AGENDA – PLANNING AND ZONING COMMISSION
NOTICE OF MEETING
Notice is hereby given that the Planning and Zoning Commission of the City of Canyon will meet
at 4:00 p.m. on the 11th day of October 2021, in the 2nd Floor City Commission Chambers at 301
16th Street in the City of Canyon to discuss the following agenda items.
1. Call to Order.
2. Approval of the Minutes of the September 13, 2021 Meeting.
3. Consider and Take Appropriate Action on the City of Canyon Comprehensive Plan
Implementation Matrix and Annual Report.
4. Adjourn.
I certify that the above Notice of Meeting was posted on the bulletin board of the Civic Complex
of the City of Canyon, Texas on the 8th day of October, 2021.
Gretchen Mercer, City Clerk
City of Canyon
Planning and Zoning Commission Meeting
Minutes – September 13, 2021
The Planning and Zoning Commission of the City of Canyon met in the City Commission Chambers of the
Civic Complex. Vice Chair Jeremy Bradford presided over the meeting with the following Commissioners
in attendance: Larry Raemakers, Roger Mitchell, Corey Collier, Lori Wilhite, and Joel Enriquez. Bill
Craddock and Tonya Tyler were unable to attend. Assistant City Manager Jon Behrens, Building Official
Craig Brown, and Director of Planning and Development Danny Cornelius were also present.
Item 1: Call to Order.
Vice Chair Bradford called the meeting to order at 4:01 pm.
Item 2: Approval of the Minutes from the August 9, 2021 Meeting.
Commissioner Enriquez moved, duly seconded by Commissioner Raemakers, to approve the minutes from
the August 9, 2021 meeting. The motion passed unanimously.
Item 3: Conduct a Public Hearing and Consider and Take Appropriate Action on a Request
to Rezone a Property at 2520 5th Ave to MF (Multi-Family Attached Residential
District) from SF-S (Single-Family Suburban Residential District).
Scott Allison of Champion 1 Builders, LLC submitted a change of zoning application for a property at 2520
5th Ave. The requested zoning is MF (Multi-Family Attached Residential District). The property is
currently zoned SF-S (Single-Family Suburban Residential District).
Letters were sent to 19 property owners within 200’ of the request. Responses were received from 7
property owners with 2 being in support of and 5 opposed to the request.
Vice Chair Bradford opened the public hearing at 4:03. Mr. Allison presented his request. He plans to build
a stackable duplex with 4 bedrooms in each unit and 8 off-street parking spaces. There being no one else
requesting to speak, Vice Chair Bradford closed the public hearing at 4:05.
After discussion, Commissioner Enriquez moved, duly seconded by Commissioner Raemakers, to
recommend approval of the zoning request. The motion passed unanimously.
Item 4: Adjourn.
Vice Chair Bradford adjourned the meeting at 4:15 pm.
Bill Craddock, Chairman
Planning and Zoning Commission
ATTEST:
Gretchen Mercer, City Clerk
AGENDA
To: Planning and Zoning Commission
From: Danny Cornelius, Director of Planning and Development
Date: October 11, 2021
Re: Consider and Take Appropriate Action on the City of Canyon Comprehensive
Plan Implementation Matrix and Annual Report.
The City of Canyon adopted our current Comprehensive Plan in 2019. Freese and Nichols, Inc.
was hired as the consultant and, with Assistant City Manager Jon Behrens working as the
primary staff liaison, guided a City Commission appointed advisory committee, the Planning
and Zoning Commission, and the City Commission though a process of study and community
engagement. The plan acts as a guide, providing recommended strategies, actions, and policies
for community development.
Chapter 9 of the Comprehensive Plan provides an Implementation Matrix which contains
specific recommendations to facilitate bringing the plan’s vision to reality. Staff has prepared
the attached matrix with notes of progress on several actions and policies. The City
Commission will be provided with report upon approval by the P&Z.
City of Canyon
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
CHAPTER 3: FUTURE LAND USE
1. UPDATE THE ZONING AND
SUBDIVISION REGULATIONS TO MATCH
THE RECOMMENDATIONS OF THIS
COMPREHENSIVE PLAN
Review all recommended code updates with In process. Staff is working with Freese &
the Planning and Zoning Commission and City Nichols, Inc. to draft total revisions to the In process
Commission. (P&D) Zoning and Subdivision Ordinances. FY 21-22 Completion
Update the zoning and subdivision regulations In process with draft Zoning and Subdivision
(either a complete re-write or specific updates Ordinances. In process
based on guidance from the City FY 21-22 Completion
Commission). (P&Z, P&D, CC, PW)
2. PROMOTE THE DEVELOPMENT OF KEY
GATEWAYS AND NODES FOR NON-
RESIDENTIAL DEVELOPMENT.
Focus non-residential development in a nodal A node is a hub outside of the city center.
pattern around key, high visibilityContaining activity and infrastructure to
intersections: FM 3331/IH-27, 4th/IH-27, and support it, such as residential, commercial and
areas north of W Country Club Road. (P&Z, retail buildings. Developments such as Ongoing
CC, P&D) Madison Park and Spring Canyon provide for
commercial and retail uses to serve the
residential areas.
Update the zoning regulations to require In process with draft Zoning Ordinance.
higher standards for non-residential uses such In process
as retail and commercial uses. (P&Z, CC, FY 21-22 Completion
P&D, B&CD)
1
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
3. CREATE FAMILY-ORIENTED VENUES
AND GATHERING PLACES.
Consider options for multi-purpose uses in
future public facilities that would allow for Not started
youth activities or space for event rentals.
(Parks, PW, P&D)
Work with the EDC to provide incentives to
businesses that cater to youth and Not started
entertainment options. (B&CD, P&D)
Continue to monitor areas that are appropriate Discussions have occurred in the past. No
for a convention center and work with other joint projects at this point. CISD has
entities for joint funding partnerships (West completed the Happy State Bank Conference Ongoing
Texas A&M University, Canyon ISD, and/or Center at Happy State Bank Field. A new
Canyon EDC). (B&CD, P&D) Hampton Inn is being built on WTAMU
property, containing a conference space.
4. CONTINUE TO WORK WITH THE EDC
TO PROMOTE NEW BUSINESS.
Educate the EDC staff about the new Future Initial presentation 7/19. Another update will Ongoing
Land Use Map and associated policies. (P&D) occur in 2022.
Designate a City representative to attend all The CM or ACM will attend meetings. Completed
EDC meetings. (CM)
Assist in speeding up the development review In process with draft Subdivision Ordinance
process and/or waiving development fees for and Development Guide. Staff has
the new businesses that align with the goals implemented several initiatives including
and actions of this Plan. (P&D) written procedures/workflow and regularly Ongoing
scheduled weekly meeting where multiple
department representatives are available for
contractors, developers, architects, etc. to
discuss projects.
2
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
5. FOCUS KEY NON-RESIDENTIAL
REDEVELOPMENT EFFORTS AROUND
THE PROMINENT THOROUGHFARES AND
INTERSECTIONS, INCLUDING THE
INTERSECTION OF 4TH AVENUE AND 23RD
STREET.
Create a redevelopment plan/policy for key A thoroughfare plan will be included with the
thoroughfares/intersections. (PW, P&D, CC) Subdivision Ordinance. A plan will be included Not started
in the CIP.
Work with EDC to bring target business to Ongoing
these areas. (B&CD, CEDC, CM)
Consider purchasing properties in these
areas, as they become available. (P&D, Ongoing
B&CD)
Adopt specific design standards for these The draft Zoning Ordinance will provide for a
areas to set them apart. (P&Z, P&D, CC) Main Street Overlay District containing all In process
Main Street designated areas including, but
not limited to, 4th Ave & 23rd Street.
6. CREATE ORDINANCES TO PROTECT
FLOODPLAINS.
Coordinate with the Planning and The current ordinance is following all NFIP
Development staff to review existing floodplain requirements including an additional 1’ Ongoing
ordinances. (P&D) freeboard requirement for all new construction
and substantially improved structures.
Identify potential updates and review with the Discuss any potential updates with the P&Z.
Planning and Zoning Commission and the City Freese and Nichols has been contracted to
Commission. (P&D) aide in submittal of a Hazard Mitigation Grant. Ongoing
Updates may arise from the process.
3
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
7. CONTINUE TO DEVELOP PUBLIC USES
NORTH OF THE SQUARE.
Consider this area for all future public facilities. Discussing potential civic complex expansion. Ongoing
(P&D, CM, CC, CM, ACM)
Brand the area as a municipal complex, with
consistent signage and way-finding. (P&D, Not started
CM, ACM)
Develop the property north of City Hall for Preliminary discussions have occurred.
future expansion of the Civic Complex. Expansion/funding was mentioned in the FY Initiated
(CM,CC, PW) 2022 Budget Presentation.
8. PROMOTE RURAL LAND USES THAT
WILL HAVE LIMITED OR NO CITY
SERVICES.
Through the subdivision ordinance, allow for Draft Subdivision Ordinance is in process.
rural residential lots with septic sewer and well In process
water. (P&D) FY 21-22 Completion
9. BEGIN TO MAKE INFRASTRUCTURE
UPGRADES IN THE DOWNTOWN AREA.
Before making upgrades, define the exact Development stages for Downtown Master
boundaries of the downtown area. (P&D, PW, Plan Project are in process. The plan should In process
CC, City E) be complete in FY 2022. FY 21-22 Completion
Budget for sidewalk repairs every year to bring Downtown Master Plan Project and CIP will
sidewalks up to ADA standards. (CM, CC, include sidewalk projects. Not started
PW)
Study the downtown drainage issues and The TxCDBG Main Street Revitalization
budget for improvements. (CM, CC, PW) Program grant was applied for in 2020 and In process
2021. TIRZ options are being explored.
Downtown MP will provide projected cost.
4
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
Continue to implement the actions from the A Downtown Master Plan is in process. No longer relevant due to
Downtown Streetscape Master Plan. (CM, development of the DTM.
CC, PW)
10. PROMOTE LOW DENSITY
RESIDENTIAL DEVELOPMENT IN THE ETJ.
Adopt an ordinance requiring annexation into Will be included in the new Subdivision
the City for water and wastewater service. Ordinance. Initiated
(CM, CC)
Through the subdivision regulations, require Ordinance No. 1100 Complete – Ordinance No. 1100 – Adopted
the same level of standards in the ETJ that are November 5, 2018.
required in the City. (P&Z, CC, P&D)
Study the feasibility of annexing some of the HB 347 largely prohibits annexation unless by
recommended growth areas in the next five owner consent. When in the City’s best
years. (P&D) interest, growth areas will be encouraged to Ongoing with legislative restrictions
annex in accordance with state law and local
ordinances.
11. EXPAND LIGHT INDUSTRIAL USES
ALONG HIGHWAY 60.
Rezone vacant land in this area to light The CEDC has purchased some property in
industrial. (P&Z, P&D) this area. As development occurs, the land Ongoing
will be appropriately zoned. The area is
included in a draft TIRZ.
Work with EDC to promote these areas to No formal discussions specifically related to Not started
future industries. (B&CD, CM) this area. The area is included in a draft TIRZ.
Consider incentives, like reduced or waived No discussions related to this concept. There
development fees. (B&CD, P&D, CM) may be opportunities for these to occur Not started
through Development Agreements.
5
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
CHAPTER 4: TRANSPORTATION
1. UPDATE AND STREAMLINE
THOUOUGHFARE DOCUMENTS.
Verify the City has active functional Currently discussing further development of
classifications and roadways standards. If so, Thoroughfare Plan which will be part of the
update the elements to reflect the currently Amarillo Area Multimodal Plan. The plan is
understood regulations and coordinate nearing completion. A plan will be included in
updates between all City documents, the CIP.
including, but not limited to the Code of In process
Ordinances, subdivision regulations, and
Comprehensive Plan to ensure consistency.
The City should formulate and adopt these
standards if they are not currently active.
(P&D, PW)
Develop cross sections to accompany the Updated Subdivision Ordinance and In process
City’s roadway design standards. (PW) specifications will include this information. FY 21-22 Completion
Create a map of City roads and their Updated Subdivision Ordinance will clarify the In process
corresponding roadway classification. (PW) roadway classifications. FY 21-22 Completion
Conduct an annual review of the Thoroughfare Plan to be updated and then regular review will
Plan Map to ensure that it reflects future land occur. A plan will be included in the CIP. Not started
use policies and planned roadway and
transportation policies. (PW)
2. CONTINUE TO ADDRESS TRAFFIC AND
TRANSPORTATION ISSUES WITHIN THE
COMMUNITY.
6
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
BRICK STREETS: Through a survey or other Downtown Master Plan will assist in defining
means of public outreach, identify whether the downtown district and provide guidance
community would like to expand or consolidate related to the future of various blocks of In process
the City’s brick streets. Identify and prioritize streets. There are plans to meet with City of
the roadways that should be modified. Any Amarillo staff to discuss their program.
bricks that are removed should be recycled for
infill. It is recommended that the City consider
the brick streets on 4th and 5th Avenues and
15th and 16th Streets first. (P&D, PW)
23RD STREET AND 4TH AVENUE: Initiate a To be addressed in updated Thoroughfare
traffic operational study to identify specific Plan.
issues and evaluate strategies to address Not Started
congestion. One consideration could be to
improve and widen parallel routes. (PW)
PARKING: Consider parking demand impacts Downtown Master Plan will include a Traffic
in coordination with ongoing and future traffic Study and should provide guidance for the
and traffic studies. Create a long-term future in this area. In process
strategy to meet parking demands by FY 21-22 Completion
identifying options including on and off-street
parking and shared parking. (P&D, PW,
B&CD)
BIKE LANES: Conduct a bike study to better Studies yet to be completed. Bike lanes have
understand bike usage and demand, as well been designated along Russell Long Blvd. Initiated
as identify the best options for routes. (P&D,Preliminary discussions have occurred related
PW) to possible bike routes. Thoroughfare plan
should be multimodal.
US 87 AT IH 27: Add acceleration and TxDOT owned roadways. The City now has a
deceleration lanes along IH 27 SB frontage voting representative to the area MPO. This Ongoing
road and add a frontage road/off-ramp on I-27 gives the City a voice in future TxDOT
projects.
7
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
north of FM 3331 and a connection to W.
Country Club Road. (PW)
FM 2590: Conduct a corridor study to develop TxDOT owned roadway. Amarillo Area MPO
and evaluate strategies to alleviate traffic currently evaluating projects for this corridor. Ongoing
safety and operational issues; two strategies Ordinance No. 1140 lowers the speed limit on
to be included could be adding acceleration FM 2590. A 4-way stop has been installed at
and deceleration lanes at appropriate the W Country Club intersection.
locations. (PW)
3. INCORPORATE COMPLETE STREET
TREATMENTS IN FUTURE PROJECTS.
Reference the Complete Street Treatments Street design standards will be included in the
and identify the suitable treatments for each Subdivision Ordinance and Thoroughfare In process
roadway project. (P&D, PW) Plan.
Prioritize roadways and areas to receive The Thoroughfare Plan, Downtown Master
complete street improvements. Hire a grant Plan, and Multimodal Plan will aide in
coordinator or consultant to identify identification of projects. In process
transportation funding sources, create a
funding strategy, and timeline for
improvements. (CM, P&Z, P&D, PW)
Coordinate with TxDOT regarding
The Spur 48 (Russell Long Blvd) project was
improvements to State-owned roadways as recently completed (3/20) in coordination with Ongoing
TxDOT and WTAMU. A 23rd St sidewalk
well as planned and future projects. (PW, CM)
project may occur in 2023.
Create an internal process to ensure that The Thoroughfare Plan, Downtown Master
opportunities for roadway improvements are Plan, and Multimodal Plan will aide in creation
considered in conjunction with planned of the process. Initiated
roadway repairs, expansions, or extensions.
(PW, CM)
8
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
4. COORDINATE THOROUGHFARE
PLANNING WITH REGIONAL AND STATE
AGENCIES.
Coordinate with TxDOT regarding any Staff will remain in contact with TxDOT and
improvements or extension of local roads that coordinate efforts when opportunities exist. Ongoing
could impact State-owned roads. One
example is the possible extension of
Valleyview (local roadway) to FM 3331
(TxDOT roadway). (P&D, PW, CM)
Coordinate with TxDOT and the MPO to The City now has a voting representative to
identify cost-sharing or grant opportunities for the area MPO. This gives the City a voice in
transportation-related projects and to ensure future TxDOT projects. Ongoing
that planning efforts within the City are
accurately reflected in regional planning
initiatives. (P&D, PW)
CHAPTER 5: UTILITIES &
INFRASTRUCTURE
1. UPDATE UTILITY PLANS REGULARLY,
IN COORDINATION WITH THE FUTURE
LAND USE PLAN.
Review all utility plans each time the Future Utilities will be reviewed as the plan is
Land Use Plan is updated, and make updates updated. Water and Sewer studies reviewed Ongoing
as needed (and vice versa). (P&D, PW) and considered early in all development
discussions. A plan will be included in the CIP.
9
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
2. FORMALIZE A CAPITAL
IMPROVEMENTS PROGRAM (CIP).
Educate the P&Z and City Commission on the Preparation for CIP is underway. Initial
process of capital improvement programming funding was approved for FY 2022. Project Completed
and solicit their feedback. (CM) sheets have been distributed to Department
Heads. Project review will take place
according to the CIP schedule.
To move forward with implementing a CIP, The CIP format has been adopted.
obtain permission from the City Commission. Completed
(CM)
Work with a consultant to develop a long and The Strategic Plan process (to be completed
short-range CIP specifically tailored to December 2021) will aide in development. In process
Canyon. (CM)
Include the top priority infrastructure projects CIP will assist with this prioritization. In process
identified on page 121. (CM)
3. CONSIDER THE FEASIBILITY OF AN
IMPACT FEE PROGRAM TO FUND FUTURE
INFRASTRUCTURE.
Review State law regarding impact fees and/or Freese and Nichols and been contracted to
have an internal staff educational seminar. study development sustainability and funding
(P&D, PW, CM) options. Verdunity has provided fiscal In process
analysis of a proposed development. They FY 21-22 Completion
have contracted to perform another.
Educate the P&Z and City Commission on the Funding options have been discussed at
process of impact fees and solicit their multiple meetings and feedback has been Completed
feedback. (P&D, PW, CM) solicited.
10
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
4. DEVELOP AN ASSET MANAGEMENT
PROGRAM.
Conduct a street condition inventory. (PW) Will be included in the CIP. Initiated
Conduct a water/wastewater condition Will be included in the CIP. Initiated
inventory. (PW)
Rank necessary projects for updating aging CIP will assist in prioritization of projects.
facilities based on current effectiveness and Initiated
maintenance needs. (CM, PW)
CHAPTER 6: PUBLIC FACILITIES
1. MONITOR GROWTH AND PLAN FOR
PUBLIC FACILITIES, AS NEEDED, TO
MEET POPULATION DEMAND.
Monitor population projections and track The Planning and Development Department
estimated population based on yearly building will continue to track Ongoing
permits. (P&D)
Adopt standards for each public facility type No action. Not started
that operates on a service area. (PW, P&D)
Budget for new or updated public facilities in CIP is in process. Discussions occurring
the Capital Improvement Program years in related to future facilities. Ongoing
advance of the population growth. (CM, CC,
PW)
2. IMPLEMENT PLANS FOR THE NEW
POLICE DEPARTMENT.
Continue working with the Police Department Will be included in the CIP.
and the architectural consultant to finalize the Initiated
plans. (CM, CC, PW, ACM)
Present plans to the City Commission to Expansion plans/funding were mentioned
obtain approval for funding, construction, etc. during the FY 2022 Budget Presentation. Initiated
(CM, CC, PW)
11
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
Begin to develop a plan to utilize the current Preliminary plans and drawings exist related to
Police Department space to house other City renovations to City Hall. Updates will be Initiated
departments after the new facility is needed prior to finalization. Will be included in
constructed. (CM, PW, ACM) the CIP.
3. MAINTAIN HIGH QUALITY STANDARDS
FOR ALL PUBLIC FACILITIES.
For all new public facilities, follow the updated Staff will continue to follow the latest design
non-residential design guidelines, as guidelines. Ongoing
appropriate. (P&D)
Identify upgrades to existing public facilities Creation of CIP is in process. Projects to be
and budget for the improvements over the next determined.
five years. (CM, CC, PW) Initiated
4. COORDINATE WITH RANDALL COUNTY
ABOUT THE FUTURE OF THE
COURTHOUSE.
Identify a City staff member, along with other No action.
community advocates, to regularly meet with a
point of contact at the County to discuss Not Started
partnerships and future options for the
Courthouse; Present ideas to the County
Commissioner’s Court as needed. (CC)
Allocate funds, as appropriate, to assist with No action.
any future efforts or partnerships related to the Not Started
County Courthouse. (CM, CC)
Establish a taskforce committee from key Ongoing discussions.
governmental entities to address key issues Not Started
such as the Courthouse. (CM)
CHAPTER 7: HOUSING AND
NEIGHBORHOODS
12
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
1. PROTECT EXISTING NEIGHBORHOODS
Develop infill standards that protect the look Draft Zoning Ordinance in process.
and feel of existing neighborhoods. (P&D, In process and ongoing
P&Z, CC)
Update zoning ordinance to ensure that Draft Zoning Ordinance is in process.
adjacency standards are included for Adjacency standards are included. In process
protecting residential areas that are near FY 21-22 Completion
commercial or retail areas. (P&D, P&Z, CC)
Encourage housing maintenance strategies No action.
and neighborhood associations within existing Not Started
neighborhoods to increase community
involvement and buy-in. (P&D, B&CD)
2. IMPLEMENT PROACTIVE CODE
ENFORCEMENT.
Develop a neighborhood engagement plan the In process – Water bill inserts, articles, social
Planning and Development department can media. Ongoing
use as a proactive tool. (P&D)
Research the latest softwares for code A new software product, MyGov, has been Completed
enforcement departments. (P&D) purchased and implemented.
3. IMPLEMENT HOME MAINTAINANCE
STRATEGIES.
With City Staff and City Commission direction, No action.
pick a few programs and implement them Not Started
annually or on an on-going basis. (P&D, CC,
P&Z)
Establish a quantitative annual goal (i.e. No action. Not Started
rehabilitate three houses/year). (CM, CC)
Hire a grant coordinator to identify and pursue No action.
funding opportunities for housing and Not Started
neighborhood preservation. (CM, P&D)
13
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
4. ADOPT UPDATED GUIDELINES FOR
NEW SINGLE-FAMILY HOMES.
Review the residential portion of the zoning In process with Draft Zoning Ordinance.
ordinance and identify any deficiencies; In process
Update to ensure that housing FY 21-22 Completion
recommendations in this Plan can be
enforced. (P&D, CC, P&Z)
5. ALLOW FOR SUBDIVISIONS WITH A
MIXTURE OF DIFFERENT LOT SIZES,
HOUSING TYPES, AND AMENITIES.
Create a residential zoning category that will In process with Draft Zoning Ordinance
allow for development with a variety of lot In process
sizes and housing types (i.e. Single-family with FY 21-22 Completion
townhomes). (P&D, CC, P&Z)
6. PROMOTE TARGET AREAS FOR
RESIDENTIAL DENSITY.
Promote higher residential densities along No action.
Valley View Rd and Highway 60. (P&D, Not Started
B&CD)
7. DEVELOP PROTYPE HOUSING IDEAS.
Create a development guidebook with pictures No action.
of desired housing products for Canyon; Not Started
Include desired building materials and other
aesthetic elements. (P&D)
CHAPTER 8: COMMUNITY LIVABILITY
1. UPDATE THE ZONING AND
SUBDIVISION REGULATIONS.
14
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
Include land use compatibility mechanisms In process with the Draft Zoning Ordinance.
between nonresidential and residential uses. In process
(P&D, CC, P&Z) FY 21-22 Completion
FACADES: Add requirements for sign In process with the Draft Zoning Ordinance.
materials (100% masonry/stone or compatible In process
with the materials of the primary building). FY 21-22 Completion
(P&D, CC, P&Z)
SCREENING: Require all waste receptacles In process with the Draft Zoning Ordinance.
and outside storage areas within view from the
Right-of-Way be screened from public view
with a masonry wall on three sides, a metal In process
door, and landscaping features. Receptacles FY 21-22 Completion
should not be located in the required parking
areas. (P&D, CC, P&Z)
LANDSCAPING: Adopt more comprehensive In process with the Draft Zoning Ordinance.
landscaping regulations to conserve water
and improve the aesthetic quality of In process
nonresidential development. Develop an FY 21-22 Completion
approved plant list with native and drought-
tolerant plants. (P&D, CC, P&Z)
TREES: Amend the tree ordinance to identify No action.
the appropriate party responsible for removal
of dead trees from private property, but work Not Started
with the community to develop cost-sharing
and maintenance and assistance programs.
(P&D, CC, P&Z)
2. ADOPT A PARKLAND DEDICATION
ORDINANCE.
15
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
Review existing PDOs in Texas and consult A plan will be included in the CIP.
studies from institutions such as Texas A&M
RPTS Extension Service and identify the best
practices that are appropriate for Canyon;
Continue to draft the PDO and update the In process
Parks Advisory Committee, P&Z, and City
Commission on a regular basis, including a
review of any eventual draft ordinance to
solicit their feedback. (Parks, ACM, CM)
Formally adopt a parkland dedication A plan will be included in the CIP.
ordinance as a part of the subdivision In process
regulations. (P&D, CC, P&Z)
Train the appropriate staff on the No action.
implementation of the program and assessing Not Started
the fees. (P&D)
3. ESTABLISH A DEAD TREE
REMOVAL PROGRAM.
Obtain permission from the City Commission No action.
to develop the program and consider Not Started
establishing a task force of partners and
stakeholders. (P&D, PW)
4. IMPLEMENT COMMUNITY CHARACTER
AND BRANDING ENHANCEMENTS.
Develop a plan which prioritizes and designs CIP will include possible related projects. The
the major gateways and finance projects as Downtown Master Plan and Thoroughfare Initiated
funds become available. (P&D, PW) Plan will provide guidance. TIRZ may provide
a possible funding source.
Identify opportunities to highlight Canyon’s CIP will include possible related projects. The
heritage through continued historic Downtown Master Plan and Thoroughfare
preservation and incorporation of the historic Not Started
16
2018 COMPREHENSIVE PLAN IMPLEMENTATION MATRIX – 2021 Update
RECOMMENDATION ACTION & COMMENTS STATUS
inventory into branding and gateway Plan will provide guidance. TIRZ may provide
strategies. (P&D) a possible funding source.
Consider priority gateway and branding CIP will include possible related projects. The
initiatives as part of complete street Downtown Master Plan and Thoroughfare Initiated
improvements. (PW) Plan will provide guidance. TIRZ may provide
a possible funding source.
Ensure that opportunities for roadway Staff will continue to discuss. The Subdivision
improvements are considered in conjunction Ordinance, Thoroughfare Plan, and Ongoing
with planned roadway repairs, expansions, or Multimodal Plan will aide in the process.
extensions. (PW)
Completed The recommendation has been accomplished
Ongoing The recommendation is in place, but is not a one-time activity
In process The recommendation is underway with an expected completion
Initiated Some work has been done on the recommendation, but there is not an active effort underway
Not started No efforts have been made
Updated 9/2021
Presented to City Commission 10/18/21
17