Design Review Board
Regular MeetingBellingham, WA · October 3, 2023
Minutes
Design Review Board Minutes
City of Bellingham, Washington
Tuesday 3:00 PM
October 3, 2023 City Council Chambers
Video Recorded https://meetings.cob.org
ROLL CALL: Jan Hayes, Maggie Bates, Ryan Van Straten, Coby Jones and David Heck (Recused)
Staff Present: Lindsey Kershner, PCDD , Fiona Starr PCDD, Kathy Bell, PCDD
-
Call to Order
The Design Review Board meeting was called to order by the Chair at 3:00 PM.
2. Approval of Minutes
Public Comment Period
During this time, citizens may take up to three (3) minutes to address the members about any topic not on the
agenda. Citizens wishing to speak during this time will be recognized by the Chair for comment.
Agenda Items
Public Meeting
1. Early Design Guidance Meeting for a project located at 110 W. Laurel Street Also
Known As Millworks Phase II
Development of a seven-story, mixed-use building with a ground floor food campus, second floor office and meeting
spaces, and five-stories of approximately 80 owner-occupied and rental workforce housing units above. A three-story
structured parking garage with a public plaza and event center above the garage is proposed on the east side of the
development to be used by both Millworks Phase I (100 W. Laurel St.) and the subject project. The project proponent is
requesting departures from the pedestrian connectivity, building scale, and blank walls waterfront urban village design
guidelines and standards, Section 20.25.080 Bellingham Municipal Code. Design Review is required because the project
is in the Waterfront design review district.
Staff Overview
Lindsay Kershner said this project in the waterfront district and requires design review. It follows the established
waterfront district design standards, distinct from recently adopted urban village design guidelines. The applicant's
proposal, including a setback from West Laurel Street and a public plaza, may deviate from some standards. The board
will assess which guidelines apply, referencing detailed attachments and the applicant's justifications. The discussion will
be organized using recommendation found on A.2.
Applicant Presentation:
Applicant Team: Neil McCarthy and Robert Wright, RMC Architects, Mauri Ingram, Whatcom Community Foundation
Neil McCarthy began stating he will be navigating through the standards systematically. He will be focusing the
Millworks 2 site on the old parcel between the railroad line and Cornwall Avenue. Phase 1 is under construction, while
Phase 2 is the highlighted yellow area. This parcel is in close relationship to the waterfront and downtown districts,
influencing design decisions and design constraints moving forward. He said he wanted to start with site standards,
beginning with the focus on pedestrian orientation at streets, parks, and trails. Phase 2 features a 7-story building—5
residential stories over a 2-story base. The site is located between Cornwall Avenue and Laurel Street. Emphasis is
placed on the pedestrian environment, particularly along Cornwall, where there's no sidewalk on one side due to
elevation. He highlighted the pedestrian experience on Laurel and internally on the site. Neil McCarthy continued in
identifying the pedestrian park for the overall site, addressing challenges like slopes and constraints. The focus is on
creating connections, including a plaza, third-floor terrace, and potential pedestrian bridges for future integration.
Acoustical considerations due to the proximity to the railroad were discussed, with plans for noise mitigation through
building design and infrastructure. Moving on to the building standards, he provided an overview of the site plans,
building scale, rooftop features, and materials. Mitigating a blank wall along the railroad line involves architectural
concrete, green walls, and acoustical treatment. Finally, he highlighted potential departures related to building length,
plaza location, and blank walls, seeking consideration for the unique project constraints.
Board Clarifying Questions:
Coby Jones asked about the parking garage, specifically on level 2, as seen on sheet 25. He asked if the designs shows
there are windows facing the parking garage. Is this intentional, and if so, what purpose or design concept does it serve?
Neil McCarthy said those windows would be commercial type windows to give the appearance of commercial space.
Coby Jones continued and asked about the covered accessibility of the terrace (confirmed accessible with 2 sets of
elevators). Regarding the entry stairwell and its 60% transparency requirement and the design incorporates a bend. Is
there a reason it isn’t more wide open. Neil McCarthy said it is to provide a buffer from the railroad line, emphasizing
robust landscaping for plaza privacy. The intention is to create a more direct connection between the stairs and the
plaza, while also offering a varied and experiential journey through different levels of the stair. Maggie Bates asked if the
spaces would have limited access by the public. Neil McCarthy said yes likely. Ryan Van Straten asked if windows facing
the railroad would buffer more sound. Neil McCarthy confirmed they would.
Public Comment
There was no public comment.
Board Discussion
The Board agreed to walk through packet attachment A-2.
Departure - Pedestrian Through Block Connections
Achieved: Yes
Consensus: Creative solutions to restraints of site
Departure Plaza/Building Scale
Achieved: Yes
Consensus: Because the applicant is proposing a plaza the building scale design standard is being
met.
Misc. Comment
Coby Jones asked about the terrace stairs and will there be differentiation between the common food court and the
public space terrace? Neil McCarthy confirmed there will be.
Departure – Weather Protection
Achieved: Yes with Plaza not needed
Consensus: Weather protection will be provided along Laurel
Departure – Blank Walls
Achieved: Yes to wall adjacent to railroad – No to parking garage wall.
Consensus: The wall adjacent to the railroad track being treated with concrete detail and louvers is fine
with board. The blank wall on east façade of parking garage needs to be further addressed further.
Can consider expanding the openings along this side to break up the wall or mitigate with more
landscaping. They could also include windows. There was consensus it shouldn’t be a solid wall and
openings need to be made for visibility.
Other Business
Agenda
Design Review Board Agenda
October 3, 2023, at 3:00 PM
City Council Chambers
Participation Options: Design Review Board meetings have returned to in-person but can also be attended virtually online or by
phone by using the meeting information below.
Virtual Meeting Link www.cob.org/drb
By Phone: • (253) 215-8782 • (669) 900-6833 • (301) 715-8592 • (929) 205-6099
ID/ Password: Meeting ID: 933 8224 5585 / Password: 9
Design Review Board Members
Maggie Bates, Jan Hayes, David Heck, Coby Jones and Ryan Van Straten
Call to Order
1. Roll Call
2. Approval of Minutes
Public Comment Period
During this time, citizens may take up to three (3) minutes to address the members about any topic not on the agenda. Citizens
wishing to speak during this time will be recognized by the Chair for comment.
Agenda Items
Public Meeting
1. Early Design Guidance Meeting for a project located at 110 W. Laurel Street Also Known As p. 2
Millworks Phase II
Information/Discussion
Other Business
Accessibility: The City of Bellingham complies with the Americans with Disabilities Act. Elevator access to the second floor is
available at City Hall’s west entrance. Hearing assistance is available, and a receiver may be checked out through the clerk prior to
the meeting. For additional accommodations, contact Shannon Taysi at 360-778-8300 (voice), 711 (WA State Relay), or
staysi@cob.org at least 3 days prior to the meeting.
Get email alerts for Bellingham
A daily email when new agendas and minutes are posted.