Muyni
← Back to Chagrin Falls

Architectural Board of Review

Regular Meeting

Chagrin Falls, OH · June 17, 2025

AgendaMinutes

Minutes

THE VILLAGE OF CHAGRIN FALLS ARCHITECTURAL BOARD OF REVIEW JUNE 3, 2025 Meeting Called to Order 8:30 A.M. Members Present: George Clemens, Mike Corcoran, Chuck Fazio, Eric Kaminski, Steve King, Phil Koepf Wendy Naylor (Absent) Also Present: Dominic Cribari, Joan Andersen APPROVAL OF MINUTES Motion by King, seconded by Corcoran to approve the minutes of the May 6, 2025, meeting. Roll Call: Fazio-yea, Kaminski-yea, Corcoran-yea, King-yea. Motion passed. APPROVAL OF MINUTES Motion by Corcoran, seconded by Kaminski to approve conditionally the minutes of the May 20, 2025, meeting once Janna Lutz is contacted. Roll Call: Corcoran-yea, Kaminski-yea, Lutz via email yea. Motion passed. 1. Nuzzo 391 Hickory Hill Exterior Alterations-Final Jeffrey Bogart (Architect) and Natali Nuzzo (Homeowner) presented these plans. Jeff said that they are replacing two windows and replacing a swing door with a sliding glass door. He said that they are replacing it with similar material. The Board liked it. Summation-motion by King, seconded by Kaminski for final approval of plans as presented. Roll Call: Fazio-yea, Corcoran-yea, King-yea, Kaminski-yea. Motion passed. 2. Overland 31 North Main Signage-Final Justin McDonald presented these plans. He said that the sign is an individual letter stud mounted sign, and the color is brown. The Board liked the new sign. Summation-motion by King, seconded by Kaminski for final approval of plans as presented. Roll Call: Corcoran-yea, Fazio-yea, Kaminski-yea, King-yea. Motion passed. 3. Cordiak 181 Bradley St. Exterior Alterations-Final Brian Miller (Contractor) and Christine Cordiak (Homeowner) presented these plans. Brian said that they took the recommendations of the Board and bumped out the side rear addition and bumped it in on the side and that they were able to keep the second-floor window. They also changed the kitchen window to a rectangular one. The Board liked the changes. Summation-motion by King, seconded by Kaminski for final approval of plans as presented. Roll Call: Fazio-yea, Corcoran-yea, Kaminski-yea, King-yea. Motion passed. 4. Liederbach 163 Solon Rd. Accessory Structure-Final Brian Liederbach (Homeowner) presented these plans. He said that they took the recommendations from the Board and removed the shower from the second floor. The Board liked the change. Summation-motion by Kaminski, seconded by King for final approval of plans as presented. Roll Call: Corcoran-yea, Fazio-yea, Kaminski-yea, King-yea. Motion passed. 5. Siegel 103 South Main Retaining Wall-Final Zach Goebelt (Contractor) presented these plans. He said that they are replacing the retaining wall with a sandstone retaining wall. He said that it is 24” at the base and 16” at the top which is the same height as the current one. Zach said that they wanted something more natural. There was discussion about the drainage system and the Board recommended having a landscape architect/engineer come out and survey the property. The Board thought aesthetically the job looked nice. Ginny Fitz (homeowner) at 95 South Main said that this property has a shared driveway and she asked that they be informed when they won’t be able to use the driveway because their trucks will be bringing in equipment. Zach said that they were going to set up a staging area on the client’s grass and would not be blocking the drive. She said she thinks the drainage issue happened when they installed the pool and that the current drainage that comes down makes the sidewalk very icy and dangerous during the winter. Zach said the wall would be 8” away from the sidewalk. Clemens said that the foundation drainage could go to daylight. Dominic said that the wall drainage could be daylighted. There was much discussion about the drainage issue and how to resolve it. Zach said that the landscape architect met him at the property and that was the first time he had seen the seepage. He said he would like to find out where the seepage is coming from. Summation-motion by King, seconded by Kaminski for final approval of design plans of the wall as presented with the following comment: They need the landscape architect and engineer to reach out to our Building and Zoning Inspector Dominic Cribari after they solve the water problem on the property. Roll Call: Corcoran-yea, Fazio-yea, King-yea, Kaminski-yea. Motion passed. 6. Goldstein 26 South Franklin St. Exterior Alterations-Final Adam Rosekelly (Architect) presented these plans. He said that the variances have been granted and that was for a setback issue and that they are one foot off the property line with the bottom of the steps. Koepf asked if that included the ADA compliant handrailing’s and Adam said yes. The Board liked the design and Koepf recommended not bringing the railing extension out too far. Summation-motion by King, seconded by Corcoran for final approval of plans as presented. Roll Call: Kaminski-yea, Fazio-yea, King-yea, Corcoran-yea. Motion passed. 7. Ashba 105 Bell St. Exterior Alterations-Field Changes George Clemens (Architect) and Peter Nogay (Architect) presented these plans. George said that originally they weren’t going to add to the basement. He said that they are trying to achieve a walk out on the back of the addition. He said they are trying to reorientate the steps from the back to the side. Peter said that they are trying to connect the addition to the foundation by giving them more basement. Building and Zoning Inspector Dominic Cribari asked about the siding change. George said that the siding is in bad shape and that their father (contractor) wants to replace it all. Dominic said they want to install Dilapidated Cedar Lap siding with new Hardie siding to match existing exposure. Koepf said that if you remove the siding off the house, you will no longer have a historic home. Summation-motion by King, seconded by Kaminski to approve the field change for the basement. Summation-motion by King, seconded by Kaminski to table the replacement of the siding, on the house until the Board can go and look at the home. Roll Call: Fazio-yea, Corcoran-yea, Kaminski- yea, King-yea. Motion passed. 8. King 117 May Court Exterior Alterations-Final Steve King presented these plans. He said that they want to add a door to the rear of the house. He said right now there is only a window. He said that right now they can only access the backyard by a side door. The Board was fine with adding a door. Summation-motion by Kaminski, seconded by Corcoran for final approval of plans as presented. Roll Call: Fazio-yea, Kaminski-yea, Corcoran-yea, King (abstain). Motion passed. Meeting Adjourned 9:47 A.M. __________________________________________ Steve King (Chairman) Date

Agenda

ARCHITECTURAL BOARD OF REVIEW AGENDA June17, 2025 8:30 AM Board Members: Steve King, Wendy Hoge-Naylor, Mike Corkran, Erik Kaminski Architect Advisors: Phil Koepf, George Clemens This is a public meeting, and all are welcome to attend. In-person meetings are held in council chambers at Village Hall located at 21 W. Washington Street, Chagrin Falls Ohio, 44022. A. Approval of Minutes: June 3, 2025 B. Review Submissions 1. Healing Studio 79 North Main Signage – Final Proposing a new wall sign. 2. Lavigna Interiors 91 North Main Signage - Final Proposing a new projecting sign. 3. Skoch 278 Orchard St Exterior Alterations – Prelim Proposing a new rear overhang over deck; HSR required 4. Benedetti 52 South Main New Dwelling – Prelim Proposing new single-family dwelling; Variances required C. Address general public for walk-in opportunity. D. Next meeting: July 1, 2025 E. Adjournment. 21 W. Washington Street, Chagrin Falls, OH 44022 440-247-5050 | www.chagrin-falls.org

Get email alerts for Chagrin Falls

A daily email when new agendas and minutes are posted.

Report an issue with this meeting