Historic Preservation Commission
Regular MeetingBatavia, IL · March 9, 2026
Agenda
City of Batavia
Historic Preservation Commission
Monday, March 9, 2026 at 5:00 PM
100 N. Island Ave, Batavia, IL 60510 in the City Council Chambers
Questions and comments regarding agenda items can be submitted prior to 4 PM the day of the meeting by emailing
Zach Ewoldt, Planner at zewoldt@bataviail.gov
Page
1. Meeting Call to Order
2. Roll Call
Jamie Saam, Chair Tom Connelly, Vice Chair
Phil Bus William Mahler
Mark Allen Jamie Koc
3. Approval of Minutes
3.1 February 9, 2026 2
Minutes
4. Items Removed, Added or Changed
5. Matters from the Public: (For Items NOT on the Agenda)
6. Regular Agenda
6.1 Property Owner Discussion: 30 S Shumway Ave "Old City Hall"
6.2 Adoption of Certificate of Appropriateness Approval Matrix 5
Staff Memo - Approval Matrix
6.3 2025 Year End Report 11
2025 Year End Report
7. Updates
8. Other Business
9. Adjournment
Individuals with disabilities should notify the City Administrator’s office at 630-454-2053 if they have a
disability which will require special assistance or services and, if so, what services are required. This
notification should occur as far as possible before the City-sponsored function, program, or meeting.
Page 1 of 15
MINUTES
February 9, 2026
Historic Preservation Commission
City of Batavia
PLEASE NOTE: These minutes are not a word-for-word transcription of the statements made at the meeting, nor
intended to be a comprehensive review of all discussions. They are intended to make an official record of the actions
taken by the Commission and to include some description of discussion points as understood by the minute-taker.
They may not reference some of the individual attendees’ comments, nor the complete comments if referenced.
1. Meeting Called to Order for the Historic Preservation Commission
Chair Saam called the meeting to order at 5:00 P.M.
2. Roll Call:
Members Present: Commissioner Koc, Commissioner Allen, Commissioner Bus, Vice
Chair Connelly, Chair Saam
Members Absent: Commissioner Mahler
Also Present: Zach Ewoldt (Planner), Sarah Cowan (Recording Secretary)
3. Approval of Minutes
3.1. January 12, 2026
Motion: To approve the minutes.
Maker: Bus
Second: Connelly
Voice Vote: 5:0 – Motion Carried.
3.2. January 26, 2026
Motion: To approve the minutes.
Maker: Connelly
Second: Bus
Voice Vote: 5:0 – Motion Carried.
4. Items to be Removed, Added or Changed: None.
5. Matters From the Public (Not on the agenda): None.
6. Regular Agenda Items
6.1 Certificate of Appropriateness for Building Façade Modifications at 101 South Batavia Avenue
Alex Teipel, Applicant
Page 2 of 15
Plan Commission
January 21,2026, Page 2
Zach Ewoldt presented the request on behalf of the applicant, requesting authorization to install two
new windows on the non-contributing structure. Alex Teipel stated there is no intention of painting
the brick underneath the façade, and there are no plans to change to rear of the building at this time.
Motion: To approve the COA as submitted
Maker: Connelly
Second: Allen
Roll Call Vote: 5:0 – Motion Carried.
6.2 Discussion: Certificate of Appropriateness Approval Matrix
Zach Ewoldt continued the discussion from the previous Historic Preservation Commission meeting
on the Certificate of Appropriateness Approval Matrix. Ewoldt stated that staff has no intention of
issuing a denial, and that the Historic Preservation Commission would have the role of denial, and
this will be added in the wording of the document for clarity. Ewoldt also agreed to modify the
wordings of “Community and Economic Development Staff” more specifically to the Community
and Economic Development director or designee. Ewoldt confirmed the ability to provide updates on
each agenda for items that have been approved. Ewoldt stated that for the record, this matrix was
modeled after Geneva and could be reviewed annually. Ewoldt stated this topic will be presented to
the Historic Preservation Commission again in February or March.
7. Updates:
7.1 RFP: Exterior Building Condition Assessments for Historic District Properties
Zach Ewoldt reviewed the request for proposals for the exterior building assessment which will close
February 13, 2026, with an expected well-rounded pool of applicants. Ewoldt stated that each
property designated as significant would have an assessment of the condition of windows, doors,
roofing, siding etc., documented with photographs. Ewoldt noted there is an option to provide a base
estimate for the contributing structures.
7.2 30 South Shumway “Old City Hall” New Property Owner
Zach Ewoldt stated that the old City Hall has sold, and the new property owner may attend the next
Historic Preservation Commission meeting on February 23, 2026, to discuss several necessary
updates including siding replacement, window modifications, and balcony work. Ewoldt confirmed
this building is currently occupied by three office tenants and Bird is the Word, and the building is
designated as a significant structure. A walk-through of the building will be planned for a future date
with the Historic Preservation Commission.
8. Other Business: None
Page 3 of 15
Plan Commission
January 21,2026, Page 3
9. Adjournment: There being no other business to discuss, Chair Saam asked for a motion to adjourn
the meeting; there was a first by Vice Chair Connely and a second by Commissioner Allen. By voice
vote the motion was carried and the meeting adjourned at 5:40 P.M.
The minutes were transcribed and respectfully submitted by Sarah Cowan, Recording Secretary.
Page 4 of 15
MEMO
To: Historic Preservation Commission
From: Zach Ewoldt AICP, Planner
Date: March 5, 2026
Re: Adoption of Certificate of Appropriateness Approval Matrix
City of Batavia, Applicant
Summary: The Historic Preservation Commission (HPC) has reviewed and discussed a draft Certificate of
Appropriateness Approval Matrix at its January 12 and February 12 meetings. The matrix is intended to
outline which improvements within the City of Batavia’s Historic District, or on properties that have been
locally designated, may be administratively approved by staff and which require action by the Historic
Preservation Commission.
Background: Over the past several years, staff and the Historic Preservation Commission have discussed
expanding administrative approvals to allow additional improvements to be reviewed and approved by
City staff. In recent months, staff conducted a review of comparable communities and prepared a draft
approval matrix. The matrix identifies each type of improvement and indicates whether it may be
administratively approved or requires Commission approval, based on the property’s designation as non-
designated, noncontributing, contributing, or significant. The framework for the matrix is modeled after
the City of Geneva’s approach, which has improved project timelines and provided clearer information to
the public regarding the approval process.
The proposed process is consistent with an existing procedure under the Zoning Code and the Plan
Commission, whereby staff may approve projects administratively when they meet established criteria
and comply with all applicable codes and regulations. This process has been in place since 2010 and has
been implemented successfully without issue. When a project proposes multiple improvements, does
not align with adopted design guidelines, or may alter the character of the surrounding area, it is
referred to the Plan Commission for review and action.
Staff would employ a similar process for the proposed matrix. Any project that does not clearly meet the
established criteria, or that raises questions or concerns regarding appropriateness or potential impacts,
would be referred to the Historic Preservation Commission for review and action. Staff would not be
authorized to issue administrative denials, subject to the direction of the Historic Preservation
Commission and the pending amendments to Title 12 of the City Code.
Staff Recommendation: Staff recommends that the Historic Preservation Commission review and adopt
the proposed Certificate of Appropriateness Approval Matrix. If adopted, the matrix would become
effective immediately.
Attachments: Approval Matrix C: Mayor and City Council
Department Heads
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 5 of 15
City of Batavia
Certificate of Appropriateness (COA) Review Process
Batavia Historic District or Designated Individual Landmarks
The Historic Preservation Commission has adopted the following list of improvements that are eligible for
administrative review and approval of a Certificate of Appropriateness (COA) by the Director of the Community and
Economic Development Department, or their designee. Staff shall not deny a Certificate of Appropriateness under
administrative review. Any application that does not clearly meet the administrative review criteria, or that raises
questions regarding appropriateness, consistency, or potential impacts to historic district, shall be referred to the
Historic Preservation Commission for review and action.
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Repair & Maintenance
Building
Architectural Features, repair of X X X X
existing
Siding / Trim, repair of original X X X X
material including up to 10%
replacement
Chimney Repair and no material X
replacement
Masonry Repointing with X
compatible mortar and no change
in joint width, color, style or
texture (no material replacement)
Painting of previously painted X
surfaces (regardless of paint color)
Roof cladding with like materials X X X X
Site
Access Drives X X X X
Fences X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
Storage and/or Accessory X X X X
Structures, repair or replacement
of existing
Walkways X X X X
1|Page
Page 6 of 15
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Alterations and New Construction
Building
Access Ramps/Lifts, erection, X X X X
alteration and/or removal
(primary or street façade)
Access Ramps/Lifts, erection, X X X X
alteration and/or removal (facades
not visible from public way)
Architectural Features and Details, X X X X
reconstruction or replication of
original elements with like
materials
Architectural Features and Details, X X X X
replacement or installation of new
with substitute materials
Awnings X X X X
Additions at any location, X X X X
horizontal or vertical
Architectural Modification (minor), X X X X
primary or street-facing facade
Architectural Modification (minor), X X X X
any facade not visible from public
way
Chimney Replacement, primary or X X X X
street-acing façade, including
material replacement
Chimney Replacement, secondary X X X X
or rear elevation, including
material replacement
Decorative Glass (colored, leaded X X X X
or beveled)
Doors, except storm/screen doors X X X X
Gutters / downspouts, attached X
Gutters / downspouts, integral X
Gutter Fascia Trim, installation of X X X X
substitute material obscured by
gutter
Lighting, attached X X X X
2|Page
Page 7 of 15
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Mailboxes X
Masonry Repair/Repointing X X X X
(including material replacement,
infill of existing openings and/or
insertion of new openings)
Painting of unpainted material X X X X
(including masonry, metals, and
wood)
Porches, decks, outdoor seating X X X X
areas, raised terraces and
attached steps (including
enclosure of existing porches)
Principal Structure, new X X X X
Roof cladding, change in materials X X X X
Roofs, change in roofline and/or X X X X
pitch
Roof, flat roof not visible from X X X X
public street.
Satellite Dishes X
Shutters, new X X X X
Shutters, removal of existing X X X X
Shutters, or replacement X X X X
Siding / Trim, removal of synthetic X X X X
materials
Siding / Trim, repair of original X X X X
material more than 10%
replacement
Siding / Trim, installation of X X X X
substitute material at existing
structure or new addition
Signs, new (attached) X X X X
Signs, replacement of existing face X X X X
(attached)
Storm/Screen Doors and Windows, X
wood
Storm/Screen Doors and Windows, X
non-wood
Window Repair or replacement, X X X X
street-facing facade or visible from
public way
3|Page
Page 8 of 15
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Window Repair, any facade not X X X X
visible from public way except at
rear facades along public alleyway
Window Replacement, any X X X X
facade not visible from public
way except at rear facades along
public alleyway
Site
Accessory Buildings or Structures X X X X
100 sq. feet or more
Access Drives, expansion or X
modification
Access Drives, replacement in- X
kind
Air Conditioner Condensing Units X X X X
Fences, front or corner side X X X X
setback
Fences, side or rear setback X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
Lighting, General Building Facade X X X X
Lighting, Landscape or site X X X X
Mechanical and Electrical Service X X X X
Equipment, at grade
Mechanical and Electrical Service X X X X
Equipment, thru wall
Parking Lots X
Patios, at grade X X X X
Patios, raised X X X X
Signs, new (free-standing) X X X X
Signs, replacement of existing X X X X
face
Walkways, expansion or X X X X
modification
Walkways, replacement in-kind X X X X
All Other Site Modifications X X X X
4|Page
Page 9 of 15
Type of Work Proposed Exempt Minor Work Significant Work
Work Administrative Review HPC Review
Non-Designated Non-Contributing Contributing Non-Designated Non-Contributing Contributing
Significant Significant
Demolition, Removal and Relocation
Accessory Buildings or Structures X X X X
Chimney Removal X X X X
Principal Structures X X X X
Fences/Walls, non-historic X X X X
Fences/Walls, historic X X X X
Landscape Structures (walls, X X X X
pergolas, gazebos, etc.)
5|Page
Page 10 of 15
MEMO
To: Historic Preservation Commission
From: Zach Ewoldt AICP, Planner
Date: March 5, 2026
Subject: 2025 Annual Report of the Historic Preservation Commission
This report summarizes the actions of the Historic Preservation from January 1 through December 31,
2025. During this period, the Commission held thirteen (13) regular meetings, with eleven (11) meetings
cancelled.
Certificate of Appropriateness Applications Reviewed
Historic Preservation City Council Action*
Commission Action
Improvement Type Total Approved Pending Denied Approved Pending Denied
Awnings 2 2
Building Addition 1 1
Building Facade 3 3 - - -
Deck 1 1 - - -
Demolition 3 3 2 1 -
Doors 1 1 - - -
Mural/Public Art 1 1
Roof 4 4 - - -
Signage - - -
Free Standing 2 2 - - -
Wall 2 2 - - -
Site Improvements 2 2
Solar 1 1 - - -
Windows 2 2
Total Applications 25 25 0 0 24 1 0
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 11 of 15
*Not all Certificate of Appropriateness Applications do not require City Council approval, unless
a decision is appealed or the requested Certificate of Appropriates Application is for the
demolition of a building or structure.
LIST OF CERTIFICATE OF APPROPRIATNESS APPLICATIONS
• Wall Sign, 100 North Island Avenue – City Hall for Batavia
o Applicant: Batavia Public Art Initiative
o The application proposed the installation of an informational sign for the public art
installation on 100 North Island Avenue (City Hall) along the river walk.
o Project Status: Completed
• Exterior Decks, 10 Shumway Avenue – Sturdy Shelter Brewery
o Applicant: Frank Mercadante
o The application proposed the installation of two (2) decks, an upper and lower deck on
the east side of the building/property.
o Project Status: Permit Under Review
• Exterior Façade & Site Improvements, 28 South Water Street – Batavia WorkNet Center
o Applicant: BEI Commercial Real Estate
o The application proposed the installation of new first floor windows, restoration of
windowsills, a new door, and other minor masonry work.
o Project Status: Complete
• Exterior Façade & Site Improvements, 21 North River Street
o Applicant: Carrier Sebold
o The application proposed comprehensive improvements to the building façade and
overall site to facilitate restaurant use.
o Project Status: Withdrawn (Applicant No Longer Pursuing Purchase of Property)
• Roof Replacement, 25 -31 North River Street – Pal Joeys Building
o Applicant: One Source Roofing
o The application proposed the replacement of the flat roof membrane.
o Project Status: Permit Issued
• Free Standing Sign, 108 North Batavia Avenue – Shell Gas Station
o Applicant: HM1 Batavia, LLC
o The application proposed modifying the existing gas station sign, allowing for an
additional tenant sign to be added.
o Project Status: Complete
• Roof Replacement, 239 East Wilson Street
o Applicant: Mike West Construction
o The application proposed replacing the existing roof.
o Project Status: Complete
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 12 of 15
• Public Art Project, 18 East Wilson Street- Comedy Vault Building
o Applicant: Water Street Studios
o The application proposed the installation of a public art installation on the building’s
southern façade.
o Project Status: Complete
• Rooftop Solar, 21 South Batavia Avenue – Congregational Church of Batavia
o Applicant: Independence Renewable Energy
o The application proposed the installation of roof mounted solar on portions of the
church’s flat roof.
o Project Status: Permit Issued
• Building Addition, 125 Flinn Street – QT9 Project
o Applicant: Torch Architecture
o The application proposed façade changes and site improvements to the former Pamarco
industrial space.
o Project Status: Permit Under Review
• Roof & Building Façade, 226 South Batavia Avenue – Consentino Law Firm
o Applicant: Chris Consentino
o The application proposed the replacement of the garage’s roof and siding, as it was
damaged in a fire in 2025.
o Project Status: Completed
• Building Demolition, 23 North Water Street
o Applicant: Batavia United Methodist Church
o The application proposed the demolition of the Quonset Hut on the property.
o Project Status: City Council Approved
• Site Improvements, 106 North River Street – City of Batavia Bathroom Plaza
o Applicant: City of Batavia
o The application proposed the construction of a public plaza and bathroom facility along
North River Street.
o Project Status: Permit Under Review
• Wall Sign, 28 South Van Buren Street – Cinco De Mayo Grocery Store
o Applicant: Gerardo Parra
o The application proposed the replacement a wall sign in the tenant space formerly
occupied by Berkley finer foods.
o Project Status: Completed
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 13 of 15
• Roof & Gutter Replacement, 10 South Batavia Avenue – Batavia Public Library
o Applicant: All American Exterior Solutions
o The application proposed the replacement of the roof and gutters. The primary change
to the roof design was to not include the decorative copper ridge vent with the roof’s
replacement.
o Project Status: Completed
• Window Replacement. 28 South Water Street
o Applicant: BEI Commercial Real Estate
o The application proposed the replacement of the windows on the second floor of the
building.
o Project Status: Completed
• Building Demolition, 14-18 North Batavia Avenue
o Applicant: Batavia United Methodist Church
o The application proposed the demolition of the former Hubbard’s/Ethan Allen Furniture
Store.
o Project Status: Pending City Council Review (City Awaiting Additional Documentation)
• Awnings & Freestanding Sign, 320 Houston Street
o Applicant: Stephan Perrault on behalf of West DuPage Cabinets & Granite
o The building awnings and freestanding signage replaced.
o Project Status: Completed
• Chimney Demolition, 25-31 North River Street
o Applicant: Mary Claire Keen
o The application proposed the demolition of a former industrial chimney stack on the
property.
o Project Status: Building Permit Approved
• Awnings, 25-31 North River Street
o Applicant: Mary Claire Keen
o The application proposed the removal of awnings on the building. The commission
required an awning or covering to remain above the 21 N River Street apartment
building entrance.
o Project Status: Building Permit Issued
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 14 of 15
Commissioner Attendance
Plan Commission and Zoning Board of Appeals Member Attendance
Commissioner Name Meetings Present Meetings Absent
Mark Allen 10 3
Phil Bus 12 1
Tom Connelly, Vice Chair 9 4
Jamie Koc 4 9
William Mahler 11 2
Jamie Saam, Chair 11 2
Vacant - -
c Mayor and City Council
Department Heads
Media
Jeffery D. Schielke Government Center ● 100 N. Island Ave ● Batavia, IL 60510 ● 630-454-2000 ● www.BataviaIL.gov
Page 15 of 15
Get email alerts for Batavia
A daily email when new agendas and minutes are posted.