CITY COUNCIL WORK SESSION MINUTES
Tuesday, June 03, 2025 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
Mayor Olson called the meeting to order at 5:30 p.m.
ROLL CALL
Mayor Darrel Olson and Council Members Connie Lyscio, Zach Tabatt, Patrick Sundberg, and Mark Cross were
present.
City Administrator Brad Chapulis, Assistant City Administrator Kelly Steele, Police Chief Matt Maier, Finance
Director Jeremy Vacinek, Community Development Director Josh Doty, Assistant City Engineer Trevor Thompson,
Environmental Resource Technician Kelly Robinson, and Public Works Director Trevor Walter were present.
BUSINESS ITEMS
1. North Inglewood Detachment Inquiry
City Administrator Chapulis explained on November 6, 2024, Brent Gunsbury inquired if the council
would consider the detachment of his property located at the intersection of Inglewood Road and
Pine Beach Road. The council informed Mr. Gunsbury that they would take his request under
advisement and would discuss it at a future work session.
City Administrator Chapulis further explained the subject property was annexed into the city in 2015
in conjunction with the 2015 Inglewood drive reconstruction project. Inglewood Drive was
reconstructed to a 10-ton design. Both Crow Wing County and the city agreed that Inglewood Drive
would function more as a city major collector roadway. As such, the annexation included Inglewood
Drive and a portion of the land on each side of the roadway so that there are benefiting property
owners in the city on each side of the roadway.
City staff has reviewed Mr. Gunsbury’s request and concluded that any detachment of the property
would injure the city’s interests. The reasons for the 2015 annexation continue to exist today as they
did in 2015. Should Mr. Gunsbury continue to seek detachment, he has the option to follow the
detachment process outlined in state statute.
The council discussed the zoning classification of the subject project and that development is
encroaching towards the property.
The council consensus was to not support detachment of Mr. Gunsbury’s property. Staff was directed
to send Mr. Gunsbury a letter indicating their decision.
2. City Code and Policy Review related to Paved Street Widths, Cul-de-Sac Paved Radius Dimensions,
and Cul-de-Sac Right-of-Way Radius Dimensions
City Administrator Chapulis explained the council requested additional information after the previous
discussion. Paul Sandy, with SEH, will present the information requested by the council.
6/3/2025 City Council Work Session Minutes Page 2
Mr. Sandy explained he previously presented three memos to the council. The first memo outlined
the general overview and history related to street widths and cul-de-sac design, including right-of-
way requirements. The second memo outlined standards relevant to local street design. The third
memo provides recommendations.
Mr. Sandy provided additional information requested from the council on the consideration of
restriping rural and local streets to 10-foot drive lanes with 3-foot shoulders. Mr. Sandy provided a
map and summarized state aid street standards. A summary of local and urban street system widths
was reviewed. Mr. Sandy explained a proposal for utilizing the South Forestview project area as a
pilot study for implementing 10-foot driving lanes and 3-foot shoulders and the inclusion of 4” white
edge fog lines.
The council consensus is to complete the pilot striping project, complete the donut on cul-de-sacs,
and any roadways wider than 24’ must be justified on a project by project basis
3. Review Draft Feasibility Report for the 2026 Clearwater Road, North Lynndale Area, & Brentwood
Circle Street & Utility Improvements Project, Municipal Project No. 4068
Neil Heinonen, with SEH, explained the council previously approved feasibility reports for the
Clearwater Road, North Lynndale Area, and Brentwood Circle projects as two separate reports. Those
reports are being combined into one project. Mr. Heinonen summarized the improvement project,
including estimated project costs, and explained staff is preparing to hold a neighborhood
informational meeting on June 24th.
The council would like additional information before making decision regarding the annexation or
use of future connection charges for a parcel included in the project.
4. Review Feasibility Report for the 2026 Mill & Overlay and Full Depth Reclamation Improvements
Project Municipal Project No. 4426
Alex Bitter, with Widseth, provided an updated project memo to the council. The memo reviewed
the roadways deferred from the 2026 mill and overlay and full depth reclamation improvement
project and explained how roadway surface conditions declined overtime. Mr. Bitter summarized
each roadway’s previous improvement, the roadway’s PASER rating, and recommended
improvement.
The council inquired if the Joler Road trail improvement could be delayed.
Mr. Bitter explained the trail should be repaired as it doesn’t meet ADA standards.
5. 2030 Welton Road, Ashley Road, Baywood Road, Black Oak Road, Springwood Drive, and Springwood
Court Utility and Roadway Improvements Project, Municipal Project No. 4143 Feasibility Report
Discussion
Due to the time allocated for the work session expiring, this item will be placed on a future council
work session.
ADJOURN
6/3/2025 City Council Work Session Minutes Page 3
MOTION by Council Member Lyscio, seconded by Council Member Tabatt to adjourn at 6:57 p.m. Motion carried
unanimously.
Approved by: Respectfully submitted,
_____________________________
Darrel Olson Kelly Steele
Mayor Assistant City Administrator
Agenda
CITY COUNCIL WORK SESSION AGENDA
Tuesday, June 03, 2025 at 5:30 PM
Baxter City Hall, 13190 Memorywood Drive, Baxter, MN
“A Growing Community”
CALL TO ORDER
ROLL CALL
BUSINESS ITEMS
1. North Inglewood Detachment Inquiry
2. City Code and Policy Review related to Paved Street Widths, Cul-de-Sac Paved Radius Dimensions,
and Cul-de-Sac Right-of-Way Radius Dimensions
3. Review Draft Feasibility Report for the 2026 Clearwater Road, North Lynndale Area, & Brentwood
Circle Street & Utility Improvements Project, Municipal Project No. 4068
4. Review Feasibility Report for the 2026 Mill & Overlay and Full Depth Reclamation Improvements
Project Municipal Project No. 4426
5. 2030 Welton Road, Ashley Road, Baywood Road, Black Oak Road, Springwood Drive, and Springwood
Court Utility and Roadway Improvements Project, Municipal Project No. 4143 Feasibility Report
Discussion
ADJOURN