Planning Commission
Regular MeetingBlaine, MN · March 14, 2017
Minutes
Blaine City Hall
City of Blaine 10801 Town Sq Dr NE
Blaine, MN 55449
Anoka County, Minnesota
Minutes - Final
Planning Commission
The Planning Commission is an advisory body to the City
Council. One of the Commission’s functions is to hold public
hearings and make recommendations to the City Council. The
City Council makes all final decisions on these matters.
Blaine City Ordinances require that certain documents and
information be included in applications. The Planning
Commission may postpone consideration of an application
that is incomplete and may, for other reasons, postpone final
action on an application. For each item the Commission will
receive reports prepared by the City staff, open the hearing to
the public, and discuss and act on the application.
Tuesday, March 14, 2017 7:00 PM Council Chambers
1. Roll Call
The Blaine Planning Commission met in the City Hall Chambers on Tuesday,
March 14, 2017. Chair Ouellette called the meeting to order at 7:00 p.m.
Staff Present: Shawn Kaye, Associate Planner
Bryan Schafer, Community Development Director
Tom Scott, Project Coordinator
Dan Schluender, Assistant City Engineer
Present: 7 - Chair Ouellette, Commissioner Homan, Commissioner York,
Commissioner Goracke, Commissioner Olson, Commissioner Ponds, and
Commissioner Halpern
2. Approval of Minutes
TMP 17-0112 Approval of January 10, 2017 Planning Commission Minutes
Motion by Commissioner York to approve the minutes of January 10, 2017, as
presented. Motion seconded by Commissioner Halpern. The motion passed
6-0-1 (Homan abstained).
Aye: 6 - Chair Ouellette, Commissioner York, Commissioner Goracke,
Commissioner Olson, Commissioner Ponds, and Commissioner Halpern
Abstain: 1 - Commissioner Homan
3. Old Business
None.
None.
4. New Business
City of Blaine Page 1
Planning Commission Minutes - Final March 14, 2017
4.1 RES 17-041 GRANTING PRELIMINARY PLAT APPROVAL TO SUBDIVIDE 2.93
ACRES (6 EXISTING LOTS) INTO 18 LOTS AND ONE COMMON
LOT TO BE KNOWN AS ASPEN VILLAGE TOWNHOMES,
LOCATED AT 9103 LEXINGTON AVENUE NE. ASPEN GARDEN
HOLDINGS, LLC. (CASE FILE NO. 17-0005/SLK)
The report to the Planning Commission was presented by Shawn Kaye,
Associate Planner. The public hearing for Case File 17-0005 was opened at
7:08 p.m.
RoseAnn Flor, 9052 Jackson Avenue in Lexington, stated she was present on
behalf of her father. Her father wanted to make the developer aware of a large
pile of tires that had been abandoned by the pond that would need to be
removed.
The public hearing was closed at 7:09 p.m.
Motion by Commissioner Goracke to recommend approval of Planning Case
17-0005A a Preliminary Plat approval to subdivide 2.93 acres (6 existing lots)
into 18 lots and one common lot to be known as Aspen Village Townhomes,
based on the following conditions:
Case 17-0005A:
1. Park dedication will be required for the 18 new units being proposed at the
rate in effect at the time of Final Plat Approval. The 2017 park dedication rate
is $4,114 per unit. A total of $74,052 is due prior to release of final plat mylars
for recording purposes at Anoka County.
2. Anoka County review of development is required.
3. Sanitary Availability Charges (SAC) and sanitary usage fees shall be paid to
the City of Blaine. A permit from the Met Council for sewer connection must be
issued prior to plan approval by the City.
4. Water Availability Charges (WAC) and water usage fees shall be paid to the
City of Lexington. WAC fees shall be based on the City of Blaine’s rate. Water
usage fees shall be based on the City of Lexington’s rates. A permit from the
City of Lexington and the Anoka County Highway Department for the south
water connection must be issued prior to plan approval by the City.
5. Existing storm sewer easement will need to be vacated prior to building
permits issued for the north building. Private connections to the existing
storm sewer are not allowed.
6. A Rice Creek Watershed District permit is required prior to plan approval by
the City.
7. The Mayor, City Clerk and City Manager are hereby authorized to execute
any and all necessary documents, agreements and releases related to the
approval, recording or administration of Aspen Village Townhomes.
City of Blaine Page 2
Planning Commission Minutes - Final March 14, 2017
Motion by Commissioner Goracke to recommend approval of Planning Case
17-0005B a Conditional Use Permit to allow for construction of five attached
multi-family townhome buildings with a total of 18 units in a DF (Development
Flex) zoning district based on the following conditions:
Case 17-0005B:
1. Site plan approval is required prior to any work beginning on site. In order
to receive site plan approval, the developer will need to submit acceptable
plans, a site improvement performance agreement and a financial guarantee
that covers the cost of the exterior improvements on site. This financial
guarantee for the cost of the site work must be in the form of 10% cash and the
remainder of cost must be covered by an acceptable bank issued Letter of
Credit.
2. All landscaping on site must be installed as shown on the drawings
attached to this report. Underground irrigation must be provided for the entire
site. The following landscaping is required on site:
Overstory Trees: 18
Conifer Trees: 18
Ornamental Trees: 18
3. All exterior building elevations must be constructed as shown on the
drawings attached to this report. The buildings to be constructed of stone,
glass and cement board siding on the front elevation. The side and rear
elevations may have vinyl siding.
4. All signage is issued under a separate permit.
5. SAC and WAC payments will be due prior to issuance of first building
permits for each building.
6. The buildings construction and components to meet the Noise Abatement
Standards outlined by Zoning Section 33.22 based on the site’s proximity to
Lexington Avenue.
7. Rice Creek Watershed review and permit is required prior to any activity
occurring on site.
8. Building floor elevations must meet the requirements in the City’s
Comprehensive Water Resource Management Plan.
Motion seconded by Commissioner Homan. The motion passed 7-0.
Aye: 7 - Chair Ouellette, Commissioner Homan, Commissioner York,
Commissioner Goracke, Commissioner Olson, Commissioner Ponds, and
Commissioner Halpern
Chair Ouellette noted this would be on the agenda of the April 6, 2017 City
Council meeting.
4.2 RES 17-043 GRANTING PRELIMINARY PLAT APPROVAL TO SUBDIVIDE 93.6
ACRES INTO TWO (2) LOTS AND ONE (1) OUTLOT TO BE
KNOWN AS INDEPENDENT SCHOOL DISTRICT 16, LOCATED AT
City of Blaine Page 3
Planning Commission Minutes - Final March 14, 2017
DAVENPORT STREET NE/105TH AVE NE. NATIONAL SPORTS
CENTER AND SPRING LAKE PARK SCHOOL DISTRICT NO. 16.
(CASE FILE NO. 17-0006/BKS)
The report to the Planning Commission was presented by Bryan Schafer,
Community Development Director. The public hearing for Case File 17-0006
was opened at 7:14 p.m.
Amy Schultz, Spring Lake Park School District #16 representative, thanked
staff for the thorough presentation. She explained the City of Blaine was
continuing to grow and she discussed why the school district had selected the
proposed site. She indicated the school district would be saving $3.1 million
by not having to construct ballfields given the fact the site was adjacent to the
National Sports Center. She noted both parking and traffic studies were
completed.
Paul Aplikowski, architect for the project, reviewed the conditions for
approval with the Commission and how the School District had worked to
comply with the City’s requests. He noted the building had been moved 15
feet in order to provide property right-of-way. He reported the National
Sports Center had provided a separate addressing several of the conditions.
He provided further comment on the traffic study and noted peak traffic times
for the property. He requested the access point to the staff parking lot remain
in place to allow for a separation of bus and vehicle traffic for children safety.
Chair Ouellette questioned how many students would occupy this building.
Ms. Schultz reported the school district was planning for 650 students.
Chair Ouellette commented on the amount of traffic that would be entering
and exiting the school. He asked how many busses would be entering this
property on a daily basis.
Ms. Schultz estimated 11 to 14 full sized busses and four to seven special
education busses. She reported these numbers would be finalized after
ridership was determined. She noted the building would have 60 staff
members. She provided further comment on how traffic would flow through
the school property internally.
Mr. Aplikowski explained the independent traffic engineer has reported the
school would not be adding a significant amount of traffic at peak rush hour
times.
Chair Ouellette stated he had a real hard time with the existing level of traffic
along Davenport Street at 105th Avenue and feared how the school would
further aggravate this situation.
City of Blaine Page 4
Planning Commission Minutes - Final March 14, 2017
The public hearing was closed at 7:32 p.m.
Commissioner Goracke questioned if any new staff members would be hired
for the new school.
Ms. Schultz explained custodians and food service staff would be added to the
district but anticipated a number of teachers would be relocated to the new
school.
Commissioner Goracke stated he had many of the same concerns as Chair
Ouellette regarding the traffic concerns at Davenport Street and 105th
Avenue. He requested further information on the traffic study.
Assistant City Engineer, Dan Schluender reported the traffic study considered
peak traffic times for the school starts and stops. He understood Davenport
Street currently had queuing issues.
Ms. Schulz understood there were traffic concerns in this area. She explained
the right-in, right-out could be changed to an exit only to alleviate some of the
Commission’s concerns.
Commissioner Olson believed there were existing schools within the district
with more traffic concerns than the proposed school. She supported the
right-in, right-out becoming an exit only.
Commissioner Halpern asked if the City had received approval on the 105th
Avenue plan.
Assistant City Engineer, Dan Schluender reported the City had not yet
received approval from the State. It was the City’s hope they would receive
the green light along with funding in May of 2017. If this were to occur the
project would begin later this year and would continue into 2018.
Chair Ouellette inquired if the signal timing could be adjusted to address the
traffic concerns in the area.
Assistant City Engineer, Dan Schluender explained the timing was pretty well
maxed out for the east-west and north-south motions.
Chair Ouellette asked if the ballfields would be fenced.
Mr. Aplikowski reported a fence would only be constructed around the early
childhood development play area.
Commissioner Goracke believed the school building itself was very nicely
done. He was pleased the school district had done their research and would
City of Blaine Page 5
Planning Commission Minutes - Final March 14, 2017
be saving the tax payers millions of dollars.
Chair Ouellette requested staff comment regarding the issues the project had
with the National Sports Center.
Community Development Director, Bryan Schafer provided further comment
on the outstanding concerns with the National Sports Center and noted the
biggest concern was access to 105th Avenue. He noted the property did have
assessment issues that would have to be resolved between the NSC and the
City.
Commissioner Olson questioned how staff would address the conditions the
applicant did not support.
Community Development Director, Bryan Schafer explained there were only
two conditions within the Conditional Use Permit that were a concern. He
noted the driveway location and potential access would have to be further
discussed if the applicant desired changes prior to this item being reviewed
by the City Council in April.
Motion by Commissioner Olson to recommend approval of Planning Case
17-0006A a Preliminary Plat to subdivide 93.6 acres into two (2) lots and one (1)
outlot to be known as Independent School District 16, based on the following
conditions:
Case 17-0006A:
1. The plat and site plan to include thee dedication of an additional 20-feet of
r-o-w along the entire west side of the site (Davenport corridor).
2. NSC to provide a narrative that contains the terms of a mining-pit closure
plan. Provide specifics on when the City should expect complete closure and
what the key steps will be in that process.
3. The site plan to show the removal of the proposed north driveway for the
new parking lot at the southwest corner of the NSC site.
4. No subsequent permits for building expansion or building remodeling that
generates increased parking demand will be approved for the south campus
unless there are sufficient parking stalls added to support the expanded use or
it is adequately justified and determined by the City that current parking is
sufficient.
5. Park dedication for Lot 1 (the school site) will be calculated at the
commercial rate of $8,704/per acre and applied to the developed portion of Lot
1 (estimated at 5.1 acres).
6. Hauling of fill either in or out of the sand mining pit site will not be allowed
to utilize 105th Avenue as a hauling access once the City begins work on
105th. The City will notify the NSC in writing 30 days prior to that date and will
gate off the access at the end of the 30-day period. The NSC will need to have
an alternate access plan approved by the City at that time.
City of Blaine Page 6
Planning Commission Minutes - Final March 14, 2017
7. The NSC Campus Master Plan (which is to be completed this fall) should
examine pedestrian access between the two campus locations and include,
among the possible solutions, how a pedestrian overpass above 105th might
be incorporated into the NSC facility. The plan would also include details on
how pedestrians will be directed to use the overpass.
8. The existing levied assessments for Davenport Street will need to be paid
or otherwise addressed as part of the lease agreement for the softball wheel
prior to release of the plat for recording.
9. The site and landscape plan for the new SW parking area to meet the 25
-foot setback from the new right-of way line and Performance Standards
Section 33.08.
10. The minimum lot size in the RR (Regional Recreation) zoning district is five
(5) acres. Any outlot that is platted with less than five (5) acres may not be
allowed in the future to be re-platted or issued a building permit.
11. The new SW area parking lot to be completed and ready for use no later
than October 31, 2017.
Motion by Commissioner Olson to recommend approval of Planning Case
17-0006B a Conditional Use Permit to allow for a Pre-K thru 4th grade
elementary school in an RR (Regional Recreation) zoning district, based on the
following conditions:
Case 17-0006B:
1. The site plan should be modified to close/remove the northern most site
driveway from Davenport St. The circulation plan will need to be modified to
reflect the new bus circulation plan and site plan. This will reduce the bus trips
on Davenport and reduce the conflicts at the north intersection with National
Market Center and the queuing problems associated with these conflicts.
2. The gated driveway entrance on the south side of the parking area west of
the school is too close to Davenport Street and should be relocated to the east
and serve the east drive aisle of the parking lot so that it has a greater stacking
distance from Davenport Street.
3. Provide a narrative on site grading for the school site including fill
requirements, source of fill, timing; etc.
4. The landscape plan for the school site to meet Performance Standards
Section 33.08.
5. Freestanding site lighting will be limited to not more than 20-feet in height.
6. School business signage, both wall-attached and freestanding, shall be by
separate review and permit. The school, based on the revised plat with lot
frontage on 105th Avenue, will be allowed two wall elevations.
7. WAC (Water Access Charge) and SAC (Sewer Access Charge) will be
calculated and paid as part of building permit.
City of Blaine Page 7
Planning Commission Minutes - Final March 14, 2017
8. One freestanding sign will be allowed with maximum height of 10-feet and
area not to exceed 80 square feet. An electronic reader board is permitted
within those standards.
9. The addition of other non-school uses such as a church is not permitted by
the RR zoning text.
10. A SIPA and financial guarantee to cover site improvements are required
to be put in place prior to start of site work for either the school or new SW
parking area.
11. Formal Site Plan Approval is required from the City prior to start of site
work for either the school or the new SW parking area.
12. The new SW area parking lot to be completed and ready for use no later
than October 31, 2017.
13. A Coon Creek Watershed (CCWD) Permit is required prior to start of site
work.
14. This is a conditional use permit for a Pre-K thru 4th grade elementary on
Lot 1 Block 1 only and does not provide any approval for a school on other
NSC owned/controlled property. Any subsequent expansion of the school on
Lot 1, Block 1 will require a CUP amendment.
15. The issuance of a Conditional Use Permit for an elementary school
requires a separate code amendment that is being processed through the City.
Any recommendation for approval of the CUP is contingent upon the code
amendment being adopted by the City Council.
Motion seconded by Commissioner Ponds. The motion passed 5-2 (York and
Chair Ouellette opposed).
Aye: 5 - Commissioner Homan, Commissioner Goracke, Commissioner Olson,
Commissioner Ponds, and Commissioner Halpern
Nay: 2 - Chair Ouellette, and Commissioner York
Chair Ouellette noted this would be on the agenda of the April 6, 2017 City
Council meeting.
4.3 TMP 17-0088 Public Hearing Case File No. 17-0007 // City of Blaine
The City is proposing a code amendment to the RR (Regional
Recreation) zoning district to add Elementary School as a use allowed
by Conditional Use Permit.
The report to the Planning Commission was presented by Bryan Schafer,
Community Development Director. The public hearing for Case File 17-0007
was opened at 7:51 p.m. As no one wished to appear, the public hearing was
closed at 7:51 p.m.
Motion by Commissioner Goracke to recommend approval of Planning Case
17-0007 a Code Amendment to the RR (Regional Recreation) zoning district to
City of Blaine Page 8
Planning Commission Minutes - Final March 14, 2017
add Elementary School as a use allowed by Conditional Use Permit, based on
the following rationale:
Case 17-0007:
1. While not necessarily envisioned within the RR zoning, the addition of an
elementary school use does not in and of itself pose any land use conflicts.
Schools, like churches, are supported by a variety of zoning districts within the
city from residential to retail and commercial zones.
2. Adding the use as a Conditional Use allows the City the review authority
necessary to place appropriate conditions as provided by the CUP process.
Motion seconded by Commissioner Halpern. The motion passed 7-0.
Aye: 7 - Chair Ouellette, Commissioner Homan, Commissioner York,
Commissioner Goracke, Commissioner Olson, Commissioner Ponds, and
Commissioner Halpern
Chair Ouellette noted this would be on the agenda of the April 6, 2017 City
Council meeting.
Other Business
Bryan Schafer, Community Development Director provided the Planning
Commission with an update on the 2040 Comprehensive Plan update.
Informational; no action required.
Adjournment
Motion by Commissioner Homan to adjourn the Regular Planning Commission
meeting. Motion seconded by Commissioner York. The motion passed 7-0.
Adjournment time was 7:54 p.m.
Aye: 7 - Chair Ouellette, Commissioner Homan, Commissioner York,
Commissioner Goracke, Commissioner Olson, Commissioner Ponds, and
Commissioner Halpern
City of Blaine Page 9
Agenda
Blaine City Hall
City of Blaine 10801 Town Sq Dr NE
Blaine, MN 55449
Anoka County, Minnesota
Meeting Agenda - Final
Planning Commission
The Planning Commission is an advisory body to the City
Council. One of the Commission’s functions is to hold public
hearings and make recommendations to the City Council. The
City Council makes all final decisions on these matters. Blaine
City Ordinances require that certain documents and
information be included in applications. The Planning
Commission may postpone consideration of an application that
is incomplete and may, for other reasons, postpone final action
on an application. For each item the Commission will receive
reports prepared by the City staff, open the hearing to the
public, and discuss and act on the application.
Tuesday, March 14, 2017 7:00 PM Council Chambers
1. Roll Call
2. Approval of Minutes
TMP Approval of January 10, 2017 Planning Commission Minutes
17-0112
3. Old Business
4. New Business
4.1 TMP Public Hearing Case File No. 17-0005 // Aspen Garden Holdings, LLC //
17-0086 9103 Lexington Avenue NE
The applicant is requesting the following:
a) Preliminary Plat approval to subdivide 2.93 acres (6 existing lots) into
18 lots and one common lot to be known as Aspen Village Townhomes.
b) Conditional Use Permit to allow for construction of five attached
multi-family townhome buildings with a total of 18 units in a DF
(Development Flex) zoning district.
City of Blaine Page 1 Printed on 3/9/2017
Planning Commission Meeting Agenda - Final March 14, 2017
4.2 TMP Public Hearing Case File No. 17-0006 // National Sports Center and
17-0087 Spring Lake Park School District No. 16 // Davenport Street NE/105th
Ave NE
The applicants are requesting the following:
a) Preliminary Plat approval to subdivide 93.6 acres into two (2) lots
and one (1) outlot to be known as Independent School District 16.
b) Conditional Use Permit to allow for a Pre-K Thru 4 Elementary
School in an RR (Regional Recreation) zoning District.
4.3 TMP Public Hearing Case File No. 17-0007 // City of Blaine
17-0088
The City is proposing a code amendment to the RR (Regional
Recreation) zoning district to add Elementary School as a use allowed
by Conditional Use Permit.
City of Blaine Page 2 Printed on 3/9/2017
Get email alerts for Blaine
A daily email when new agendas and minutes are posted.