Downtown Review Board
Regular MeetingBlue Springs, MO · October 5, 2017
Agenda
Annex Conf. Room – BEHIND CITY HALL – 903 W. Main Street – City Hall
DOWNTOWN REVIEW BOARD
MEETING AGENDA
Thursday, October 5, 2017 - 4:00 p.m.
Board Members please call 228-0207 if unable to attend
1 CALL TO ORDER
A. Approval of July 13, 2017 meeting minutes
2 REVIEW OF PROJECT APPLICATIONS
A. DRB-09-17-6053 / 1201 W. Main Street / Façade and Exterior Site Improvements
3 OTHER BUSINESS
4 ADJOURN
If special accommodations are required for citizen participation in this meeting,
PLEASE CALL 228-0207 (VOICE) OR 228-0250 (TDD)
07-11-17 Page 1 of 1
mw
City of Blue Springs
903 Main
Blue Springs, Missouri 64015
Downtown Review Board
MINUTES
Thursday, July 13, 2017
A meeting of the Downtown Review Board of the City of Blue Springs was held in the City Hall East Conference
Room located at 903 W. Main Street on Thursday, July 13, 2017 with the following members, guests and staff in
attendance:
ATTENDANCE Kent Edmondson, Councilman Scott Allen, Community Dev.
James Wallace, PC Rep. Chris Sandie, Public Works
Yvonne Woods, Vice Chairman Joe Haney, PC Rep.
STAFF Matt Wright, Senior Planner
Karen Findora, Recording Secretary
ABSENT Jennifer Hauschild
Cindy Miller, Chairman
Jackie Fairbanks, PC Alt. Rep.
Chris Lievsay, Councilman
CALL TO ORDER Vice Chairman Yvonne Woods called the meeting to order at 4:00 p.m.
CONSENT AGENDA Vice Chairman Woods requested action on the Consent Agenda with a
APPROVAL motion by Board Member James Wallace, to approve the minutes for May
25, 2017, a second from Councilman Kent Edmondson, and a unanimous
vote, the Minutes of May 25, 2017, were approved as submitted.
AGENDA ITEM 2A. Matt Wright, Senior Planner, stated that before the DRB is a recommendation
DRB-07-17-5912 / “1002 W to approve the improvements to the building located at 1002 W Main Street.
Main Street” / Façade The applicant is proposing to add cedar planks to the front façade, over the
Improvements brick. The applicant presented another option for the awning. That option
showed the awning made from wood. There will also be a 2 ft. x 5 ft. section
DRB Minutes – 07.13.17 Page 1 of 3
kf
in front of the display window for landscaping. The applicant will paint one
of the sides of the building.
APPLICANTS Mike Yancik & John Broker
Both were present.
QUESTIONS Scott Allen, Director of Community Development, asked if this fits in with
the new Downtown Design Guidelines. Mr. Wright stated that it does. The
building materials will still have 50% masonry with the concrete block. Mr.
Allen asked if any roof improvements were to be done. The applicants stated
that there would not.
Councilman Kent Edmondson asked if the applicant would also enhance the
side entrance to the west. Mike Yancik stated that they would add an awning
to that door way and wrap the siding around the corner of the building.
MOTION
Board Member Joe Haney moved to approve DRB-07-17-5912 / “1002 W
AGENDA ITEM 2A.
Main Street” / Façade Improvements.
DRB-07-17-5912 / “1002 W
Main Street” / Façade
Improvements
Seconded by Councilman Kent Edmondson.
SECOND
Yvonne Woods – Aye James Wallace – Aye
VOTE
Joe Haney – Aye Kent Edmondson – Aye
Jennifer Hauschild - Absent Chris Lievsay – Absent
Scott Allen – Aye Jackie Fairbanks – Absent
Cindy Miller, Chairman - Absent Chris Sandie – Aye
(APPROVED 6-Aye, 0-No)
Board Member Joe Haney amended his motion to approve DRB-07-17-5912
AMENDED MOTION
/ “1002 W Main Street” / Façade Improvements to allow either awning
AGENDA ITEM 2A.
option.
DRB-07-17-5912 / “1002 W
Main Street” / Façade
Improvements
Seconded by Councilman Kent Edmondson.
SECOND
Yvonne Woods – Aye James Wallace – Aye
VOTE
Joe Haney – Aye Kent Edmondson – Aye
Jennifer Hauschild - Absent Chris Lievsay – Absent
Scott Allen – Aye Jackie Fairbanks – Absent
Cindy Miller, Chairman - Absent Chris Sandie – Aye
(APPROVED 6-Aye, 0-No)
With no further discussion, a motion was made by Councilman Kent
MEETING ADJOURN
Edmondson to adjourn at 4:05 p.m. Seconded by Board Member James
Wallace.
DRB Minutes – 07.13.17 Page 2 of 3
kf
_________________________
Respectfully Submitted by,
Karen Findora, Recording Secretary
____________________________________ __________________________
Cindy Miller, Chairman Date
DRB Minutes – 07.13.17 Page 3 of 3
kf
DOWNTOWN REVIEW BOARD
STAFF REPORT
Meeting Date: October 5, 2017 Agenda Item: 2A
Case File Number: DRB-09-17-6053
Project Name: 1201 W. Main Street
Type of Application: N/A
Request: Façade and Exterior Site Improvements for East Forty
Brewing
Applicant: Premier RE, LLC (David Mann) / J3 Contracting (Jerry
Charlton)
Property Owner: Kent Edmondson
Engineer: S&S Engineering, Inc. (Santanu Nath)
Architect: CHorse DB, LLC (Mark Charlton)
Sign Designer: N/A
Location (Address): 1201 W. Main Street
General Location: Northwest corner of NW 12th Street and W. Main Street
Area: 0.56 acres
Lots: 1
Existing Zoning: “T5” (Urban Center)
Existing Land Use: Retail Service/Office
Proposed Land Use: Retail Service/Office & Bar/Tavern
Comprehensive Plan
Designation: Distinct Destination
Attachments: DRB Application
Site and Building Plans
Other Boards Assigned: N/A
Planner: Matt Wright, Senior Planner
Page 1 of 4
Project: DRB – 1201 W. Main St.
Figure 1. Site Location Map
BACKGROUND INFORMATION/SUMMARY:
The applicant is requesting the following improvements to the building and site at 1201 W.
Main Street:
New paver patio addition to the west side of the building for outdoor seating, along
with wood fencing and shade sails;
Encase existing metal poles on the front and west elevations in wood;
New solar arrays on the flat rooftop and on the south-facing roof slope;
New glass panel garage door on the west side of the building facing the patio for
light and ventilation;
Repave and restripe parking lot;
Paint exterior brick light grey and installation of mural art on the east side of the
building;
New deck off of the rear of the west side of the building; and
New fencing and/or landscaping along the north and west property lines to block
view of adjacent industrial uses.
Page 2 of 4
Project: DRB – 1201 W. Main St.
PREVIOUS ACTIONS/APPROVALS:
On March 26, 2007, the Planning Commission recommended approval of a
rezoning from “CB” (Central Business) to “T5” (Urban Center) as part of the
rezoning for the Downtown Zoning District. The City Council approved the rezoning
on April 2, 2007.
FUTURE APPLICATIONS/REVIEWS ANTICIPATED OR REQUIRED:
Once the application has been reviewed and approved by the Downtown Review Board,
the applicant must submit a building permit for any improvements that require a building
permit, which in addition to interior improvements, include: fencing, shade sails, garage
door addition, decking, and solar arrays. Staff will approve the building permit
administratively. A sign permit will also be required to “change the face” of the sign from
the current business to East Forty Brewing. Mural art does not require a sign permit, unless
there is lettering or branding advertising a specific business. If a sign permit is required for
the mural, the mural must be reviewed by the Downtown Review Board prior to
administrative approval.
The applicant has also requested MCRC (Main Center Redevelopment Corporation) tax
abatement and permit fee reductions, which is an available financial assistance option in
designated areas in Downtown. The financial assistance package must be approved prior
to the issuance of a building permit for improvements.
ABUTTING ZONING AND LAND USES:
Direction Current Zoning Surrounding Land Uses
North: “LI” (Light Industrial) Industrial/Storage
South: Right-of-Way W. Main Street
East: Right-of-Way NW 12th Street
West: Right-of-Way Kansas City Southern Railroad
DOWNTOWN DEVELOPMENT CODE / DOWNTOWN DESIGN STANDARDS:
The subject building was constructed in 1975 with a brick front and concrete block on the
remaining sides.
There will be no changes in setbacks as the building footprint is proposed to remain the
same. The parking lot will be repaved and striped to meet the site’s parking lot setbacks,
which include a minimum 25-ft from street right-of-way and 6-ft. from adjacent property
lines, not including access drives.
The new paver patio addition with fencing and shade sails meets the intent of the
Downtown Review Standards. This addition will provide additional outdoor seating options
creating more activity along Main Street. Details of the shade sails must be reviewed as
part of the Building Permit process. Fencing must also be reviewed as part of the Building
Permit process.
Other proposed changes also meet the Downtown Review Standards, including: encasing
existing metal poles in wood, addition of new glass panel garage door on the west
elevation, exterior painting (generally painting brick is not recommended, but the building
Page 3 of 4
Project: DRB – 1201 W. Main St.
and the brick is not considered historic), new deck off of the rear west side of the building,
and new fencing and/or landscaping along the north and west property lines.
Murals are permitted in Downtown, but may require a sign permit if any lettering or
branding of a specific business is included on the mural. Prior to the installation or painting
of the mural, a proposed image of the mural must be submitted to the Community
Development Department for review. At that time, the Community Development
Department will notify the applicant whether a sign permit and/or Downtown Review Board
will be required.
The final item is the installation of new solar arrays on the flat roof and the half-shed roof
facing Main Street. The Downtown Review Standards make the following
recommendations for the installation of roof-mounted solar panels:
Solar panels should not be visible from the street and are most appropriate on
rear-facing elevations and roof slopes; and
Solar panels on flat roofs should be screened from view with a parapet wall.
Based on the Downtown Review Standards and past applications, staff supports the
installation of solar arrays on the flat roof of the building, providing that the tilt of the arrays
are not to such a degree that they would be visible over the parapet wall, unless additional
height will be added to the parapet wall to screen the arrays from view. However, staff is
not supportive of the solar arrays being installed on the half-shed roof facing Main Street
due to the visibility from the street.
RECOMMENDATION:
Staff recommends approval of all proposed improvements, except for the
installation of solar arrays on the half-shed roof facing Main Street, and proposes
the following conditions for other items:
A. Solar arrays installed on the flat roof must be screened from view with a
parapet wall. If the current parapet wall cannot effectively screen the solar
arrays from street view, additional screening walls may be required.
B. A Building Permit is required for all interior improvements and the following
exterior improvements: fencing, shade sails, garage door addition, decking,
and solar arrays.
C. A Sign Permit is required for the “change of face” to the current tenant sign.
The current tenant space has an active business license through February
28, 2018. A sign permit application must be submitted within 90 days of the
current tenant’s business license expiring or the legal non-conforming sign
must be removed.
D. A proposed image of the mural must be submitted to the Community
Development Department prior to installation or painting for review. At that
time, staff will determine whether a sign permit and/or Downtown Review
Board will be required.
Page 4 of 4
Get email alerts for Blue Springs
A daily email when new agendas and minutes are posted.