALL
FINISH
2"
PATCH SIDING ABOVE WINDOWS & WHERE STONE PANELS
HAVE BEEN REMOVED w/ SIDING TO MATCH EXISTING
4 3/4'
NEW ALUMINUM FRAMES & 1/2" INSULSTING GLASS
EXISTING WINDOW & DOORS
NO CHANGE
2"
1'-9"
REMODELING for MARBERRY CLEANERS at
1
EAST ELEVATION
TYP.
Note: • • • • • • • •• • •• • • • •• • •• • • •• • • • •• • •• • • • • • •• ••• •• • • • •• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •
FRONT SET - STICK ASSEMBLY OUTSIDE GLAZED
A2
(1/4" INFILL) APPROVED ALTERNATE MANUFACTURERS ALLOWED
Existing Plan with Demolition & Floor Plan & Notes
1. Entire East Elevation will need to be painted, prep &
2 coats; verify color with owner.
1'-9"
SCALE: 1/4" = 1'-0"
2. Inspect existing flat roof and back side of Mansard 4'-6"
roof and advise on repairs or new single ply membrane
roof w/ insulation.
4"
101 South Batavia Avenue
TYPICAL WINDOW DETAIL
1
Batavia, Illinois
NOT TO SCALE
Date 01/19/26
Scale AS NOTED
HOLD HARMLESS STATEMENT
Drawn W.A.T.
The Architect is not overseeing the construction of this building. The use
of these drawings by any Contractor, Subcontractor, Builders, Mechanic, Job 26-3206
Tradesmen or Worker shall instigate a Hold Harmless Agreement between
the drawing User and the Architect. The User shall in fact agree to hold
Page 15 of 28
the Architect harmless for any responsibility in regard to construction means,
methods, techniques, sequences or procedures and for any safety precautions
Sheet
and programs in connection with the work and further shall hold the Architect
A2
harmless for costs and problems arising from the negligence of Contractor,
Subcontractor, Builders, Mechanic, Tradesmen or Workers. The use of these
Drawings also implies that the Architect shall take no responsibility for the plan
User's failure to carry out the work in accordance with the Drawing or Contract
Documents.
Of 3 Sheets
Page 16 of 28
Page 17 of 28
Page 18 of 28
Page 19 of 28
Page 20 of 28
Page 21 of 28
MEMO
To: Historic Preservation Commission
From: Zach Ewoldt AICP, Planner
Date: February 6, 2026
Re: Discussion: Certificate of Appropriateness Approval Matrix
City of Batavia, Applicant
Update: Staff provided an initial introduction of the Approval Matrix at the January 12, 2026 meeting.
Following preliminary discussion, the Commission requested additional time for review and continued
the item to the February 9, 2026 meeting.
Since that meeting, one member of the public, Al Watts of Preservation Partners, contacted staff. He
suggested that the Commission consider discussing the following items to determine whether
administrative approval is appropriate, noting that changes in these areas could have potential negative
impacts on the overall historic district or on adjacent contributing/significant structures:
• Repair & Maintenance: Fencing, Accessory Structures
• Alterations & New Construction: Architectural Features, Awnings, Gutters/Downspouts,
Lighting, Shutters (new or replacement), Siding Trim (replacement of less than 10%)
• Site: Landscape Structures, Lighting
• Demolition: Accessory Building
No revisions to the matrix have been made since the initial presentation.
Summary: Staff has prepared a draft Certificate of Appropriateness Approval Matrix outlining which
improvements may be administratively approved by staff and which require action by the Historic
Preservation Commission.
Background: Over the past several years, staff and the Historic Preservation Commission have discussed
the expansion of administrative approvals to allow additional improvements to be approved by City staff.
In recent months, staff has conducted a review of comparable communities and prepared a draft
approval matrix. The matrix identifies each type of improvement and indicates whether it may be
administratively approved or requires approval by the Historic Preservation Commission, based on the
property’s designation as non-designated, noncontributing, contributing, or significant. The framework
for the matrix is based on the City of Geneva’s approach, which has improved project timelines and
provided clearer information to the public regarding the approval process.
The proposed process aligns with an existing procedure under the Zoning Code and the Plan
Commission, where staff may approve projects administratively when they meet established criteria and
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 22 of 28
comply with all applicable codes and regulations. This process has been in place since 2010 and has been
successfully implemented without issue. When a project proposes multiple improvements, does not
align with adopted design guidelines, or may alter the character of the surrounding area, it is referred to
the Plan Commission for review and action. Similarly, staff anticipates not issuing administrative denials
under the proposed matrix and would refer any project raising questions or concerns to the Historic
Preservation Commission for review.
Staff Recommendation: Staff recommends that the Historic Preservation Commission review and discuss
the proposed approval matrix and provide feedback to staff. Should the Commission determine that
additional time or modifications are necessary, the item may be continued to a date certain for further
discussion or scheduled for formal action.
Attachments: Approval Matrix
C: Mayor and City Council
Department Heads
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 23 of 28
City of Batavia
Certificate of Appropriateness (COA) Review Process
Batavia Historic District or Designated Individual Landmarks
The Historic Preservation Commission has adopted a list of improvements eligible for administrative review and
approval by Community and Economic Development Department staff for a Certificate of Appropriateness (COA). The
Director may refer any administrative COA to the Historic Preservation Commission for action.
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Repair & Maintenance
Building
Architectural Features, repair of X X X X
existing
Siding / Trim, repair of original X X X X
material including up to 10%
replacement
Chimney Repair and no material X
replacement
Masonry Repointing with X
compatible mortar and no change
in joint width or color (no material
replacement)
Painting of previously painted X
surfaces (regardless of paint color)
Roof cladding with like materials X X X X
Site
Access Drives X X X X
Fences X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
Storage and/or Accessory X X X X
Structures, repair or replacement
of existing
Walkways X X X X
Page 24 of 28
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Alterations and New Construction
Building
Access Ramps/Lifts, erection, X X X X
alteration and/or removal
(primary or street façade)
Access Ramps/Lifts, erection, X X X X
alteration and/or removal (facades
not visible from public way)
Architectural Features and Details, X X X X
reconstruction or replication of
original elements with like
materials
Architectural Features and Details, X X X X
replacement or installation of new
with substitute materials
Awnings X X X X
Additions at any location, X X X X
horizontal or vertical
Architectural Modification (minor), X X X X
primary or street-facing facade
Architectural Modification (minor), X X X X
any facade not visible from public
way
Chimney Replacement, primary or X X X X
street-acing façade, including
material replacement
Chimney Replacement, secondary X X X X
or rear elevation, including
material replacement
Decorative Glass (colored, leaded X
or beveled)
Doors, except storm/screen doors X X X X
Gutters / downspouts, attached X
Gutters / downspouts, integral X
Gutter Fascia Trim, installation of X X X X
substitute material obscured by
gutter
Lighting, attached X X X X
Page 25 of 28
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Mailboxes X
Masonry Repair/Repointing X X X X
(including material replacement,
infill of existing openings and/or
insertion of new openings)
Painting of unpainted material X X X X
(including masonry, metals, and
wood)
Porches, decks, outdoor seating X X X X
areas, raised terraces and
attached steps (including
enclosure of existing porches)
Principal Structure, new X X X X
Roof cladding, change in materials X X X X
Roofs, change in roofline and/or X X X X
pitch
Satellite Dishes X
Shutters, new X X X X
Shutters, removal of existing X X X X
Shutters, or replacement X X X X
Siding / Trim, removal of synthetic X X X X
materials
Siding / Trim, repair of original X X X X
material more than 10%
replacement
Siding / Trim, installation of X X X X
substitute material at existing
structure or new addition
Signs, new (attached) X X X X
Signs, replacement of existing face X X X X
(attached)
Storm/Screen Doors and Windows, X
wood
Storm/Screen Doors and Windows, X
non-wood
Window Repair or replacement, X X X X
street-facing facade or visible from
public way
Page 26 of 28
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Window Repair, any facade not X X X X
visible from public way except at
rear facades along public alleyway
Window Replacement, any X X X X
facade not visible from public
way except at rear facades along
public alleyway
Site
Accessory Buildings or Structures X X X X
100 sq. feet or more
Access Drives, expansion or X
modification
Access Drives, replacement in- X
kind
Air Conditioner Condensing Units X X X X
Fences, front or corner side X X X X
setback
Fences, side or rear setback X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
Lighting, General Building Facade X X X X
Lighting, Landscape or site X X X X
Mechanical and Electrical Service X X X X
Equipment, at grade
Mechanical and Electrical Service X X X X
Equipment, thru wall
Parking Lots X
Patios, at grade X X X X
Patios, raised X X X X
Signs, new (free-standing) X X X X
Signs, replacement of existing X X X X
face
Walkways, expansion or X X X X
modification
Walkways, replacement in-kind X X X X
All Other Site Modifications X X X X
Page 27 of 28
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Demolition, Removal and Relocation
Accessory Buildings or Structures X X X X
Chimney Removal X X X X
Principal Structures X X X X
Fences/Walls, non-historic X X X X
Fences/Walls, historic X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
Page 28 of 28
Get email alerts for Batavia
A daily email when new agendas and minutes are posted.