Town Council - Public Works Committee
Regular MeetingBraintree, MA · September 30, 2021
Minutes
MEMBERS
Braintree Town Council Charles Ryan, Chairman
Lawrence Mackin, Vice Chairman
Committee On The Department of Public Works Julia Flaherty, member
One JFK Memorial Drive
Braintree, Massachusetts 02184
September 30, 2021
MINUTES
A meeting of the Committee on the Department of Public Works was held in Remote via Zoom
webinar, on Thursday, September 30, 2021 at 6:30p.m.
Councilor Charles Ryan, Chairman was in the Chair.
Clerk of the Council, Susan Cimino conducted the roll call.
Due to remote participation all votes are taken by roll call vote.
Present: Charles Ryan, Chairman
Julia Flaherty, member
Not Present: Lawrence Mackin, Vice-Chairman
Also Present: James Arsenault, DPW Director
John Thompson, Assistant DPW Director/Town Engineer
Mary Mulroney, National Grid Representative
APPROVAL OF MINUTES
• August 3, 2021
Motion made by Councilor Flaherty. Chairman Ryan stepped down to second the motion and stepped
back up as Chairman.
Motion: by Councilor Flaherty to Approve Minutes of August 3, 2021
Second: by Councilor Ryan
Vote: For (2 – Flaherty, Ryan), Against (0), Absent (1 - Mackin), Abstain (0)
• September 21, 2021
Motion made by Councilor Flaherty. Chairman Ryan stepped down to second the motion and stepped
back up as Chairman.
Motion: by Councilor Flaherty to Approve Minutes of September 21, 2021
Second: by Councilor Ryan
Vote: For (2 – Flaherty, Ryan), Against (0), Absent (1 - Mackin), Abstain (0)
September 30, 2021 Department of Public Works Page 1 of 3
OLD BUSINESS
• None
NEW BUSINESS
• 21 045 National Grid Petition: 274 Walnut Street or take up any action relative thereto
Chairman Ryan had Mr. Thompson give an overview and staff recommendations. This section of
Walnut Street is not under the moratorium. The street was last resurfaced by overlay in 2012. While
the roadway is not under moratorium, the pavement is generally in good condition. As such, the DPW
recommends that the petition be granted with the below conditions. There will also be a pre-
construction meeting to discuss the corridor assignment.
Motion was read by Councilor Flaherty for favorable recommendation to the full Council with Staff
Recommendations.
MOTION: To extend the 2-inch plastic main on Walnut Street 50 feet to service 274 Walnut St.
Braintree. Install approximately 40 feet of 1-inch service to point of entry with Staff
Recommendations:
BELD: BELD has no utility conflicts with this petition 21 045.
DPW: The DPW has reviewed the subject petition and the accompanying sketch for the gas main
extension on Walnut St. The work is being proposed is to bring gas service to house #274 Walnut St.
This section of Walnut Street is not under the moratorium. The street was last resurfaced by overlay in
2012. While the roadway is not under moratorium, the pavement is generally in good condition. As
such, the DPW recommends that the petition be granted with the following conditions:
- A temporary patch shall be placed immediately after the work. The street excavation should be
sawcut, backfilled and compacted in 8-inch lifts, paved to match existing asphalt depth (with a
minimum depth of four inches) in two-inch lifts to match the existing street grade.
- After maintaining the temporary patch through one winter, a permanent patch shall be placed the
following spring. The permanent patch should be a grind and inlay patch, milled to one foot outside the
trench limits with a pavement depth of 1.5 inches.
We also recommend that the following requirements be added to the permit, if it is to be granted:
- National Grid must arrange a pre-construction meeting with Braintree the DPW to discuss utility
corridor assignment. The gas main extension must not encroach on any existing utilities.
- Neither National Grid nor any of its contractors is authorized to close any street or to close a direction
of travel to facilitate their work without authorization from the Director of the Department of Public
Works or the Highway Superintendent. The Chief of Police can also authorize a closure for a police or
September 30, 2021 Department of Public Works Page 2 of 3
fire emergency. Construction zone traffic safety issues are to be addressed by using appropriate traffic
control signs and devices and the use of police officers for traffic control to safely guide traffic through
the work zone. If a closure is authorized by the DPW, it shall not be implemented until signs and police
officers (where needed) are properly in place in conformity with the written plan prepared by the
contractor’s engineer and approved by the DPW and Police Department.”
Motion made by Councilor Flaherty. Chairman Ryan stepped down to second the motion and stepped
back up as Chairman.
Motion: by Councilor Flaherty to Approve Order 21 045
Second: by Councilor Ryan
Vote: For (2 – Flaherty, Ryan), Against (0), Absent (1 - Mackin), Abstain (0)
• 21 046 National Grid Petition: Granite/Forbes or take up any action relative thereto (WITHDRAWN
by National Grid – this is MassDOT roadway)
No action required. This has been WITHDRAWN by National Grid.
It was unanimously voted to adjourn the meeting at 6:37p.m.
Respectfully submitted,
Susan M. Cimino
Clerk of the Council
Documents provided for Meeting
• 21 045 National Grid Petition: 274 Walnut Street or take up any action relative thereto
• 21 046 National Grid Petition: Granite/Forbes or take up any action relative thereto
(WITHDRAWN by National Grid – this is MassDOT roadway)
September 30, 2021 Department of Public Works Page 3 of 3