Mayor & Board of Trustees
Regular MeetingBriarcliff Manor, NY · September 28, 2016
Agenda
?>
AGENDA
SEPTEMBER 28. 2016
BOARD OF TRUSTEES
VILLAGE OF BRIARCLIFF MANOR, NEW YORK
REGULAR MEETING - 8:00 PM
Board of Trustees Announcements
Village Managers Report
Public Comments
1. Adoption of Capital Budget for 2016-2017
2. Tax Certiorari - Deercliff Builders, lnc.
3. Amendment to the Designation of Banks for the Deposit of Village Funds
4. Budget Transfer - Buckhurst, Fish and Jacquemart
5. Authorize Village Manager to Execute a Professional Services Agreement
with Buckhurst, Fish and Jacquemart for Planning Consulting Services
6. Award of Bid
a) Electrical lntersection lmprovements - Pleasantville and North State
Roads
b) Civil lntersection lmprovements - Pleasantville and North State Roads
7. Minutes
. September 7,2016 - Regular Meeting
NEXT REGULAR BOARD OF TRUSTEES MEETING - OCTOBER 5, 2016
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
1. ADOPTION OF CAPITAL BUDGET FOR FY 2016.2017
BE lT RESOLVED, that the Board of Trustees does hereby adopt the Capital
Budget for Fiscal Year 2016-2017 in the amount of $4,332,668 as follows:
Víf lage of Briarcliff Manor 2Ot6-L7 Capital Projects
PPU
Departmental Funding w/ (Years)
Budget 2%
PROJECT Requested Costs
Police Department:
Equipment: License Plate Reader S 18,500 S t8,8zo 5
Equipment: Security Cameras S 75,ooo s 76,500 10
Total Requirements: $ 93,500 # S gs,3zo
Fire Department:
Equipment: Thermal lmaging Camera S 12,ooo 5 t2,2qo 5
Turnout Gear S 60,000 S 61,200 5
Total Requirements: 5 72,ooo 5 73,440
Ambulance:
Software: Pre-hospital Care Reporting S 12,ooo 5 12,240 5
Total Requirements: s 12,000 5 12,240
Department of Public Works: (general)
Annual Paving 2OLS|L6 s 125,000 5 rzT,soo 15
Annual Paving 20t6l17 s L25,000 5 tz7,soo 15
Streetsca pe Study/Design s 25,000 S 25,500 15
Total Requirements: s 275,000 s 280,500
Department of Public Works: (vehicles)
25 Yard Packer Truck S i.9o,ooo S i-93,800 15
Satellite Truck s 85,000 s 86,700 15
Mason Dump with Plow s 70,000 5 7L,4oo L5
Total Requirements S 345,ooo S 351,900
Department of Public Works: (equipment)
Bucket Truck S 2oo,ooo S 2o4,ooo 15
Road Cutting Saw S 15,ooo S 15,300 15
Total Requirements: s 215,000 s 219,300
Department of Public Works: (water) Self-Funded Self-Funded
Sanitary Sewer Feasibility Study s 26,000 s 26,000 40
SCADA -Sewer Pump Stations s 75,000 s 75,000 40
Water Meter/Remote Read Upgrade s 325,000 S 325,ooo 40
Total Requirements: S 426,000 S 426,000
Department of Public Works: (Water Vehicles) Self-Funded
Pick-Up Truck s 45,000 S 45,ooo 40
Service Truck 5 75,ooo S zs,ooo 40
Total Requirements: S rzo,ooo S 12o,ooo
Facilities:
VH HVAC Replacement 5 861,000 s 878,220 20
Replace (15) Street Lights S 8z,5oo s 84,150 5
Pleasantville & North State Road s 525,000 S 53s,5oo 15
Rte 9A & North State Road 5 1_75,000 s 178,500 15
Gas Tank & Computer System S lso,ooo S 153,ooo 5
lT Replacement; Server, PC's, Notebooks S 5o,ooo S si-,ooo 5
s 1,S43,s00 S 1,880,370
Parks:
Pavilion: Re-Build - lnsurance Funded 5L,869,292 s 5 15
Pavilion: Accessible Bathrooms s 7,286 s 7,432 20
Pavilion: Upper Terrace s 320,090 s 326,492 20
Pavilion: Water Supply for fire protection/Security System s 25,000 s 25,500 20
Accessible Pathway Atria to Park & Park to Library s 359,3L8 s 366,504 20
Pond Revitalization s 90,000 s 91,800 20
Park lrrigation/Pla nting s 9,O20 s 9,200 20
Neighborhood Park 3 s 35,700 20
5 sqsltq S ssz 628
Total-General Fund $3,7ot,714 # 53,775,749
Total-Water Fund s 546,000 s 546,000
Total - All Projects 247 7L4 s 4,332,669
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
2. TAX CERTIORARI - DEERCLIFF BUILDERS, INC.
WHEREAS, Deercliff Builders, Inc. instituted tax certiorari proceedings pursuant
to Article 7 of the Real Property Tax Law of the State of New York; and
WHEREAS, the tax certiorari filings were for Town of Ossining assessment years
2008-2011; and
WHEREAS, the tax certiorari filings relate to Village of Briarcliff Manor fiscal
yea rs 2009-201 0, 20 1 0-20 1 1, 20 1 1 -20 12 and 20 I 2-20 1 3 ; a nd
WHEREAS, a Consent Order of the Supreme Court of the State of New York,
County of Westchester, was entered on January 11,2016;
WHEREAS, the Consent Order was received after the finalization of the approval
of the Village budget for Fiscal Year 2016-2017;
WHEREAS, the Consent Order reduced the tax assessment for the subject
property for the Fiscal Years 2009-2010,2010-2011,2011-2012 and 2012-2013
assessment roll; and
NOW THEREFORE, BE lT RESOLVED that the Board of Trustees does hereby
authorize the refund of the tax bill for Fiscal Years 2009-2010,2010-2011,2011-
2012 and 2012-2013 in the amount of $3,395.31 based upon the reduced
assessment value in the Consent Order.
New
Assessed Assessed Assessment Original Tax Reduced
Year Address Value Value Reduction Amount Tax Amount Refund
2008 'l 250 Pleasantville Rd. $82,200 $67,000 $15,200 $7,1 16.89 $5,800.87 $1 ,316.02
2009 1250 Pleasantville Rd $82,200 $68,000 $14,200 $7,176.79 $5,937.00 $1,239.79
2010 1250 Pleasantville Rd $82,200 $75,000 $7,200 $7,315.80 $6,675.00 $640.80
2011 1250 Pleasantville Rd $82,200 $80,000 $2,200 $7,424.30 s7,225.60 $198.70
$38,800 $3,395.31
TOTAL
TOTAL AV REVENUE
REDUCTION REDUCTION
7t6t2015 2007 2008 2009 20'to 2011 20't2 2013 2014 2015 20't6
Rate -Town of Ossin¡ng Il 045ô 84 8943 86 5802 ù 8731 $ 8900 90 32 93 988 97 166 99 188 99 8684
B¡II Year VBM
Assessmenrt Parcel
Biil Assessed Current Reduction New Reduction NewTax Change
Refund Prior Refund
Year Owner on B¡ll Address Tax B¡ll Tex B¡lll Amount ln Tax Yrs Yr Abate 2nd
2009 Deercl¡ff Bu¡lders 20091404 '1250 Pleasaniville Rd 98 10-1-41 $ 82.200 00 $ 7 11689 s 1,316 02 $ 67.000 00 i 15 200 00 s 580087 si 't :a1f;02 $ 1,316.02
201 0 Deercliff Bu¡lders 2010140,4 1250 Pleasantv¡lle Rd 90 17-1-6 $ a2 200 00 $ 7.176.79 $ 1.239 79 $ 68 000 00 s t4 200 00 $ 5,937 00 $ 1.239 79 $ 1.239 79
2011 Builders 1250 Pleasantv¡lle Rd 90.1 7-1-6 $ a2 200 00 $ 7,315.80 $ 640.80 s 75 000 00 $ 7,200 00 $ 6.675 00 $ 640 80 $ ô40 80
2012 2rJ121't6l) 1250 Pleasantv¡lle Rd 90't7-1-6 ü ö2,2UU 0U s 7,424 30 $ 198 70 Þ öu,uuu uu s 2,200 00 $ 7.225 60 $ 198 70 $ 198 70
$
3,395 31 $ 339531 $
41964.423 Budget $ 100,000 00
Prior Refunds $ (s,2ô6 56)
Current refund $ (3,395 31)
Balance $ 91,338.13
A1 964 423 Refund of Real Prop $ 3,395 31
40102 1001 Real Prop Tax Rev $
At a Special Term, Part IV of the
Supreme Court of the State ofNew
York, held in and for the County of Westchester at I 11
Martin Luther Krg, Jr. Blvd in the City of \Mhite Plains
PRESENT:
HON. BRUCE E. TOLBERT,
ruSTICE OF THE SUPREME COURT
CONSENT JUDGEMENT
DEERCLIFF BITTLDERS, INC. Index Nos. 22182108
Petitioners, 23241/09
2s07Utj
- against- 15151/11
THE TOWN OF'OSSINING
Respondent
X
Upon reading the armexed Consent signed by the attorneys for the respective parties hereto,
and due deliberation having been had thereon, it is
ORDERED, ADJUDGED AND DECREED, that the assessrnents for the assessment years,
2008,2009,2010and20ll affectingthepropertiesdescribedasTaxLD.No.98.l0-1-41 ontheTær
Assessment Map of the Town of Ossining, New York, provided the assessed valuation of the
Petitioner's property for the assessment years enumerated above be reduced as follows:
Section 98.i 0 Block I Lot 4l (1250 Pleasantvílle Road, BriarcliffManoa NY)
Valuation
Assessed Amount
Assessment Year Reduced Fiom Reduced to of Reduction
2008 s82,200 $67,000 vsdooM
ff/(/
2009 982,200 $68,000 $L4,200
2010 $82,200 $75,000 $.7,200
201,1 $82,200 $80,000 s 2,200
said total assessment to be divided between land and improvements as the Assessol of the Town of
Ossining, New York shall determine in his sole discretion, and it is fiirther
ORDERED, ADruDGED AND DECREED, that the offrcer or officers having custody of
said assessment roll and any tax roll upon which the above-mentioned assessments and any taxes
levied have been entered, shall conect the said entries in conformity with this Consent Judgment and
shall note upon the margin of said rolls opposite said entries, that the same have been corrected by
the authorization of this Consent Judgment, and it is further
ORDERED, ADruDGED AND DECREED, thatthere shall be audited, allowed and paid
by the Town of Ossining, New York, to the Petitioner, the amounts, if any, paid by the said
Petitioner, their agents or representatives as taxes against the said assessments for the above-
referred assessment years in excess of what the taxes should have been if the said assessments
had been as herein ordered and determined, with no interest provided refunds are paid within
60 days of service by mail of a copy of this Consent Judgment with Notice of Entry upon
Respondents, otherwise, with interest as provided by law, and it is further
2-
ORDERED, ADJUDGED AND DECREED, that there shall be audited, allowed and paid by
the Village of Briarcliff Manor, if any, paid by the said Petitioners as taxes against the assessrnents
for the above-referenced assessment years in excess of what the taxes would have been if the said
assessments had been determined by this Order, with no interest provided the refund is paid within
60 days of service by mail of a copy of this Order withNotice of Entry upon the Viilage ofBriarcliff
Manor, New York, and it is further
ORDER-ED, ADJUDGED AND DECREED, that the County Legislators of the County of
Westchester, State ofNew York, be and are hereby directed and authorizedto audit, allow and pay to
the Petitioner the amounts, if an¡ of State, County, Judiciary, Sewer District Taxes paid by the
Petitioners as taxes against the said assessment for the above-referenced assessment years in excess
of what the taxes should have been if the said assessment had been determined by this Consent
Judgment, with no interest provided refunds ale paid within 60 days of service by mail of a copy of
this Consent Judgment with Notice of Entry upon the Commissioner of Finance of the County of
'Westchester,
along with proof of payment of County taxes, otherwise with interest as provided by
law, and it is further
ORDERED, ADruDGED AND DECREED, thatthere shall be audited, allowed andpaidto
the Petitioner by the BriarcliffManor Union Free School District, the amount, if any, paid by the
Petitioner as School District Taxes against the assessments for the above-reference assessment years
in excess of what the taxes would have been ifthe assessments made in the aforesaid years had been
herein determined, with no interest provided refunds are paid within 60 days of service by mail of a
copy of this Consent Judgment with Notice of Entry upon Respondents, otherwise, with interest, as
provided by law, and it is further
- 3-
ORDERED, ADJUDGED AND DECREED, that all refirnd checks a¡e to be made payable to
',PAUL S. RICHMOND, ESQ., AS ATTORNEY FOR PETITIONER'., And SENt tO PAUI S.
Richmond, Esq., The h-ns of Court, 99 Court Street,'White Plains, New York 10601.
ORDER-ED, ADJUDGED AND DECREED, that there sirall be no costs or disbursements.
ENT
J. S. C.
øV" 6nro¿'t ßlbn'-r
THE OFFICE OF THE WESTCHESTER
COUNTY ATTORNEY HAS NO OBJECTION
TO THE ENTERING OF THE WITHIN
ORDER.
DATED: la--^"'", 5 )¿,/ (¿
-4-
,)"
,-_ _r1l 6L-zad' COUNTY ATTORNEY
--' nlT\r OF WESTCI-IESTER,::,is+*¿-4rt
SIGNING AND ENTRY OF THE WITHIN ruDGMENT IS HEREBY CONSENTED TO:
for Petitioners
Dated:
,r//. Attorney for
5
ALL.Sf'ifE LEG,iLâ
ù7toi.0F. ofl 02.01. t7rðJ-GY. 47tAn.ü!Ìr
nñ.22,O5 lO :'.r.rid.lÈÍ¡l.con!
húen lio. Year 20
!
{
t
COANTY OF WESTCHESTER '¡
DEERCLIFF B AILDERS, INC.
PETTTTONER(S), .
-AGATNST-
î
THE TOTT/N OF OSSINING
A Municìpøl Corporatiott, ìts Å,ssess'or or Boartl of A.ts¿ssørs' anrl Boardbf Review
Attd tlte Briarclìff Mønor Anion Free School Dìst¡ìct
RESPONDENT(S)
'ì
Þ
coNSENr JUDçìV{ENT' J
I
Paur- S. Rrcrrr,roND
Attontey for
PnTTTTôIVr..Tl¡/.qì
THE lhll.ls OF CoURT
" "-ii: :.i,i,":l Tå Låï "'
t9l41 324-Os40
Pursua¡¿t, ¿o 22 Ii-fCRR L30-1.1-ø, tlrc un:d,ersígned, øn attorney crdmitted to practice in the co¿¿rts of Neu Yorh State,
certifies th,at, upon ínfonnøtíon artd belief ønd reøsonable inquiry, (1) th,e conter¿tiotts coniaíned ín the anne,rcd
document are not fi'íuolous ønd thøt Ø if the øt¿nexed, documen,t is an initíatíng pleading, (i) tlte ntatter wq,s not
obtøined througlt, illegøI condztct, or thøt if ít wøs, the øttorney or other persons responsible for tlrc íIlegal conduct are
not pørticipating ín th,e maiter or sh.aring ùt any fee eøt'ned therefi'om ønd thøt (ü) íf tlze mo,tter ittvol'ves poteniiøl
claim,s ior personøl ínjury or urongfttl death, the maiter wqs not obtai.ned ín uioløtíon oi 22 NYCfi.B 1200.41-0.
Dated: Signature
pÂflT. .q pT \
rl
Print SigeerÈ Lrame..'.".'....'...
Seruí,ce of a, coTsy of th,eu'itlti:t¿ æ havbg adnui,tted.
Døted:
Attonzel1(s) Jot
PLEASE T¿I-KE NOTICE
@
¡
I
that the tui tttin is a. (c er t'i¡i,ect)
.*r*:..99nu 3¡ "
ØOfç <'Ð + TUJ[S t en[
g
4 ENTRY
OF enterecl, itt, tlze ofJ'ice oJ tlæ cl.erk of itirz toi,tlui'n'-nanied Cout't on fufft) âFF tÇ ÀÞ 20
'(_
o
n thøt øt¿ Orcler of uhich, tl¿e wi,tlví;n is ø tt'u.e co'py 'w[,tL be'presented fot' settlanent to tl¿e
ruor|f! or Hon. , one. of tlze Xlucl,ges of the wi,tlún-nanzecl, Ccttn't,
SETTLEn¡ENT o,t
on 20 ,&t ilL
Dated,: lelr n^øf¿ /1, JO t¿
v A. Peur- S. Rrc-trltoND
A no ney for
r (e*,{f *lsÊJr
THE I¡I¡IS OF COURÏ
To:
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
3 AMENDMENT TO THE DESIGNATION OF BANKS FOR THE DEPOSIT
OF VILLAGE FUNDS
BE lT RESOLVED, that the Board of Trustees of the Village of Briarcliff Manor
hereby designate the following banks for the deposit of Village funds:
a. JP Morgan Chase
b. Wells Fargo Bank, NA
c. Fidelity
d. TD Bank
e. Greater Hudson Bank
Í. Webster Bank
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
4. BUDGET TRANSFERS- 20I6.2017 - BUCKHURST, FISH AND
JACQUEMART
BE lT RESOLVED that the Board of Trustees does hereby authorize the
following budget transfers for FY 2016-2017:
From: 40909 Fund Balance $35,000
To: 41010.460 BOT Contractual $35,000
BUDGET TRANSFER (Fy 16-17) REQUEST FORM
Amount from: Mu Code Bu Line
$ 35,000.00 A0909 Fund Balanced - Unreserved
Amount to: un B
$ 35,000.00 41010.460 BOT Contractual Services
Reason for Transfer Re st: Allocate funds for a stu on updating the Villa Comprehensive Plan, cally the "8" Zone
IL
uest Department Head Date Signed
aè-
Village Manager App Date Signed
q 2>
tÉ
Village Treasurer Approva I Date Signed
lf over S10,000, Board of Trustees Approval Date
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
5. AUTHORIZE VILLAGE MANAGER TO EXECUTE A PROFESSIONAL
SERVICES AGREEMENT WITH BUCKHURST, F¡SH AND
JACQUEMART FOR PLANNING CONSULTING SERVICES
BE lT RESOLVED that the Village Manager is hereby authorized and directed to
execute on behalf of the Village a Professional Services Agreement with
Buckhurst, Fish and Jacquemart for Planning Consulting Services to prepare a
Comprehensive Plan Addendum for updated recommendations for the B-District
as per their proposal totaling $35,000.
BFJPlanning Pl,i¡ri.ltti.,
-\ lL
llÈ!Êr I Dr''l-'-
!:i l\1 ÌÈ r, i Lr1¡_:ll ¡Â.1,ål I ÀiY\llr
Ri:¡, l::iAIF ( í)t.t5|ì.i]tj r:i
l' îÅ t.i _qpi_-rl?l,c ii(_rl i p[,ô j r¡l i ¡.lG
September 79,2016
Mayor LoriA. Sullivan and Philip Zegarelli, Village Manager
Village of Briarcliff Manor, Village Hall
Ll.lL Pleasantville Road
Briarcliff Manor, NY 105L0
RE: Comprehensive Plan Addendum to provide updated recommendations for B
District - Proposalfor Consultant Services
Dear Mayor Sullivan and Mr. Zegarelli,
Based on our September 7th meeting with the Village Board of Trustees (BOT), we
understand that the village is interested in pursuing an addendum to the 2007
Comprehensive Plan to provide updated recommendations for the Village's (B)
Planned Office Building and Laboratory District. At the time the 2007 Comprehensive
Plan was adopted, all four properties located wíthin the Village's B District (i.e.
Briarcliff Executive Park (Mearl), Philips Laboratories, Sony Electronics, and Briarcliff
Corporate Campus) were occupied and contributing to the commercial tax base of
the Village. Therefore, the Comprehensive Plan recommended that the B D¡stricts
remain as zoned and continue to only allow commercial business uses. Over the past
nine years, much has changed in the office market in Westchester County and
planned office complexes in isolated suburban locations, for the most part, are no
longer economically viable. Accordingly, three of the four office complexes are
currently vacant, and have been for some time, and the fourth is only part¡ally
occupied.
ln addition, the Village has also recently received preliminary applications for
redevelopment of two of the vacant B zoned parcels (Mearl and sony) with mult¡-
family residential uses. Ratherthan undertake redevelopment of these properties on
a piecemeal basis, the Village is in a posítion to set a new vision for how it would like PÂI iI IiI]{.KT II JÑST ÂÍIiIIA
to see these properties brought back into productive use and determine the type and FR.¿.¡]i"i S FiSi-i FAICP
(lE+R':ìEi .iÀi CìUËi¡r'iPr PE ¿'rl(lP
density of uses permitted. The first step ¡n setting the stage for future reuse of these
iAR,{H K YA'T:ÈL Äi':P
long vacant properties is to undertake a targeted addendum to the 2007 r,u:i¡f.j Ë,\_\,"4 iE Al{_:P P¡,
Comprehensive Plan that specifically looks at the existing B Districts and makes
recommendations as to potential future use, density and zoning opt¡ons. once the
comprehensive Plan has been updated, the Village or a project applicant could move
forward with zoning text and map amendments as needed.
WWW-EFJPLANNING.COM
BF}I Planning P-,itìi.tLi.iì-,
r i1lß,., ¡l aji-,t4,)i.l
i: tlv t{ i,ì l lù11_:¡l Ì :\ L,!, i l¿r.i /:,/.lr
r
i? !E¡\1, L:l i,i II (: a-ìt.l î]r.i i Ti ¡] a'
'í E,rt ¡ 5 P(lit i.¿, { ii',i1 |1,1 ril'¡ | ¡lr-:
Ms. Sullivan, Mayor
Mr. Zegarelli, Village Manager
September 19,20L6
Page2
This memorandum outlines BFJ Planning's proposed scope of work related to the
proposed Comprehensive Plan Addendum and the related New York State
Envíron menta I Quality Review Act (SEQR) docu mentation.
Scope of Work
BFJ proposes the following scope of work
PHASE 7: COMPREHENSIVE PLAN ADDENDUM
Task 1: Comprehensive Plan Advisory Committee - As a first step, BFJ will work with
a Comprehensive Plan Advisory Committee consisting of approximately six to eight
Village stakeholders. The Committee would be tasked with developing land use and
zoníng recommendations for the Village's B Districts to present to the BOT. BFJ will
review existing conditions at each of the B zoned parcels with the Committee and
explore with them various zoning options and land use scenarios. The potential
environmental impact of various opt¡ons will also be discussed. Once the Committee
has formed a consensus on the recommendations forthe D District, BFJ will present
them at a joint BOT and Committee meeting. lt is estimated that the Committee
would meet individually with BFi three times and once at a joint meeting with the
BOT.
Task 2: Prepare Comprehensive Plan Addendum - Once the Advisory Committee
recommendations have been presented to the BOT and the BOT has reached
agreement on the recommendations, BFJ will draft the Comprehensive Plan
Addendum. Rather than undertake a complete update to the 2007 Comprehensive
Plan, we are proposing to only undertake a targeted update to the B District
recommendations in the Comprehensive Plan. The addendum, would be a standalone
document that accompany the Comprehensive Plan. We believe this is the most
expedient approach, given that the rest of the Comprehensive Plan is still workíng for
the Village and the only area really in need of an update is the B District
recommendations. Once the Addendum has been drafted, we will submit it to the
BOT for review and discussion. Following this discussion we will make any necessary
revisions to the addendum and resubmit to the Village.
¡1lti.l ij(,
BIII Planning Pl_
I ll(l1l!ì ) LIF') í-'';1
È i'jti Èir ) Þ) \1Ê¡J ì,{1. q ¡'jå.1'i:ìlt
Br¡\i lili l:\l'r q:{rf'l:,Lìl f ll'.i'i-ì
I RAi'r39ilR l \ i irl¡1 PL,,\¡r)'l | ¡li rj
Ms. Sullivan, Mayor
Mr. Zegarelli, Village Manager
September 19,2076
Page 3
Task 3: Public Hearing - Once the addendum is drafte d, the Village is in a position to
schedule a public hearing. BFJ will attend the public hearing on the Comprehensive
Plan addendum and present the recommendations to the BOT and public, if needed.
Based on the outcome of the public hearing, BFJ with input from the BOT, will revised
and finalize the addendum.
PHASE 2:SEQR - FULL ENVIRONMENTAL ASSESSMENT FORM
Prior to adoption of the Comprehensive Plan Addendum, the Village must comply
with the New York State Environmental Quality Review Act (SEQR). We propose to
undertake a Full EnvironmentalAssessment Form (EAF) containing relevant technical
appendices/attachments to support a determination of non-significance (Negative
Declaration). The EAF is generally prepared following the completion of the draft
Comprehensive Plan addendum.
Task 1: Preoaration of Full Environ mental Assessment Form (EAF) Part 1 - Part 1 of
a Full EAF and technical appendices/attachments will be prepared for the
Comprehensive Plan Addendum (proposed action) to ass¡st the lead agency (Board of
Trustees) in determining whether the proposed action may result in a significant
effect on the environment. The Full EAF will be accompanied by a detailed project
description and íllustrative maps and graphics. Based on our understanding of the
project, we anticipate the need to prepare detailed technicalstudies in the following
environmental impact areas to be appended to the Full EAF:
¡ Land use, zoning and public policy
¡ Community Facility lmpacts (i.e schools, police and fire)
o Traffic (trip generation)
Upon completion, Part 1 of the EAF will be submitted to the BOT for review and
comment. ln addition, BFJ will prepare a draft Resolution of lntent to be Lead Agency
as part of the SEQR coordinated review process (required for Type I Actions). This
Resolution will establish the BOT's intent to be the SEQR lead agency for the
environmental review process for the project. Once comments have been received
from the BOT, BFJ will finalize the EAF and submit the document to the board for
circulation to all interested and involved agencies. At the same time, the board will
r',i'iîìiilr
BFJPlanning Dl.
Illìfj rt: r : ji. rl.r,i.l
l. ì l\/iR' .j1.1,,,11ì'l f ,\L Ätl¡J í\ll)
R:¡; [5i/,ii; (. {-;¡13!]L'lli!ii
¡ {.: ¡ r:;ir( lll I \IJ(-)i ¡ Pi A¡i,\Jil llr
Ms. Sullivan, Mayor
Mr. Zegarelli, Village Manager
September t9,2OL6
Page 4
adopt the Resolution of lntent to be Lead Agency. The involved agencies will have 30
calendar days to respond to the EAF and Resolution.
- Once
the BOT has been established as the lead agency, BFJ will assist the board in the
preparation of a Parts 2and3 EAF as required by SEQR. The lead agency is responsible
for preparation of Part 2 and normally uses Part 2 EAF to determine whether the
proposed action will result in any significant adverse lmpacts. Using the information
provided in Parts L and2 of the EAF, the lead agency will determine the significance
of the action by making a positive or negative declaration (Part 3). Generally, when a
negative declaration is filed, the lead agency determines that no significant
environmental impacts are anticipated, and the SEQR process isthen completed. BFJ
will prepare the negative or positive declaration for the lead agency. lf a negative
declaration is issued, the SEQR process is concluded; however, if a positive
declaration is adopted, the preparation of a Generic EIS will be required. As proposed
herein, we would intend to rule out or mit¡gate1 any potential adverse environmental
impacts from the proposed project in the hopes of adopting a Negative Declaration.
Timetable
Based on the above, we propose to complete the scope of work within 4-5 months of
receiving a signed authorization to proceed. A detailed project schedule is included
as Attachment A.
Budget
BFJ proposes to complete the scope of work on a t¡me and expense basis as outlined
in the budget estimate contained in Attachment B.
Please do not hesitate to contact me if you have any questions regarding the above.
A countersignature below will serve as authorization to proceed with work on the
Comprehensive Plan Addendum.
1
Any proposed mitigation measures would be incorporated into the project description and
not be listed as mitigation measures per se.
mJPhnning PL,/{N^trl.lG
URBA¡I I')E5IGI,]
E NV I IìO N,VlET\T,At ANAtYSIS
REAI TSJ¡\TE CÖNSIJ !TINC
TRA¡JSPORTAIION PLAI'INING
Ms. Sullivan, Mayor
Mr. Zegarelli, Village Manager
September t9,20L6
Page 5
Sincerely,
Sarah K. Yackel, AICP
Principa I
Agreed to:
Philip Zegarelli, Village Manager Date
Enc Attachment A - Timeline
Attachment B - Budget
Attachment A: Comprehensive Plan Addendum - Timeline
Month L 2 3 4 5
Tasks Oct Nov Dec Jan Feb
PHASÉ L Compreheorrv+ Pl.rr¡ Arjrlendum
1: Comprehensive Plan Advisory Committee
Task 2: Prepare Comprehensive Plan Addendum Addendum
Adopled by BOT
3. Public Hearing and Final Zoning Amendments
PI.IASf .] SEQR
Prepare Part 1 EAF (including 30-day Coordinated review) llrt Adopì Neg
Dec
2. Prepare Parts 2 and 3 EAF and Neg Dec (SEQR Complete)
Key:
Meetings: o
Public Hearing: a
Attachment B
BFJ Planning Cost Estimate
Below is a detailed breakdown of our proposed fee for completing the scope of services outlined in the
attached proposal letter. BFJ proposes to complete the proposed project for 525,000, as outlined below,
against the attached 2016 public billing rates. We propose to bill monthly on a time and expense basis
not to exceed 525,000. Should the work be completed for less than the estimated 525,000, the Village
would be charged the lesser amount.
WORK TASKS FEE (s)
Task 1: Comprehensive Plan Advisory Committee S7,5oo
Task 2: Prepare Comprehensive Plan Addendum S6,ooo
Task 3: Public Hearing and FinalZoning Amendments S1,5oo
Sub-Total STs,ooo
Task 1: Prepare Part 1 EAF (including 30-day Coordinated review) $8,ooo
Task 2: Prepare Parts 2 and 3 EAF and Neg Dec (SEQR Complete) S1,5oo
Sub-Totøl 59,5oo
Expenses ssoo
TOTAL: s25,000
BFJ 2016 PUBLIC BILTING RATES
PRINCIPATS RATE PER HOUR
F. Fish s23s
G. Jacquemart Szgs
S. Yackel S2i.o
S. Favate s210
SENIOR ASSOCIATES
J. West 522s
J. Martin Szos
ASSOCIATES
N. Levine s 740
S. Kates s t40
PROFESSIONAL STAFF
L. Rennée Si.os
J. Douglas Sgo
woRDPROCESSTNG/PRODUCTTON s70
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
6A. AWARD OF BID FOR ELECTRICAL INTERSECTION IMPROVEMENTS
- PLEASANTVILLE AND NORTH STATE ROADS
WHEREAS the Village received 1 qualified bid for the VM 1516-7 Electrical
Intersection lmprovements Pleasantville and Nofth State Roads Project; and
WHEREAS funding for this project will be charged to H.1440.201.17220; and
NOW, THEREFORE, BE lT RESOLVED that the bid for the VM 1516-7 Electrical
lntersection lmprovements Pleasantville and North State Roads Project is hereby
awarded to the lowest responsible bidder Verde Electric with their bid proposal of
$199,945; and
BE lT FURTHER RESOLVED that the Village Manager is hereby authorized and
directed to execute a contract with Verde Electric for said project.
11 1 1 PLEASANTVILLE ROAD
VILLAGE OF BRIARCLIFF MANOR, N.Y. I051O
BRIARCLIFF MANOR TELEPHON E : (91 41 944-277 0
www. bria rc I iffm a no r. orq FAX: (914) 9414837
MEMORANDUM
September 7,2016
To: Philip E. Zegarelli - Village Manager
David J. Turiano, p.n. O¡U
From
!nd,rþ-
Re: VM 1516-7 - Electrical. I tersection f m nrovem ents
Bids were opened on July 19,2016, at 11:00 a.m. for the above referenced project. Pre-
sent at the bid opening were David J. Turiano, P.E., Village Engineer, and Village Man-
ager Philip E. Zegarelli.
BIDDER BID
AMOUNT
Verde Electric $199,945.00
Recall that this project was originally bid as a single prime contract whereby the civil
portion of the work (retaining wall and grading), and the electrical portion of the work
(traffic signal) were to be performed by a single prime contractor. Bidder tumout was
poor with one bidder submitting a bid of $595,500.00. The Village was not comfortable
with this single bid as it recognized that it did not get competitive pricing for the civil
portion of the work. Accordingly, the project was rebid as two separate prime contracts,
one each for the electrical and for the civil portions.
Unfortunately, after an aggressive bid solicitation process, only one bid was received for
the electrical project, Verde Electric. This is a common occuffence in the industry as it
relates to traffic signal installations as there are few contractors in the region that perform
this type of work. The Village in the past has successfully awarded projects to Verde
Electric when they were the sole bidder.
The bids were reviewed by my office for completeness and it was determined that the bid
was complete and acceptable. In addition, the bid price was compared to two other traf-
fic signals recently installed by the Village and the bid number appears to fall in line.
Funding for this project has been proposed in the amount of $200,000.00 in the upcoming
Capital Improvement Plan (CIP). Funds should be available under H.1440.201.17220 for
this project pending approval of the CIP by the Village Board.
Based on the above, it is recommended that the Village award the project to Verde Elec-
tric of Mount Vernon, New York in the amount of $199,945.00.
Please feel free to contact me if you have any questions relating to the above
VILLAGE OF BRIARCLIFF MANOR
BOARD OF TRUSTEES AGENDA
SEPTEMBER 28, 2016
68. AWARD OF BID FOR CIVIL INTERSECTION IMPROVEMENTS -
PLEASANTVILLE AND NORTH STATE ROADS
WHEREAS the Village received 6 qualified bid for the VM 1516-7 Civil
lntersection lmprovements Pleasantville and North State Roads Project; and
WHEREAS funding for this project will be charged to H.1440.201.17220; and
NOW, THEREFORE, BE lT RESOLVED thatthe bid forthe VM 1516-7 Civil
lntersection lmprovements Pleasantville and North State Roads Project is hereby
awarded to the lowest responsible bidder Abbott & Price with their bid proposal of
$318,000; and
BE lT FURTHER RESOLVED that the Village Manager is hereby authorized and
directed to execute a contract with Abbott & Price for said project.
1111 PLEASANryILLE ROAD
VILLAGE OF BRIARCLIFF MANOR, N.Y. 10510
BRIARCLIFF MANOR TELEPHONE: (91 a) 944-2770
www. bria rcliffmanor.orq FAX: (9la) 9414837
MEMORANDUM
September 7,2016
To: Philip E. Zegarelli - Village Manager
From: David J. Turiano, P.E
Qgq-Î,¡tt¡*'
Re VM 1516-7- Civil - Intersection Improvements - Pleasantville
and North State Roads
Bids were opened on July 19,2016, at 1 1:00 a.m. for the above referenced project. Pre-
sent at the bid opening were David J. Turiano, P.E., Village Engineer and Philip E. Ze-
garelli, Village Manager.
This project includes the construction of a reinforced concrete retaining wall together
with backfrlling and rough grading in the vicinity of the former Birrittella property. This
work, in connection with the pending Westchester County Pleasantville Road Recon-
struction Project, and the Village's Traffic Signal Installation Project will provide for an
overall intersection upgrade and improvement.
Six (6) bids were received ranging from $3 1 8,000.00 to $915,000.00 as shown below
Vendor Bid
McNamee Construction Corp. s915,000.00
Con-Tech Construction Technology, $538,000.00
Inc.
Villa Construction $357,000.00
Morano Brothers Corp $672,425.00
Tony Casale, Inc. $390,000.00
Abbott & Price $318,000.00
Recall that this project was originally bid as a single prime contract whereby this civil
portion of the work (retaining wall and grading), and the electrical portion of the work
(traffrc signal) were to be performed by a single prime contractor. The Village was not
comfortable with this single bid as it recognized that it did not get competitive pricing for
this portion of the work. Accordingly, the project was rebid as two separate prime con-
tracts, one each for the electrical and for the civil portions.
2
The low bidder was reviewed by my offrce for completeness and it was determined that
the bid was complete and acceptable. Abbott & Price has recently performed several pro-
jects for the Village, including the Community Center and Comfort Station/Pump Station
Project. Putting aside timing and scheduling concerns, Abbott & Price did provide a
wide range of construction services in a satisfactory manner. The range of services
ranged from excavation, utility and building construction. The current Project is excava-
tion/civil related in which Abbott & Price owns and operates most of his own equipment
and should be able to complete without incident.
The Village did not perform any reference checks on Abbott & Price as it is very familiar
with their work and have an ongoing working relationship.
Funding for this project has been proposed in the amount of $325,000.00 in the upcoming
Capital Improvement Plan (CIP). Funds should be available under H.I440.201.17220 for
this project pending approval of the CIP by the Village Board.
Based on the above, it is recommended that the Village award the project to Abbott &
Price.
Please feel free to contact me if you have any questions relating to the above.
Village Board of Trustees
Regular Meeting
September 7,2016
8:00 p.m.
The Regular Meeting of the Board of Trustees of the Village of Briarcliff Manor,
New York was held in the Village of Briarcliff Manor Village Hall, at 1111
Pleasantville Road, Briarcliff Manor, New York on the 7th of September,2016
commencing at 8:00 p.m.
Present
LoriA. Sullivan, Mayor
Cesare DeRose, Jr. Trustee
Mark L. Wilson, Trustee
Bryan Zirman, Trustee
Also Present
Philip Zegarelli, Village Manager
Christine Dennett, Village Clerk
Anna Georgiou, Village Counsel
Absent
Mark Pohar, Deputy Mayor
Church
Upon motion by Trustee Wilson, seconded by Trustee DeRose, the Board voted
unanimously to open the Public Hearing.
The Board discussed the church's Special Use Permit renewal process and
stated there were some discrepancies with the renewal dates and they wanted to
correct the record and clarify the date going fonruard.
There were no public comments.
Upon motion by Trustee Zirman, seconded by Trustee DeRose, the Board voted
unanimously to close the Public Hearing.
Upon motion by Trustee Wilson, seconded by Trustee Zirman, the Board voted
unanimously to approve the following resolution as amended:
BE lT RESOLVED that the Special Use Permit issued to Scarborough
Presbyterian Church and Nursery School is hereby renewed subject to the same
conditions included in the original Special Use Permit approval dated June 27,
1985 and as amended on August 19,2015.
1
BE lT FURTHER RESOLVED that the Special Use Permit amendment and
renewal are hereby consolidated into one permit and shall supersede all prior
permits and conditions with respect to expiration dates and shall extend to June
27,2021.
BE lT FURTHER RESOLVED that should the Scarborough Presbyterian Church
and Nursery School desire to renew this Special Use Permit for another five year
period, commencing in 2021, the Church/School shall be responsible for
requesting the renewal at least sixty (60) days prior to the expiration of the
Special Use Permit.
Board of Trustees Announcements bv Trustee Zirman
o All residents are encouraged to sign up for the Village Manager's weekly
news blast.
. The Library is very busy with programs. Their brochure is available on
their website.
. The pool is closed for the season. Thank you to all that made the season
a success.
o The Youth Center "Back with a Splash" Party is scheduled for 9/8.
. Community day will be 9/10, mark your calendars!
. Any nonprofits interested in participating, please contact the Recreation
Department.
o The Fall Brochure is available on the website.
o The Town of Ossining is hosting a joint 9/11 memorial at 2pm.
Villaoe Manaqers Reoort Villaqe Manaoer Zeqarelli
o A punch list for the Community Center is being worked on,
. The Pavilion bid is out and due on 9123.
. The Village is scheduling a meeting regarding the Route gA and North
State Road Intersection.
. Con Edison work is continuing on Pleasantville Road.
. Paving will begin on 9112.
o The next regular meeting of the Board of Trustees will be on gl28 at 8pm
at the William J. Vescio Community Center with a Work Session at 7pm.
Public Comments
There were no public comments
Aooointment Police Chief
Upon motion by Trustee Zirman, seconded by Trustee DeRose, the Board voted
unanimously to approve the following resolution:
2
BE lT FURTHER RESOLVED that Donald Gorey is hereby appointed as
Provisional Police Chief effective September 8,2016 with a salary of
$143,000.00.
Tax Certiorari - Urstadt Biddle Properties. lnc.
Upon motion by Trustee DeRose, seconded by Trustee Wilson, the Board voted
unanimously to approve the following resolution:
WHEREAS, Urstadt Biddle Properties, Inc. instituted tax certiorari proceedings
pursuant to Article 7 of the Real Property Tax Law of the State of New York; and
WHEREAS, the tax certiorari filings were for Town of Ossining assessment years
2011-2013; and
WHEREAS, the tax certiorari filings relate to Village of Briarcliff Manor fiscal
years 2012-2013,2013-2014 and 2014-2015; and
WHEREAS, a Consent Order of the Supreme Court of the State of New York,
County of Westchester, was entered on July 21,2016;
WHEREAS, the Consent Order was received after the finalization of the approval
of the Village budget for Fiscal Year 2016-2017;
WHEREAS, the Consent Order reduced the tax assessment for the subject
property for the Fiscal Years 2012-2013,2013-2014 and 2014-2015 assessment
roll; and
NOW THEREFORE, BE lT RESOLVED that the Board of Trustees does hereby
authorize the refund of the tax bill for Fiscal Years 2012-2013,2013-2014 and
2014-2015 in the amount of $5,266.56 based upon the reduced assessment
value in the Consent Order.
New
Assessed Assessed Assessment Original Tax Reduced
Year Address Value Value Reduction Amount Tax Amount Refund
2011 1844 Pleasantville Rd $57,1 00 $40,950 $1 6,1 50 $5,157.27 $3,698.60 $1,458.67
.1844
2012 Pleasantville Rd $57,1 00 $36,600 $20,500 $5,366.71 $3,439.96 $1,926.75
201 3 1844 Pleasantville Rd $57,1 00 $37,740 $19,360 $5,548.1 I $3,667.04 $1,881.13
$56,010 $5,266.56
TOTAL
TOTAL AV REVENUE
REDUCTION REDUCTION
Scarborouoh Station Road with the United States Postal Service
The agreement was tabled to a future meeting
a
J
with the New York State Denartm of Transoortation for the 2016-2017
Snow and lce Aqreement
Upon motion by Trustee Wilson, seconded by Trustee Zirman, the Board voted
unanimously to approve the following resolution;
BE lT RESOLVED that the Village Manager is hereby authorized and directed to
execute an agreement with the New York State Department of Transportation to
extend the lndexed Lump Sum Municipal Snow and lce Agreement for the period
from July 1,2016 through June 30, 2017 in the amount of $4,085.85.
Authorize Villaqe Manaser to Execute a Master Municipal Multi-Modal (MM)
Caoital Proiect Aoreement with the New York State Deoartment of
Transportation
The Board thanked Village Staff for all the work they did to make the project
happen and thanked the other municipalities for joining the effort and asked them
to fund the project as pledged.
Upon motion by Trustee DeRose, seconded by Trustee Wilson, the Board voted
unanimously to approve the following resolution subject to review by Village
Counsel:
Authorizing the implementation, and funding in the first instance of the State
Multi-Modal Program-aid (and State administered federal program-aid) eligible
costs, of a capital project, and appropriating funds therefore.
WHEREAS, a Project for the Road Reconstruction to ease traffic
transiting east/west through the Route 9A/North State Road lntersection,
P.l.N. 8MA 197.30A (the Project") is eligible for funding (under Title 23
U.S. Code, as amended, and) New York States Multi-Modal Program
administered by the NYS Department of Transportation (NYSDOT); and
WHEREAS, the Village of Briarcliff Manor desires to advance the Project
by making a commitment of advance funding of the non-local share and
funding of the full local share of the costs of the Project; and
NOW, THEREFORE, the Víllage of Briarcliff Manor Board, duly convened
does hereby
RESOLVE, that the Village of Briarcliff Manor Board hereby approves the
above-subject project; and it is hereby further
RESOLVED, that the sum of $800,000 is hereby appropriated from other
local funding and made available to cover the cost of participation in the
above phase of the Project; and it is further
4
RESOLVED, that in the event the full non-federal share costs of the
project exceeds the amount appropriated above, the Village of Briarcliff
Manor shall convene as soon as possible to appropriate said excess
amount immediately upon the notification by the Village Manager thereof,
and it is further
RESOLVED, that the Village Manager of The Village of Briarcliff Manor be
and is hereby authorized to execute all necessary Agreements,
certifications or reimbursement requests for Multi-Modal Program Funding
on behalf of the Village of Briarcliff Manor with NYSDOT in connection with
the advancement or approval of the Project and providing for the
administration of the Project and the municipality's first instance funding of
project costs and permanent funding of the local share of federal-aid and all
project costs that are not so eligible, and it is further
RESOLVED, that a Certified Copy of this Resolution be filed with the
Commissioner of Transportation of the State of New York by attaching it
to any required and/or appropriate Agreements executed in connection
with the project between Village of Briarcliff and the State of New York;
and it is further
RESOLVED, that this Resolution shall take effect immediately
State Environ mental Clualitv Review Act Neoative Decla - Route 9A &
North State Road lntersection lmprovements
Upon motion by Trustee Zirman, seconded by Trustee DeRose, the Board voted
unanimously to approve the following resolution:
WHEREAS, the Board of Trustees ("Board of Trustees") of the Village of Briarcliff
Manor, New York ("Village") is undertaking roadway improvements to the
intersection of Route 9A and North State Road ("Proposed Action") and
accordingly prepared an accompanying Short Environmental Assessment Form
Part 1, prepared by Sarah K. Yackel of BFJ Planning, Village Planning
Consultant, dated May g, 2016 ("EAF"); and
WHEREAS, the Proposed Action has primarily local impacts, and the Board of
Trustees is the local agency involved in the Proposed Action which has the
broadest governmental powers for the investigation into the impacts of the
Proposed Action and the greatest capability for providing the most thorough
environmental assessment of the Proposed Action; and
WHEREAS, the Board of Trustees has determined that the Proposed Action is
subject to the State Environmental Quality Review Act ("SEQR"), that it does not
5
involve any federal agency, that it will involve other agencies, and that it is
classified as an Unlisted Action under SEQR; and
WHEREAS, the Board of Trustees by Resolution adopted July 20, 2016 declared
its intent to serve as lead agency and circulated the Part 1 EAF for a 30-day
coordinated review to all involved agencies as follows: Westchester County
Board of Legislators, Town of Ossining, New York State Department of
Transporlation, Region 8; and
WHEREAS, during the 30-day coordinated review period, no objections as to
lead agency status were received and on or about August 19,2016, the Board of
Trustees became lead agency; and
WHEREAS, the Board of Trustees reviewed an EAF Parts 2 and 3 dated August
29,2016, prepared by BFJ Planning, and the EAF Part 2 did not identify any
potential moderate to large environmental impacts.
NOW THEREFORE, BE IT
RESOLVED, that pursuant to SEQR, the Board of Trustees hereby determines
that construction of the proposed improvements to the intersection of Route gA
and North State Road will not have a significant impact upon the environment
and hereby adopts a Negative Declaration under SEQRA in accordance with the
applicable provisions of law with respect to the Amended Site Plan Application.
Fire Department Memberships
The Board thanked the new members for volunteering
Upon motion by Trustee Wilson, seconded by Trustee Zirman, the Board voted
unanimously to approve the following resolution:
BE lT RESOLVED, that the Board of Trustees of the Village of Briarcliff Manor
hereby approves the membership of Peter J. Ceravino to the Briarcliff Manor
Engine Company.
BE lT RESOLVED, that the Board of Trustees of the Village of Briarcliff Manor
hereby approves the under 18 membership of Joseph Raphael to the Briarcliff
Manor Engine Company.
Minutes
Upon motion by Trustee DeRose, seconded by Trustee Wilson, the Board voted
unanimously to approve the minutes of August 17,2016.
6
Adiournment
Upon motion by Trustee Wilson, seconded by Trustee Zirman, the Board voted
unanimously to adjourn the meeting at 9:06pm.
Respectfully Submitted By,
Christine Dennett
Village Clerk