Town Council - Public Works Committee
Regular MeetingBraintree, MA · July 18, 2018
Minutes
MEMBERS
Braintree Town Council Thomas Whalen, Chairman
Charles Kokoros, Vice Chairman
Committee On The Department of Public Works Stephen O’Brien, member
One JFK Memorial Drive
Braintree, Massachusetts 02184
July 18, 2018
MINUTES
A meeting of the Committee on the Department of Public Works was held in Johnson Chambers,
Braintree Town Hall, on Wednesday, July 18, 2018, at 3:00p.m.
There was a moment of silence for all those serving in our armed services, past and present, and the
meeting was opened with the pledge of allegiance to the flag.
Councilor Whalen was in the Chair.
Clerk of the Council, Susan Cimino conducted the roll call.
Present: Thomas Whalen, Chairman
Charles Kokoros, Vice-Chairman
Stephen O’Brien, member
Also Present: James Arsenault, DPW Director
Mike Wojcicki, Comcast representative
Neil Carroll, Comcast contractor
APPROVAL OF MINUTES
• April 30, 2018
Motion: by Councilor Kokoros to Approve Minutes of April 30, 2018
Second: by Councilor O’Brien
Vote: For (3- Kokoros, O’Brien, Whalen), Against (0), Absent (0), Abstain (0)
NEW BUSINESS
• 18 044 Comcast Petition: 150 Grossman Drive or take up any action relative thereto
Neil Carroll, Comcast contractor stated that Georganna Street is the closest point of service for them
to tie into. He also stated when going under the Union Street bridge they will attempt to eliminate
the pigeons by placing something on top of the piping to deter the pigeons from sitting there.
Councilor Kokoros read the motion for favorable recommendation to the full Council on the following
with staff recommendations:
July 18, 2018 Department of Public Works Page 1 of 3
To install and maintain approximately 1,769 feet of communications cable 24 inches deep 521 feet in
Georganna Street and Washington Street, 1059 feet in the Union Street layout and adjacent MBTA
property but not under the roadway and 783 feet in the Grossman Drive sidewalk to #150 Grossman
Drive and including 4 new handholes, from utility pole #1A near the intersection of Georganna Street
and Washington Street, to an existing conduit at 150 Grossman Drive in order to provide cable
communication service to #150 Grossman Drive.
with staff recommendations:
BELD: There are No underground electric utility conflicts or special requirements within the proposed
scope of work.
Please note,
BELD has a 13,800 volt underground system on these roads. This is a concrete encased duct bank to
be identified through the Dig safe process.
DPW: Both Union Street and Grossman Drive are under the moratorium but sidewalk and roadside
areas where the conduits are to be installed are not. Since the plan is to install the conduit and cable
WITHOUT disturbing the roadway pavement we’d recommend that the permit be granted with the
normal conditions imposed by the DPW Highway Division plus that:
1. any work outside of the accepted Public Way be located within a properly acquired
easement, recorded copies of which must be presented to the Town prior to the
start of the work;
2. in the Traffic Management Plan (TMP) Phase 4- the set-ups for the off-road work
need to be added during construction. Also need two drum transition rows west of
the bridge with a buffer space between them;
3. in the TMP Phases 6 through 9- The sidewalk closures and the set-ups for the in-
sidewalk work need to be added during construction;
4. where sidewalk surfaces are disturbed the surface is to be replaced in kind, at ADA
compliant slopes and for the full width of the sidewalk;
5. all matches with existing surfaces be smooth, safe, properly surfaced and
satisfactory to the Town;
6. the work be coordinated with the abutters to ensure that the properties are
accessible at all times, including ADA compliant pedestrian access;
7. the cable be installed outside of the trenches of the water and sewer mains and
other utilities in service and that the trench pavement not be left low for any length
of time;
8. as-built plans be prepared and submitted satisfactory to the Department of Public
Works;
9. the construction portion of the permit period not exceed two months from the start
of construction and that the entire permit period be set at one year beginning at the
date of Council approval.
July 18, 2018 Department of Public Works Page 2 of 3
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither Comcast nor any of its contractors is authorized to close any street or to close a direction of
travel to facilitate their work without authorization from the Director of the Department of Public
Works or the Highway Superintendent. The Chief of Police can also authorize a closure for a police or
fire emergency. Construction zone traffic safety issues are to be addressed by using appropriate
traffic control signs and devices and the use of police officers for traffic control to safely guide traffic
through the work zone. If a closure is authorized by the DPW, it shall not be implemented until signs
and police officers (where needed) are properly in place in conformity with the written plan prepared
by the contractor’s engineer and approved by the DPW and Police Department.”
Motion: by Councilor Kokoros for Favorable Recommendation to the full Council per Staff
Recommendations.
Second: by Councilor O’Brien
Vote: For (3 – Kokoros, O’Brien, Whalen), Against (0), Absent (0)
OLD BUSINESS
• NONE
It was unanimously voted to adjourn the meeting at 3:14p.m.
Respectfully submitted,
Susan M. Cimino
Clerk of the Council
Documents provided for Meeting
• 18 044 Comcast Petition: 150 Grossman Drive or take up any action relative thereto