City Council
Regular MeetingBelton, TX · February 12, 2019
Minutes
Belton City Council Meeting
February 12, 2019 - 5:30 P.M.
The Belton City Council met in regular session in the Wright Room at the Harris
Community Center with the following members present: Mayor Marion Grayson, Mayor
Pro Tern Craig Pearson and Councilmembers David K. Leigh, Dan Kirkley, Guy
O'Banion, John R. Holmes, Sr. and Wayne Carpenter. Staff present included Sam Listi,
Gene Ellis, John Messer, Amy Casey, Brandon Bozon, Chris Brown, Matt Bates, Paul
Romer, Bob van Til, Bruce Pritchard, Kim Kroll, Judy Garrett, Angellia Points and Cheryl
Maxwell.
The Pledge of Allegiance to the U.S. Flag and the Pledge of Allegiance to the Texas
Flag were led by Cub Scout Troop #117, and the Invocation was given by Matt
Thrasher, Pastor of Crossroads Church.
1. Call to order. Mayor Grayson called the meeting to order at 5:32 p.m.
Mayor Grayson recognized Councilmember David K. Leigh for obtaining his
doctorate from the University of Texas. His dissertation is titled, "Improved Process
Stability and Ductility in Laser Sintered Polyamide."
2. Public Comments. There were none.
3. Presentation of Police Department Annual Report including Annual Racial
Profiling Report.
Assistant City Manager/Chief of Police Gene Ellis presented the Police Department
Annual Report, including the Racial Profiling Report for 2018. Councilmember Leigh
asked how "incidents" are defined. Chief Ellis replied that it includes thefts, criminal
mischief, alcohol offenses and drug offenses among other Part 1 UCR crimes as the
FBI defines them.
Mayor Pro Tern Pearson asked how many officers were injured in the line of duty in
2018. Chief Ellis said that he has that information, but he does not have it with him.
He said there were a few, mainly knees and elbows, and the latest was a car
accident.
Chief Ellis concluded by thanking the Council for their support. No action was
required by the Council.
Consent Agenda
Items 4-8 under this section are considered to be routine by the City Council and may
be enacted by one motion. If discussion is desired by the Council, any item may be
removed from the Consent Agenda prior to voting, at the request of any
Councilmember, and it will be considered separately.
Belton City Council Meeting
February 12, 2019 - Page 2
4. Consider minutes of previous meetings:
A. January 22, 2019, City Council Meeting
8. January 31, 2019, City Council Special Called Meeting
5. Receive a report on the annual review of the City's Ethics Ordinance, No. 2018-
03, by the Ethics Commission.
6. Consider a resolution ordering the General Election to be held on May 4, 2019.
7. Consider a resolution authorizing the submittal of a grant application to the
US Department of Justice, Bureau of Justice Assistance, for an Edward Byrne
Memorial Justice Assistance Grant (JAG}.
8. Consider an ordinance on first reading granting a franchise to Atmos Energy,
and set a public hearing and second reading for February 26, 2019.
Upon a motion by Councilmember Holmes and a second by Councilmember Carpenter,
the Consent Agenda, including the following captioned resolutions and ordinance, was
unanimously approved by a vote of 7-0.
RESOLUTION NO. 2019-05-R
A RESOLUTION CALLING AND ORDERING A GENERAL ELECTION TO BE HELD
ON MAY 4, 2019, AND ESTABLISHING PROCEDURES THEREOF.
RESOLUCION NO. 2019-05-R
RESOLUCION CONVOCANDO ELECCIONES GENERALES A REALIZARSE EL 4
DE MAYO DEL 2019 Y LOS PROCESOS A CUMPLIRSE.
RESOLUTION NO. 2019-06-R
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BELTON, TEXAS,
APPROVING THE SUBMITTAL OF A GRANT APPLICATION TO THE US
DEPARTMENT OF JUSTICE, BUREAU OF JUSTICE ASSISTANCE, FOR AN
EDWARD BYRNE MEMORIAL JUSTICE ASSISTANCE GRANT, DESIG-NATING AN
AUTHOIZED OFFICIAL.
ORDINANCE NO. 2019-13
AN ORDINANCE GRANTING TO ATMOS ENERGY CORPORATION, A TEXAS AND
VIRGINIA CORPORATION, ITS SUCCESSORS AND ASSIGNS, A FRANCHISE TO
CONSTRUCT, MAINTAIN, AND OPERATE PIPELINES AND EQUIPMENT IN THE
CITY OF BELTON, BELL COUNTY, TEXAS, FOR THE TRANSPORTATION,
DELIVERY, SALE, AND DISTRIBUTION OF GAS IN, OUT OF, AND THROUGH SAID
Belton City Council Meeting
February 12, 2019- Page 3
CITY FOR ALL PURPOSES; PROVIDING FOR THE PAYMENT OF A FEE OR
CHARGE FOR THE USE OF THE PUBLIC RIGHTS-OF-WAYS; AND PROVIDING
THAT SUCH FEE SHALL BE IN LIEU OF OTHER FEES AND CHARGES,
EXCEPTING AD VALOREM TAXES; AND REPEALING ALL PREVIOUS GAS
FRANCHISE ORDINANCES.
Miscellaneous
9. Hold a public hearing regarding an application for Community Development
Block Grant funds that proposes to replace the water line on N. East Street
and E. 5th Street.
Grants and Special Projects Coordinator Bob van Til thanked several Staff members
for their help in compiling the data for this project. He explained that Staff is in the
process of applying for a grant from the Texas Department of Agriculture (TOA) to
replace a 6-inch diameter deteriorated water line with an 8-inch diameter water line
that will run from E. 2nd Street north on N. East Street, east on E. 5th Street, and
ending at the east side of N. Penelope Street. He said the grant source is the Texas
Community Development Block Grant (TxCDBG) Program, and the funding
originates from the US Housing and Urban Development (HUD).
Mr. van Til explained that, as part of the application process, the City must conduct a
public hearing to allow the public adequate opportunity to comment on the pending
application as well as provide comment on overall community needs.
Mayor Grayson opened the public hearing. Seeing no one wishing to speak, she
closed the public hearing. There was no other action required of the Council as the
resolution of support will be presented at the meeting on February 26, 2019.
10. Hold a public hearing and consider ordinances on second and final reading
granting one year extensions to commercial solid waste collection franchises
with the following companies:
A. Waste Management, Inc.
B. Waste Connections (formerly IESI and Progressive Waste Solutions)
C. Eagle Disposal
0. Temple Iron & Metal
City Clerk Amy Casey said that in January 2016, Council authorized commercial
solid waste franchises with Waste Management, Progressive Waste Solutions (now
Waste Connections), Eagle Disposal and Temple Iron & Metal. The original term of
the franchises expired on January 26, 2019. The four service providers desire an
extension to the franchise agreement which is allowed under the original terms of
the agreements. The original term of the agreements is for three years with two (2)
optional one-year extensions. The City currently has commercial solid waste
franchise agreements with these four service providers, as well as Sunbright
Belton City Council Meeting
February 12, 2019- Page 4
Disposal Services. She added that the Sunbright franchise will be up for renewal
later in the year.
Casey explained that the City receives 5% of the companies' total gross receipts
from customers as a franchise fee . FY2019 Budget for this franchise fee is $110,900
from all commercial haulers.
Mrs. Casey stated that franchises require two readings of the ordinance, as well as a
public hearing.
Mayor Grayson opened the public hearing. Seeing no one wishing to speak, she
closed the public hearing.
Councilmember Leigh asked when the City's bulky waste collections are held.
Director of Public Works Angellia Points replied that they are held quarterly, and the
last one was held this past Saturday. Mr. Leigh recommended that this information
be published for the citizens' benefit.
Upon a motion by Mayor Pro Tern Pearson , and a second by Councilmember
Holmes, Item #10, including the following captioned ordinances, was unanimously
approved on second reading by a vote of 7-0.
ORDINANCE NO. 2019-04
AN ORDINANCE AMENDING A FRANCHISE AGREEMENT WITH WASTE
MANAGEMENT INC., TO PROVIDE COMMERCIAL SOLID WASTE COLLECTION
SERVICES WITHIN THE CITY OF BELTON; AND MAKING OTHER PROVISIONS.
ORDINANCE NO. 2019-05
AN ORDINANCE AMENDING A FRANCHISE AGREEMENT WITH WASTE
CONNECTIONS (FORMERLY PROGRESSIVE WASTE SOLUTIONS), TO
PROVIDE COMMERCIAL SOLID WASTE COLLECTION SERVICES WITHIN THE
CITY OF BELTON; AND MAKING OTHER PROVISIONS.
ORDINANCE NO. 2019-06
AN ORDINANCE AMENDING A FRANCHISE AGREEMENT WITH EAGLE
DISPOSAL, TO PROVIDE COMMERCIAL SOLID WASTE COLLECTION
SERVICES WITHIN THE CITY OF BEL TON; AND MAKING OTHER PROVISIONS.
ORDINANCE NO. 2019-07
AN ORDINANCE AMENDING A FRANCHISE AGREEMENT WITH TEMPLE IRON
& METAL, TO PROVIDE COMMERCIAL SOLID WASTE COLLECTION
SERVICES WITHIN THE CITY OF BELTON; AND MAKING OTHER PROVISIONS.
Belton City Council Meeting
February 12, 2019 - Page 5
11. Hold a public hearing and consider adopting the City of Belton's Drought
Contingency and Water Conservation Plan.
Director of Public Works Angellia Points explained that in 2004, TCEQ required
potable water providers to develop and adopt a Drought Contingency Plan. In 2007,
the 80th Texas Legislature amended the Texas Water Code to require each retail
public utility that provides potable water service to 3,300 or more connections to
submit a water conservation plan to the State for review and acceptance. Therefore,
she said a 2009 combined Drought Contingency and Water Conservation Plan was
developed and adopted by the City of Belton. The code also requires the plan to be
reviewed and updated once every five years thereafter, and for the entity to report
annually on the progress of program implementation. The current 2014 - 2019
Drought Contingency and Water Conservation Plan needs to be updated and a new
2019- 2023 Plan needs to be adopted.
Mrs. Points explained that Staff has updated the Plan to meet the current TCEQ and
TWOS requirements. The significant changes to the updated 2019-2023 Plan
including the following:
1. Modified layout of the Plan to have Drought Stage information in one location.
The Drought Stage triggers, goals, best management practices for supply
management, water use restrictions, and termination requirements are all under
each Stage.
2. Removed references for the City to provide wholesale of water. These sections
did not apply.
3. The best management practices for supply management will always be one
Stage ahead of the general public's Drought Stage.
4. Lessened the burden on master meters and multi-family water users by
increasing the base water rationing amount to match the City's base rate
allocation.
5. Changed the water rationing amounts to be the same for residents inside and
outside of the City limits. The only difference will be the volumetric rate charge,
which is 1.25 times more for those outside of the City limits.
6. Updated the water rates to match the City's current fee schedule.
7. Updated the Water Conservation Plan to include population, water use, sewer
flow, water loss, and water supply data.
8. A new enforcement paragraph was added to allow for violators of the Plan to
appear in municipal court. Failure to appear in court may result in a warrant for
arrest. A summons to appear may be issued in lieu of an arrest warrant.
9. Included the updated Fee and Rate Schedule.
She added that the deadline to submit the Plan to TCEQ is May 1, 2019.
Mayor Grayson opened the public hearing. Seeing no one wishing to speak, she
closed the public hearing.
Belton City Council Meeting
February 12, 2019 - Page 6
Councilmember Kirkley said that Belton has had problems in the past with water, so
this is very important plan . He thanked Mrs. Points and her Staff for their work on
updating the Plan. Mayor Grayson agreed, and said she only remembers once
during her tenure on the City Council that the Plan had to be implemented.
Upon a motion by Councilmember Holmes, and a second by Councilmember
Kirkley, Item #11, including the following captioned ordinance, was unanimously
approved by a vote of 7-0.
ORDINANCE NO. 2019-12
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BELTON, TEXAS,
AMENDING THE CITY'S DROUGHT CONTINGENCY AND WATER
CONSERVATION PLAN WHICH ESTABLISHES CRITERIA FOR THE INITIATION
AND TERMINATION OF DROUGHT REPSONSES STAGES; RESTRICTIONS ON
CERTAIN WATER USES; PENALTIES FOR THE VIOLATIONS OF AND
PROVISIONS FOR ENFORCEMENT OF THESE RESTRICTIONS; PROCEDURES
FOR GRANTING VARIANCES; AND PROVIDING SERVERABILITY AND AN
EFFECTIVE DATE.
12. Consider authorizing the City Manager to execute a contract with Bell
Contractors for construction of the North Belton 16-inch Transmission Main
project, and any change orders associated with the contract, not to exceed the
amount authorized under state law.
Director of Public Works Angellia Points stated that on October 11, 2016, the City
Council awarded a professional services contract to Kasberg, Patrick and
Associates (KPA) to design Belton's third elevated storage tank and corresponding
waterline to supply water to the proposed tank. The driver for the project was to
address the City's required storage capacity per TCEQ requirements.
While the project was being evaluated and designed, the property for the tank site
was acquired. The alignment for the waterline was also negotiated with the affected
property owners.
Mrs. Points said that on May 8, 2018, the City Council authorized the City Manager
to execute a Second Amendment with Bell County Water Control Improvement
District No. 1 (BCWCID No. 1) to allow the City of Belton to count 95% of the water
stored in the 3 million gallon tank owned and maintained by BCWCID No. 1. This
contractual agreement boosted the City's storage capacity, meeting the TCEQ
requirements as stated in the previous triennial inspection. However, the need for
the tank still remains, though the need is not as immediate. Although the tank
requirement can be delayed a few years, the need for the supply waterline is still a
priority in order to boost pressures in the Dawson Ranch/Highland Estates
subdivisions. Staff continued to work on the alignment of the waterline in order to
prepare for the future third elevated storage tank.
Belton City Council Meeting
February 12, 2019 - Page 7
On November 13, 2018, Staff presented a non-annexation development agreement
for the Dickson Ranch properties. The request for a non-annexation development
agreement was a condition for providing a waterline easement to the City of Belton
for the waterline project that will connect the proposed third elevated storage tank to
the transmission line from BCWCID No. 1, which lies in an easement on the Dickson
Ranch properties. The agreement was approved at the November 13, 2018 Council
meeting, and the easement for the waterline was subsequently provided .
Points said that another driver for the water transmission project was the stipulation
in the utility easement agreements on the Dickson Ranch properties. The following
are the timelines agreed upon with the granting of the easement agreements.
• If the pipeline is not constructed by January 1, 2021, the easement shall
terminate.
• Once construction commences, the installation of the water pipeline shall be
completed within 183 calendar days.
• If the City ceases to use the easement for water pipeline purposes for a period of
24 consecutive months, the easement shall terminate and any pipeline installed
shall be removed.
• The City shall restore the property to pre-construction conditions within 30 days
of finishing the waterline construction.
Mrs. Points explained that the waterline is planned to be a 16-inch ductile iron pipe,
connecting to the 21-inch transmission line. The new 16-inch waterline is shown to
be placed in the utility easement on the Dickson Ranch property and the dedicated,
recorded, right-of-way for Dawson Ridge. The line would also extend to the property
proposed for the third elevated water storage tank. The waterline plans also include
a connection to the existing 8-inch waterline along Chisolm Trail Parkway that
serves the Dawson Ranch subdivision.
Dawson Ridge is currently under construction. Mrs. Points explained that the bid did
account for boring under the new Dawson Ridge roadways, if the construction of the
subdivision was farther along . However, that bid alternative will not be needed as the
construction in Dawson Ridge will allow the City's contractor to open cut the
waterline before the roads are constructed .
Also, the contract documents were developed to show the price difference between
plastic pipe (PVC) and ductile iron pipe. For a 16-inch waterline under such
pressures, ductile iron is the preferred and recommended pipe material. However,
the documents were developed to give the City as much flexibility as possible,
knowing the timeline requirements and funding considerations for this waterline.
Between the eleven (11) qualified bids received for the PVC and ductile iron prices,
Staff recommends proceeding with the ductile iron pipe. To compare, the 16-inch
waterline in the Lake-to-Lake ROW is ductile iron, and ductile iron is known to be
more durable than PVC.
Belton City Council Meeting
February 12, 2019 - Page 8
Mayor Grayson asked if we typically use ductile iron on waterlines. Mrs. Points said
that larger waterlines are usually ductile iron pipe.
KPA completed the design in December 2018, and bids were opened on January
22, 2019. Eleven (11) qualified bids were received for the project for the 16-inch
ductile iron pipe. The Director of Public Works/City Engineer, the Assistant Director
of Public Works, and the Project Engineer at KPA evaluated the bids received. The
low bidder, Bell Contractors of Belton, has successfully worked with the City of
Belton in the past on projects such as the Nolan Creek Trunk Sewer Project.
Points added that the construction is anticipated to take approximately 8 months at a
cost of $804,121.75. The funding for the project is the 2016 Water and Sewer Bond
Fund.
Upon a motion by Councilmember Leigh , and a second by Councilmember
Carpenter, Item #12 was unanimously approved by a vote of 7-0.
13. Consider authorizing the City Manager to enter into a professional services
agreement with Kasberg, Patrick and Associates for Construction
Administration services for the North Belton 16-inch Transmission Main
project.
Director of Public Works Angellia Points explained that Kasberg , Patrick and
Associates (KPA) is the design engineer for the third elevated storage tank and
corresponding waterline to supply water to the proposed tank. The scope awarded to
KPA in October 2016 included the design and bid phases for the waterline and tank
project, but it did not include construction administration services. Staff recommends
awarding a contract to KPA for construction administration services on the North
Belton Waterline Project. The scope includes review of submittals, attending and
coordinating monthly progress meetings, reviewing and approving pay applications,
general site visits, every other week construction staking, and development of the
record drawings.
The cost for these construction administration services is $35,120, which is to be
funded by the 2016 Water and Sewer Bond Fund.
Upon a motion by Councilmember Holmes, and a second by Councilmember Leigh ,
Item #12 was unanimously approved by a vote of 7-0.
Executive Session
At 6:15 p.m. , the Mayor announced the Council would move to the Smith Room and go
into Executive Session for the following item:
14. Executive Session pursuant to the provision of the Open Meetings Law,
Chapter 551, Govt. Code, Vernon's Texas Codes Annotated, in accordance
Belton City Council Meeting
February 12, 2019 - Page 9
with the authority contained in Section 551.074, Personnel - conduct an
evaluation of the City Manager's performance.
The Mayor reopened the meeting at 7:55 p.m., and there being no further business, the
meeting was adjourned.
ATTEST:
Amy M. Casey, City Clerk
Agenda
City of Belton, Texas
City Council Meeting Agenda
Tuesday, February 12, 2019 - 5:30 p.m.
Wright Room, Harris Community Center
401 N. Alexander, Belton, Texas
Pledge of Allegiance. The Pledge of Allegiance to the U.S. Flag will be led by
Councilmember David K. Leigh.
Texas Pledge. The Pledge of Allegiance to the Texas Flag will be led by Grants and
Special Projects Coordinator Bob van Til.
“Honor the Texas flag; I pledge allegiance to thee Texas, one state under
God, one and indivisible.”
Invocation. The Invocation will be given by Matt Thrasher, Pastor of Crossroads Church.
1. Call to order.
2. Public Comments.
Citizens who desire to address the Council on any matter may register to do
so prior to this meeting and speak during this item. Forms are located on the
table outside of the south side entry to the meeting room. Please state your
name and address for the record, and limit your comments to three minutes.
Also, please understand that while the Council appreciates hearing your
comments, State law (Texas Gov’t Code §551.042) prohibits them from: (1)
engaging in discussion other than providing a statement of specific factual
information or reciting existing City policy, and (2) taking action other than
directing Staff to place the matter on a future agenda.
3. Presentation of Police Department Annual Report including Annual Racial Profiling
Report.
Consent Agenda
Items 4-8 under this section are considered to be routine by the City Council and may
be enacted by one motion. If discussion is desired by the Council, any item may be
City Council Meeting Agenda
February 12, 2019
Page 1 of 3
removed from the Consent Agenda prior to voting, at the request of any
Councilmember, and it will be considered separately.
4. Consider minutes of previous meetings:
A. January 22, 2019, City Council Meeting
B. January 31, 2019, City Council Special Called Meeting
5. Receive a report on the annual review of the City’s Ethics Ordinance, No. 2018-03,
by the Ethics Commission.
6. Consider a resolution ordering the General Election to be held on May 4, 2019.
7. Consider a resolution authorizing the submittal of a grant application to the US
Department of Justice, Bureau of Justice Assistance, for an Edward Byrne Memorial
Justice Assistance Grant (JAG).
8. Consider an ordinance on first reading granting a franchise to Atmos Energy, and
set a public hearing and second reading for February 26, 2019.
Miscellaneous
9. Hold a public hearing regarding an application for Community Development Block
Grant funds that proposes to replace the water line on N. East Street and E. 5th
Street.
10. Hold a public hearing and consider ordinances on second and final reading granting
one year extensions to commercial solid waste collection franchises with the
following companies:
A. Waste Management, Inc.
B. Waste Connections (formerly IESI and Progressive Waste Solutions)
C. Eagle Disposal
D. Temple Iron & Metal
11. Hold a public hearing and consider adopting the City of Belton’s Drought
Contingency and Water Conservation Plan.
12. Consider authorizing the City Manager to execute a contract with Bell Contractors
for construction of the North Belton 16-inch Transmission Main project, and any
change orders associated with the contract, not to exceed the amount authorized
under state law.
13. Consider authorizing the City Manager to enter into a professional services
agreement with Kasberg, Patrick and Associates for Construction Administration
services for the North Belton 16-inch Transmission Main project.
City Council Meeting Agenda
February 12, 2019
Page 2 of 3
The City Council will recess and reconvene in the Smith Room for the following
item.
Executive Session
14. Executive Session pursuant to the provision of the Open Meetings Law, Chapter
551, Govt. Code, Vernon's Texas Codes Annotated, in accordance with the authority
contained in Section 551.074, Personnel - conduct an evaluation of the City
Manager’s performance.
The City Council reserves the right to adjourn into Executive Session at any time
regarding any issue on this agenda for which it is legally permissible.
City Council Meeting Agenda
February 12, 2019
Page 3 of 3