Metropolitan Planning Commission
Regular MeetingBossier City, LA · October 28, 2024
Agenda
AGENDA
Metropolitan Planning Commission
Meeting
10:00 AM - Monday, October 28, 2024
City Council Chambers, Bossier City Hall
620 Benton Road, Bossier City, Louisiana
**APPLICANT OR REPRESENTATIVE MUST BE PRESENT AT THE MPC MEETING**
Page
A. CALL TO ORDER
B. ROLL CALL
C. APPROVE AGENDA
1. Amend agenda to show election of Chairman Pro Tem for the Monday,
October 28, 2024 Special Call Meeting.
2. Approve agenda as amended.
D. SPECIAL ELECTION
1. Due to the absence of our chairman and our vice chairman We will need to
elect the chairman pro tem to preside over the Special Call Meeting for
October 28, 2024.
E. PUBLIC HEARING/ACTION
3 - 31 1. C-USE-000171-2024(SC)-The application of Mindy Wardlaw, Pinnacle
Realty Advisors, requesting Temporary Use Approval for Mastec
Network Solutions to utilize the property located at 2911 Douglas Drive,
for an industrial utility operation to include indoor and outdoor storage of
equipment and materials and to install a commercial grade 6 foot chain
link fence with 3 strand barb wire, Bossier City, Louisiana. (north of
Douglas Dr., west of Altitude Trampoline Park) (City Council District
5)(Police Jury District 7)
C-USE-000171-2024(SC)- CUA for Temporary Use Indoor-Outdoor
Storage, 2917 Douglas Dr, Mindy Wardlaw Pinnacle Realty Advisors
Page 1 of 31
F. ADJOURN
Page 2 of 31
C-USE-000171-2024(SC)
MPC ACTIONS
______________
METROPOLITAN PLANNING COMMISSION
SPECIAL CALL MEETING
October 28, 2024
10:00 A.M.
PRELIMINARY [ ] PUBLIC HEARING [X] CONDITIONAL USE [ ]
FROM: Carolina Blunck, MPC Assistant Planner
THROUGH: Carlotta Askew-Brown, MPC Executive Director
PRESENTER:
APPLICANT: Mindy Wardlaw, Pinnacle Realty Advisors
ITEM C-USE-000171-2024(SC) – The application of Mindy Wardlaw, Pinnacle
Realty Advisors, requesting Temporary Use Approval for Mastec Network
Solutions to utilize the property located at 2911 Douglas Drive, for an industrial
utility operation to include indoor and outdoor storage of equipment and materials
and to install a commercial grade 6 foot chain link fence with 3 strand barb wire,
Bossier City, Louisiana. (North of Douglas Dr., west of Altitude Trampoline Park)
(City Council District 5)(Police Jury District 7)
[ ] ZONING AMENDMENT [ ] PLANNED UNIT DEVELOPMENT
[X] TEMPORARY USES [ ] CONDITIONAL USE
[ ] SUBDIVISION APPROVAL [ ] OTHER
APPLICATION CONTACT INFORMATION:
OWNER/APPLICANT:
Mindy Wardlaw,
Pinnacle Realty Advisors
1000 Chinaberry Drive Suite 400
Bossier City, LA 71111
I. APPLICATION SUBMITTAL DATE: September 23, 2024
II. PROJECT NAME:
Page 1 of 29
Page 3 of 31
C-USE-000171-2024(SC)
Temporary Use for an Industrial Operation
III. LOCATION:
Generally located at 2911 Douglas Dr. Bossier City, LA 71111. (north of
Douglas Dr., west of Altitude Trampoline Park.)
IV. BACKGROUND INFORMATION:
The applicant is requesting approval for a Temporary Use approval for
Mastec Network Solutions to operate an utility facility at 2911 Douglas
Drive. The proposed use includes the indoor and outdoor storage of
equipment, utility vehicles, commercial equipment and materials.
The applicant anticipates approximately 25 employees accessing the site;
however, the majority will load trucks in the morning and leave for the day,
with fewer than 10 employees working on-site regularly.
In addition, the applicant plans to install a commercial-grade 6-foot chain-
link fence topped with 3-strand barbed wire to secure the premises.
Hours of Operation:
• Monday – Friday: 6:30 am – 5:00 pm
Note: Temporary uses may be approved no more than two consecutive
time periods on the same site.
V. PHYSICAL CONDITIONS:
There is an existing warehouse facility.
VI. UNRESOLVED ISSUES:
There are no irresolvable issues at this time.
VII. PLANNING ANALYSIS:
The Planning Staff advice that the following criteria must be met to
approve this request.
1. LAND USE (MASTER PLAN - 2013):
Future Land Use Plan: Designates this area as Public / Semi-
Public.
2
Page 2 of 29
Page 4 of 31
C-USE-000171-2024(SC)
Thoroughfare Plan: This property is accessed from Douglas Drive,
a local street.
2. ZONING:
The following zoning issues are relative to this request:
Zoning District B-3 (General Business)
Base Zoning District Requirements:
• Minimum Lots Size:
Residential: 6,000 sq. ft.
Any other permitted use: None
• Maximum Height: 60’
• Yard requirements: Front 35’, Side 10’ and Rear 25’
Adjacent Zoning:
Zoning
North R-A Residential Agriculture
South Douglas Drive
East B-3 General Business
West B-1 Business, commercial office
3. AIR INSTALLATION COMPATIBLE USE ZONE:
AICUZ – Outside AICUZ Decibel Level Contour
4. UTILITIES:
Bossier City water and sewer.
VIII. ATTACHMENTS:
• Property Owner Certification
• Vicinity Map
• Zoning Map
• District Map
• FLU Map
• FEMA Map
• Letter of Intent
• Photos
• Proposed Floor Plan
• Property Owners Within 300’
3
Page 3 of 29
Page 5 of 31
dotloop signature verification: dtlp.us/I9FV-eL22-JCiH
Property Owner Certification
Application Instructions and Submittal Documents
1. ALL owners of record must sign this certificate and upload it into the Energov system.
2. If a company (including an LLC), corporation, partnership, or other group is an owner of the property, the signee must indicate
company/corporate position/title AND submit substantiating documentation.
3. Any person signing with Power of Attorney for others must print the names of those individuals AND attach a notarized copy of the
Power of Attorney.
Application Type*
☐ Alcohol ☐ Master Development Plan ☐ Preliminary Plat
☐ Annexation ☐ Miscellaneous Request ☐ Small Cell Tower
☐ Amended/Minor Plat ☐ Off-Premise Sign Review ☐ Telecommunication Tower
☐ Conditional Use (land use, ☐ On-Premise Sign Review ☐ Temporary Use
parking, landscaping, etc.) ☐ Planned Unit Development ☐ Zoning Amendment
☐ Final Plat
Project Information
Audubon Properties LLC
Name of Project*:__________________________________________________________________________________________________
Property 2911 Douglas Drive Bossier City LA 71111
Address*:_________________________________________________________________________________________________
(If property address is not assigned, please indicate assessment number(s).)
Tax Assessment Number*:___________________________________________________________________________________________
Property Owner Contact Information
Check here if primary contact ☐ Ms Wardlaw serves as Real Estate Representative Ms Brainard is authorized Power of Attorney in Fact for
Audubon Properties, LLC and Landowner Dirk Rainwater
First Name* Mindy Wardlaw and/or Amy Last Name* Business Name
Brainard
Mailing Address
Address* 1000 Chinaberry Drive Ste 400 City* Bossier city State* Zip Code*
LA 71111
318 469 3261- Mindy Wardlaw
Email: * mindywardlaw@gmail.com Phone Number: * 318 294 8185 - Amy Brainard
Authorized Representative*
Dirk Rainwater of Audubon Mindy Wardlaw Realtor as Real Estate
_________________________________ will represent myself; or I hereby designate representative and
I Properties, LLC Amy Brainard, Power of
__________________________________________
(Property Owner) Attorney
(NameinofFact forRepresentative)
Project Audubon Properties, LLC
to act in the capacity as my agent for submittal, processing, representation, and/or presentation of this request.
Acknowledgment*
1. I acknowledge that private deed restrictions or covenants may exist on the subject property. I recognize that neither the Bossier
City – Parish Metropolitan Planning Commission (MPC) nor its staff may consider such deed restrictions or covenants, if any,
when determining approval or denial of an application.
2. I understand that the application fee is nonrefundable.
3. Pending Application Expiration: The applicant understands that the application expiration timeframe begins when the applicant
submits the application. Pending applications shall expire 180 days from the date of submittal.
4. I hereby certify that I am the owner of the property and further certify that the information regarding the property ownership
provided as a part of this application is true and correct. (Attach additional pages if necessary)
Property Owner(s) Signature Date
dotloop verified
Dirk Rainwater/Douglas Audubon Properties LLC 09/19/24 12:43 PM CDT
DHXN-WUFT-4F0G-0EUR
Property Owner(s) Signature Date
Page 4 of 29
* Required information in order to process Application.
Page 6 of 31
Letter of Intent
In regards to the business itself.
Type and description of business :
Mastec is an international company in which this location will conduct acts in the
Telecommunications capacity of laying underground lines for such communication.
This location will be the site for ground operations of such lines to build a stronger and up-to-
date communication network for the citizens throughout the region.
From their website:
MasTec Network Solutions (MNS) is a division of MasTec that provides comprehensive services
and turnkey solutions for Telecom operators. With the acquisition of QuadGen wireless, MNS is
uniquely positioned to offer true and unmatched end to end services to our customers for
planning, design, SAQ, construction, material management, integration & RAN Optimization
services for 5G, LTE, private LTE and small cells. The telecommunications industry is one of the
most dynamic industries in the global marketplace today. Consumer demand, technological
advances, and new networking applications continue to fuel a fast-paced business
environment. A wholly-owned subsidiary of MasTec, Inc. (stock symbol: MTZ), MNS is a
telecommunications infrastructure services company that is well positioned to outmatch the
demands of this type of business climate.
Hours of operation:
The hours of operation at this location would be 630 a.m. to 5 p.m.
Employees on site:
There will be approximately 25 total employees coming and going, however, most will be
loading in the morning trucks and leaving until the next day. The amount of employees actively
working there on a daily basis will be 10 or less.
Page 5 of 29
Page 7 of 31
Mastec is asking for temporary use for :
2911 Douglas Drive Bossier City, La 71111 owned by Audubon
Properties, LLC.
MasTec has been involved in some of the largest and most complex
infrastructure construction projects across the country
With 80 years of experience and a workforce of nearly 22,000 skilled
professionals, MasTec has the expertise and resources required to
reliably deliver innovative solutions, everytime
Cell tower construction, wireline ber expansion and broadband cable trenchin
We provide engineering, design, construction and maintenance services for wireline and
wireless communications, including cell tower construction, broadband ber optic cable
installation,and wireline construction and emergency maintenance services all across
the country. We combine cutting-edge technology, innovative solutions, skilled
professionals and an unfailing commitment to safety to ensure that our customers are
able to meet their customers' communication needs with the highest levels of reliability
and quality, and we're able to supply crews and equipment to our customers 24/7
Page 6 of 29
g
.
fi
.
.
fi
Page 8 of 31
Use & Intent
They are looking to have 10-12 employees at the location with trucks that will
come in and pick up supplies around 630-730 am and then some may or may not
return. Total of approx 30 employees. There will be limited trucks parked in the
back of building overnight or on the side. Mastec is willing to spend 25,000 for
fencing with slats for privacy and barbed wire, that is required by the utility
company. The location while in “schools such” was once home to a large tropical
sh manufacturer and distributor only 4 years ago. There will be little large truck
traf c and minimal onsite that is visible. Most will be stored inside the 8000 sq ft
warehouse facility that has a loading dock and overhead doors as shipping and
receiving was used there for years without incident.
Page 7 of 29
fi
fi
Page 9 of 31
From: mindy wardlaw
To: Banks, Katie
Subject: Re: [EXT} zoning
Date: Wednesday, September 25, 2024 8:17:54 PM
Mastec is applying for conditional use of the property by Audubon
Properties located at 2911 Douglas Drive Bossier City LA 71111. We are a
national telecommunications company that needs a base for our
operations to install underground utilities and bring new technology to the
region. We will have 2-4 trucks daily and approximately 8-10 employees
there daily. Our drivers and installers will come in the morning to obtain
required materials and leave to the appropriate sites. The hours will be
early 630 am to 5 pm.
We are willing to install fencing with slats for privacy but our contracted
companies do require barbed wire at the top of fencing. We will be
installing security system as well. We hope that this large warehouse
space that we have been seeking, and unable to find in the area will allow
us to accommodate your area and leave it a better place for its citizens.
Mindy Wardlaw for Mastec Telecommunicatons representative.
On Tue, Sep 24, 2024 at 10:14 AM Banks, Katie <banksk@bossiercity.org> wrote:
Subject: C-USE-000171-2024 (2911 DOUGLAS DR 71111) application
Good Morning!
I am starting to work the first part of the file to get it on the agenda and I think we missed a letter
of intent. This would just be a document stating why you are applying for the conditional use. If
you have email it to me I will add that to the application.
Thank you for your attention to this item.
From: mindy wardlaw <mindywardlaw@gmail.com>
Sent: Monday, September 23, 2024 1:24 PM
To: Banks, Katie <banksk@bossiercity.org>
Subject: [EXT} zoning
Page 8 of 29
Page 10 of 31
Page 9 of 29
Page 11 of 31
Page 12 of 31
Page 10 of 29
BOSSIER LAND PLAN
N
ACCOUNT LLC
TATIO
B-3 DR
BOSSIER LAND
WAL-MART
ACCOUNT LLC
R-A
REAL ESTATE
V
R O SE A
MEL
PLAN
N
TATIO
BOSSIER LAND
R-A ACCOUNT LLC
B-1
2800 GUEST HOUSE OF BOSSIER LAND
DR
Melrose ACCOUNT LLC
BOSSIER LLC
B-3 AVE
2911
DR
GLAS
DOU LC
B-3
LOWE'S HOME CENTERS INC
DOUGLAS
L
SOIGNE LAND
AUDUBON
PROPERTY LLC 2917
B-1 2911 Douglas DR
Douglas DR
COMPANY LLC
2901
Douglas DR R
L AS D
DOUG
DR
ATI ON
I-1 I-1 Proposed Location
PLANT
I-1
I-1 2902 Douglas DR
I-1
2900
Douglas DR BOSSIER LAND
Bossier Schools I-1 ACCOUNT LLC
Virtual Learning
Program
B-3
B-1
F
Parcels B-1 (Business, Commerical Office) I-1 (Light Industrial) Restric Uses (Alc.)
Bossier City Addresses B-3 (General Business) R-A (Residential Agriculture)
Bossier City Road
0 100 200
Feet
Bossier City-Parish
ZONING BOSSIER MAP C-USE-00
Metropolitan Planning Commission
0171-2024
2911 Douglas Dr, Bossier Parish, LA
(SC)
Bossier City, LA 71111 Drawn by: Blunck Page 10.3.24
Map Revised: 11 of 29
Page 13 of 31
BOSSIER LAND PLAN
N
ACCOUNT LLC
TATIO
WAL-MART DR
REAL ESTATE BOSSIER LAND
ACCOUNT LLC
AV
R OSE
MEL
PLAN
N
2800
TATIO
BOSSIER LAND
Melrose ACCOUNT LLC
AVE
BOSSIER LAND
GUEST HOUSE OF
DR
ACCOUNT LLC
BOSSIER LLC 2911
DOUGLAS
DR LLC
LOWE'S HOME CENTERS INC
SOIGNE LAND DOUGLAS
COMPANY LLC AUDUBON 2917
PROPERTY LLC Douglas DR
2901
Douglas DR 2911
Douglas DR
R Mr. Vince
LAS D
DOUG Maggio
DR
ATI ON
Proposed Location
2902
PLANT
Douglas DR
Jimmy Cochran
2900
Douglas DR
BOSSIER LAND
Bossier Schools ACCOUNT LLC
Virtual Learning
Program
BOSSIER PARISH
SCHOOL BOARD
F
Parcels District 7 - Jimmy Cochran Restric Uses (Alc.)
Bossier City Addresses City District 5 - Vince Maggio
Bossier City Road
0 100 200
Feet
Bossier City-Parish
DISTRICT BOSSIER MAP C-USE-00
Metropolitan Planning Commission
0171-2024
2911 Douglas Dr, Bossier Parish, LA
(SC)
Bossier City, LA 71111 Drawn by: Blunck Page 10.3.24
Map Revised: 12 of 29
Page 14 of 31
BOSSIER LAND PLAN
N
ACCOUNT LLC
TATIO
WAL-MART DR
REAL ESTATE
BOSSIER LAND
ACCOUNT LLC
AV
R OSE
MEL
PLAN
N
2800
TATIO
BOSSIER LAND
Melrose ACCOUNT LLC
AVE
BOSSIER LAND
GUEST HOUSE OF
DR
ACCOUNT LLC
BOSSIER LLC
2911
DOUGLAS DR
LLC
2917
LOWE'S HOME CENTERS INC
SOIGNE LAND DOUGLAS
COMPANY LLC AUDUBON
Douglas DR
2901 PROPERTY LLC
Douglas DR 2911
Douglas DR
R
L AS D
DOUG
DR
ATI ON
Proposed Location
2902
PLANT
Douglas DR
2900
Douglas DR
BOSSIER LAND
Bossier Schools ACCOUNT LLC
Virtual Learning
Program
BOSSIER PARISH
SCHOOL BOARD
F
Parcels High Density Residential Public/Semi-Public Restric Uses (Alc.)
Bossier City Addresses Commercial Sensitive Development Area
Bossier City Road Commercial Office
0 100 200
Feet
Bossier City-Parish
FLU BOSSIER MAP C-USE-00
Metropolitan Planning Commission
0171-2024
2911 Douglas Dr, Bossier Parish, LA
(SC)
Bossier City, LA 71111 Drawn by: Blunck Page 10.3.24
Map Revised: 13 of 29
Page 15 of 31
BOSSIER LAND PLAN
N
ACCOUNT LLC
TATIO
WAL-MART DR
REAL ESTATE
BOSSIER LAND
ACCOUNT LLC
AV
R OSE
MEL
PLAN
N
2800
TATIO
BOSSIER LAND
Melrose ACCOUNT LLC
AVE
BOSSIER LAND
GUEST HOUSE OF
DR
ACCOUNT LLC
BOSSIER LLC
2911
DOUGLAS DR
LLC
2917
LOWE'S HOME CENTERS INC
SOIGNE LAND DOUGLAS
COMPANY LLC AUDUBON
Douglas DR
2901 PROPERTY LLC
Douglas DR 2911
Douglas DR AE
R
LAS D
DOUG
DR
ATI ON
Proposed Location
2902
PLANT
Douglas DR
2900
Douglas DR
BOSSIER LAND
Bossier Schools ACCOUNT LLC
Virtual Learning
Program
BOSSIER PARISH
SCHOOL BOARD
F
Parcels AE Restric Uses (Alc.)
Bossier City Addresses
Bossier City Road
0 100 200
Feet
Bossier City-Parish
FEMA BOSSIER MAP C-USE-00
Metropolitan Planning Commission
0171-2024
2911 Douglas Dr, Bossier Parish, LA
(SC)
Bossier City, LA 71111 Drawn by: Blunck Page 10.3.24
Map Revised: 14 of 29
Page 16 of 31
Page 17 of 31 Page 15 of 29
Page 18 of 31 Page 16 of 29
Page 17 of 29
Page 19 of 31
Page 20 of 31 Page 18 of 29
Page 21 of 31 Page 19 of 29
Page 22 of 31
Page 20 of 29
REQUEST FOR PROPOSAL
PLEASE DO NOT redline this document.
Please fill in blanks.
Any changes to printed language / comments should be made in LL Response areas.
.
From: MasTec North America (“Tenant”)
To: _________________________ (“Landlord”)
The purpose of this Request for Proposal (“RFP”) is to request from Landlord the terms and conditions
upon which Landlord would like to lease the Premises. This RFP is not intended to bind the Landlord or
the Tenant in any way, but is written solely as an expression of the terms the parties would consider for
leasing the Premises. The mutually agreed lease may contain the following terms:
1. Leased Premises Property: single-tenant ☒
Address: 2911 Douglas Drive, Bossier City, LA 71111
Square footage Leased Premises: 16,560 sf
Description (Ex: warehouse/office/yard):
1.17 acres
LL Response:
2. Base Rent $10,185 per month
LL Response:
3. Additional Rent Tenant’s percentage:100 %
Initial Estimated Additional Rent Monthly: $_________
Break-down:
Taxes: $________
Insurance: $________
Common Area Maintenance: $__________
Cap on Operating Expenses: ____%
If Additional Rent is increase (only) in Operating Expenses, Base
Year is 20____.
Operating Expenses exclusions to be defined in Lease.
Page 21 of 29
Page 23 of 31
Tenant will have right to audit books and records regarding
Operating Expenses.
LL Response:
4. Security Deposit $10,185
LL Response:
5. Term Three (3) years
LL Response:
6. Commencement Date 11/1/ 2024
LL Response:
7. Tenant Improvements Landlord, at Landlord’s expense – turnkey to complete the
following improvements:
1. All mechanical systems in good working order
2. Tenant has the right to fence in the outdoor storage area and
create a curshed stone surface
LL Response:
8. Warranty Landlord to provide 120 day warranty that the Premises, including
HVAC, electrical, plumbing, fire suppression and other
mechanical systems, utilities, docks, lifts, doors windows in good
working order and repair.
LL Response:
9. Use Any legal use, including without limitation, office, warehouse,
outside storage and staging of materials and equipment, parking
for construction vehicles and equipment and passenger vehicles,
including overnight parking and related uses. Landlord warrants
that the zoning allows for such use.
Page 22 of 292
Page 24 of 31
LL Response:
10. Maintenance / Repairs Landlord:
Landlord, at Landlord’s expense, to maintain, repair replace roof,
foundation, structure, slab, exterior walls, underground utilities
and plumbing lines outside the building and underneath the
building slab.
LL Response:
Tenant:
Tenant to maintain and repair interior, including mechanical
systems, and exterior groundskeeping however, Tenant’s
maintenance and repair obligations shall not exceed $1,250 per
occurrence with no more than two (2) occurrences per year
(“Repair Cap”).
LL Response:
11. Utilites Landlord warrants electricity, water, sewer, gas, phone and
internet currently serve the Premises. Tenant shall contract
directly with the applicable providers for service.
LL Response:
12. Renewal Option 2 options for three years each
Base Rent for Renewal:
current market rent ☐
Notice to exercise to be given 120 days prior to end of Term.
LL Response:
13. Termination Option Tenant to have right to terminate after the second year of the
Term, with 120 days’ notice and contiginent upon township
approval for the outdoor storage .
LL Response:
Page 23 of 293
Page 25 of 31
14. Holdover Any holdover will be month-to-month tenancy on same terms.
LL Response:
15. Legal To include:
Landlord warranty Premises in compliance with laws
Mutual indemnification for negligence / willful
misconduct
Mutual waiver of consequential damages
Waiver of Landlord’s lien / security interest for Tenant’s
property
Tenant remedies to include self-help for Landlord repairs
and right to terminate for Landlord default.
LL Response:
16. Brokers Landlord:
Broker: Mindy Wardlaw / Pinnacle Realty Advisors
Address: 1000 Chinaberry Drive, Suite 400
E-mail address: mindywardlaw@gmail.com
Phone: 318 469 3261
Tenant:
Broker: Fred A Meyer / NAI Mertz
Address: 21 Roland Avenue
E-mail address: fred.meyer@naimertz.com
Phone: 609-410-9223
Landlord pays all commissions per separate agreement.
LL Response:
17. Landlord Entity Entity Name: ___________________________________
Address: _______________________________________
Contact Name: __________________________________
Contact Phone: __________________________________
LL Response:
Page 24 of 294
Page 26 of 31
This RFP is not intended to constitute a binding agreement, but shall merely serve as the basis for
negotiating and drafting a definitive lease agreement between the parties containing the terms stated in
this RFP as such terms may be further negotiated and mutually agreed upon by the parties, and such other
terms and conditions to be determined and also mutually agreed upon by the parties. Neither party will
rely on this RPF as binding upon the other, and any such reliance would be imprudent and unreasonable.
Neither party will be bound unless and until a definitive agreement has been executed and delivered by
both parties and their respective attorneys.
It is understood and agreed that this RFP does not contain all the essential terms that the parties expect
will be part of an agreement. Further negotiations between the parties are contemplated before a binding
agreement will be prepared, but neither party is bound to continue such negotiations, which may be
terminated at any time by either party. Efforts by either party to perform due diligence, arrange or obtain
financing, or carry out other acts in contemplation of the possible lease of the Premises may not be
deemed evidence of intent by either party to be bound by this RPF.
The performance by either party before execution of a formal lease agreement of any of the obligations
that may be included in a lease agreement between the parties when negotiations are completed will not
be considered evidence of intent by either party to be bound by this RFP.
Page 25 of 295
Page 27 of 31
C-USE-000171-2024(SC)
MPC ACTIONS
______________
METROPOLITAN PLANNING COMMISSION MEETING
October 14, 2024
2:00 P.M.
PRELIMINARY [ ] PUBLIC HEARING [X] CONDITIONAL USE [ ]
FROM: Carolina Blunck, MPC Assistant Planner
THROUGH: Carlotta Askew-Brown, MPC Executive Director
PRESENTER:
Previous
APPLICANT: Mindy Wardlaw, Pinnacle Realty Advisors
ITEM C-USE-000171-2024(SC) – The application of Mindy Wardlaw, Pinnacle
Realty Advisors, requesting Temporary Use Approval for Mastec Network
Solutions to utilize the property located at 2911 Douglas Drive, for an industrial
utility operation to include indoor and outdoor storage of equipment and materials
and to install a commercial grade 6 foot chain link fence with 3 strand barb wire,
Bossier City, Louisiana. (North of Douglas Dr., west of Altitude Trampoline Park)
(City Council District 5)(Police Jury District 7)
[ ] ZONING AMENDMENT [ ] PLANNED UNIT DEVELOPMENT
[X] TEMPORARY USES [ ] CONDITIONAL USE
[ ] SUBDIVISION APPROVAL [ ] OTHER
APPLICATION CONTACT INFORMATION:
OWNER/APPLICANT:
Mindy Wardlaw,
Pinnacle Realty Advisors
1000 Chinaberry Drive Suite 400
Bossier City, LA 71111
I. APPLICATION SUBMITTAL DATE: September 23, 2024
II. PROJECT NAME:
Temporary Use for an Industrial Operation
Page 26 of 29
Page 28 of 31
C-USE-000171-2024(SC)
III. LOCATION:
Generally located at 2911 Douglas Dr. Bossier City, LA 71111. (north of
Douglas Dr., west of Altitude Trampoline Park.)
IV. BACKGROUND INFORMATION:
The applicant is requesting approval for a Temporary Use approval for
Mastec Network Solutions to operate an utility facility at 2911 Douglas
Drive. The proposed use includes the indoor and outdoor storage of
equipment, utility vehicles, commercial equipment and materials.
The applicant anticipates approximately 25 employees accessing the site;
however, the majority will load trucks in the morning and leave for the day,
with fewer than 10 employees working on-site regularly.
Previous
In addition, the applicant plans to install a commercial-grade 6-foot chain-
link fence topped with 3-strand barbed wire to secure the premises.
Hours of Operation:
• Monday – Friday: 6:30 am – 5:00 pm
Note: Temporary uses may be approved no more than two consecutive
time periods on the same site.
V. PHYSICAL CONDITIONS:
There is an existing warehouse facility.
VI. UNRESOLVED ISSUES:
There are no irresolvable issues at this time.
VII. PLANNING ANALYSIS:
The Planning Staff advice that the following criteria must be met to
approve this request.
1. LAND USE (MASTER PLAN - 2013):
Future Land Use Plan: Designates this area as Public / Semi-
Public.
Thoroughfare Plan: This property is accessed from Douglas Drive,
a local street.
2
Page 27 of 29
Page 29 of 31
C-USE-000171-2024(SC)
2. ZONING:
The following zoning issues are relative to this request:
Zoning District B-3 (General Business)
Base Zoning District Requirements:
• Minimum Lots Size:
Residential: 6,000 sq. ft.
Any other permitted use: None
• Maximum Height: 60’
• Yard requirements: Front 35’, Side 10’ and Rear 25’
Adjacent Zoning:
Zoning
Previous
North R-A Residential Agriculture
South Douglas Drive
East B-3 General Business
West B-1 Business, commercial office
3. AIR INSTALLATION COMPATIBLE USE ZONE:
AICUZ – Outside AICUZ Decibel Level Contour
4. UTILITIES:
Bossier City water and sewer.
VIII. ATTACHMENTS:
• Property Owner Certification
• Vicinity Map
• Zoning Map
• District Map
• FLU Map
• FEMA Map
• Letter of Intent
• Photos
• Proposed Floor Plan
• Property Owners Within 300’
3
Page 28 of 29
Page 30 of 31
Assessmen Assessmen Address1 Address2 Address3 Address4
SOIGNE LAN 129091 2209 N BOLALEXANDRIA LA 71303
GUEST HOU 129092 P O BOX 14WINNFIELD LA 71483
BOSSIER LA 129737 W HARLAN 2250 HOSP BOSSIER CITY LA 71111
RED RIVER 165263 2800 MELR BOSSIER CITY LA 71111
DOUGLAS A 202124 2911 DOUGBOSSIER CITY LA 71111
BOSSIER PA 148963 P O BOX 20BENTON LA 71006
BOSSIER LA 178164 W HARLAN 2250 HOSP BOSSIER CITY LA 71171
EAST DOUG 179984 DBA: ALTIT 2917 DOUGBOSSIER CITY LA 71111
DOUGLAS A 180170 215 SOUTH SALT LAKE CITY UT 84111
2911 DOUG 180171 2163 AIRLINBOSSIER CITY LA 71111
CELLCO PA 201322 DBA VERIZOC/O DUFF &PO BOX 254ADDISON TX 75001
SOUTHWES 203148 C/O PROPE PO BOX 164COLUMBUS OH 43216-6428
Page 29 of 29
Page 31 of 31
Get email alerts for Bossier City
A daily email when new agendas and minutes are posted.