TRI TOWN BOARD
Of Water Commissioners
Braintree, Holbrook, Randolph
Braintree Town Hall
MINUTES
July 9, 2018
Present: Joseph Sullivan, Chair, Town of Braintree; Richard Brewer, Town of Randolph; Daniel
R. Lee, Town of Holbrook.
In attendance: David Ankener, Jim Arsenault, Jim Boyle, Lou Dutton, Ben Fehan, Helen
Gordon, Paul Hogan, Lisa McIntosh, Barbara Mello, Chris Pellieri, Loretta See, Mike Walsh,
Yichen Zhang, Robyn LaFrance.
Mayor Sullivan opened the meeting at 1:05 pm. Daniel Lee, Chair, Holbrook Board of
Selectman, introduced himself and explained he is substituting for Tim Gordon.
Water Treatment Plant update: Jim Arsenault, Helen Gordon
Jim Arsenault and Helen Gordon discussed the status of the OPM contract with
Environmental Partners Group (EPG) to perform OPM Services, explaining briefly that
the contract is not quite finalized.
Helen Gordon discussed EPG’s Phase I Preliminary Design Review process. She talked
briefly about the Basis of Design Review and Value Engineering process and the
Designer Selection process. It was briefly explained that CDM did the original design
but ultimately the firm selected as the designer will want to re-do it.
Helen Gordon explained that EPG will schedule a two day value engineering workshop
with MassDEP to discuss value engineering and re-look at the CDM design. The purpose
is to have an accurate picture for the RFQ. It was explained that alot has changed in ten
years and a new concept plan is needed to give to the designers. There is a need to
develop a new set of parameters. The preliminary designer selection task is to look at
current market pricing and develop new conceptual plans that reflect budget and needs.
Daniel Lee said this seems to be a forward moving path and he is in agreement with the advice of
EPG and keep moving forward. Mike Walsh explained that they have been using the
engineering standards to determine cost increase but said that it is now eight years out and it
would be a good time to review.
David Ankener, MassDEP, Construction Inspector, gave the board an update on the SRF
Program. Mr. Ankener explained that the board met the deadline of submitting confirmation of
appropriation by June 30, 2018 and the next step is to submit an application and basic plan specs
by October 15, 2018. Paul Gabriel noted that they might have a new designer by that date
(October 15).
Mr. Ankener briefly discussed the Massachusetts Environmental Justice Policy and said he will
check with Steve McCurdy on how the principle forgiveness would exactly be distributed for the
Tri Town Board. He explained that the calculation is based on Tiers and it needs to be
determined what Tier each town is in. Helen Gordon said she would look into the Tier status of
the three towns also.
Brief discussion followed concerning the Project Evaluation Form, bidding, and the “to-do” list
regarding the October 15 deadline. Mr. Ankener said everything is in Tri Town’s court now.
Lastly, it was reiterated that the OPM Contract needs to be signed as soon as possible.
2018 Phase I Dam Inspection, Great Pond Upper Reservoir Dam: Lou Dutton
Lou Dutton explained that the PARE Corporation contract is still outstanding and needs
to be signed.
MOTION: by Richard Brewer to pay PARE for the Upper Reservoir inspection not to exceed
four thousand dollars ($4000).
SECOND: Daniel Lee
VOTE: Unanimous
Cochato River Diversion: Lisa McIntosh and Paul Hogan, Woodard & Curran
Lisa McIntosh and Paul Hogan presented a draft report on the Cochato River Diversion
Water Quality Assessment, and discussed how to approach the next step in the permitting
process. Copies of the report were provided to the board.
Lisa McIntosh gave a brief history of the Baird & McGuire chemical plant in Holbrook
that operated from 1912 to 1983, and the remediation clean-up efforts that have taken
place since the early 1980’s. She provided a hand-out of the Site Plan and a hand-out of
the Hazardous Waste Site map
Lisa specifically talked about the sediment from the late 1980’s to early 1990’s and
explained that they have been collecting nine different samples from three locations. Lisa
provided a hand-out of the Summary of Surface Water Analytical Results. Lisa
explained that the overall samples are good at this point and future resampling will take
place. Lisa further discussed water testing.
Paul Hogan discussed the environmental permitting process and explained that it is
extensive and will be a two year process at minimum.
Paul briefly discussed the Regulatory and Permitting Requirements and the
Massachusetts Environmental Policy Act (MEPA) and outlined the steps to the MEPA
process, including; MassDEP Firm Yield Analysis of safe yield; Water Management
Process; Army Corps of Engineers dredging. He also mentioned fishery considerations
and herring.
Mayor Sullivan asked if this is worthy to pursue. The response was that it can be done parallel to
the water treatment plant. Mayor asked Paul Hogan if it would be timely to ask a rep from
MassDEP to attend the next Tri Town meeting. The response was that the design has to go to the
Southeast Region and that James McLaughlin, MassDEP, Southeast Region will need to be
involved regarding the treatment plant. It was noted that the Cochato River Diversion issue will
not impact the treatment plant process. It was noted that the Cochato River Diversion will
increase the Safe Yield.
Helen Gordon suggested that the board follow Paul Hogan’s recommendation to meet with
MassDEP, and that Jim McLaughlin should be copied on everything. Paul Hogan said he will
reach out to two or three departments and schedule them to attend a meeting.
Security Camera update: Jim Arsenault, Jim Boyle
Jim Arsenault briefly described the vandalism that occurred several months ago at the
pump station and explained the danger of trespassers accessing the pump equipment. He
discussed the vegetation clean up and another incident of access and the need for a
camera system.
Jim Boyle explained the Braintree Electric Light Department’s business relationship with
Netwatch, and talked about the voice deterrent. Jim presented some video footage on the
tv monitor demonstrating how the system works. Both presented a thorough review of
the Netwatch proposal.
MOTION: by Daniel Lee to grant Netwatch a three (3) year agreement not to exceed thirty
thousand dollars ($30,000). Ten thousand ($10,000) paid on year one, and year two and three to
be paid quarterly at twenty five hundred dollars ($2,500.00) per quarter.
SECOND: by Rich Brewer
VOTE: Unanimous
Progress Report on Great Pond Dam Repair Project: Ben Fehan
Ben Fehan explained that after the last meeting the paving was done. Ben is working
with Camp, Dresser & McKee to schedule a visit to inspect and he suggested that the
board be there and make an event out of it.
Other:
Paul Gabriel noted that contract conversations are underway and asked for a vote before
the next meeting. Barbara Mello explained that the board is not ready to take a vote but
she suggested a meeting in early August.
Next meeting date: Mayor Sullivan scheduled the next meeting for Tuesday, July 31 at 1:00 pm
at Braintree Town Hall. Mayor said that he is open to meeting in Holbrook or Randolph any time
if the other board members are interested in hosting.
Mayor explained that the agenda for the July 31 meeting will be:
1. Possibility of Paul Hogan getting a DEP representative to attend and discuss the Cochato
River (Paul Hogan will ask about this)
2. Possible visit/event at the Great Pond Dam site (Ben Fehan will look into this)
3. Environmental Partners update
The meeting adjourned at 2:15 pm.
Respectfully submitted,
Robyn LaFrance
Recording Secretary
Agenda
TRI TOWN BOARD
of Water Commissioners
Braintree, Holbrook, Randolph
Johnson Chambers, Braintree Town Hall
July 9, 2018 | 1:00 pm
AGENDA
1. Minutes of May 21, 2018
2. Water Treatment Plant update
3. 2018 Phase I Dam Inspection – Lou Dutton
4. Cochato River Diversion – Lisa McIntosh, Woodard & Curran
5. Security Camera and updated Netwatch proposal – Lou Dutton, Jim Arsenault
6. Progress Report on Great Pond Dam Repair Project
7. Next meeting date