Town Council - Public Works Committee
Regular MeetingBraintree, MA · September 15, 2020
Minutes
MEMBERS
Braintree Town Council Charles Ryan, Chairman
Lawrence Mackin, Vice Chairman
Committee On The Department of Public Works Julia Flaherty, member
One JFK Memorial Drive
Braintree, Massachusetts 02184
September 15, 2020
MINUTES
A meeting of the Committee on the Department of Public Works was held in Remote via Zoom
webinar, on Tuesday, September 15, 2020 at 6:30p.m.
Councilor Charles Ryan, Chairman was in the Chair.
Clerk of the Council, Susan Cimino conducted the roll call.
Due to remote participation all votes are taken by roll call vote.
Present: Charles Ryan, Chairman
Lawrence Mackin, Vice-Chairman
Julia Flaherty, member
Also Present: James Arsenault, DPW Director
John Thompson, Assistant DPW Director/Town Engineer
Mary Mulroney, National Grid Representative
Dennis McAffrey, National Grid Representative
APPROVAL OF MINUTES
• August 4,2020
Motion: by Councilor Mackin to Approve Minutes of August 4, 2020
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
OLD BUSINESS
• None
September 15, 2020 Department of Public Works Page 1 of 9
NEW BUSINESS
These are not typical Grants/petitions. These are gas leak repairs and mandated work by the DPU
(Department of Public Utilities). National Grid applied for permits from the Town of Braintree DPW.
The DPW and the Mayor’s office would not issue a permit unless it was reviewed and given approval by
Town Council.
• 20 060 National Grid Petition: 14 Sterling Park or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 14 Sterling Park with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Sterling Park is under the moratorium having been paved in 2017.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 060
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 2 of 9
• 20 061 National Grid Petition: 79 Edgemont Road or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 79 Edgemont Road with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Edgemont Road is under the moratorium having been paved in 2019.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 061
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 3 of 9
• 20 062 National Grid Petition: Linden Street or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at Linden Street with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Linden Street is under the moratorium having been paved in 2015.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 062
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 4 of 9
• 20 063 National Grid Petition: 15 Hemlock Street or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 15 Hemlock Street with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Hemlock Street is under the moratorium having been paved in 2018.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 063
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 5 of 9
• 20 064 National Grid Petition: 49 Cotton Avenue or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 49 Cotton Avenue with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Cotton Avenue is under the moratorium having been paved in 2019.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 064
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 6 of 9
• 20 065 National Grid Petition: 61 Birchcroft Road or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 61 Birchcroft Road with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Birchcroft Road is under the moratorium having been paved in 2017.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 065
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 7 of 9
• 20 066 National Grid Petition: 59 Hancock Street or take up any action relative thereto
MOTION: To perform gas leak and corrosion repairs on roadways at 59 Hancock Street with staff
recommendations:
BELD: There are no underground electric utility conflicts or special requirements within the proposed
scope of work.
DPW: This section of Hancock Street is under the moratorium having been paved in 2019.
The following trench repair conditions should apply to each petitioned location:
Temporary patches - All street excavations shall be sawcut, backfilled and compacted in 8-inch lifts
(maximum), paved to match existing asphalt depth (with a minimum depth of four inches) in two inch
lifts to match the existing street grade.
Permanent patches – Permanent patches shall be milled curb to curb for a length no less than fifteen
feet (centered on the temporary patch) and machine laid with 2-inches of asphalt top course. Tack coat
should be applied to milled surfaces and joints prior to paving. Finished joints should be treated with a
rubberized asphalt sealer.
All excavation work and temporary patching shall be completed prior to the November 15, 2020 and all
permanent patching shall take place between May 1 and May 31, 2021. Any roadway striping that is
disturbed must be replaced in kind.
Lastly, if the petitions are so granted, National Grid should resubmit excavation permits to DPW
Highway Division so that standard permit requirements can be applied.
We also recommend that the following requirement be added to the permit, if it is to be granted:
“Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department
of Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for
a police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be
implemented until signs and police officers (where needed) are properly in place in conformity with
the written plan prepared by the contractor’s engineer and approved by the DPW and Police
Department.”
Motion: by Councilor Mackin to Approve Order 20 066
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
September 15, 2020 Department of Public Works Page 8 of 9
It was unanimously voted to adjourn the meeting at 7:20p.m.
Respectfully submitted,
Susan M. Cimino
Clerk of the Council
Documents provided for Meeting
• Minutes August 4, 2020
• 20 060 National Grid Petition: 14 Sterling Park or take up any action relative thereto
• 20 061 National Grid Petition: 79 Edgemont Road or take up any action relative thereto
• 20 062 National Grid Petition: Linden Street or take up any action relative thereto
• 20 063 National Grid Petition: 15 Hemlock Street or take up any action relative thereto
• 20 064 National Grid Petition: 49 Cotton Avenue or take up any action relative thereto
• 20 065 National Grid Petition: 61 Birchcroft Road or take up any action relative thereto
• 20 066 National Grid Petition: 59 Hancock Street or take up any action relative thereto