A meeting of the Committee on the Department of Public Works was held in Johnson Chambers,
Braintree Town Hall, on Tuesday, August 3, 2021 at 7:00p.m.
There was a moment of silence for all those serving in our armed services, past and present, and the
meeting was opened with the pledge of allegiance to the flag.
Councilor Charles Ryan, Chairman was in the Chair.
Clerk of the Council, Susan Cimino conducted the roll call.
Present: Charles Ryan, Chairman
Lawrence Mackin, Vice-Chairman
Julia Flaherty, member
Also Present: James Arsenault, DPW Director
John Thompson, Assistant DPW Director/Town Engineer
Mary Mulroney, National Grid Representative
APPROVAL OF MINUTES
• June 15, 2021
Motion: by Councilor Mackin to Approve the Minutes of June 15, 2021
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
OLD BUSINESS
• None
August 3, 2021 Department of Public Works Page 1 of 3
NEW BUSINESS
• 21 035 National Grid Petition: Arnold Street or take up any action relative thereto
Chairman Ryan stated we have a recommendation from the DPW stating Arnold Street is not under
moratorium. The Engineering Division was planning on completing a sidewalk reconstruction project,
along with a subsequent resurfacing of the roadway for the 2021 construction season. The
recommendation is that the petition be granted as soon as possible.
Motion was read by Councilor Mackin for favorable recommendation to the full Council with Staff
Recommendations:
MOTION: Relay approximately 275 feet of 2-inch coated steel (1956) gas main, approximately 635 feet
of 2- inch bare steel (1947) gas main, and approximately 290 feet of 1.5 inch bare steel (1949) gas main
in Arnold Street from Middle St. to #66 Arnold St. with 1400 feet of 2-inch plastic gas main and
abandon same limit with the following staff recommendations:
BELD: BELD has No conflicts on this road
DPW: The DPW has reviewed the subject petition and the accompanying sketch for the new gas main
location and have the following recommendations:
Arnold Street is not under the moratorium. The street was last resurfaced by overlay in 2003. The
Engineering Division was planning on completing a sidewalk reconstruction project, along with a
subsequent resurfacing of the roadway for the 2021 construction season. Work to install a new
sidewalk along this section of Arnold Street is already underway. We would recommend that the
petition be granted as soon as possible so that the gas main replacement can be completed ahead of
the Town’s planned resurfacing work. Given the late nature of National Grid’s request, and given that
the Town’s reconstruction project has already started, the Engineering Division is also recommending
the following:
- The petition should be granted conditionally upon National Grid’s ability to begin work
immediately following Council approval, so that the Town can still resurface the roadway before the
end of the 2021 calendar year construction season
- National Grid shall guarantee that all excavated trenches within the town’s right-of-way are
backfilled to attain a minimum of 95% compaction, to ensure that the excavated areas will not settle
once the roadway and sidewalks are resurfaced in the fall. Should the newly paved roadway and/or
sidewalk settle because of poorly compacted trenches, National Grid will be required to perform large
scale, curb-to-curb repairs to fully mitigate any deficiencies
We also recommend that the following requirements be added to the permit, if it is to be granted:
- National Grid must arrange a pre-construction meeting with Braintree DPW, Braintree Police
and BELD prior to any excavation to discuss utility corridor assignment and traffic management for the
project.
August 3, 2021 Department of Public Works Page 2 of 3
- Neither National Grid nor any of its contractors is authorized to close any street or to close a
direction of travel to facilitate their work without authorization from the Director of the Department of
Public Works or the Highway Superintendent. The Chief of Police can also authorize a closure for a
police or fire emergency. Construction zone traffic safety issues are to be addressed by using
appropriate traffic control signs and devices and the use of police officers for traffic control to safely
guide traffic through the work zone. If a closure is authorized by the DPW, it shall not be implemented
until signs and police officers (where needed) are properly in place in conformity with the written plan
prepared by the contractor’s engineer and approved by the DPW and Police Department.”
Motion: by Councilor Mackin to Approve Order 21 035
Second: by Councilor Flaherty
Vote: For (3 – Flaherty, Mackin, Ryan), Against (0), Absent (0), Abstain (0)
It was unanimously voted to adjourn the meeting at 7:21p.m.
Respectfully submitted,
Susan M. Cimino
Clerk of the Council
Documents provided for Meeting
• Minutes of June 15, 2021
• 21 035 National Grid Petition: Arnold Street or take up any action relative thereto
August 3, 2021 Department of Public Works Page 3 of 3
Get email alerts for Braintree
A daily email when new agendas and minutes are posted.