Special City Council
Special MeetingBatavia, IL · November 10, 2025
Agenda
Special City Council - Nov 10 2025
Monday, November 10, 2025 at 7:05 PM
100 N. Island Ave, Batavia, IL 60510
For viewing purposes only, the meeting will be broadcast live on BATV’s YouTube channel which can be
accessed from their website at myBATV.com at https://www.youtube.com/user/BATV1017
Page
1. Meeting Called to Order
2. Invocation, followed by Pledge of Allegiance
3. Roll Call
4. Reminder: Please speak into the microphone for BATV recording
5. Matters from the Public (For items not on the agenda)
6. Items removed, added, or changed
7. Consent Agenda
The consent agenda is made up of items recommended by city staff that require
recommendation to the full City Council by the Cow. This agenda is placed as a
separate item of the COW agenda. The items on the consent agenda are usually
minor items, already budgeted, standard non-policy activities or outgrowths of
earlier meetings and are voted on as a “package” in the interest of saving time on
non-controversial issues. However, any council member may, by simple request,
have an item removed and placed on the “regular” agenda
Accept and Place on File
Approvals
Page 1 of 28
8. Regular Agenda
8.1 Resolution 2025-132-R: Authorizing Emergency Repairs of Well 3 - 13
#9 - PU (JB)
2025-132-R Memo.docx Resolution 2025-132-R.docx Resolution
2025-132-R_PACKET.pdf
8.2 Resolution 2025-131-R: Authorizing Emergency Repairs of 14 - 22
Sewer Cleaning Equipment - PU (JB)
2025-131-R Memo.docx Resolution 2025-131-R .docx
Resolution 2025-131-R_PACKET.pdf
8.3 Ordinance 2025-065: Amending the Municipal Code Adding 23 - 28
Title 7, Chapter 8: Restricted Uses of City Property - GS (LN)
Amending TItle 7 Chapter 8 of the Municipal Code.pdf
9. City Council Updates
9.1 Administrator's Report
9.2 Other Business
9.3 Mayor's Report
10. Adjournment
Individuals with disabilities should notify the City Administrator's office at 630-454-2053 if they
have a disability which will require special assistance or services and, if so, what services are
required. This notification should occur as far as possible before the City-sponsored function,
program or meeting.
Page 2 of 28
Agenda Topic: RES 2025-132-R: Authorizing Emergency Rehabilitation of Well No. 9
From: Jeremy Barkei, Asst. Director of Public Works
Date: 11/6/2025
Materials: Resolution 2025-132-R, Proposal, Bid Tab
Staff Contact(s): Jeremy Barkei, Asst. Director of Public Works
Andrea Podraza, Director of Public Works
Strategic Plan or Other Effective Governance & Service Delivery
Goal(s):
Purpose of Agenda Item
Seeking City Council approval authorizing emergency rehabilitation of Well No. 9.
Well No. 9 is the City’s highest-producing groundwater deep well, experienced a catastrophic motor
failure on July 19, 2025, resulting in the need for removal, comprehensive inspection, and extensive
repair. Approval of this emergency rehabilitation ensures the City maintains a reliable water supply
and minimizes potential service disruptions.
This action aligns with the City’s strategic goal of maintaining critical infrastructure to ensure safe
and reliable water delivery to residents and businesses.
Background Information/History
On July 19, 2025, Well No. 9 experienced an overload fault during active production. Preliminary data
indicated a probable catastrophic motor failure and/or phase-to-phase short. Emergency T&M work
was approved to pull the motor from the well and perform a comprehensive inspection. The motor
and pump assembly were successfully extracted to grade (approx. 1,275’) for evaluation.
Inspection findings confirmed that the motor failed, and the pump/motor assembly required either
repair or replacement. Water Well Solutions of Elburn, selected through an RFP process, provided a
repair estimate. While preliminary cost estimates suggested a potential expense of approximately
$400,000, the actual repair/replacement cost is anticipated to be around $257,183.50.
Page 3 of 28
Analysis and Implications for Policy, Budget, and Communications
• Policy Implications: Ensuring the functionality of Well No. 9 aligns with existing municipal
water system policies and emergency preparedness measures. Failure to act may lead to
reduced water production capacity, impacting operational reliability and compliance with
service standards.
• Budget/Financial Implications: Funds for this repair are anticipated to come from the Water
Utility Capital Budget. The actual repair/replacement cost is estimated at approximately
$257,000, which is below the preliminary estimate. Approval of this expense will be reflected
in upcoming budget adjustments or potentially a budget amendment.
• Communication: Staff will notify stakeholders, including the City Council and Sr. Staff,
regarding the repair schedule and expected timeline for return to service. Residents will not
see any disruption of water service.
Pros and Cons of Various Actions and Alternatives
Approval of repair/replacement:
• Pros: Restores full capacity of water production, ensures reliable water supply, aligns with
City infrastructure policies.
• Cons: Immediate expenditure of $257,183.50 +/-
Delay or take no action:
• Pros: Avoids immediate expenditure.
• Cons: Reduced water production capacity, potential service disruptions, higher risk of
emergency situations, and long-term increased repair costs.
Recommendation and Action
Staff recommend City Council authorize the emergency rehabilitation of Well No.9 by Water Well
Solutions of Elburn at an estimated cost of $257,183.50. Because these proposed costs are strictly
estimates, staff is requesting authorization for 10% contingency, bringing the authorization to
$282,902.00.
Expenses have already been paid out for complete removal and comprehensive inspection of the Well
No. 9 pump and motor assy. This was needed to understand the full scope of the rehabilitation
efforts. These previous expenditures are included in this all-inclusive authorization.
Next Steps
Upon approval, the City will authorize Water Well Solutions to perform the rehabilitation work as
proposed. Work is expected to begin immediately, with an estimated return to service within 30 days.
Staff will provide periodic updates to Council regarding the progress and completion.
Page 4 of 28
Page 5 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-132-R
CITY OF BATAVIA, ILLINOIS
RESOLUTION 2025-132-R
AUTHORIZING EMERGENCY REHABILITATION OF WELL NO. 9
WHEREAS, the City of Batavia has identified a catastrophic failure of the City’s Well No. 9; and
WHEREAS, Staff acknowledge the need for qualified professional services related to the repair
and replacement of critical components; and
WHEREAS, the City of Batavia has requested and received proposals from several municipal
well rehabilitation firms for such work; and
WHEREAS, Water Well Solutions, LLC, Elburn, IL submitted the lowest qualified proposal and
has the appropriate expertise and experience necessary to provide the services needed for the Well
No. 9 rehabilitation efforts; and
WHEREAS, the estimated cost of the Well No. 9 rehabilitation is $257,183.50; and
WHEREAS, due to the hidden and unanticipated nature of this work, staff is requesting
authorizing an additional 10% contingency, bringing the total authorization to $282,902.00; and
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of
Batavia, Kane and DuPage Counties, Illinois, as follows:
SECTION 1: That the City Council hereby authorizes the emergency rehabilitation of
Well No. 9 for an amount not to exceed $282,902.00.
Page 1 of 2, excluding Exhibit A
Page 6 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-132-R
PRESENTED to the City Council of the City of Batavia, Illinois, this 10th day of November,
2025.
PASSED by the City Council of the City of Batavia, Illinois, this 10th day of November, 2025.
APPROVED by me as Mayor of said City of Batavia, Illinois, this 10th day of November,2025.
______________________________
Jeffery D. Schielke, Mayor
Ward Alderman Aye Nay Abstain Absent
1 Baerren
1 Solfa
2 Leman
2 Wolff
3 Lohman
3 Malone
4 Malay
4 Pieper
5 Fahrenbach
5 Beck
6 Anderson
6 Lanci
7 White
7 Barraza
Mayor Schielke
AYES NAYS ABSTAIN ABSENT
TOTALS
total holding office: Mayor and 14 Aldermen
ATTEST:
Kate Garrett, City Clerk
Page 2 of 2, excluding Exhibit A
Page 7 of 28
Agenda Topic: RES 2025-132-R: Authorizing Emergency Rehabilitation of Well No. 9
From: Jeremy Barkei, Asst. Director of Public Works
Date: 11/6/2025
Materials: Resolution 2025-132-R, Proposal, Bid Tab
Staff Contact(s): Jeremy Barkei, Asst. Director of Public Works
Andrea Podraza, Director of Public Works
Strategic Plan or Other Effective Governance & Service Delivery
Goal(s):
Purpose of Agenda Item
Seeking City Council approval authorizing emergency rehabilitation of Well No. 9.
Well No. 9 is the City’s highest-producing groundwater deep well, experienced a catastrophic motor
failure on July 19, 2025, resulting in the need for removal, comprehensive inspection, and extensive
repair. Approval of this emergency rehabilitation ensures the City maintains a reliable water supply
and minimizes potential service disruptions.
This action aligns with the City’s strategic goal of maintaining critical infrastructure to ensure safe
and reliable water delivery to residents and businesses.
Background Information/History
On July 19, 2025, Well No. 9 experienced an overload fault during active production. Preliminary data
indicated a probable catastrophic motor failure and/or phase-to-phase short. Emergency T&M work
was approved to pull the motor from the well and perform a comprehensive inspection. The motor
and pump assembly were successfully extracted to grade (approx. 1,275’) for evaluation.
Inspection findings confirmed that the motor failed, and the pump/motor assembly required either
repair or replacement. Water Well Solutions of Elburn, selected through an RFP process, provided a
repair estimate. While preliminary cost estimates suggested a potential expense of approximately
$400,000, the actual repair/replacement cost is anticipated to be around $257,183.50.
Page 8 of 28
Analysis and Implications for Policy, Budget, and Communications
• Policy Implications: Ensuring the functionality of Well No. 9 aligns with existing municipal
water system policies and emergency preparedness measures. Failure to act may lead to
reduced water production capacity, impacting operational reliability and compliance with
service standards.
• Budget/Financial Implications: Funds for this repair are anticipated to come from the Water
Utility Capital Budget. The actual repair/replacement cost is estimated at approximately
$257,000, which is below the preliminary estimate. Approval of this expense will be reflected
in upcoming budget adjustments or potentially a budget amendment.
• Communication: Staff will notify stakeholders, including the City Council and Sr. Staff,
regarding the repair schedule and expected timeline for return to service. Residents will not
see any disruption of water service.
Pros and Cons of Various Actions and Alternatives
Approval of repair/replacement:
• Pros: Restores full capacity of water production, ensures reliable water supply, aligns with
City infrastructure policies.
• Cons: Immediate expenditure of $257,183.50 +/-
Delay or take no action:
• Pros: Avoids immediate expenditure.
• Cons: Reduced water production capacity, potential service disruptions, higher risk of
emergency situations, and long-term increased repair costs.
Recommendation and Action
Staff recommend City Council authorize the emergency rehabilitation of Well No.9 by Water Well
Solutions of Elburn at an estimated cost of $257,183.50. Because these proposed costs are strictly
estimates, staff is requesting authorization for 10% contingency, bringing the authorization to
$282,902.00.
Expenses have already been paid out for complete removal and comprehensive inspection of the Well
No. 9 pump and motor assy. This was needed to understand the full scope of the rehabilitation
efforts. These previous expenditures are included in this all-inclusive authorization.
Next Steps
Upon approval, the City will authorize Water Well Solutions to perform the rehabilitation work as
proposed. Work is expected to begin immediately, with an estimated return to service within 30 days.
Staff will provide periodic updates to Council regarding the progress and completion.
Page 9 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-132-R
CITY OF BATAVIA, ILLINOIS
RESOLUTION 2025-132-R
AUTHORIZING EMERGENCY REHABILITATION OF WELL NO. 9
WHEREAS, the City of Batavia has identified a catastrophic failure of the City’s Well No. 9; and
WHEREAS, Staff acknowledge the need for qualified professional services related to the repair
and replacement of critical components; and
WHEREAS, the City of Batavia has requested and received proposals from several municipal
well rehabilitation firms for such work; and
WHEREAS, Water Well Solutions, LLC, Elburn, IL submitted the lowest qualified proposal and
has the appropriate expertise and experience necessary to provide the services needed for the Well
No. 9 rehabilitation efforts; and
WHEREAS, the estimated cost of the Well No. 9 rehabilitation is $257,183.50; and
WHEREAS, due to the hidden and unanticipated nature of this work, staff is requesting
authorizing an additional 10% contingency, bringing the total authorization to $282,902.00; and
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of
Batavia, Kane and DuPage Counties, Illinois, as follows:
SECTION 1: That the City Council hereby authorizes the emergency rehabilitation of
Well No. 9 for an amount not to exceed $282,902.00.
Page 1 of 2, excluding Exhibit A
Page 10 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-132-R
PRESENTED to the City Council of the City of Batavia, Illinois, this 10th day of November,
2025.
PASSED by the City Council of the City of Batavia, Illinois, this 10th day of November, 2025.
APPROVED by me as Mayor of said City of Batavia, Illinois, this 10th day of November,2025.
______________________________
Jeffery D. Schielke, Mayor
Ward Alderman Aye Nay Abstain Absent
1 Baerren
1 Solfa
2 Leman
2 Wolff
3 Lohman
3 Malone
4 Malay
4 Pieper
5 Fahrenbach
5 Beck
6 Anderson
6 Lanci
7 White
7 Barraza
Mayor Schielke
AYES NAYS ABSTAIN ABSENT
TOTALS
total holding office: Mayor and 14 Aldermen
ATTEST:
Kate Garrett, City Clerk
Page 2 of 2, excluding Exhibit A
Page 11 of 28
Water Well Solutions Illinois, LLC.
825 E North Street
Elburn, IL 60119
www.wwssg.com
P: 630-365-9099
PROPOSAL TO:
Date: 10/31/2025
Company: City of Batavia Public Works Dept Job Name:
Address: 200 N. Raddant Road Batavia, IL - Well 9
City: Batavia, IL 60510
Attention: Jeremy Barkei Office:
Email: jbarkei@bataviail.gov Mobile: 630-454-2452
WELL 9 UPDATED REPAIR PROPOSAL Terms: 10 Days
Qty Description Unit Price TOTAL
1 Lump sum of previous invoice - includes mobilizing, pulling, transporting $40,832.50 $40,832.50
bowl, motor, and pitless, and cleaning & inspecting the pipe
FIELD LABOR
1 TV survey $1,800.00 $1,800.00
1 Mobilize materials to job site $1,500.00 $1,500.00
48 Hours for Large rig and 1-man crew to set pumping equipment & test $270.00 $12,960.00
48 Hours for serivceman and truck to set pumping equipment & test $245.00 $11,760.00
YARD LABOR
12 Hours for machinist to tear down and inspect bowl $200.00 $2,400.00
12 Hours for serviceman to inspect motor and bowl $185.00 $2,220.00
32 Hours for machinist to repair bowl $200.00 $6,400.00
16 Hours for helper to assist machinist with repairs $156.00 $2,496.00
15 Hours for helper to load/unload $156.00 $2,340.00
1 Transport of pipe $4,120.00 $4,120.00
33 Cut and rethread column pipe, per end $273.00 $9,009.00
1 Touchup pipe repairs with epoxy, estimated $7,500.00 $7,500.00
MATERIALS
4 Bowl zinc sleeves, if needed (none on current bowl) $150.00 $600.00
850 #2 power cable, 5kV $30.00 $25,500.00
10 Bronze wear rings (includes machining bowls) $1,280.00 $12,800.00
2 Suction bowl bushings $569.00 $1,138.00
1 Refurbished Sunstar motor, 14" 300HP 4-pole 2300V w/ flat cable $91,014.00 $91,014.00
17 10" pipe coupling $262.00 $4,454.00
63 10" T&C coated pipe, for pipe makeup $180.00 $11,340.00
1 Estimated freight for motor shipping and crating $3,000.00 $3,000.00
1 Miscellaneous materials (airline, tape, banding, etc…) $2,000.00 $2,000.00
NOTE ON MATERIAL PRICES: The material pries noted above are based on current market prices. The price and other
materials are volatile. Therefore, we must reserve the right to adjust the above material prices based on market pricing the date
your order is signed and returned to us. In order to hold the current pricing, it will be necessary to immediately order the materials.
Further, Water Well Solutions will bill for the materials so ordered at the same time, signature below constitutes agreement to be
billed for those materials ordered and is your further agreement to pay, within 30 days of invoice date, for those materials ordered.
Total Amount Proposed $257,183.50
CLIENT WATER WELL SOLUTIONS ILLINOIS, LLC
The above prices, specifications and conditions are All material is guaranteed to be specified. All work to be completed in a workmanlike manner
satisfactory and are hereby accepted. Water Well according to standard practices. Any alteration or deviation from above specifications involving
Solutions is authorized to do the work as specified. Payment extra costs, will be executed only upon written orders and will become an extra charge over and
will be made within ten (10) days of invoice date, above this proposal. All agreements are contingent upon strikes, accidents or delays beyond
our control. Owner to carry fire, tornado, and other insurance.
BY: _______________ DATE: ________________ BY: ______________________ DATE: ________________
Page 12 of 28
INVOICES. Invoices will be submitted once a month with payment due within 10 days of the invoice date. A late charge at the rate of 1-1/2 %
per month, or the highest rate allowed by applicable law, whichever is lowest, will be added to all amounts outstanding after 30 days. Purchaser
agrees to pay any and all attorneys’ fees and court costs should attorneys be utilized or court proceedings initiated to collect any past due
amounts.
INFORMATION. It is recognized that Purchaser has superior knowledge of the job site, site history, access routes to the job site, known or
suspected contaminants, surface and subsurface conditions, etc., and Purchaser is obligated to advise Water Well Solutions of all or any
conditions that may affect Water Well Solutions performance hereunder. Purchaser agrees to provide Water Well Solutions with such
specifications, plans, site history information, reports, studies or other information on surface and subsurface conditions as will be reasonably
required by Water Well Solutions for safe, proper and timely performance of the work. Purchaser shall obtain all necessary permits and rights-
of-way and indemnify and hold Water Well Solutions harmless for its failure to do so and for claims of trespass or damage to property,
including underground utilities or structures; provided such claims of trespass or damage to property did not arise due to Water Well Solutions'
negligence or intentional act which arise out of the work.
LIABILTY. Neither party shall be liable to the other party for any special, indirect, incidental or consequential damages, whether based on
contract, tort (including negligence), strict liability or otherwise. Further, Purchaser agrees to indemnify and hold Water Well Solutions
harmless from and against any and all claims, demands, causes of action (including third party claims for contribution or indemnification),
liability and costs (including attorneys’ fees and other costs of defense) which result from (I) any release or threatened release of any substance
(whether hazardous of not); (ii) any claim that Water Well Solutions or any of its subcontractors was a “generator” or “transporter” of hazardous
waste or an “operator” of the job site (as such terms are used or defined under local, state or federal laws or regulations); or (iii) any negligent or
wrongful act or omission of Purchaser or others under Purchaser’s control, except that this indemnification shall not apply to the extent any
demand of cause of action results from Water Well Solutions negligence or intentional misconduct.
PERFORMANCE. Water Well Solutions will exercise reasonable skill and judgment in performing the work, EXCEPT AS EXPRESSLY
PROVIDED HEREIN, NO OTHER WARRANTIES (EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, WARRANTIES OF
MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE) ARE GIVEN HEREUNDER. Water Well Solutions does not warrant
specific results of any kind or provide any guarantee of water quality or quantity.
CHANGED CONDITIONS. The discovery of any hazardous waste, substance, pollutant, contaminant, underground obstruction, condition or
utilities on or under the job site which were not brought to the attention of Water Well Solutions prior to the date of this Work Agreement will
constitute a materially different site condition entitling Water Well Solutions, at its option, to terminate this Work Agreement (and to receive
payment for all work performed up to and including the date of such termination) or to receive an equitable adjustment in the contract price and
time for performance. Water Well Solutions, however, shall only have the right to terminate if such different site condition(s) creates additional
health and safety risks or requires Water Well Solutions to perform work outside the original scope or beyond its capabilities. In any event,
Water Well Solutions may terminate operations on a site which it believes presents an unreasonable health or safety risk.
DELAYS. Water Well Solutions shall have no liability to Purchaser, or its clients, contractors or consultants for delays attributable to acts of God,
acts of third parties, weather which is not reasonably anticipatable, intervention or public authorities, inability to obtain permits necessary to
perform the work, work stoppages, changes in applicable laws or regulations after the date of commencement of performance hereunder and
any other conditions or events which are beyond the reasonable control of Water Well Solutions shall be entitled to additional time to perform
this Work Agreement equal to the time of any such delay.
MISCELLANEOUS. The terms and conditions set forth in the Work Agreement constitute the entire understanding of the parties relating to the
work. All previous proposals, offers, and other communications relative to the work, oral or written, are hereby superseded. Any additional or
conflicting provision(s) contained in any purchase order, acknowledgement, or other form of the Purchaser is hereby expressly objected to by
Water Well Solutions and shall not modify this Work Agreement.
INTERPRETATION. This Work Agreement shall be governed and construed in accordance with the laws of the state of the job site location. If
any term, provision or condition contained herein shall, to any extent, be invalid or unenforceable, pursuant to state law or otherwise, the
remainder of the terms, provisions and conditions stated in the Work Agreement (or the application of such term, provision or condition to
person or circumstances other than those in respect of which it is invalid or unenforceable) shall not be affected, and each term, provision and
condition of this Work Agreement shall be valid and enforceable to the fullest extent permitted by law.
Page 13 of 28
Agenda Topic: RES 2025-131-R: Authorizing Emergency Repairs of Sewer Cleaning
Equipment
From: Jeremy Barkei, Asst. Director of Public Works
Date: 11/6/2025
Materials: Resolution 2025-131-R, Proposal
Staff Contact(s): Jeremy Barkei, Asst. Director of Public Works
Andrea Podraza, Director of Public Works
Scott Haines, Public Properties and Services Superintendent
Strategic Plan or Other Effective Governance & Service Delivery
Goal(s):
Purpose of Agenda Item
Requesting approval to move forward with repairs to the combination sewer cleaning and hydro
excavation truck, which recently experienced a catastrophic failure to the vacuum/fan assembly. The
total repair cost is estimated at $57,646.30.
This truck is used heavily every day by multiple divisions including Streets, Water/Sewer, Electric, and
Wastewater. It’s one of those pieces of equipment that’s relied upon to keep everything moving
behind the scenes. Having it out of service impacts several departments, so getting it repaired
quickly is critical to Public Works operations.
Background Information/History
The combination unit has been one of Public Work’s most relied-upon pieces of equipment for years.
It’s used daily for sewer maintenance, hydro excavation, and a wide variety of utility support work.
Unfortunately, the vacuum/fan assembly recently failed and rendered the hydro-excavation (vacuum)
component completely inoperable.
After a full inspection and diagnosis, it was determined that significant repairs are needed to restore
full operation. The total cost to complete the repairs is estimated at $57,646.30. While this is a
substantial repair, it’s still far less than the cost of purchasing a new combination unit, which can
exceed $600,000.
Given how much this truck is used by multiple divisions, repairing it is the most practical and cost-
effective option at this time.
Page 14 of 28
Analysis and Implications for Policy, Budget, and Communications
• Policy Implications: Repairing the truck aligns with our ongoing commitment to maintaining
reliable equipment and supporting essential public works services.
• Budget/Financial Implications: The repair cost of $57,646.30 will be covered through a split
of General Fund and Sewer Utility. Considering the age, condition, and replacement cost of
this truck, the repair represents a responsible use of resources.
• Communication: Once approved, staff will coordinate directly with the repair vendor (EJ
Equipment) to schedule the work and provide updates to all affected divisions.
Pros and Cons of Various Actions and Alternatives
Approval of repair:
• Pros: Restores a critical piece of equipment needed daily by multiple divisions, minimizes
downtime, and avoids the cost of replacement.
• Cons: Requires an unplanned expense of $57,646.30 +/-
Delay or take no action:
• Pros: Avoids immediate expenditure.
• Cons: Leaves multiple departments without a vital piece of equipment, increasing downtime,
creating inefficiencies, and requiring outside contractors at a much higher cost.
Recommendation and Action
Staff recommend City Council authorize the emergency repair of the combination sewer cleaning and
hydro excavation truck’s vacuum/fan assembly at a cost estimated at $57,646.30. Because these
proposed costs are strictly estimates, staff is requesting authorization for 10% contingency, bringing
the total authorization to $63,410.93.
Next Steps
Once approved, we’ll authorize the repair and coordinate with EJ Equipment to begin work
immediately. We’ll keep the affected divisions updated on progress and the timeline for returning the
truck to service.
Page 15 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-131-R
CITY OF BATAVIA, ILLINOIS
RESOLUTION 2025-131-R
AUTHORIZING EMERGENCY REPAIRS OF SEWER CLEANING
EQUIPMENT
WHEREAS, the City of Batavia has identified a catastrophic failure of the City’s sewer cleaning
truck; and
WHEREAS, Staff acknowledge the need for qualified professional services related to the repair
and replacement of critical components; and
WHEREAS, the City of Batavia has requested and received a proposal from the specific
equipment vendor; and
WHEREAS, EJ Equipment, Inc., Addison, IL has submitted a reasonable proposal and has the
appropriate expertise and experience necessary to provide the repairs to the sewer cleaning truck;
and
WHEREAS, the estimated cost of the emergency truck repair is $57,646.30, which is fair and
reasonable; and
WHEREAS, due to the hidden and unanticipated nature of this work, staff is requesting
authorizing an additional 10% contingency, bringing the total authorization to $63,410.93; and
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of
Batavia, Kane and DuPage Counties, Illinois, as follows:
SECTION 1: That the City Council hereby authorizes the emergency repairs of sewer
cleaning equipment for an amount not to exceed $63,410.93.
Page 1 of 2, excluding Exhibit A
Page 16 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-131-R
PRESENTED to the City Council of the City of Batavia, Illinois, this 10th day of November,
2025.
PASSED by the City Council of the City of Batavia, Illinois, this 10th day of November, 2025.
APPROVED by me as Mayor of said City of Batavia, Illinois, this 10th day of November,2025.
______________________________
Jeffery D. Schielke, Mayor
Ward Alderman Aye Nay Abstain Absent
1 Baerren
1 Solfa
2 Leman
2 Wolff
3 Lohman
3 Malone
4 Malay
4 Pieper
5 Fahrenbach
5 Beck
6 Anderson
6 Lanci
7 White
7 Barraza
Mayor Schielke
AYES NAYS ABSTAIN ABSENT
TOTALS
total holding office: Mayor and 14 Aldermen
ATTEST:
Kate Garrett, City Clerk
Page 2 of 2, excluding Exhibit A
Page 17 of 28
Agenda Topic: RES 2025-131-R: Authorizing Emergency Repairs of Sewer Cleaning
Equipment
From: Jeremy Barkei, Asst. Director of Public Works
Date: 11/6/2025
Materials: Resolution 2025-131-R, Proposal
Staff Contact(s): Jeremy Barkei, Asst. Director of Public Works
Andrea Podraza, Director of Public Works
Scott Haines, Public Properties and Services Superintendent
Strategic Plan or Other Effective Governance & Service Delivery
Goal(s):
Purpose of Agenda Item
Requesting approval to move forward with repairs to the combination sewer cleaning and hydro
excavation truck, which recently experienced a catastrophic failure to the vacuum/fan assembly. The
total repair cost is estimated at $57,646.30.
This truck is used heavily every day by multiple divisions including Streets, Water/Sewer, Electric, and
Wastewater. It’s one of those pieces of equipment that’s relied upon to keep everything moving
behind the scenes. Having it out of service impacts several departments, so getting it repaired
quickly is critical to Public Works operations.
Background Information/History
The combination unit has been one of Public Work’s most relied-upon pieces of equipment for years.
It’s used daily for sewer maintenance, hydro excavation, and a wide variety of utility support work.
Unfortunately, the vacuum/fan assembly recently failed and rendered the hydro-excavation (vacuum)
component completely inoperable.
After a full inspection and diagnosis, it was determined that significant repairs are needed to restore
full operation. The total cost to complete the repairs is estimated at $57,646.30. While this is a
substantial repair, it’s still far less than the cost of purchasing a new combination unit, which can
exceed $600,000.
Given how much this truck is used by multiple divisions, repairing it is the most practical and cost-
effective option at this time.
Page 18 of 28
Analysis and Implications for Policy, Budget, and Communications
• Policy Implications: Repairing the truck aligns with our ongoing commitment to maintaining
reliable equipment and supporting essential public works services.
• Budget/Financial Implications: The repair cost of $57,646.30 will be covered through a split
of General Fund and Sewer Utility. Considering the age, condition, and replacement cost of
this truck, the repair represents a responsible use of resources.
• Communication: Once approved, staff will coordinate directly with the repair vendor (EJ
Equipment) to schedule the work and provide updates to all affected divisions.
Pros and Cons of Various Actions and Alternatives
Approval of repair:
• Pros: Restores a critical piece of equipment needed daily by multiple divisions, minimizes
downtime, and avoids the cost of replacement.
• Cons: Requires an unplanned expense of $57,646.30 +/-
Delay or take no action:
• Pros: Avoids immediate expenditure.
• Cons: Leaves multiple departments without a vital piece of equipment, increasing downtime,
creating inefficiencies, and requiring outside contractors at a much higher cost.
Recommendation and Action
Staff recommend City Council authorize the emergency repair of the combination sewer cleaning and
hydro excavation truck’s vacuum/fan assembly at a cost estimated at $57,646.30. Because these
proposed costs are strictly estimates, staff is requesting authorization for 10% contingency, bringing
the total authorization to $63,410.93.
Next Steps
Once approved, we’ll authorize the repair and coordinate with EJ Equipment to begin work
immediately. We’ll keep the affected divisions updated on progress and the timeline for returning the
truck to service.
Page 19 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-131-R
CITY OF BATAVIA, ILLINOIS
RESOLUTION 2025-131-R
AUTHORIZING EMERGENCY REPAIRS OF SEWER CLEANING
EQUIPMENT
WHEREAS, the City of Batavia has identified a catastrophic failure of the City’s sewer cleaning
truck; and
WHEREAS, Staff acknowledge the need for qualified professional services related to the repair
and replacement of critical components; and
WHEREAS, the City of Batavia has requested and received a proposal from the specific
equipment vendor; and
WHEREAS, EJ Equipment, Inc., Addison, IL has submitted a reasonable proposal and has the
appropriate expertise and experience necessary to provide the repairs to the sewer cleaning truck;
and
WHEREAS, the estimated cost of the emergency truck repair is $57,646.30, which is fair and
reasonable; and
WHEREAS, due to the hidden and unanticipated nature of this work, staff is requesting
authorizing an additional 10% contingency, bringing the total authorization to $63,410.93; and
NOW, THEREFORE, BE IT RESOLVED, by the Mayor and City Council of the City of
Batavia, Kane and DuPage Counties, Illinois, as follows:
SECTION 1: That the City Council hereby authorizes the emergency repairs of sewer
cleaning equipment for an amount not to exceed $63,410.93.
Page 1 of 2, excluding Exhibit A
Page 20 of 28
CITY OF BATAVIA, ILLINOIS, RESOLUTION 2025-131-R
PRESENTED to the City Council of the City of Batavia, Illinois, this 10th day of November,
2025.
PASSED by the City Council of the City of Batavia, Illinois, this 10th day of November, 2025.
APPROVED by me as Mayor of said City of Batavia, Illinois, this 10th day of November,2025.
______________________________
Jeffery D. Schielke, Mayor
Ward Alderman Aye Nay Abstain Absent
1 Baerren
1 Solfa
2 Leman
2 Wolff
3 Lohman
3 Malone
4 Malay
4 Pieper
5 Fahrenbach
5 Beck
6 Anderson
6 Lanci
7 White
7 Barraza
Mayor Schielke
AYES NAYS ABSTAIN ABSENT
TOTALS
total holding office: Mayor and 14 Aldermen
ATTEST:
Kate Garrett, City Clerk
Page 2 of 2, excluding Exhibit A
Page 21 of 28
CITY OF BATAVIA 02 - NORTH
200 N RADDANT RD
BATAVIA,IL 60510-2292 11/03/2025 10:03:21 (O) 1
01
BATAV001 6304542000 005730
CITY OF BATAVIA
200 N RADDANT RD
BATAVIA IL 60510
308
ESTIMATE QUOTE VALID: 11/30/2025
Stock #: 002567 VAC-CON 9 YARD MS #: 04188162
Make: VC Model: V390
THE FOLLOWING WORK TO BE PERFORMED
NA
__________
COMPLAINT:
***THIS IS JUST AN ESTIMATE, ANY ADDITIONAL PARTS AND OR
LABOR NEEDED WILL BE DISCUSSED WITH CUSTOMER PRIOR TO THE
REPAIRS BEING PERFORMED. FREIGHT IS ONLY ESTIMATED***
-IMPELLER BRG CAUGHT ON FIRE. CAUSING DAMAGE IN THE FAN
ASSY. AFTER INSPECTING THE FAN ASSY WE FOUND THAT THE BRG
IS BAD CAUSING THE FAN TO BECOME DISLODGED AND THE FAN
BLADES ARE RUBBING INSIDE THE HOUSING.
-RECOMMENDED REPAIR IS TO REPLACE THE FAN ASSY. (16 hours)
-FOUND THAT THE SILENCER IS CRACKED AT MOUNTS.
-RECOMMENDED IS TO REPAIR OR REPLACE THE SILENCER. (3 hours
to replace/ 5 hours to repair.)
_______________________
ADDITIONAL DESCRIPTION:
CITY OF BATAVIA
Part#
_______________ Description
_______________ ________
Qty ____________
Price ____________
Amount
613-0222 FAN SILENCER- T 1 5142.65 5142.65
711-57745C VACUUM COMPRESS 1 47619.00 47619.00
FRT FREIGHT 1 600.00 600.00
MISCELLANEOUS CHARGES: _______________
Description ____________
Price ____________
Amount
SHOP SUPPLIES
Parts: 53361.65
Labor: 4179.00
Miscellaneous: 105.65
Authorization: _________________________ TOTAL: 57646.30
Page 22 of 28
Agenda Topic: Ordinance 2025-065: Amending the Municipal Code Adding Title 7,
Chapter 8: Restricted Uses of City Property
From: Laura Newman, City Administrator
Date: November 10, 2025
Materials:
Staff Contact(s): Laura Newman, Eric Blowers
Strategic Plan or Other Trustworthiness and Transparency, Vibrant and Diverse Community,
Goal(s): Safety and Wellbeing, Community Engagement and Inclusion
The ordinance establishes Title 7, Chapter 8 of the Batavia Municipal Code and prohibits the use of City-
owned and controlled properties, such as parking lots, vacant lots, and garages, as staging areas,
processing locations, or operations bases for civil immigration enforcement. It also outlines procedures
for City departments to identify and post signage on applicable properties, and to report any suspected
or actual unauthorized use to the City Administrator.
Additionally, the ordinance:
• Requires federal officials conducting immigration enforcement on City property to present a
warrant and display agency-issued identification and remove any face coverings.
• Prohibits the use of City-managed data systems or platforms to support civil immigration
enforcement.
• Clarifies that the ordinance does not interfere with lawful judicial warrants, criminal law
enforcement, or existing lease agreements.
The City Attorney has reviewed the ordinance as to form and legality.
Page 23 of 28
CITY OF BATAVIA, ILLINOIS
ORDINANCE 2025-065
AMENDING THE MUNICIPAL CODE ADDING TITLE 7,
CHAPTER 8: RESTRICTED USES OF CITY PROPERTY
ADOPTED BY THE
MAYOR AND CITY COUNCIL
THIS 10TH DAY OF NOVEMBER, 2025
Published in pamphlet form Prepared by:
by authority of the Mayor
and City Council of the City of Batavia, City of Batavia
Kane & DuPage Counties, Illinois, 100 N. Island Ave.
This 11th day of November, 2025 Batavia, IL 60510
Page 1 of 5
Page 24 of 28
CITY OF BATAVIA, ILLINOIS, ORDINANCE 2025-065
CITY OF BATAVIA, ILLINOIS
ORDINANCE 2025-065
AMENDING THE MUNICIPAL CODE ADDING TITLE 7, CHAPTER 8:
RESTRICTED USES OF CITY PROPERTY
Whereas, the City of Batavia, Kane and DuPage County, Illinois (the “City”) is a home rule
municipality as contemplated under Article VII, Section 6, of the Constitution of the State of
Illinois, and the passage of this Ordinance constitutes an exercise of the City’s home rule powers
and functions as granted in the Constitution of the State of Illinois; and
Whereas, subject to said Section, a home rule unit may exercise any power and perform any
function pertaining to its government and affairs for the protection of public health, safety,
morals, and welfare; and
Whereas, the City of Batavia scrupulously follows the Illinois TRUST Act (5 ILCS 805/1 et
seq.) which prohibits local law enforcement from participating in civil immigration enforcement,
including supporting, or assisting an immigration agent’s civil immigration enforcement efforts
or operations, or permitting immigration agents use of city facilities for civil immigration
enforcement purposes; and
Whereas, under the constitutional anti-commandeering principle, affirmed by the Tenth
Amendment to the United States Constitution and recognized by the Supreme Court of the
United States, the federal government may not compel state or local governments or their
officials to administer or enforce federal regulatory programs, including civil immigration laws;
and
Whereas the City of Batavia is committed to ensuring the safety, dignity, and human rights of all
residents, regardless of race, religion, gender, sexual orientation, immigration status, ethnicity, or
national origin; and
Whereas the unauthorized use of the City of Batavia’s resources, property, or personnel to
facilitate civil immigration enforcement actions interferes with the City of Batavia’s authority
over, and its use of, its own resources, property, and personnel; and
Whereas the City of Batavia sets forth a finding that allowing the use of City resources, property
and personnel for civil immigration enforcement has a negative impact on the residents of
Batavia as it erodes trust, and discourages access to city services, including crime reporting,
participation in community events, use of City spaces, and participation in City activities, which
are a hallmark of the Batavia community; and
NOW, THEREFORE, BE IT HEREBY ORDAINED by the City Council of the City of
Batavia, Kane and DuPage Counties, Illinois as follows:
Page 2 of 5
Page 25 of 28
CITY OF BATAVIA, ILLINOIS, ORDINANCE 2025-065
The following shall be added to the Municipal Code as Title 7, Chapter 8: Restricted Uses of
City Property
Section 1: Use of City Property for Civil Immigration Enforcement
1. No City-owned and controlled parking lot, vacant lot, garage, or other applicable
property shall be used as a staging area, processing location, or operations base for
civil immigration enforcement.
2. For the purposes of this ordinance, the following terms shall have the meanings set
forth herein:
a. “Staging area” means an area that is used to assemble, mobilize, and deploy
vehicles, equipment, or materials, and related personnel, for the purpose of
carrying out civil immigration enforcement operations.
b. “Processing location” means an area where individuals or materials are
checked, identified, or documented in connection with civil immigration
enforcement activity.
c. “Operations base” means a central location used to coordinate and manage
civil immigration enforcement activities.
3. Within 7-days of the execution of this ordinance, City Departments shall collaborate
to identify City-owned and controlled parking lots, vacant lots, garages, or other
applicable property that either have been used, or are likely to be used in the future, as
a staging area, processing location, or operations base for the purpose of civil
immigration enforcement. City departments shall ensure that all such properties have
clear and conspicuous signage stating: This property is owned and controlled by
the City of Batavia. It may not be used for civil immigration enforcement as a:
Staging Area, Processing Location, or Operations Base.
4. Within 7-days of the execution of this ordinance, City departments shall develop the
procedures necessary to implement this ordinance. These implementing procedures
shall provide that any city employee who becomes aware of any attempted, suspected,
or actual use of a city-owned property as a staging area, processing location, or
operations base for civil immigration enforcement shall as soon as practicable report
to their supervisor. Supervisors shall as soon as practicable report said information
their department head and the City Administrator.
5. As warranted, the City Administrator may share documented violations with local,
county, and state officials for the purpose of documenting unauthorized uses of city
property.
6. Scope
Page 3 of 5
Page 26 of 28
CITY OF BATAVIA, ILLINOIS, ORDINANCE 2025-065
a. This ordinance does not apply to property that is subject to existing leases or
concession agreements to which the City is a party. This ordinance is not
intended to, and shall not be interpreted to, interfere with any such lease or
agreement.
b. Nothing in this ordinance shall be construed as restricting or interfering with
the execution of lawful judicial warrants or the enforcement of criminal law,
nor as limiting the rights of any person or entity under state or federal law.
c. This ordinance does not prohibit the lawful use of city-owned and controlled
property for purposes other than a staging area, processing location, or
operations base for civil immigration enforcement, nor does it restrict any
person or entity from carrying out functions unrelated to those purposes on
such property.
Section 2: Requirements for Federal Civil Immigration Enforcement Action on City
Property
1. Enforcement of federal civil immigration enforcement action on City-owned property
under the control of the City of Batavia shall adhere to the following requirements:
a. A warrant shall be presented (or verified in accordance with standard law
enforcement protocol) to the office’s security and/or reception office. City
personnel who are presented with a warrant should immediately contact their
office’s supervisor.
b. Federal officials shall remove face coverings and ensure continuous visibility of a
badge issued by their respective agency when engaged in immigration
enforcement operations on city property. As warranted, the City Administrator
may share documented violations with local, county, and state officials.
Section 3: Use of City Data or Data Systems
1. No officer, employee, contractor, agent, or any other person acting on behalf of the City
shall use, permit the use of, or provide access to any City-owned, City-managed, or City-
controlled data, information, database, technology system, communications network, or
digital platform for the purpose of facilitating, supporting, or assisting civil immigration
enforcement.
Page 4 of 5
Page 27 of 28
CITY OF BATAVIA, ILLINOIS, ORDINANCE 2025-065
PRESENTED to the City Council of the City of Batavia, Illinois, this 10th day of November
2025.
PASSED by the City Council of the City of Batavia, Illinois, this 10th day of November 2025.
APPROVED by me as Mayor of said City of Batavia, Illinois, this 10th day of November 2025.
Jeffery D. Schielke, Mayor
Ward Alderman Aye Nay Abstain Absent
1 Baerren
1 Solfa
2 Leman
2 Wolff
3 Lohman
3 Malone
4 Malay
4 Pieper
5 Fahrenbach
5 Beck
6 Anderson
6 Lanci
7 White
7 Barraza
Mayor Schielke
AYES NAYS ABSTAIN ABSENT
TOTALS
total holding office: Mayor and 14 Aldermen
ATTEST:
Kate Garrett, City Clerk
Page 5 of 5
Page 28 of 28
Get email alerts for Batavia
A daily email when new agendas and minutes are posted.