Board of Public Works
Regular MeetingBrookfield, WI · September 13, 2021
Minutes
OFFICIAL MINUTES OF A BOARD OF PUBLIC WORKS:
Regular: Board of Public Works
Date and Time: Tuesday, September 13, 2021 at 7:00pm
Location: City Hall, 2000 N. Calhoun Road, Council Chambers
Members Present: Alderman Rick Owen-Chairman, Alderman Chris Blackburn, Alderman Scott Berg (Mayor
alt.), Alderman Mike Hallquist and Alderman Bill Carnell
Members Excused: Mayor Ponto, Alderwoman Jenna Meza
Others Present: Director of Public Works Tom Grisa, City Engineer Jeff Chase
1. Roll Call
Alderman Rick Owen noted a quorum present and called the Board of Public Works meeting to order at 9:24pm.
2. Announcements
The next regularly scheduled meeting will be held on Tuesday, October 12, 2021 at 7:00pm.
3. Minutes of the August 10, 2021 meeting
Motion by Alderman Chris Blackburn, second by Alderman Mike Hallquist to approve the minutes of the
August 10, 2021 Board of Public Works meeting. Motion carried 4-0-1. Alderman Carnell abstains.
4. Unfinished Business
a) None
5. New Business
a) Agreement with RA Smith to provide design and construction engineering for the Gebhardt Road
bridge reconstruction project
Alderman Hallquist questioned if the bridge would qualify for federal funding. Mr. Grisa responded that it does
not qualify for federal funding at this time.
Alderman Blackburn asked if this is to approve the design only and are the design standards the same from year
to year. Mr. Chase responded that much of the design would need to be redone if federal funds were used.
Mr. Grisa stated the bridge would be likely be a reconstruction.
Board of Public Works September 13, 2021 Page 1 of 2
Motion by Alderman Mike Hallquist, second by Alderman Bill Carnell to approve the agreement with RA Smith
to provide design and construction engineering for the Gebhardt Road bridge reconstruction project. Motion
carried 5-0.
b) Award of the Corporate Drive north bridge reconstruction project
Mr. Grisa advised the project came in over budget. The bidder advised if he rebids the cost would be higher
because they would not have the same materials on hand. The City would bond for the project over a 20 year
period. Mr. Chase changed his recommendation based on new information received regarding the cost.
Alderman Berg preferred the item be put on hold until all questions regarding the project have been answered
including sending to finance for discussion of funding. Mr. Chase responded the project needs to be awarded by
the Board of Public Works before the Finance Committee will review the project.
Motion by Alderman Mike Hallquist, second by Alderman Bill Carnell to approve the award of the Corporate
Drive North Bridge reconstruction project contingent upon the Council having funding. Motion carried 4-1.
Alderman Berg against.
c) Legislative referral by Alderman Meza to rename N. 186th Street between Burleigh Road and Hoffman
Avenue to Waverly Place.
Alderman Berg suggested the item be moved to the next Board meeting since the Alderman making the request
was absent.
Alderman Blackburn asked if there is a policy regarding naming streets. Mr. Grisa replied there is no policy.
Motion by Alderman Mike Hallquist, second by Alderman Bill Carnell to postpone the legislative referral by
Alderman Meza to rename N. 186th Street between Burleigh Road and Hoffman Avenue to Waverly Place.
Motion carried 5-0.
b) Adjournment
Motion by Alderman Mike Hallquist, second by Alderman Christopher Blackburn to adjourn the meeting at
9:50 pm. Motion carried 5-0.
Respectfully Submitted:
Tom Grisa
Director of Public Works
Board of Public Works September 13, 2021 Page 2 of 2
Agenda
C I T Y O F
BROOKFIELD
OFFICIAL NOTICE AND AGENDA
Notice is hereby given that a public meeting will be held on the date, time and location shown below. Upon
attaining a quorum of members, all items listed on the agenda shown below may be considered (discussed and/or
acted upon).
Regular: Board of Public Works
Date and Time: September 13, 2021 @ 7:00 pm (following Water and Sewer Board)
Location: City Hall, 2000 N. Calhoun Road, Council Chambers
Members: Rick Owen - Chairman, Chris Blackburn, Scott Berg (Mayor alt.), Mike
Hallquist, Jenna Meza, Bill Carnell (Aid. Alt.), Mayor Steven Ponto
(NUMBER OF MEMBERS NEEDED TO MEET QUORUM REQUIREMENTS: 3 OF 5)
1. ROLL CALL
2. ANNOUNCEMENTS
a. The next regularly scheduled meeting is Tuesday, October 12, 2021 @ 7:00 pm
3. MINUTES
a. Minutes of the August 10, 2021 meeting.
4. UNFINISHED BUSINESS
a. None
5. NEW BUSINESS
a. Agreement with RA Smith to provide design and construction engineering for the Gebhardt Road
bridge reconstruction project.
b. Award of the Corporate Drive north bridge reconstruction project
c. Legislative referral by Alderman Meza to rename N. 1861h Street between Burleigh Road and
Hoffman Avenue to Waverly Place
6. ADJOURNMENT
It is possible that members of and possibly a quorum of members of other governmental bodies of the
municipality may be in attendance at the above stated meeting to gather information; no action will be taken by
any governmental body at the above-stated meeting other than the governmental body specifically referred to
above in this notice.
THOMAS M. GRISA
DIRECTOR OF PUBLIC WORKS
POSTED: SEPTEMBER 10, 2021@ 2:00 PM
ANY PERSON WHO HAS A QUALIFYING D1SABILl1Y AS DEFINED BY THE AMERICANS WITH DlSABllllY ACT THAT REQUIRES THE MEETING OR MATERIALS TO BE IN
AN ACCESSIBLE LOCATION OR FORMAT, MAY CONTACT THE CITY CLERK AT {262)782-9650 OR 2000 NORTH CALHOUN ROAD, FOR ACCOMMODATIONS.
REQUESTS FOR ACCOMMODATIONS FOR MEETINGS SHOULD BE MADE ATLEAST THREE (3) BUSINESS DAYS IN ADVANCE OF THE MEETING. EVERY EFFORT WILL
BE MADE TO ARRANGE ACCOMMODATIONS FOR ALL MEETINGS.
Board of Public Works September 13, 2021 Page 1 of 1
C I T Y O F
BROOKFIELD
OFFICIAL MINUTES OF A BOARD OF PUBLIC WORKS:
Regular: Board of Public Works
Date and Time: Tuesday, August 10, 2021 at 7:00pm
Location: City Hall, 2000 N. Calhoun Road, Council Chambers
Members Present: Alderman Rick Owen-Chairman, Alderman Chris Blackburn, Alderman Scott Berg (Mayor
alt.), Alderman Mike Hallquist, Alderwoman Jenna Meza
Members Excused: Mayor Ponto
Others Present: Director of Public Works Tom Grisa, (ity Engineer Jeff Chase, Alderman Bill Carnell
1. Roll Call
Alderman Rick Owen noted a quorum present and called the Board of Public Works meeting to order at 7:22pm.
2. Announcements
The next regularly scheduled meeting will be held on Tuesday, September 14, 2021 at 7:00pm.
3. Minutes of the July 13, 2021 meeting
Motion by Alderman Chris Blockburn, second by Alderman Mike Hallquist to approve the minutes of the July
13, 2021 Board of Public Works meeting. Motion carried 5-0.
4. Unfinished Business
a) Solid Waste Collection and Disposal contract for 2022
Mr. Grisa provided updates on the changes to the contract. Exhibit A discusses the County and local
fees. Exhibit E had a typo regarding the delay on pickup trucks.
Alderman Blackburn asked about the requirement for residents to bring their trash cans down to the
road for three months. Mr. Grisa advised that the garbage collectors will go up to collect the can if not
within 25 feet of the road.
Alderman Owen clarified Mr. Grisa recommends a 7 year contract with Green for Life.
Mr. Grisa indicated there is a proposed change of service with the contract. The proposed change has
5 days of service versus the current routes that are done in 4 days of service. If the changes are
approved the residents will be notified by mail.
Motion by Alderman Scott Berg, second by Alderman Chris Blackburn to approve the Solid Waste Collection
and Disposal contract for 2022. Motion carried 5-0.
Board of Public Works August 10, 2021 Page 1 of 2
5. New Business
a) Rejection of the Woodbridge and Santa Maria Bridge Decks project SW-21-03
Alderman Hallquist asked if the Capital plan needs to be changed by putting off this project. Mr. Grisa
responded that the City may be able to use existing City crews to complete the project.
Motion by Alderman Chris Blackburn, second by Alderman Mike Hallquist to approve the rejection of bids for
the Woodbridge and Santa Maria Bridge Decks project SW-21-03. Motion carried 5-0.
b) Parking restrictions on Hoffman Avenue at Brookfield Road
Mr. Grisa stated the Community Development Department is asking the board to be aware they could consider
time of day parking restrictions so people can park there in the morning.
Motion by Alderman Mike Hallquist, second by Alderwoman Jenna Meza to approve the No parking
restrictions on Hoffman Avenue at Brookfield Road. Motion carried 5-0.
c) Parking restrictions on 186'h Street and Pleasant Street (Cottage Commons PDD)
Alderman Meza stated the yield signs are appropriate for this area.
Motion by Alderwoman Jenna Meza, second by Alderman Chris Blackburn to approve the No parking
restrictions on 1861" Street and Pleasant Street {Cottage Commons PDD}. Motion carried 5-0.
6. Adjournment
Motion by Alderman Mike Hallquist, second by Alderwoman Jenna Meza to adjourn the meeting at 8:50 pm.
Motion carried 5-0.
Respectfully Submitted:
Tom Grisa
Director of Public Works
Board of Public Works August 10, 2021 Page 2 of 2
ENGINEERING DIVISION
Theresa J. Cave11, P.E., CFM
Stormwater Project Engineer
2000 North Calhoun Road
C 0 F Brookfield, Wisconsin 53005-5095
BROOKFIELD (262) 787-3547 FAX (262) 782-1323
MEMORANDUM
To: BPW & Common Council
From: Theresa Caven, P.E., Stormwater Project Engineer
Subject: SW-21-03 Gebhardt Road Bridge
Date: August 18, 2021
Requested Action: Staff is recommending that BPW & Common Council award the design and
construction inspection of the Gebhardt Road Bridge replacement to the lowest
responsible bidder, RA Smith, in an amount, not to exceed, $86,281.
Fiscal Impact: Design Phase $ 42,707.00
Construction Phase $ 43,574.00
TOTAL $ 86,281.00
Source of Funds: CIP 61211301 703122 {Enterprise Ave. Bridge Funds) $ 80,000.00
CIP 61211301 703122 ST193 (Corporate Dr. North) $ 6,281.00
Rationale: Gebhardt Road Bridge is located on Gebhardt Rd., west of Pilgrim Parkway, and crosses over
the Dousman Ditch. The existing pre-stressed concrete bridge was c:;onstructed in 1966.
The 2020 bridge report identified numerous large spalls with exposed pre-stressed steel and
delamination in the channel girder stems at the beam ends. It is expected that the rate of
decay will continue and a full bridge replacement is the most cost-effective solution. The
replacement structure will be placed in the same general location/alignment; as such, it is
anticipated that the new bridge will be approximately the same length and width. The
proposed design will also provide an equivalent capacity.
Work History: Public Works Department has worked with RA Smith on numerous projects. They have
completed the project accurately, within budget and on-time.
Funding: Originally, the Gebhardt Rd. bridge was scheduled for design in 2022, and the Enterprise
Ave. bridge was scheduled for design in 2021. However, the Enterprise Ave. bridge may
qualify for federal funds; as such, the projects were switched. Switching the two projects
provides the City the opportunity to submit an application for funds for Enterprise Ave.
under the Wis DOT Local Bridge Improvement Assistance program.
EXHIBIT "A"
GEBHARDT ROAD BRIDGE SW-21-03
RFP Due: July 21, 2021
Budgeted: $80,000.00
RFP's SENT TO:
RA Smith Proposal Received
16745 West Bluemound Rd
Brookfield, WI 53005-5938
GRAEF Declined to Submit Proposal
275 W Wisconsin Ave Suite 300
Milwaukee, WI 53203
Ayres Associates Declined to Submit Proposal
20975 Swenson Drive, Suite 200
Waukesha, Wl 53186
Collins Engineers Declined to Submit Proposal
2033 West Howard Avenue
Milwaukee, WI 53221
Baxter & Woodman Declined to Submit Proposal
115 S 84th St #220Milwaukee
Milwaukee, WI 53214
Mead & Hunt Declined to Submit Proposal
10700 W Research Dr., Suite 155
Wauwatosa, WI 53226
2
RESOLUTION#____ OF THE CITY OF BROOl(FIELD, WISCONSIN
Committee: Board of Public Works Pub lic He aring: N/A
Committee Date: September 14, 2021 Counci l Date: September 21, 2021
Committee Recommend at ion: Counci l Act ion:
Award of Gebhardt Road Bridge Project SW-21-03
to RA Smith
WHEREAS, it is in the best interest of the City of Brookfield to award the Gebhardt Road Bridge
Project contract to RA Smith, and
WHEREAS, your Board of Public Works has consider the award the Gebhardt Road Bridge Project
to RA Smith, at its meeting held on September 14, 2021, and recommends approval thereof.
Now, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Brookfield that the
contract be awarded to RA Smith, in the amount of $86,281.00, and
BE IT FURTHER RESOLVED, that the proper city official(s) be hereby authorized and directed to
carry out the council's action (if required)
Adopted this 21th day of September, 2021.
Ap proved:
Mayor Steven V. Ponto
Attested:
City Clerk Kelly Michaels
Page 1 of 1
C I T Y O F
BROOKFIELD
PROFESSIONAL SERVICES AGREEMENT
CITY OF BROOKFIELD
GEBHARDT ROAD BRIDGE REPLACEMENT
Theresa Caven, P.E., CFM
Project Manager
J:\Projects\2021\STORM - Gebhardt Road Bridge\Consultant Contract
AGREEMENT FOR
GEBHARDT ROAD BRIDGE REPLACEMENT
This is an agreement for professional services between the City of Brookfield, a
Wisconsin municipal corporation, (hereinafter "CITY"), and raSmith (hereinafter
"PROVIDER").
1. SCOPE OF SERVICES
The services to be performed by the PROVIDER ("Project") on behalf of the CITY,
including the time of performance, are described in Exhibit A, which is attached hereto
and incorporated herein by this reference. The obligations and responsibilities of the
CITY to provide information and support to the PROVIDER are also described in Exhibit
A. Time is of the essence in the performance of all phases of this Agreement. Any other
general contract provisions that may be in the exhibits are overridden by the terms of
this Agreement.
2. COMPENSATION AND PAYMENT
The CITY agrees to pay PROVIDER an amount not to exceed $86,281 or for the
services set forth herein. Rates and fees when charged on time and expense basis shall
be those listed in Exhibit A.
PROVIDER will submit to the CITY a detailed billing invoice on or before the first day of
each month during the term of this Agreement. It shall be directed to the attention of the
Project Manager. Invoices will show the total amount being invoiced and hours of
service, nature of work, and previous invoiced amounts where applicable.
The CITY will endeavor to make payments on or after the third Friday of the month for
services provided and for billing received prior to the first day of that month. A purchase
order will be prepared and will become a part of this Agreement.
3. COMMENCEMENT OF WORK
PROVIDER shall commence the work to be performed under this Agreement upon
receipt of written authorization to proceed from the CITY.
4. COMPLETION OF WORK
PROVIDER shall complete the work to be performed under this Agreement within the
time specified in Exhibit A. If none is specified, the PROVIDER shall complete the work
within a reasonable time for the type of work involved.
Gebhardt Road Bridge Replacement 2 Revised Date: 2/2019
5. ADMINISTRATION AND NOTICE
The Project Manager, Theresa Gaven, P.E., CFM, will administer this Agreement on
behalf of the CITY. All written notices shall be sent to the attention of the Project
Manager at City Hall, 2000 North Calhoun Road, Brookfield, WI 53005.
This Agreement will be administered on behalf of the PROVIDER by: Gary Raasch,
P.E., CFM. All notices shall be directed to the attention of the PROVIDER at: 16745 W.
Bluemound Road, Brookfield, WI 53005.
6. INSURANCE
A. PROVIDER shall maintain insurance as specified below. Authorization to
commence work on the Agreement will not be given until proof of insurance
required has been submitted approved by the CITY. All insurance shall remain in
force until the work is completed and the length of time that is specified, if any, in
the Agreement or listed below, whichever is longer.
1. Commercial General Liability Insurance. The PROVIDER shall
maintain the coverage listed below with the following minimum limits:
i. Each Occurrence - $1,000,000
ii. Personal and Advertising Injury - $1,000,000
iii. General Aggregate - $2,000,000
iv. Products- Completed Operations - $2,000,000
v. Products-Completed Operations coverage shall be maintained
for two years after acceptance of completed work.
vi. If the work involves the use of or operation of any watercraft,
then Watercraft Liability insurance must be in force with a limit
of $1,000,000 per occurrence for bodily injury and property
damage.
2. Automobile Liability Insurance. The PROVIDER shall maintain
business auto coverage with a combined single limit per accident for
bodily injury and property damage for "any auto" basis - $1,000,000.
3. Worker's Compensation Insurance. The PROVIDER shall maintain
coverage as required by the State of Wisconsin and Employers
Liability Insurance with the following minimum limits:
i. $100,000 each accident
ii. $500,000 disease policy limit
iii. $100,000 disease - each employee
iv. Employer's Liability insurance limits must be sufficient to meet
umbrella liability insurance requirements.
4. Umbrella Liability Insurance. The PROVIDER shall maintain coverage
at least as broad as the underlying Commercial General Liability
Insurance, Automobile Liability, and Employers' Liability with the
following minimum limits:
i. Each Occurrence - $5,000,000
Gebhardt Road Bridge Replacement 3 Revised Date: 2/2019
ii. General Aggregate - $5,000,000
iii. The self-insured retention cannot exceed $10,000.
5. Aircraft Liability Insurance. If the work includes the use of or operation
of any aircraft or helicopter, the PROVIDER shall maintain aircraft
liability insurance with a minimum limit of $3,000,000 per occurrence
for bodily injury and property damage, including passenger liability and
liability for any slung cargo.
6. Unmanned Aircraft Liability Insurance. If the work includes the use of
or operation of any unmanned aircraft, the PROVIDER shall carry
unmanned aircraft liability insurance with a minimum limit of
$1,000,000 per occurrence for bodily injury liability, property damage
liability, and invasion of privacy liability.
7. Professional Liability Insurance. In addition to the other coverages set
forth herein, if the work includes the services of an accountant,
advertising agency, architect, consultant, engineer, financial advisor,
graphic designer, information technology consultant, insurance
professional, investment advisor, legal advisor, management
consultant, medical professional, public relations firm, real estate agent
or broker, software developer, or other professional, the PROVIDER
shall maintain the coverage below with following minimum limits:
1. $1,000,000 each claim
ii. $1,000,000 annual aggregate
iii. Must continue coverage for two (2) years after final acceptance
of work.
8. Cyber Risk/Privacy Insurance. If the work includes electronic data
transfer of protected health information, as defined in 45 CFR 160.103,
or personal identifying information, as defined in Wis. Stat. Sec.
943.201(1)(b), the PROVIDER shall carry cyber risk/privacy insurance
with a minimum limit of $3,000,000 per occurrence that includes
coverage for liability incurred from alleged or actual theft,
dissemination, and/or use of personal or confidential information and
any related forensic costs, crisis management costs, investigation
costs; (ii) network security liability arising from the unauthorized access
to, use of, or tampering with computer systems, including hacker
attacks or inability of an authorized third party to gain access to
services, including denial of service, unless caused by a mechanical or
electrical failure; (iii) liability arising from the introduction of a computer
virus into, or otherwise causing damage to, a customer's or third
person's computer, computer system, network, or similar computer
related property and the data, software, and programs thereon; (iv) any
government investigations resulting from the alleged or actual
Gebhardt Road Bridge Replacement 4 Revised Date: 2/2019
disclosure of personal or confidential information or network security
liability event; and (v) non physical business interruption.
B. For All Insurance:
1. All insurance must be primary and non-contributory to any insurance or
self-insurance carried by the CITY. Proof of such shall be provided to the
CITY.
2. Insurance is to be placed with insurers who have an A.M. Best rating of no
less than A- and a financial size category of no less than Class VII, and
who are authorized as an admitted insurance company in the State of
Wisconsin.
3. The following must be named as additional insureds on all liability policies,
except for worker's compensation and errors and omission insurance:
"The City of Brookfield, its elected and appointed officials, officers,
employees, authorized representatives, and authorized volunteers."
Endorsements evidencing such additional insured coverage shall be
provided to the CITY. For commercial general liability insurance, form
CG 20 10 07 04 for ongoing operations and form CG 20 37 07 04 for
products completed operations hazard, or forms containing language with
equivalent coverage, shall be endorsed to the policy on the CITY's behalf
and shall be provided to the CITY.
4. Waivers of Subrogation in favor of CITY must be endorsed on the
PROVIDER'S coverages for all insurance required and provided to the
CITY.
5. Any deductible or self-insured retention shall be declared to CITY.
6. Prior to the CITY'S execution of the Agreement, the PROVIDER shall file
with the CITY a certificate of insurance (ACORD form or equivalent for all
coverages) signed by the insurer's representative evidencing the coverage
required by this Agreement. If any of the policies required above expire
while this Agreement is still in effect, PROVIDER shall provide renewal
certificate(s) to the CITY for approval.
7. All insurance, except for professional errors and omissions, shall be
written on an occurrence basis.
8. All insurance policies shall be endorsed to provide the CITY with 30 days
notice of cancellation of insurance and 10 days notice of non-renewal.
Such endorsements shall be provided to the CITY prior to the CITY'S
execution of the Agreement.
9. The CITY reserves the right to request a certified copy of any insurance
policy required of the PROVIDER under this Agreement.
7. INDEMNIFICATION AND HOLD HARMLESS
A. To the fullest extent allowable by law, PROVIDER hereby indemnifies and
shall defend and hold harmless ("Indemnity Provision") the CITY, its elected
and appointed officials, officers, employees, authorized representatives, and
authorized volunteers and each of them from and against any and all suits,
Gebhardt Road Bridge Replacement 5 Revised Date: 2/2019
actions, legal or administrative proceedings, claims demands, damages,
liabilities, interest, attorneys' fees, costs, and expenses of whatsoever kind or
nature whether arising before, during, or after completion of the work
hereunder and in any manner directly or indirectly caused, occasioned, or
contributed to in whole or in part or claimed to be caused, occasioned, or
contributed to in whole or in part, by reason of any act, omission, fault, or
negligence, whether active or passive, of PROVIDER or of anyone acting
under its direction or control or on its behalf in connection with or incident to
the performance of this Agreement. PROVIDER'S aforesaid indemnity and
hold harmless agreement shall not be applicable to any liability caused by the
sole fault, sole negligence, or willful misconduct of the CITY, its elected and
appointed officials, officers, employees or authorized representatives, or
authorized volunteers. This Indemnity provision shall survive the termination
or expiration of this Agreement.
In any and all claims against the CITY, its elected and appointed officials,
officers, employees or authorized representatives, or authorized volunteers by
an employee of PROVIDER, any subcontractor, or anyone for whose acts any
of them may be liable, the indemnification obligation under this paragraph
shall not be limited in any way by any limitation on the amount or type of
damages, compensation, or benefits payable by or for the PROVIDER or any
subcontractor under worker's compensation, disability benefit, or other
employee benefit laws.
No part of this Indemnity Provision shall give rise to any duties not otherwise
provided for by this Agreement or by operation of law. No part of this
Indemnity Provision shall be construed to negate, abridge, or otherwise
reduce any other right or obligation of indemnity that would otherwise exist as
to the CITY, its elected and appointed officials, officers, employees,
authorized representatives, or authorized volunteers under this Agreement or
any other contract. This clause is to be read in conjunction with all other
indemnity provisions contained in this Agreement. Any conflict or ambiguity
arising between any indemnity provisions in this Agreement shall be
construed in favor of indemnified parties except when such interpretation
would violate the laws of Wisconsin.
PROVIDER shall reimburse the CITY, its elected and appointed officials,
officers, employees, authorized representatives, and authorized volunteers for
any and all legal expenses and costs incurred by each of them in connection
therewith or in enforcing the indemnity herein provided. PROVIDER'S
obligation to indemnify shall not be restricted to insurance proceeds, if any
received by the CITY, its elected and appointed officials, officers, employees,
authorized representatives, or authorized volunteers.
B. CITY agrees to indemnify, defend, and hold harmless PROVIDER and its
subcontractors, consultants, agents, directors, and employees from and
against all claims, suits, damages, and losses, including, but not limited to,
Gebhardt Road Bridge Replacement 6 Revised Date: 2/2019
those claims, suits, damages, or losses caused or arising out of, relating to, or
based upon the sole fault, sole negligence, or willful misconduct conduct of
CITY in connection with or incident to the performance of this Agreement.
C. Nothing contained within this AGREEMENT is intended to be a waiver or
estoppel of the CITY or its insurer to rely upon the limitations, defenses, and
immunities contained within Wisconsin Statutes Sections 893.80 and 345.05.
To the extent that indemnification is available and enforceable, the CITY or its
insurer shall not be liable in indemnity, contribution, or otherwise for an
amount greater than the limits of liability for municipal claims established by
Wisconsin law.
8. INDEPENDENT CONTRACTOR
A. It is agreed that PROVIDER at all times shall be considered an independent
contractor in the performance of its duties under this Agreement and its
employees and agents shall not be considered employees of the CITY for any
purpose whatsoever.
B. The CITY agrees that the PROVIDER shall have sole control of the method,
hours worked, and time and manner of any performance under this
Agreement other than as specifically provided herein. For work occurring on
CITY or public property, the CITY reserves the right to inspect the job site or
premises for the purpose of insuring that the performance is progressing or
has been completed in compliance with the Agreement. The CITY takes no
responsibility for supervision or direction of the performance of the Agreement
to be performed by the PROVIDER or the PROVIDER'S employees or
agents. The CITY further agrees that it will exercise no control over the
selection, dismissal, or management of the PROVIDER'S employees,
consultants, directors, or agents.
9. ASSIGNMENT AND SUBCONTRACTING
A. Subcontracting or assignment by PROVIDER of any portion of the services
described in this Agreement without the express written approval of the
Common Council is prohibited. If the Project Manager does approve
subcontracting or assignment, the subcontractor or assignee shall be subject
to the same insurance requirements as PROVIDER as outlined in Section 6
of this Agreement and shall not commence any work until the CITY has
reviewed and approved its insurance.
B. Nothing under this Agreement shall be construed to give any rights or benefits
in this Agreement to anyone other than the CITY and the PROVIDER, and all
duties and responsibilities undertaken pursuant to this Agreement will be for
the sole and exclusive benefit of the CITY and the PROVIDER and not for the
benefit of any other party.
Gebhardt Road Bridge Replacement 7 Revised Date: 2/2019
10. LICENSES AND PERMITS
PROVIDER shall be responsible for obtaining any licenses or permits required to
perform its obligations under this Agreement.
11. RECORDS
PROVIDER shall keep all of its records arising out of this Agreement for a period of
seven (7) years after receipt of the final payment under this Agreement and shall
provide any such records to the CITY at the CITY's request. PROVIDER understands
that such records may constitute public records subject to disclosure under the
provisions of Wisconsin law relating to public records, Wis. Stats. §§19.31-19.39 and
any successor statutes and regulations.
12. OWNERSHIP OF DOCUMENTS
All of the reports, information, data, diagrams, plans, etc. (hereinafter "Work Product"),
whether they are finished or unfinished, prepared or assembled by the PROVIDER
under this Agreement are the property of the CITY. The PROVIDER agrees that the
Work Product shall not be made available to any individual or organization without the
prior written approval of the CITY, unless such disclosure is required by law.
PROVIDER hereby assigns to the CITY any and all copyrights in and to the Work
Product. The PROVIDER agrees to limit the use of any reports, information, data,
diagrams, plans, etc., supplied by the CITY to the services being provided under the
terms of this Agreement. In addition, the PROVIDER will not copy or alter the data in
any way.
13. PRESS RELEASES
The PROVIDER may not issue press releases or provide information to any third party
regarding the Project without the prior written approval of the CITY, except as required
by federal or state regulations, or court order.
14. SITE ACCESS; DATA
A. Unless the Scope of Work provides otherwise, the CITY shall obtain or
provide reasonable access for the PROVIDER to the project site, if
applicable, when necessary and at any reasonable time requested.
B. The CITY shall attempt to provide the PROVIDER with all relevant data and
information in its possession regarding the project site. However, in providing
such data and information, the CITY or the PROVIDER assumes no
responsibility for its accuracy, reliability, or completeness.
Gebhardt Road Bridge Replacement 8 Revised Date: 2/2019
15. STANDARD OF PERFORMANCE
The PROVIDER'S services shall be performed with the usual thoroughness, skill and
competence of the consulting profession, in accordance with the standard for
professional services prevailing at the time those services are rendered.
16. ERRORS AND OMISSIONS
The PROVIDER shall be responsible for the accuracy of its work performed under the
Agreement and shall promptly make necessary revisions or corrections resulting from
its negligent acts, errors or omissions without additional compensation.
17. DISCLOSURE AND CONFLICT OF INTEREST
A. The PROVIDER warrants it has no public or private interest, and shall not
knowingly acquire directly or indirectly any such interest, which would conflict in
any manner with its performance under the Agreement.
B. The PROVIDER shall not employ any person employed by the CITY for any work
included under the provisions of this Agreement.
C. If the Agreement is discovered to be in violation in Wis. Stat. Sec. 946.13, this
Agreement is voidable by the CITY.
18. APPLICABLE LAW AND VENUE.
This Agreement shall be governed in all respects, whether as to validity, construction,
capacity, performance, or otherwise, by the laws of the State of Wisconsin, the
ordinances of the City of Brookfield, the rules and regulations of the CITY, and any
codes, specifications, or requirements related to the performance of the work under this
Agreement. Any suit, proceeding, or other action arising out of or related to this
Agreement shall be commenced and maintained only in a court of competent
jurisdiction in the state court located in Waukesha County, Wisconsin or federal court
located in Milwaukee County, Wisconsin. Each party irrevocably consents to submit to
the exclusive jurisdiction of such courts.
19. SOLE AGREEMENT
This document contains the entire agreement between the parties. Any previous
communications or agreements pertaining to the subject matter of this Agreement are
hereby superseded. The Agreement may not be modified except by a written agreement
signed by the duly authorized agents of the CITY and the PROVIDER. In the event of a
conflict between this Agreement and any Exhibit, the terms of this document shall
control.
Gebhardt Road Bridge Replacement 9 Revised Date: 2/2019
20. FORCE MAJEURE
No party shall be responsible to the other party for any resulting losses and it shall not
be a default of this Agreement if the fulfillment of any of the terms of this Agreement is
delayed or prevented by revolutions or other civil disorders, wars, acts of enemies,
strikes, fires, floods, acts of God, unusual adverse weather conditions, or by any other
cause not within the control of the party whose performance was interfered with and
which by the exercise of reasonable diligence such party is unable to prevent, whether
of the class of enumerate causes or not, and the time for performance shall be
extended by the period of delay occasioned by any such cause. Upon the occurrence
of a force majeure, written notice to the other party shall be given as herein provided. If
the period of non-performance exceeds thirty (30) days from the receipt of the notice,
the party whose ability to perform has not been so affected may, by written notice,
terminate this Agreement without penalty.
21. NO WAIVER OF CONDITIONS
The failure of either party to insist on strict performance of this Agreement does not
constitute a waiver of any of the provisions of this Agreement or a waiver of any default
of the other party.
22. TERMINATION
A. Termination for Convenience of the CITY. This Agreement may be terminated by
the CITY, in whole or in part, without penalty, in its sole discretion, with or without
cause, upon 10 days written notice to the PROVIDER. Notice of termination shall
be delivered to PROVIDER by either personal delivery or by certified mail, return
receipt requested. In the event of termination, the PROVIDER shall be paid in full
for any services performed satisfactorily to the date of that termination.
B. Termination for Cause. If, through any cause, the PROVIDER shall fail to fulfill in
a timely and proper manner its obligations under this Agreement or if the
PROVIDER shall violate any of the covenants, agreements, or stipulations of the
Agreement, the CITY shall have the right to terminate this Agreement by giving
written notice to PROVIDER of such termination and specifying the effective date
thereof, at least five (5) days before the effective date of such termination. The
PROVIDER shall be entitled to payment for any services performed satisfactorily
to the date of termination; however, the PROVIDER shall not be relieved of
liability to the CITY for damages sustained by the CITY, and CITY may withhold
any payments to the PROVIDER for the purpose of setoff until such time as the
exact amount of damages due to the CITY from the PROVIDER is determined.
C. Upon actual receipt of the notice of termination or three days after the notice of
termination was sent via certified mail, return receipt requested, whichever event
occurs earlier, the PROVIDER shall promptly discontinue all affected work
(unless the notice of termination directs otherwise), and deliver or otherwise
make available to the CITY all data, drawings, specifications, reports, estimates,
Gebhardt Road Bridge Replacement 10 Revised Date: 2/2019
summaries, and such other information and materials as may have been
accumulated by the PROVIDER in performing this Agreement, whether
completed or in progress.
23. DEFAULT
A. The occurrence of any of the following shall constitute a default ("Default") by
PROVIDER.
1. PROVIDER'S failure to adequately and timely perform or deliver the
required services;
2. PROVIDER becomes insolvent or does not or cannot pay or admits in
writing to its inability to pay its debts as they mature;
3. PROVIDER makes an assignment for the benefit of creditors or to an
agent authorized to liquidate any substantial amount of assets;
4. PROVIDER becomes the subject of an "order for relief" within the meaning
of the United States Bankruptcy Code or files a petition in bankruptcy, for
reorganization, or to affect a plan or other arrangement with creditors;
5. PROVIDER has a petition or application filed against it in bankruptcy or
any similar proceeding or has such a proceeding commenced against it,
and such petition, application, or proceeding shall remain undismissed for
a period of ninety (90) days or the PROVIDER files an answer to such
petition or application, admitting the material allegations thereof;
6. PROVIDER applies to a court for the appointment of a receiver or
custodian for any of its assets or properties or has a receiver or custodian
appointed for any of its assets or properties, with or without consent, and
such receiver shall not be discharged within ninety (90) days after his
appointment;
7. PROVIDER adopts a plan of complete liquidation of its asset;
8. PROVIDER makes a material misrepresentation to CITY;
9. PROVIDER fails to perform any material provision of this Agreement.
B. The occurrence of any of the following shall constitute a default by CITY:
1. CITY makes a material misrepresentation to PROVIDER;
2. CITY fails to perform any material provision of this Agreement.
24. REMEDIES
A. Upon a Default by PROVIDER, the CITY shall have the following rights and
remedies, which shall be cumulative to the fullest extent permitted by law:
1. Bring an action for specific performance;
2. Terminate this agreement upon notice to PROVIDER, whereupon the
PROVIDER and CITY shall have no further rights, obligations, or liabilities
hereunder, except for those agreements, which by their terms, expressly
survive termination of this Agreement; and/or
3. Bring an action for money damages.
Gebhardt Road Bridge Replacement 11 Revised Date: 2/2019
B. Upon a Default by CITY, the PROVIDER shall have the following rights and
remedies, which shall be cumulative to the fullest extent permitted by law:
1. Terminate this agreement upon notice to CITY, whereupon the
PROVIDER and CITY shall have no further rights, obligations, or liabilities
hereunder, except for those agreements, which by their terms, expressly
survive termination of this Agreement; and/or
2. Bring an action for money damages.
C. Neither party shall be liable to the other for consequential, indirect, incidental,
or exemplary damages, whether based on contract, negligence, strict liability,
or otherwise. In any action to enforce this Agreement, the prevailing party
shall be entitled to its costs, including statutory attorney's fees.
25. SEVERABILITY
The provisions of this Agreement are severable and if a court of competent jurisdiction
holds any portion of this Agreement unconstitutional or invalid, the remainder of this
Agreement shall not be affected and shall remain in full force and effect.
26. INTERPRETATION
Unless the context requires otherwise, all words used in this Agreement in the singular
number shall extend to and include the plural, all words in the plural number shall
extend to and include the singular, and all words in any gender shall extend to and
include all genders.
27. CONSTRUCTION
Each party and its counsel have had the opportunity to review and revise this
Agreement. The normal rule of construction to the effect that any ambiguities are to be
resolved against the drafting party shall not be employed in the interpretation of this
Agreement or any amendments or exhibits hereto.
28. SURVIVAL
These general terms and conditions shall survive the completion of the services under
this AGREEMENT and the termination of this AGREEMENT for any cause.
29. SUCCESSORS AND ASSIGNS
The CITY and the PROVIDER each bind themselves, their partners, successors,
assigns, and legal representatives to the other party to this Agreement and to the
partners, successors, assigns, and legal representatives of the other party with respect
to all covenants of this Agreement.
Gebhardt Road Bridge Replacement 12 Revised Date: 2/2019
30. TITLES
The headings or titles of sections of this Agreement are used for convenience and ease
of reference and are not intended to limit the scope or intent of the sections.
31. AMENDMENT OF AGREEMENT
This Agreement may be amended, supplemented, or modified at any time, but only by a
written instrument duly executed by the CITY and PROVIDER.
IN WITNESS HERETO, THE DULY AUTHORIZED AGENTS OF THE PARTIES AFFIX
THEIR SIGNATURES.
PROVIDER:
By:
Gary Raasch, P.E., CFM
Title: Date: _________, 2021
By:
(NAME)
Title: Date: ________, 2021
CITY:
By: Date: _________, 2021
Steven V. Ponto, Mayor
By: Date: ________ , 2021
Kelly Michaels, City Clerk
COUNTERSIGNED: funds necessary to pay the liabilities of this contract have been
provided. §62.09(1 O)(f), Wis. Stats.
By: Date: __________, 2021
Robert Scott, Director of Finance
Gebhardt Road Bridge Replacement 13 Revised Date: 2/2019
r Smith
EXHIBIT A
Project Understanding
We understand that the City of Brookfield intends to reconstruct the Gebhardt Road bridge (P-67-731)
over the Dousman Ditch. The existing bridge was constructed in 1966, and the deterioration indicates full
bridge replacement is the most cost-effective solution. The replacement structure will be in the same
general location and alignment, and approximately the same length and width. The City anticipates a road
closure to facilitate the bridge reconstruction in 2022.
The City of Brookfield will obtain all required permits from the Wisconsin Department of Natural
Resources (WDNR). The City will also prepare the final bid documents, advertise for bids, and evaluate
the bids, along with selecting a contractor and awarding the contract.
Project Approach
Initial Tasks
raSmith will begin the design process with data gathering and coordination with the City. We will perform
a field survey of topography, waterway, Diggers Hotline marked utilities, structures, roadway, and trees
with a six inch and larger diameter within the area between the centerlines of Pilgrim Parkway East and
Pilgrim Parkway West, and approximately 40 feet upstream and downstream of the bridge.
We will also engage our geotechnical subconsultant, ECS Midwest, LLC, to perform subsurface
investigations as soon as we are authorized. We anticipate conducting two borings, each approximately
60 feet deep, working from the roadway. The investigation includes visual classification of the samples,
basic index laboratory testing, and a report documenting the field exploration and testing, and providing
design recommendations for structure foundation, and general geotechnical-related design information.
Roadway
The RFP indicates a preference to maintain the existing 44-foot bridge width. The existing Gebhardt Road
typical section across the bridge includes a wide shoulder adjacent to the westbound lanes acting as a
bicycle/pedestrian accommodation, and a tapered eastbound approach to the Pilgrim Parkway signalized
intersection. We will review the existing traffic count data to determine the most appropriate eastbound
lane geometry at the signalized intersection and follow Facilities Development Manual (FDM) guidance
regarding turn-lane widths and tapers. We will refer to the WisDOT Bicycle Design Manual as we weigh
various options for the westbound bicycle accommodations that will best match the existing designated
bicycle lane west of Pilgrim Parkway. The preferred design will provide a balance of providing safe,
efficient operations for vehicular and bicycle traffic while not reflecting an overdesigned bridge.
Consideration may be given to widen the bridge slightly to a 45-foot width. This would allow an 8-foot
raised bicycle/pedestrian accommodation, 11-foot westbound lane, 11-foot eastbound shared through/left
turn lane, 11-foot eastbound right-turn lane, and 2-foot shy distances on each side of the travel lanes. If
current traffic volumes are shown to not warrant the eastbound shared through/left and exclusive right
turn lane, the bridge could be initially striped as a two-lane facility, as it is today. In the future, if the
Gebhardt/Pilgrim intersection is improved, the bridge infrastructure would be set up to allow for two
eastbound approach lanes (shared through-left/exclusive right, or exclusive left/shared through-right).
Hydraulics
Dousman Ditch at the Gebhardt Road crossing has a mapped regulatory floodplain. We will obtain the
regulatory floodplain hydraulic model and perform a hydraulic design analysis consistent with City of
Brookfield and WDNR floodplain zoning requirements. Based on the regulatory flood elevations, the
existing bridge is not over topped during a regional flood event, as shown in the following cross section.
The analysis will verify that the proposed replacement structure would not increase the flood elevations
for the 1 % annual chance, 100-year recurrence interval flood event. Current regulatory flood flows will be
evaluated, and the results of the hydraulic analysis will be documented in a report.
A Letter of Map Revision (LOMR) should be submitted to FEMA within six months of construction to
comply with the City's floodplain ordinance. As an additional service, raSmith would complete an as-built
record survey, prepare the LOMR application documents, and submit to WDNR and FEMA for their
approval. We will coordinate with the agencies during their review and address any review comments.
1
r Smith
Structural
We have reviewed the project scope, researched available information for the site and existing bridge,
and considered how to best serve the City on this project. Based on our understanding of the project, we
feel the structure replacement design must achieve the following objectives:
Meet applicable WisDOT FDM and BOS design standards for service life, load capacity, detailing, and
bridge geometry.
• Avoid increases in the floodplain elevations.
• Minimize right-of-way impacts and construction costs.
• Provide in-stream aquatic organism passage.
• Provide safe and efficient conveyance for pedestrian and bicycle traffic.
• Maintain roadway horizontal alignment and minimize vertical profile adjustments.
Considering the above objectives, the preliminary structure design of the bridge replacement will include
an alternatives analysis to determine the best design solution for the replacement structure. We will
evaluate various superstructure types and span lengths as part of this analysis. Superstructure types to
be evaluated include concrete flat slab and prestressed concrete girder. Each structure span length
configuration considered will be based on the hydraulic capacity needed to convey the required design
flow without increasing the floodplain elevations. For the substructure, we will evaluate pile foundations
including reuse of the existing piles. Reusing the existing piles in the replacement structure would offer
the City significant savings in construction with upwards of $40,000 in potential savings.
Development of the preliminary structure design alternatives will include coordination with the other
design disciplines including survey, geotechnical, hydraulic, and roadway design. The evaluation criteria
for the replacement structure will include estimated construction cost, utility and right-of-way impacts,
roadway vertical profile changes, constructibility constraints, and conveyance of pedestrian and bicycle
traffic. We will provide the City with a summary of the various design alternatives for review, which will
include structure type, size, layout, and an estimated construction cost. Final design will commence once
a preferred design alternative is selected.
As the structure design progresses, various other design challenges will be addressed. Utilities will need
to be coordinated and those in conflict relocated. This includes evaluation of overhead lines within the
vicinity of the bridge and utilities attached to the underside of the existing bridge. Removal of the existing
structure will need to minimize impacts to the waterway while maintaining the stream flow. This can be
accomplished by constructing the proposed abutments behind the existing abutment and using the
existing abutments as a temporary channel. The installation of any piling and sheeting will need to
consider vibrational impacts to adjacent buildings.
The structural design and plans will be prepared in accordance with the AASHTO LRFD Design
Specifications, the WisDOT BOS Bridge Manual, WisDOT Standard Specifications, and applicable City of
Brookfield standards. The preliminary structure design submittal will include general plan, cross-section,
and subsurface sheets. The final structure design submittal will include final structure plans, design
calculations, bid item quantities, and any special provisions necessary for work not covered by the
standard specification. Estimated construction costs for the replacement structure will also be prepared
during the preliminary and final design submittals.
2
aSmith
Project Schedule
Consistent with the City's request, raSmith proposes to complete the design for this project within 23
weeks of authorization to proceed, assumed to be August 17, 2021. The project is proposed to be
competed according to the following schedule:
-- -
-- - - -
Task Milestone Completion Date
Design Survey September 21, 2021
Geotechnical Investigation September 28, 2021
Concept Plan & Alternatives September 21, 2021
Hydraulic Analysis October 6, 2021
Utility Coordination December 28, 2021
Draft Plans December 7, 2021
Final Plans & Bid Documents January 25, 2022
Bidding February 2022
Construction Start March 2022
Construction Completion July 2022
3
raSmith
Fee Proposal
Hours bv Staff
Senior
Project Structural Structural Roadway Hydraulic Survey Construction Construction Total Staff Total
Phase/Task Manaaer Enaineer Enaineer Enaineer Enaineer Survevor Crew Technician Enoineer Technician Hours Cost Exoenses Cost
Billina Rate: $ 172 $ 160 $ 125 $ 145 $ 120 $ 150 $ 210 $ 120 $ 144 $ 115
Design Phase
Project Coordination 16 16 $2,752 $2,752
Geotechnical Investigation & 1 $172 $4,999 $5,171
1
Report
Project Area Survey 1 4 6 6 17 $2,752 $2,752
Utility Coordination 12 4 16 $2,644 $2,644
Bridge Design Alternatives 4 4 8 4 20 $2,908 $2,908
Preliminary Bridge Design 2 8 32 8 50 $6,784 $6,784
Hydraulic Analysis 2 16 18 $2,264 $2,264
Final Design Drawings 4 16 64 10 94 $12,698 $12,698
Construction Cost Estimate 1 2 8 11 $1,492 $1,492
Specifications 4 8 2 14 $2,258 $2,258
Bidding Assistance 2 4 6 $984 $984
Design Subtotal 49 42 112 28 16 4 6 6 0 0 263 $37,708 $4,999 $42,707
Construction Phase $100 $100
Precon Meeting 2 2 4 $518 $518
Pay Requests and Change 4 16 20 $2,416 $2,416
Orders
Site Visits/ Admin / Closeout 4 8 12 $1,840 $1,840
Structure Removal 60 60 $6,900 $6,900
Piles and Foundation walls 4 100 104 $12,076 $12,076
with Steel
Deck Pour and Steel 4 60 64 $7,476 $7,476
Backfill/ Base/ Shouldering 2 56 58 $6,728 $6,728
Paving/ Striping 10 10 $1,150 $1,150
Misc. Items 10 10 $1,150 $1,150
Restoration 16 16 $1,840 $1,840
Record Drawings 12 12 $1,380 $1,380
Construction Subtotal 4 0 0 0 0 0 0 0 24 342 370 $43,474 $100 $43,574
Project Total 53 42 112 28 16 4 6 6 24 342 633 $81,182 $5,099 $86,281
4
ENGINEERING DIVISION
Theresa J. Caven, P.E., CFM
Stormwater Project Engineer
2000 North Calhoun Road
C T y 0 F Brookfield, Wisconsin 53005-5095
BROOKFIELD (262) 787-3547 FAX (262) 782-1323
MEMORANDUM
To: BPW & Common Council
From: Theresa Caven, P.E., Stormwater Project Engineer
Subject: SW-21-02 Corporate Dr. North Bridge
Date: September 9, 2021
Requested Action: Staff is recommending that BPW & Common Council reject the bids for the
Corporate Dr. Bridge Replacement Project.
Fiscal Impact: Project Estimate: $367,000
Lowest Bid: $426,083
Source of Funds: CIP 61211301 703122 ST193 Balance $ 334,458.66
Gebhardt Road Bridge Design 6,281.00
$ 328,177.66
Rationale: The work is known officially as "Corporate Drive Bridge North Bridge Project No. SW-21-02"
and was to consist of furnishing labor, equipment, materials and all work necessary in the
construction of the following items of work: The removal of an existing bridge to be
replaced with 44 L.F. of 60" RCP storm sewer, installation of 90 L.F. of headwall/retaining
wall, grading, roadway restoration, erosion control, traffic control and landscape
restoration.
The bridge on Corporate Drive North over the ponds needs to be replaced because of
numerous spots of delamination, spalls, exposed steel, stem cracks and corrosion.
It is well known that material prices are at historic highs, with worker and material
availability being at record lows. Staff recommends rejection of the bids as the funds
are lacking. Staff also recommends the rebidding of the project at a later date, after the
design and contract documents have been reviewed for potential ways to reduce the
overall project cost.
EXHIBIT "A"
CORPORATE DR NORTH BRIDGE PROJECT NO. SW-21-02
Bid Opening Date: September 9, 2021
Engineer's Estimate: $367,000.00
Bid Tabulation:
CONTRACTOR BID
1. C.W. Purpero, Inc. $ 426,083.00
2. Lalonde Contractors, Inc. $ 651,380.00
RESOLUTION # ____ OF THE CITY OF BROOKFIELD, WISCONSIN
Committee: Board of Public Works Pub lic Hearing : N/A
Committee Date: September 14, 2021 Council Date: September 21, 2021
Committee Recommendation: Council A ction:
Rejection of Bids for the Corporate Dr. North Bridge
Project SW-21-02
WHEREAS, it is in the best interest of the City of Brookfield to reject the bids for the Corporate
Driv e North Bridge Project contract, and
WHEREAS, your Board of Public Works has consider the rejection of bids for the Corporate Drive
North Bridge, at its meeting held on September 14, 2021, and recommends rejection thereof.
Now, THEREFORE, BE IT RESOLVED, by the Common Council of the City of Brookfield that the
contract not be awarded at this time, and
BE IT FURTHER RESOLVED, that the proper city official(s) be hereby authorized and directed to
carry out the council's action (if required)
Adopted this 21th day of September, 2021.
Approved:
Mayor Steven V. Ponto
Attested:
City Clerk Kelly Michaels
Page 1 of 1
BROOKFIELD
MEMORANDUM:
To: BOARD OF PUBLIC WORKS
From: JEFFREY M. CHASE, P.E., CITY ENGINEER
Date: SEPTEMBER 9, 2021
Topic: REQUEST TO RENAME 186TH STREET TO WAVERLY PLACE
Attached is a legislative referral from Alderman Meza to change the name of N. 186 1h Street
between Hoffman Avenue and Burleigh Road to Waverly Place. It is staff understanding that
the Common Council can change a street name by Resolution, declaring the new name and
limits, and directing staff to take such administrative actions as are necessary to implement
same.
In addition to fabricating and installing new street name signs, there are a number of
administrative tasks that would be necessitated by the name change. Most of the tasks are
associated with the change of address that would result for each parcel of record on the street.
Many of the City's information systems and data records are tied to parcel addresses and
therefore would have to be updated or cross-referenced. I have attached a memo from my staff
that identifies these tasks and the estimated staff time to do so. While we have not quantified
these tasks to any great detail, it would appear to be in excess of 400 hours of time with an
associated cost in the lO's of thousands of dollars.
There are a number of outside agencies that would have to update their systems as well,
including Waukesha County Dispatch, Waukesha County Land Information System, Elmbrook
School District, the US Postal Service, WE Energies Electric and Gas, Spectrum, AT&T and
possibly others.
The Board may want to consider that there is a potential risk that one of these record updates
is overlooked or not completed in a timely fashion. The consequences for such an omission
range from very bad in the case of the County 911 Dispatch to minimal. For this reason, staff
generally does not honor individual requests for an address change. Accordingly staff
recommends against changing the street name of N. 135th Street between Hoffman Avenue and
Burleigh Road to Waverly Place.
City of Brookfield I Engineering Department I 2000 North Calhoun Road I Brookfield WI 53005
Page 1 of 1
Template Rev: May 2021
Tom Grisa
From: Jenna Meza
Sent: Monday, August 9, 2021 11 :33 AM
To: Tom Grisa; Kelly Michaels; Michael Jurken; Steven Ponto; Rick Owen
Subject: Proposal to change street name
Good morning,
I'm writing to request a referral to the public Works committee. My constituents wish to change the street name
of 'N 186th" between Hoffman Ave. and Burleigh rd. Currently there are 13 home owners that reside between
3025 N 186th to 3095 N 186th street. Six of these thirteen addresses reside in a condominium community
which has current values that well exceed $500,000 per home.
All thirteen homeowners have been surveyed about changing the street name. 12 out 13 residents have agreed
that they prefer the name "Waverly Place" to "N 186th st" for their street address. In addition the developers
who are adding residents to this street strongly support a new name to reflect the added value to this area.
These future developments have already been approved. I am making this request now to save staff time by
accomplishing this name change prior to future home construction.
The current residents and developers feel that the value of their homes would increase because they no longer
have a block and grid street name. I agree this will add value to the village area as a whole.
Thank you for your consideration of this matter.
Best regards,
Je1maMeza
Get Outlook for iOS
1
C I T Y O F
BROOKFIELD
MEMORANDUM/ STAFF REPORT:
To: JEFF CHASE P.E. CITY ENGINEER, ENGINEERING
From: JOE TEW P .l.5. ENGINEERING TECHNICIAN, ENGINEERING
Date: 2021/09/09
Topic: IN THE MATIER OF THE CHANGE OF ROAD NAME REQUEST FOR N 186'" STREET
BETWEEN HOFFMAN AVE AND W. BURLEIGH ROAD
RE: in the matter of the Change of Road Name request
Subsequent to the road name change of N 186'h street from Hoffman Ave to W. Burleigh Rd request
submitted to the Legislative and Licensing Committee and the request for a report on the system and
records modification that would result from such executed modification, the following report details the
system modification including all departments within the City along with an approximation of the
number of FTE hours required to substantiate the modification. Analysis of the modification to the road
name was completed by interviewing key staff in each department and requesting which components of
records, plans and studies, data, service and software that would be impacted by a change of name to
roadways. Some departments were left out (Accounting and Treasury) as the modifications to the data
will account for less than an hour for less than 20 parcels. Following the city departments' information
is a summary of possible residence requirements that will occur with the update.
Assessors Department modifications
Assessment tax files
Surveys
Legal descriptions
Physical descriptions and notes
Assessment Tax databases rolls
8 hours FTE
Building and Zoning inspection modifications
Individual permit records and property files
Munis database updates
Sign database
Well database
Building plans and surveys plan records
8 hours FTE
City of Brookfield I Department I 2000 North Calhoun Road I Brookfield WI 53005 I Page 1 of4
Template Rev: May 2021
Clerks and Legal modifications
Re-register of voters
Pet license and notifications
Deeds and Easement locations
Voting letters and state system registration
Aldermanic maps and other political division maps
24 hours FTE
Community Development modifications
File folder by address
Development agreements
Land Division Docs
Conceptual Plans
Neighborhood plans and noticing for amendment
Comprehensive plans and noticing for amendment
POD Zoning and ordinances and noticing for amendment
Zoning Map and noticing for amendment
Land Use Map and noticing for amendment
TIAs
Marketing materials
120 hours HE
Engineering and Public Works Modifications
Road, Water, Storm Sewer, and Sewer Plans
Road, Water, Storm Sewer, and Sewer asbuilt record plans and data (field reports and plans and
specs and folders)
Cad/GIS files and projects
Indexes
Reports and Studies for Sanitary Sewer, Storm Sewer and Water utilities
Speed Limit Maps and data
Traffic Reports maps and Data
Property R/W basemaps
Special address files
Official maps
Street lighting map and data
Refuse collection map and data
Address digital points, hardcopies and database files
Notification of addressing to all addressees
Notification of addressing to Waukesha County dispatch and emergency management
Notification of addressing to Waukesha County GIS and property database
Notification of addressing to Elmbrook School district
20 hours HE
City of Brookfield I Department I 2000 North Calhoun Road I Brookfield WI 53005 I Page 2 of 4
Template Rev: May 2021
Fire Dept. Modifications
Fire inspections
Incident reports
Response Plans
Emergency Plans
City paper maps in all vehicles and offices
Digital database updates
Training of all staff
40 hours FTE
GIS/IT Modifications
GIS database address points - numerous layers
Road and centerline labeling
Cartegraph Street library
Utilities database
8 hours FTE
Highway Dept. Modifications
Street sign installation and teardown
Plow maps in all vehicles and databases
City maps in office
Cartegraph updates
Storm Sewer inventory mapping and reports update
24 hours FTE
Police Dept. Modifications
Traffic reports
Incident reports
Response Plans
City and Patrol routes office maps
City and Patrol routes office maps
Digital database updates
Training of all staff
80 hours FTE
Sewer- Dept. Modifications
Manhole and mains plans
Jetting cards
Response plans and studies
GIS and Cartegraph data update
8 hours FTE
City of Brookfield I Department I 2000 North Calhoun Road I Brookfield WI 53005 I Page 3 of4
Template Rev: May 2021
Water Dept. Modifications
Hydrant cards
Curbstop Cards
Valve Cards
Meter Cards
Watermain plans
GIS and Cartegraph data update
8 hours FTE
-- -- ---------,-----·----------------------..
,,_, ______ . _ ___
,,,_ ,,,,,,, ___ - --
Private Residential possible Modifications
Drivers license
Voter Registration
Amazon, Fed Ex, UPS separate notifications
Private healthcare and emergency providers
Bills, Mortgages and credit card changes
Service providers such as insurance, banks accounts etc ..
Stationary, Checks and letters