Town Council - Public Works Committee
Regular MeetingBraintree, MA · April 27, 2021
Minutes
MEMBERS
Braintree Town Council Charles Ryan, Chairman
Lawrence Mackin, Vice Chairman
Committee On The Department of Public Works Julia Flaherty, member
One JFK Memorial Drive
Braintree, Massachusetts 02184
April 27, 2021
MINUTES
A meeting of the Committee on the Department of Public Works was held in Remote via Zoom
webinar, on Tuesday, April 27, 2021 at 7:00p.m.
Councilor Charles Ryan, Chairman was in the Chair.
Clerk of the Council, Susan Cimino conducted the roll call.
Due to remote participation all votes are taken by roll call vote.
Present: Charles Ryan, Chairman
Lawrence Mackin, Vice-Chairman
Julia Flaherty, member
Also Present: James Arsenault, DPW Director
John Thompson, Assistant DPW Director/Town Engineer
Mary Mulroney, National Grid Representative
APPROVAL OF MINUTES
• February 23, 2021
Motion: by Councilor Mackin to Approve the Minutes of February 23, 2021
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
OLD BUSINESS
• None
April 27, 2021 Department of Public Works Page 1 of 3
NEW BUSINESS
• 21 015 National Grid Petition: Middle Street or take up any action relative thereto
Chairman Ryan stated we have a recommendation from the DPW stating Middle Street is not under
moratorium. The Town has water main replacement and National Grid will also be replacing their gas
lines. This is an example of utility coordination. This is a good thing.
Motion was read by Councilor Mackin with Staff Recommendations:
MOTION: To Install and Maintain gas lines due to Water/utility work that the Town of Braintree is
planning with the following staff recommendations:
BELD: BELD has a 115,000-volt oil filled transmission line located on Elm/Middle/Morrison/River
streets.
BELD Engineering should be notified in advance of any excavation to be performed near this line. BELD
will provide onsite support and safety personnel at no cost to the project. BELD also has a 13,800-volt
underground system on these roads. This is a concrete encased duct bank to be identified through the
Dig safe process.
DPW: The DPW has reviewed the subject petition and the accompanying sketch for the new gas main
location and have the following recommendations:
- Relay approximately 700 feet of 4-inch coated steel (1957) gas main in Middle Street from Elm St to
#54 Middle St with 700 feet of 6-inch plastic gas main and abandon same limit.
- Relay approximately 670 feet of 4-inch coated steel (1957) gas main in Middle St from Morrison St
to River St with 670 feet of 6-inch plastic gas main and abandon same limit.
Middle Street is not under the moratorium. The street was last resurfaced with microsurface treatment
in 2008. The Braintree Water and Sewer Division is planning a water main replacement project along
this section of Middle Street during the 2021 construction season, and we would recommend that the
petition be granted as soon as possible so that the gas main replacement, the watermain replacement,
and the subsequent roadway paving can be coordinated and completed in a timely manner. It should
be noted that National Grid is not proposing to replace the gas main currently suspended beneath the
railroad crossing bridge because they have determined it to be in great shape, having received regular
maintenance and coatings on the exposed steel.
The petition should be granted under the normal conditions, with emphasis on the requirements that
the trench pavement not be left low for any length of time, and that the gas main shall not encroach
on any town-owned utilities. We also recommend that the following requirements be added to the
permit, if it is to be granted:
“National Grid must arrange a pre-construction meeting with Braintree DPW, Braintree Police and
BELD prior to any excavation to discuss utility corridor assignment and traffic management for the
project.”
April 27, 2021 Department of Public Works Page 2 of 3
“Neither National Grid nor any of its contractors is authorized to close any street or to close a direction
of travel to facilitate their work without authorization from the Director of the Department of Public
Works or the Highway Superintendent. The Chief of Police can also authorize a closure for a police or
fire emergency. Construction zone traffic safety issues are to be addressed by using appropriate traffic
control signs and devices and the use of police officers for traffic control to safely guide traffic through
the work zone. If a closure is authorized by the DPW, it shall not be implemented until signs and police
officers (where needed) are properly in place in conformity with the written plan prepared by the
contractor’s engineer and approved by the DPW and Police Department.”
Motion: by Councilor Mackin to Approve Order 21 015
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
It was unanimously voted to adjourn the meeting at 7:06p.m.
Respectfully submitted,
Susan M. Cimino
Clerk of the Council
Documents provided for Meeting
• 21 015 National Grid Petition: Middle Street or take up any action relative thereto
April 27, 2021 Department of Public Works Page 3 of 3