Tri-Town Board of Water Commissioners
Regular MeetingBraintree, MA · August 31, 2016
Minutes
TRI TOWN BOARD
Of Water Commissioners
Braintree, Holbrook, Randolph
Braintree Town Hall
MINUTES
August 31, 2016
PRESENT: Chairman, Joseph Sullivan, Mayor, Town of Braintree; Richard Brewer, Town of
Randolph, Timothy Gordon, Town Administrator, Town of Holbrook.
IN ATTENDANCE: Bob Campbell, Lou Dutton, Ben Ecord, Barbara Mello, Kelly Phelan, Mike
Walsh, Robyn LaFrance, recording secretary.
Mayor Sullivan opened the meeting at 11:15 am.
MINUTES: the minutes of the April 12, 2016 meeting were reviewed.
MOTION: by Rich Brewer to accept Minutes of 4/12/16.
SECOND: by Tim Gordon
VOTE: Unanimous
Water Ban Phase 4: Lou Dutton, Mayor Sullivan
Mayor Sullivan explained that Braintree has entered Phase 4 of a water ban. Holbrook and
Randolph are in the same situation. All Board members confirmed that their residents are
being notified of the water ban by way of an automated phone call and website notices.
No outside water use is allowed.
Lou Dutton discussed the water ban, the current drought, and the daily report of the
reservoirs. Lou reported that the Richardi Reservoir is shut off, there is no incoming water.
The current level of capacity is at 61%.
Also discussed was the total capacity of the Richardi Reservoir (350 million gallons of
water) and the bathymetric survey that was performed 2 years ago. Today’s water level is
reported to be 61% of the 1.7 billion gallon capacity of the overall reservoir system.
It was noted that the communities of Braintree, Holbrook and Randolph use a combined
total of approximately 8 million gallons of water daily.
Water use, the summer season’s high temperatures, and evaporation rate was discussed.
The drought is reported to be a 60 year occurrence, and the change in regulations over the
past several years are contributing factors to what we are experiencing now.
There was some discussion regarding the MWRA access into Braintree from Quincy, and
then to Randolph and Holbrook connections. The prohibition of adding chlorinated water
to the reservoirs was discussed. Mayor Sullivan asked Lou Dutton to look into this MWRA
water connection issue.
Question was asked how long it might take for the 61% water level to drop to 50% and
become a water emergency. A Phase 3 water ban occurs at below 70% and that began on
August 8, 2016. If the current conditions remain the same with no rain in the immediate
future, it could be 3 more weeks until a Phase 5 is necessary.
1
Discussion concerning whether or not the Board wants to look into re-opening the Cochato
River. The Tri Town Board, and specifically the Town of Holbrook, would have to make a
formal request to the Department of Environmental Protection (D.E.P). to do this.
Mayor Sullivan suggested a two-step process.
o Option 1.) Look into dredging opportunities at the Richardi Reservoir to increase
capacity. Permits are needed for this and Kelly Phelan, Bob Campbell, and Lou
Dutton would look into this.
o Option 2.) Look at the water supply of the Cochato River. The Tri Town
Board/Town of Holbrook would need to Petition D.E.P. to review this.
MOTION: By Rich Brewer to look into Option 1 and Option 2
SECOND: by Tim Gordon
VOTE: Unanimous
Great Pond Dam Repair Project update: Mike Walsh, Barbara Mello, Kelly Phelan
Mike Walsh explained delays that have affected the timeline of the project and he reported on the
current status. The need to incorporate a fish ladder, and permitting were reasons that the project
was delayed and contributed to an increase in cost.
Kelly Phelan, Braintree Conservation Planner, explained that the Conservation Commission
become involved with regard to the permitting process, a paving issue, and drainage. Kelly
explained the conservation issue.
It was reported that the design is complete, permitting is nearly done, and the project is ready to go
to bid.
Barbara Mello strongly suggested the best approach moving forward would be to appoint a Tri
Town Board “Owners’ representative” who is a professional engineer to oversee the construction
phase engineering on the Board’s behalf. She reported that the project is both over budget and
behind schedule and should have been in the construction phase in October 2015 making this one
year behind schedule.
Additional CDM invoices need to be approved (for the additional unexpected work).
It was reported that the Conservation Commission wants the wetlands re-flagged. They were
originally flagged in 2010, and flagging is only good for three years. There was a discussion of
whether that would be the responsibility of the design engineer (CDM) or the construction team.
Mayor Sullivan thanked Barbara Mello for her diligent work handling all of the administrative
responsibilities of this grant project.
Bob Campbell, Braintree Town Engineer, and Ben Ecord, Holbrook Public Works Superintendent,
were asked their professional opinion to determine if there is a staff person already involved who
could accommodate the need, or if the Board must look elsewhere. Ben Fehan’s name was
mentioned. He was not present at the meeting.
Mike Walsh expressed the interest of CDM to remain involved in this project due to their in depth
knowledge and history of it. He reported that as the first task of the construction phase, CDM
could do the conservation work if they were selected. He also suggested a two day per week
person, rather than a full time person, to keep costs down. He noted that CDM generally does the
design and construction phase services of a project and could only recall one case in 30 years in
which this did not happen.
The CDM correspondence to Barbara Mello dated May 16 was distributed to the Board for review.
It was a proposal for the bidding and construction phase services.
2
Concern was raised about CDM being over budget and adding invoice cost. Mike Walsh explained
that when a contract is awarded, CDM meets with the contractor to discuss it.
Mayor Sullivan acknowledged the frustration and reasonable argument concerning the CDM
costs. Mayor feels the Board is prepared to move forward and to tighten up controls and cost.
Barbara Mello informed the Board that another company submitted a proposal also and both will
need to be reviewed before a final determination is made.
It was requested that Barbara Mello prepare a memo to the Board members that includes the two
proposals received for the Great Pond Dam Repair Project Engineering Services. Board members
will review the two proposals for discussion at the next Tri Town Board meeting. This will give
the opportunity for the other firm to be present at the meeting.
It was agreed that the Tri Town Board will meet again in two weeks on September 13 at 10:30 am
at Braintree Town Hall.
Other: Action items
Barbara Mello will provide a memo and summary of the two proposals to the Board.
An update on the new Tri Town treatment plant was postponed until the next meeting. Mayor
Sullivan noted that he and Senator Keenan have discussed this.
Next meeting date was set for September 13 at 10:30 am at Braintree Town Hall.
MOTION: By Mayor Sullivan to adjourn meeting at 12:10 pm.
SECOND: by Tim Gordon
VOTE: Unanimous
Respectfully submitted,
Robyn LaFrance
Recording Secretary
3
Agenda
TRI TOWN BOARD
of Water Commissioners
Braintree, Holbrook, Randolph
Johnson Chambers, Braintree Town Hall
August 31, 2016
AGENDA
1. Minutes of April 12, 2016 meeting
2. Water ban Phase 4
3. Great Pond Dam Repair Project update
a. Appointment of Project Management Team
b. CDM Invoices
4. Proposal by CDM for Project Management Services – Presented by Mike Walsh
5. New Treatment Plant update
a. State Match update
b. Secretary Beaton visit
OTHER BUSINESS: As determined by the Chairman
NEXT MEETING DATE:
EXECUTIVE SESSION: