Downtown Review Board
Regular MeetingBlue Springs, MO · July 26, 2018
Agenda
Municipal Annex Conference Room
1304 W. Main Street
DOWNTOWN REVIEW BOARD
MEETING AGENDA
Thursday, July 26, 2018 - 4:00 p.m.
Board Members please call 228-0207 if unable to attend
1 CALL TO ORDER
A. Approval of June 5, 2018 meeting minutes
B. Election of Chair and Vice Chair
2 REVIEW OF PROJECT APPLICATIONS
A. DRB-07-18-6476 / Blue River Family Dental / 709 W Main Street / New Small Commercial
Building
B. DRB-07-18-6485 / Hannahs Place Lot 12 / 819 SW Walnut Street / New Single-Family House
C. DRB-07-18-6487 / Hannahs Place Lot 13 / 815 SW Walnut Street / New Single-Family House
3 OTHER BUSINESS
4 ADJOURN
If special accommodations are required for citizen participation in this meeting,
PLEASE CALL 228-0207 (VOICE) OR 228-0250 (TDD)
Posted at the Municipal Annex Building located at 1304 W Main Street and on the City’s website.
http://www.bluespringsgov.com/AgendaCenter
July 24, 2018
Karen Findora, Administrative Assistant
Community Development
07.26.2018 Page 1 of 1
kf
City of Blue Springs
903 Main
Blue Springs, Missouri 64015
Downtown Review Board
MINUTES
Tuesday, June 5, 2018
A meeting of the Downtown Review Board of the City of Blue Springs was held in the Municipal Annex Conf.
Room located at 1304 W. Main Street on Tuesday, June 5, 2018 with the following members, guests and staff in
attendance:
ATTENDANCE Chris Sandie, Public Works Mike Mallon, Community Dev.
Joe Haney Kent Edmondson, Councilman
Jennifer Hauschild Lance Tomlin
Cindy Miller, Chairman
STAFF/OTHERS Thomas Cole, Director
Mike Mallon, Assistant Director
Matt Wright, Senior Planner
Karen Findora, Recording Secretary
Mike Yancik, Dwellings by Design KC
ABSENT Cindy Miller, Chairman
Jackie Fairbanks
Chris Lievsay, Councilman
CALL TO ORDER Vice-Chairman Jennifer Hauschild called the meeting to order at 4:00 p.m.
CONSENT AGENDA Vice-Chairman Jennifer Hauschild requested action on the Consent Agenda
APPROVAL with a motion by Board Member Joe Haney, to approve the Minutes of May
15, 2018, a second from Councilman Kent Edmonson and a unanimous vote,
the Minutes of May 15, 2018, were approved as submitted.
ELECTION OF CHAIR & The election will be postponed until the next Downtown Review Board
VICE CHAIR meeting with full attendance.
AGENDA ITEM 2A / Matt Wright, Senior Planner, stated before the Downtown Review Board is
DRB-05-18-6416 / “Hannahs a request for new single-family residence on Lot 10 of Hannahs Place. It will
Place Lot 10” / 827 SW be 1,833-st. in size on the northeast corner of 9th and Walnut Streets. The
Walnut Street / New Single- home will have a finished basement, with a rear-loaded two car garage. The
Family House home will meet the 5ft. side setbacks, will be setback 31ft. from the rear, and
DRB Minutes – 06.05.2018 Page 1 of 2
kf/mk
11ft. from the front. The applicant has proposed a 3ft. setback at the corner
of the front porch, where a 5ft. setback is required. An encroachment of 2ft.
is allowed for architectural features, and this porch will be considered one,
as long as it does not become enclosed. The front façade will consist of
cement board lap siding, with masonry along the porch columns. The side
and rear facades will consist of standard lap siding.
APPLICANT Mike Yancik, Dwellings by Design KC
MOTION Board Member Joe Haney made a motion to approve DRB-05-18-6416.
AGENDA ITEM 2A /
DRB-05-18-6416 / “Hannahs
Place Lot 10” / 827 SW
Walnut Street / New Single-
Family House
SECOND Seconded by Councilman Kent Edmondson.
VOTE Chris Sandie - Aye Kent Edmondson – Aye
Joe Haney – Aye Chris Lievsay – Absent
Jennifer Hauschild - Aye Jackie Fairbanks – Absent
Mike Mallon– Aye Lance Tomblin - Aye
Cindy Miller, Chairman - Absent
(APPROVED 6-Aye, 0-No)
OTHER BUSINESS None.
MEETING ADJOURN With no further discussion, a motion was made by Councilman Kent
Edmondson to adjourn at 4:06 p.m. Seconded by Board Member Joe Haney.
____________________________
Respectfully Submitted by,
Karen Findora, Recording Secretary
____________________________________ __________________________
Jennifer Hauschild, Vice-Chairman Date
DRB Minutes – 06.05.2018 Page 2 of 2
kf/mk
DOWNTOWN REVIEW BOARD
STAFF REPORT
Meeting Date: July 26, 2018 Agenda Item: 2A
Case File Number: DRB-07-18-6476
Project Name: Blue River Family Dental
Type of Application: Conditional Use Permit
Request: Approve a Conditional Use Permit for a “Small
Commercial Building” type for Blue River Family
Dental at 709 W. Main Street
Applicant: Blue River Real Estate Investment LLC / Shawn Snider
Property Owner: Blue River Real Estate Investment LLC / Shawn Snider
Engineer: Powell CWM, Inc. / Aaron Barnhart
Architect: Primus Companies / Paul Newman
Location (Address): 709 W. Main St.
General Location: North of Main St., 230-ft. west of NW 7 Highway
Area: 0.39 +/- acres
Proposed Lots: 1
Existing Zoning: “T5” (Urban Center)
Proposed Zoning: “T5” (Urban Center)
Existing Land Use: Vacant
Proposed Land Use: Medical Services/Office
Comprehensive Plan
Designation: Distinct Destination
Attachments: Downtown Application
Preliminary Site Plan
Preliminary Building Elevations
Downtown Review Board: July 26, 2018
Planning Commission: August 13, 2018
City Council: N/A
Planner: Matt Wright, Senior Planner
Page 1 of 6
Project: Blue River Family Dental CUP
SITE LOCATION MAP:
BACKGROUND INFORMATION/SUMMARY:
The applicant is requesting approval of a Conditional Use Permit to allow a “Small
Commercial Building” type at 709 W. Main Street. The applicant proposing to develop a
single-story commercial building for medical services (dentist offices) on the subject
property. The purpose of the Conditional Use Permit is to review the building type and the
requirements associated with the building type. Other site and building requirements have
been noted in the staff report for informational purposes but are not being approved with
this application. These items will be reviewed for final approval under a future Downtown
Application prior to building permit approval.
PREVIOUS ACTIONS/APPROVALS:
On March 26, 2007, the Planning Commission recommended approval of a
rezoning from “CB” (Central Business) to “T5” (Urban Center) as part of the
rezoning for the Downtown Zoning District. The City Council approved the rezoning
on April 2, 2007.
Page 2 of 6
Project: Blue River Family Dental CUP
FUTURE APPLICATIONS/REVIEWS ANTICIPATED OR REQUIRED:
The applicant has submitted a Preliminary Plat that will run concurrently with the
Conditional Use Permit. A Final Plat and shared-access easement must be approved and
recorded prior to the issuance of a building permit for the subject property. The final
building plans, site plan, landscape plan, signage, etc. must be reviewed by the Downtown
Review Board with a Downtown Application prior to building permit approval. Any signage
that does not meet the Sign Code may also be reviewed for approval by the Planning
Commission through the Master/Alternative Sign Plan process.
ABUTTING ZONING AND LAND USES:
Direction Current Zoning Surrounding Land Uses
North: “T3” (Sub-Urban) Single-Family Residential
South: Right-of-Way W. Main Street (Local)
East: “T5” (Urban Center) Commercial Services (U.S. Bank)
West: “T4” (General Urban) Vacant
DOWNTOWN DEVELOPMENT CODE (DDC):
The following items from the Downtown Development Code (DDC) (Section 404.240)
are applicable to the rezoning request:
Land Use: The proposed land use is “Medical Services,” which
includes offices for dentists. The use is permitted by right in
the “T5” (Urban Center) zoning district.
Building Type: The proposed building type is a “Small Commercial
Building,” which is only permitted by a Conditional Use
Permit in the “T5” (Urban Center) zoning district per the
DDC. The building type is the only commercial building
type that permits a single-story building.
Although the Downtown Master Plan encourages the
development of two- to five-story mixed-use buildings
along much of Main Street, particularly on the south
side, the subject lot is suitable for a single-story
building. Most of the buildings on the north side of Main
Street are single-story. Those buildings that are two-
stories typically are single-story on Main Street with a
finished lower-level. Single-story buildings on the north
side of Main Street also provide an appropriate
transition in scale to the predominantly single-story,
single-family homes to the north, which is also sit at a
lower elevation.
Height and Area: The minimum height from floor to ceiling of the first floor is
15-feet. The proposed floor to ceiling height will be reviewed
with a future Downtown Application for building permit. The
preliminary building elevations have two different parapet
Page 3 of 6
Project: Blue River Family Dental CUP
heights, one at 19.17-ft. and the other at 24-ft. Based on the
preliminary building elevations, it appears that the 15-ft. floor
to ceiling requirement can be met.
Setbacks: The following setbacks apply to the development based on
the zoning district (T5) and frontage type (storefront):
Area Required Setback Proposed Setback
Front 0-ft. min./max. 0-ft.
Side 0-ft. min. – 10-ft. max 8-ft.
Rear 5-ft. min. 121-ft.
Surface parking shall be screened from public right-of-way
by landscaping to effectively screen parking areas from the
street. Surface parking shall be setback a minimum of 6-ft.
from any property line of a less-intensive zoning district. The
proposed parking areas
Access & Parking: Access to the subject property is proposed to be provided
through a shared-access drive on W. Main Street, where a
curb-cut was already installed when previous street
improvements were made to Main Street. The shared-
access drive on private properties will require a dedicated
and recorded easement. As the City of Blue Springs is the
property owner to the west, this easement must be
approved by the City Council and recorded with a future
Final Plat.
A minimum of 2 parking spaces per 1,000-sf. of office space
is required per the DDC. The proposed building consists of
approximately 3,371-sf., which would require 7 parking
spaces. The preliminary site plan provides 18 parking
spaces, including 2 ADA spaces, meeting the minimum
parking requirements. Bike parking requirements were
added to the DDC in March 2018. However, bike parking is
not required for small commercial building types.
Sidewalk: An 8-ft. sidewalk along W. Main Street is required per the
Downtown Master Plan. The sidewalk must be installed prior
to the issuance of a Certificate of Occupancy on the new
building.
Landscaping: The following landscaping requirements apply to the site:
Area Required Proposed
Landscaping Landscaping
Street 1 small street tree per Not required with
25-ft. of street “storefront” type and
frontage (92’ / 25 = limited space between
3.68) = 4 street trees street and building.
required
Page 4 of 6
Project: Blue River Family Dental CUP
OR
1 large street tree per
40-ft. of street
frontage (92’ / 40 =
2.3) = 2 street trees
required
Front Not required Not required
Although no specific landscaping requirements apply to the
site, some landscaping is required to soften the visual
impact of the parking areas and enhancing the overall
appearance of the site. Landscaping will be reviewed with a
future Downtown Application for building permit.
Building Design: The applicant is proposing an approximately 3,371-sf.
medical office building for Blue River Family Dental. The
building includes a mix of materials, including brick, stone
veneer, faux wood planks, and aluminum
awnings/sunshades. The varying parapet heights and
building projections create visual interest on all four-sides of
the building, with particular attention given to the Main Street
façade and the west façade (main building entrance). Aside
from the faux wood planks, the building is all masonry,
meeting and exceeding the minimum 50% requirement for
all façades.
The building design will be reviewed under the Downtown
Design Standards (adopted by the City Council in April
2017). Based on the preliminary building elevations and site
plan, the building meets the intent of the Standards.
Although the main building entrance is on the side of the
building, it has a pedestrian connection to the Main Street
sidewalk. The Main Street façade includes multiple windows
to provide visual interest and to draw customers to the main
entrance. The reason for the side entrance is to make the
building more accessible for both customers entering from
Main Street (either from on-street parking or a pedestrian)
and the parking lot in the rear of the building.
Signage is not being reviewed nor approved with the
Conditional Use Permit.
Lighting: An exterior lighting plan must be reviewed and approved
administratively through the building permit process.
REVIEW CRITERIA:
The Downtown Review Board will make a recommendation to the Planning
Commission on the Conditional Use Permit request.
Page 5 of 6
Project: Blue River Family Dental CUP
A Conditional Use Permit shall be reviewed according to the following criteria:
1. The application furthers the intent of the proposed zoning district and supports
that of any abutting districts.
2. Compliance of any proposed development with the requirements of this
Development Code.
3. Whether any additional site-specific conditions are necessary to meet the
purposes and intent of this Development Code and the intent or design
objectives of any applicable subsections of this Development Code.
4. The impact on the public realm, including the design and functions of
streetscapes and relationships of building and site elements to the streetscape.
5. The adequacy of drainage, utilities and other public facilities.
6. Compatibility with the character of the area in terms of building scale, building
form, landscape, and site design.
7. Compatibility with the area in terms of operating characteristics such as hours of
operation, visible and audible impacts, traffic patterns, intensity of use as
proposed or foreseeable, and other potential impacts on adjacent property.
8. The application will not prevent development and use of the neighboring property
in accordance with the applicable development regulations.
9. The long-range plans applicable to the site and surrounding area are not
negatively impacted considering the permanence of the proposed use, the
permanence of existing uses in the area, and any changes in character occurring
in the area.
10. The recommendations of professional staff.
STAFF RECOMMENDATION:
Staff recommends approval of the Conditional Use Permit request. Staff will add
conditions to the application prior to submittal to the Planning Commission for their review
and approval. The Downtown Review Board may recommend conditions be added
for Planning Commission consideration.
Page 6 of 6
DOWNTOWN REVIEW BOARD
STAFF REPORT
Meeting Date: July 26, 2018 Agenda Item: 2B
Case File Number: DRB-07-18-6485
Project Name: 819 SW Walnut St. (Lot 12, Hannahs Place)
Type of Application: Building Permit / New House
Request: New construction of a single-family house
Applicant: Dwellings by Design KC / Erwin Gard
Property Owner: Dwellings by Design KC / Mike Yancik
Engineer: N/A
Architect: N/A
Sign Designer: N/A
Location (Address): 819 SW Walnut Street
General Location: North of SW Walnut St., 60-ft. east of SW 9th St.
Area: 0.07 +/- acres (3,150 s.f)
Lots: 1
Existing Zoning: “T3” (Sub-Urban)
Existing Land Use: Vacant
Proposed Land Use: Single-Family Residential
Comprehensive Plan
Designation: Distinct Destination
Attachments: Downtown Application
Proposed building plans
Other Boards Assigned: Historic Preservation Commission – July 26, 2018
Planner: Matt Wright, Senior Planner
Page 1 of 4
Project: DRB – 819 SW Walnut St.
SITE LOCATION MAP:
BACKGROUND INFORMATION/SUMMARY:
The applicant is requesting to build a 1,433-sq. ft. single-family house at 819 SW Walnut
Street. The proposed two-story house will include an attached rear-loaded two-car garage
that will be accessed through a private access easement. The proposed house will
generally complement the size, scale, and materials of houses permitted elsewhere in the
Hannahs Place along SW Jones Street, SW 9th Street, and SW Walnut Street.
PREVIOUS ACTIONS/APPROVALS:
On March 26, 2007, the Planning Commission recommended approval of a
rezoning from “SF-7” (Single-Family Residential) to “T3” (Sub-Urban) as part of the
rezoning for the Downtown Zoning District. The City Council approved the rezoning
on April 2, 2007.
The City Council approved the designation of Conservation Areas in the Downtown
Blue Springs area (Resolution No. 76-2015) on October 5, 2015.
The Planning Commission recommended approval of a Final Plat (PF-03-17-5733)
for “Hannahs Place 2nd Plat” on December 11, 2017. The City Council approved
the Final Plat on December 18, 2017.
The Downtown Review Board recommended approval of a build line and partial
drainage and utility easement vacation (DRB-04-18-6343) on April 10, 2018. The
Planning Commission recommended approval of the vacation (VAC-04-18-6336)
on April 23, 2018. The City Council approved the vacation on May 7, 2018.
Page 2 of 4
Project: DRB – 819 SW Walnut St.
FUTURE APPLICATIONS/REVIEWS ANTICIPATED OR REQUIRED:
Once the application has been reviewed and approved by the Downtown Review Board
and the Historic Preservation Commission, staff will approve and issue the building permit
for the new house.
ABUTTING ZONING AND LAND USES:
Direction Current Zoning Surrounding Land Uses
North: “T3” Single-Family (Under Construction)
South: Right-of-Way SW Walnut Street (Major Collector)
East: “T3” Single-Family (Proposed)
West: “T3” Single-Family (Proposed)
DOWNTOWN DEVELOPMENT CODE (DDC) & DOWNTOWN DESIGN STANDARDS:
The following items from the DDC are applicable to the rezoning request:
Height and Area
Standards: The Downtown Development Code (DDC) (Section
404.240) states that the following minimum standards are
required in the “T3” zoning district:
Height of the primary building: Not more than two and one-
half (2 ½) stories. The new house will be two-story.
Setbacks from the property line: Front yard setback of not
less than ten (10) feet and not more than twenty-five (25)
feet to the building wall; Side yard, interior and corner
setback, and rear setback of not less than five (5) feet. The
new house will have a 10-foot front yard setback
(measured from the front porch to the front property
line). The front wall of the house will be set back 16-feet.
The side yard setbacks will be 5-feet. The rear yard
setback will be 38.8-feet. All setbacks have been met.
Building Materials: High quality masonry building materials approved for the
Downtown Zoning District are stone, brick, cast stone, and
stucco. Synthetic stone, such as pre-manufactured
fiberglass, cultured stone, or glass-fiber reinforced concrete,
is permitted, provided that it is identical in appearance and
equal or greater durability to natural stone. These masonry
materials shall be required on ten percent (10%) of the sum
total of all facades for single-family houses. To meet the
minimum 10% masonry requirement for Lot 12 (819 SW
Walnut St.), the applicant is requesting to use a cement
board siding that resembles batten board on the front
façade, which accounts for 11.5% of the façade. The
Downtown Development Code allows cement board
siding to be used to fulfill the masonry requirement, but
the percentage of masonry becomes 75% unless
otherwise approved by the Downtown Review Board.
Page 3 of 4
Project: DRB – 819 SW Walnut St.
Based on the code, the 75% is related to an increase
from the 50% masonry requirement for commercial
buildings (the masonry requirement increases 50% if
cement board siding is used). The code does not
specifically mention what percentage of cement board
siding must be used to fulfill the masonry requirement
if used on single-family houses. However, using the
same percentage increased established for commercial
(+ 50%), it could be assumed that an increase from 10%
to 15% masonry is appropriate. The code gives some
flexibility to the Downtown Review Board in
determining the appropriate percentage of cement
board siding. The applicant is providing greater than
10% masonry, but less than 15% masonry, which would
typically be required for cement board siding. The main
reason the masonry percentage is lower than previous
applications is that this is a two-story house (large
percentage of façade includes the side walls which are
50-ft. deep) and there is a covered front porch, which
adds architectural interest. Staff believes that the
proposed building design makes up for the reduction in
cement board siding. The Downtown Review Board
must make the final decision.
RECOMMENDATION:
Staff recommends approval of the building permit for the construction of a new
house at 819 SW Walnut Street.
Page 4 of 4
DOWNTOWN REVIEW BOARD
STAFF REPORT
Meeting Date: July 26, 2018 Agenda Item: 2C
Case File Number: DRB-07-18-6487
Project Name: 815 SW Walnut St. (Lot 13, Hannahs Place)
Type of Application: Building Permit / New House
Request: New construction of a single-family house
Applicant: Dwellings by Design KC / Erwin Gard
Property Owner: Dwellings by Design KC / Mike Yancik
Engineer: N/A
Architect: N/A
Sign Designer: N/A
Location (Address): 815 SW Walnut Street
General Location: North of SW Walnut St., 90-ft. east of SW 9th St.
Area: 0.07 +/- acres (3,150 s.f)
Lots: 1
Existing Zoning: “T3” (Sub-Urban)
Existing Land Use: Vacant
Proposed Land Use: Single-Family Residential
Comprehensive Plan
Designation: Distinct Destination
Attachments: Downtown Application
Proposed building plans
Other Boards Assigned: Historic Preservation Commission – July 26, 2018
Planner: Matt Wright, Senior Planner
Page 1 of 4
Project: DRB – 815 SW Walnut St.
SITE LOCATION MAP:
BACKGROUND INFORMATION/SUMMARY:
The applicant is requesting to build a 1,468-sq. ft. single-family house at 815 SW Walnut
Street. The proposed two-story house will include an attached rear-loaded two-car garage
that will be accessed through a private access easement. The proposed house will
generally complement the size, scale, and materials of houses permitted elsewhere in the
Hannahs Place along SW Jones Street, SW 9th Street, and SW Walnut Street.
PREVIOUS ACTIONS/APPROVALS:
On March 26, 2007, the Planning Commission recommended approval of a
rezoning from “SF-7” (Single-Family Residential) to “T3” (Sub-Urban) as part of the
rezoning for the Downtown Zoning District. The City Council approved the rezoning
on April 2, 2007.
The City Council approved the designation of Conservation Areas in the Downtown
Blue Springs area (Resolution No. 76-2015) on October 5, 2015.
The Planning Commission recommended approval of a Final Plat (PF-03-17-5733)
for “Hannahs Place 2nd Plat” on December 11, 2017. The City Council approved
the Final Plat on December 18, 2017.
The Downtown Review Board recommended approval of a build line and partial
drainage and utility easement vacation (DRB-04-18-6343) on April 10, 2018. The
Planning Commission recommended approval of the vacation (VAC-04-18-6336)
on April 23, 2018. The City Council approved the vacation on May 7, 2018.
Page 2 of 4
Project: DRB – 815 SW Walnut St.
FUTURE APPLICATIONS/REVIEWS ANTICIPATED OR REQUIRED:
Once the application has been reviewed and approved by the Downtown Review Board
and the Historic Preservation Commission, staff will approve and issue the building permit
for the new house.
ABUTTING ZONING AND LAND USES:
Direction Current Zoning Surrounding Land Uses
North: “T3” Single-Family (Under Construction)
South: Right-of-Way SW Walnut Street (Major Collector)
East: “T3” Single-Family (Proposed)
West: “T3” Single-Family (Proposed)
DOWNTOWN DEVELOPMENT CODE (DDC) & DOWNTOWN DESIGN STANDARDS:
The following items from the DDC are applicable to the rezoning request:
Height and Area
Standards: The Downtown Development Code (DDC) (Section
404.240) states that the following minimum standards are
required in the “T3” zoning district:
Height of the primary building: Not more than two and one-
half (2 ½) stories. The new house will be two-story.
Setbacks from the property line: Front yard setback of not
less than ten (10) feet and not more than twenty-five (25)
feet to the building wall; Side yard, interior and corner
setback, and rear setback of not less than five (5) feet. The
new house will have a 10-foot front yard setback
(measured from the front porch to the front property
line). The front wall of the house will be set back 15.67-
feet. The side yard setbacks will be 5-feet. The rear yard
setback will be 33.46-feet. All setbacks have been met.
Building Materials: High quality masonry building materials approved for the
Downtown Zoning District are stone, brick, cast stone, and
stucco. Synthetic stone, such as pre-manufactured
fiberglass, cultured stone, or glass-fiber reinforced concrete,
is permitted, provided that it is identical in appearance and
equal or greater durability to natural stone. These masonry
materials shall be required on ten percent (10%) of the sum
total of all facades for single-family houses. To meet the
minimum 10% masonry requirement, the applicant is
requesting to use cement board siding on the front
façade, which accounts for 14.41% of the façade. The
Downtown Development Code allows cement board
siding to be used to fulfill the masonry requirement, but
the percentage of masonry becomes 75% unless
otherwise approved by the Downtown Review Board.
Based on the code, the 75% is related to an increase
Page 3 of 4
Project: DRB – 815 SW Walnut St.
from the 50% masonry requirement for commercial
buildings (the masonry requirement increases 50% if
cement board siding is used). The code does not
specifically mention what percentage of cement board
siding must be used to fulfill the masonry requirement
if used on single-family houses. However, using the
same percentage increased established for commercial
(+ 50%), it could be assumed that an increase from 10%
to 15% masonry is appropriate. The code gives some
flexibility to the Downtown Review Board in
determining the appropriate percentage of cement
board siding. The applicant is providing greater than
10% masonry, but less than 15% masonry, which would
typically be required for cement board siding. The main
reason the masonry percentage is lower than previous
applications is that this is a two-story house (large
percentage of façade includes the side walls which are
55-ft. deep) and much of the front façade includes
windows and doors for added architectural interest.
Staff believes that the proposed building design makes
up for the reduction in cement board siding. The
Downtown Review Board must make the final decision.
RECOMMENDATION:
Staff recommends approval of the building permit for the construction of a new
house at 815 SW Walnut Street.
Page 4 of 4