Architectural Board of Review
Regular MeetingChagrin Falls, OH · July 15, 2025
Minutes
VILLAGE OF CHAGRIN FALLS
ARCHITECTURAL BOARD OF REVIEW
JULY 15, 2025
Meeting Called to Order 8:30 A.M.
Members Present: George Clemens, Mike Corkran, Eric Kaminski, Janna Lutz, Wendy Naylor, Phil
Koepf (Absent) Steve King (Absent)
Also Present: Dominic Cribari, Joan Andersen
APPROVAL OF MINUTES
June 17, 2025, minutes were tabled due to not enough voting members present who attended that
meeting.
Motion by Naylor, seconded by Corkran, to approve the minutes of the July 1, 2025, meeting. Roll
Call: Lutz-yea, Naylor-yea, Corkran-yea Kaminski-abstain. Motion passed.
1. DWBH LLC 146 East Washington St. Exterior Alterations-Preliminary
Jeff Helprin (Kingdom Home Builders), Kristy Schalmo (Architect) and Paul Taylor (Architect)
presented these plans. Jeff said that they received preliminary approval for the building. He said
that they reevaluated their needs for the building and decided that moving forward they were going
to make some modifications and changes from their original program and design and have hired the
Bialosky team for their project. Paul said that the HSR report showed the property has historic
significance. He said they looked at the building especially the second story which is in very
dilapidated shape and that the second floor does not have ceiling height that is up to code. He said
they are proposing to remove the 2nd story and are salvaging the one-story warehouse in the back.
He said it’s an interesting location because you have the historic homes directly to the west,
commercial buildings to the north, to the east you have a large expanse of asphalt and paving which
is the service drive to the post office along with the building and parking, and the new townhomes.
He said that there is a lot going on architecturally and this building is a very industrial utilitarian
building that doesn’t fit the neighborhood at all. Paul said that their intent with this project is to
greatly improve the building so it will fit into the character of the neighborhood. They also will
soften up the landscape around the building. He said they are proposing a 2-story addition that is
better proportioned than the existing building and that they are looking to respect the
neighborhood. He said that their client asked them to build a more contemporary building and that
what they will show is something very respectful of the neighboring historic buildings in proportion
and form. He said they will have pitched roofs on the entire property and will use very high-quality
materials that respect the residential character. Kristy said that they plan to remove the existing 2nd
story and will allow them to add a basement that will be the same level as the existing basement.
She said it will also allow them to have better head height on the second floor. She said they will
add more green space, new patio in front and an entry garden in the back. She said they have a new
loading dock and trash in the back that will be hidden. They are also proposing a new fence
between the post office and their property. Kristy said that the first floor will have offices and
storage in the back. She showed the 2 new additions on the front which will contain offices and that
the existing loading dock will have a new front porch with a patio, café, and some seating in the
front. She said the second addition will be the conference room and that by adding these new
additions it allows them to have a nice garden. She said the second floor will have offices,
conference room and the basement. Paul said that the 2nd story structure is better proportioned
with the existing homes going down the street. He said they want to respect the historic homes on
the street and will have painted composite clapboard siding and overhangs that respect the general
overhangs on the street as well as the window openings that are similar in proportion to the
windows and homes on the street. He said that all the materials will be high quality with high quality
details. Naylor asked about the stucco material and Paul said not on the facade and not as bright
on the renderings but it’s a tongue and groove vertically stained wood. He said the roof has a more
traditional overhang and the roof comes down with a slate material. Clemens asked if the wall is
slate and Paul said yes – a slate like material. He said they are looking at an asphalt shingle roof and
that the rest of the building and that the front porch spills down into a heavily landscaped screened
private patio. Building and Zoning Inspector Dominic Cribari said that hedges can be no more than
42” on the front property. Corkran said that he doesn’t see the design having any continuity with the
surrounding properties. He said that the other new buildings followed the criteria from the Village
design guidelines, and he doesn’t see any continuity with the visual appearance on the street with
the other properties. Naylor said that one of the recent new buildings on the corner of Senlac Hills
was designed to look like a house because you are in that transition area with residential and
commercial coming together. She said that this is very contemporary in relation to the context of
the surrounding neighborhood. Clemens said he doesn’t think the building is overscale and you can
make an argument about high quality modern in this spot may not be problematic. Naylor said that
the building is beautiful, but the discussion is about its location at this site, and she is looking at the
historic context of the neighborhood. Kaminski asked if it was the façade that was facing the street.
Naylor stated that the front gable with the side addition upright and wing form works in the Village.
Clemens said that the vertical wood doesn’t work since it’s not residential and neither is the frame.
Kaminski suggested they tone down the front façade in keeping with the neighborhood. He thinks
that since they are builders, they will build a beautiful building. Naylor said she understands the
challenge of identifying the historic context within the commercial pocket with a Colonial Revival
Post Office next door, the plumbing store, new condos and Two & Co. across the street and
residential National Register District to the west. Paul said it’s a commercial area right on the edge
of the historic district. Naylor said the building still must conform with the historic forms and
shapes. Jeff said that there is a lot going on in that area with the Condos, the Cleveland Plumbing
Co., Two and Co. so to say it doesn’t fit with the historic context it’s a slippery slope since it doesn’t
exist with the other buildings. He said that this building is much more toned down from the one that
was preliminarily approved. Naylor said that they have mimicked the front gable from the house
next door with a one-story wing . She said that the Code talks about the Village allowing
contemporary forms stating under “Section 1146.04 (4) Contemporary Design. All structures shall
be recognized as products of their own time. Alternations, additions and new development which
have no historical basis, and which seek to create an earlier appearance shall not be required.
Conversely, compatible contemporary design shall not be prohibited or discouraged except where
such design would clearly detract from the architectural unity of an ensemble of Historically
Significant Properties.” Clemens said he likes the rear facing gable with the horizontal lines and
how they broke up the monster building. Paul said that the building is more contemporary in the
back because it’s 100% private. Naylor said that this will be a statement building. Jeff said that if
you look at the front it looks like a home. It has a rhythm of windows, with gable roofs, the front
porch. He said it’s far more residential than the current building. Corkran said that everything in the
project with materials is first class. He said he was just uncomfortable with the façade of the
building. Lutz said that this building has nothing to do with the surrounding buildings. She said it’s
lovely and you never see the windows with different materials. Clemens said that the fascia could
be broken up in scale to make it look better, add a little more articulation and the front porch
element could have different materials. He said that they could study that area. Naylor said that
they need to restudy the front gable. Jeff asked if it was the two-tone panel in the front and whether
they could change that.
Summation-motion by Naylor, seconded by Lutz for preliminary approval of plans as presented with
the following comments: Consideration of toning down the contemporary appearance. Roll Call:
Corkran-yea, Kaminski-yea, Naylor-yea, Lutz-yea. Motion passed.
2. Horvath 255 Senlac Hills Exterior Alterations-Preliminary
Andrew Reynolds (Architect) presented these plans. He said that the existing residence has a side-
facing two-car garage, and they want to add an additional garage bay with front-facing doors. He
said they are extending the existing front porch out and that the 2nd floor will have an exercise room.
He said that they will also raise the chimney. Clemens said he is concerned about the massing
stretching across the front. He said they are doubling the front of the house. Andrew said that they
have a one car detached garage also. Kaminski and Clemens said they should look at removing that
garage. Naylor said you have as much garage as they do for the house. Corkran said that half of the
front of the house is garage doors.
Summation-motion by Naylor, seconded by Kaminski to table this submission with the following
comments: Restudy the garage configuration and massing and scale so as not to dominate the
house: Blend with character of the neighborhood. Roll Call: Corkran-yea, Lutz-yea, Kaminski-yea,
Naylor-yea. Motion passed.
3. Bidar 385 Bell St. Demolition-Preliminary
Naylor read the Historical Significance Report and said the house was built in 1846 and moved in
1985 to its current location. She said that because the house is more than 100 years old the subject
property meets the standards of a “Historically Significant Property.” The findings that while the
house is considered a “Historically Significant Property” per the Village’s Codified Ordinance, the
house would not be eligible for listing on the National Register of Historic Places (NRHP). The NRHP
reviews a potential historic property by either retaining historic integrity or not retaining integrity.
This review is completed by looking at seven aspects (or qualities) and determining if the number of
aspects which are intact warrant the property to still retain its historic integrity. When reviewing 385
Bell Street against these aspects, the house appears to lack historic integrity in terms of the NRHP:
Motion by Naylor, seconded by Lutz to receive the HSR report. Roll Call: Kaminski-yea, Corkran-yea,
Lutz-yea, Naylor-yea.
David and Theresa Bidar (Homeowners) presented these plans. Theresa read a letter that she wrote
about wanting to develop history in the Village. She showed examples of homes they are
considering building with front porches and that are keeping with the aesthetics of the architectural
homes in the neighborhood. Naylor asked if they were looking for guidance today about the process
and David said they were hoping they would vote for the demolition. Clemens said that they can’t
vote without drawings for the house they plan to build and that the historic value of this home has
been compromised. Naylor said that according to the code, if you are requesting demolition of a
property that has been determined historically significant you are required to produce an economic
feasibility report of the home that shows there is no way to rehabilitate the existing home in an
economically feasible manner. Naylor said that you would compare prices of the adjacent
properties and market value of your property and then is there a path to rehabilitate that house that
fits with an economically feasible program. She said that they are required to do that under the
code once the building is determined to be historically significant. She said that if the house is 100
years old it is automatically considered historic. Naylor said that they must be careful to follow the
process, so they don’t set a precedent for the next submission that comes in. She said they must be
careful that they treat each project through the same process. She said she understands what they
are presenting and sees where the integrity has been impacted. Another approach is to present a
structural engineer report that shows the house is compromised to justify demolishing the home.
Kaminski said they need a report from a structural engineer. He said that they are all on the same
page about this house. Naylor said that a structural engineer report will go a long way in helping to
decide. David asked what else they would need. Clemens said they need preliminary drawings.
Naylor opened the meeting to the audience about the demolition. Sharon Broz 410 Bell Street
spoke in favor of the demolition. She read a letter that she prepared regarding the demolition and
gave the Board signatures from all the property owners that live in close proximity to 385 Bell Street
that support the demolition request. The letter and signatures are attached to the minutes. The
public meeting was closed.
Naylor said that the Board needs a report from the structural engineer talking about the integrity
and condition of the building. It would help to get a report on the safety of the building, maybe some
documented police reports that would help the Board with their decision. The Building and Zoning
Inspector said that demolitions cannot be approved until the final building plans are approved.
When they give you a preliminary design approval that is their nod towards approval, unless you
come back with something completely off base to what was preliminarily discussed they will allow
you to move ahead with demolition. They cannot give approval to demolition without plans. There
was no vote taken on this matter.
4. Skoch 278 Orchard Exterior Alterations-Final
Mitchell Senac (Scenic FX) presented these plans. He said that the main change was that
everything is boxed in and closed with no open roof visible. He said that the pitch is the same.
Naylor asked about how they were tying the gutters in. He said that the gutters run into the existing
gutters on the side and then down.
Summation-motion by Naylor, seconded by Lutz for final approval of plans as presented. Roll Call:
Kaminski-yea, with the following comment that the final drawings reflect the down spout on the
right-hand side of the roof line, Corkran-yea, Lutz-yea, Naylor-yea. Motion passed.
5. Blossom Bio Clinic 15 Pleasant Ally Signage-Final
Aldo Dure (Next Awning & Graphics) presented these plans. Aldo said that they are proposing two
signs for the building. The one is an awning sign, and the other is a double-sided post and panel
sign. The Board suggested increasing the size of the fascia of the painted letters on the awning sign
for better visibility.
Summation-motion by Naylor, seconded by Kaminski for final approval of plans as presented with
the following comments: Increase the front fascia height to accommodate the wording on the
awning sign for better visibility. Roll Call: Corkran-yea, Lutz-yea, Naylor-yea, King-yea. Motion
passed.
6. Wilders 71 North Main Signage-Final
The Board reviewed the new sign for the Wilders Clothing Store since no one was here to present
the project. The Board all liked the sign.
Summation-motion by Naylor, seconded by Lutz for final approval of plans as presented. Roll Call:
Corkran-yea, Naylor-yea, Kaminski-yea, Lutz-yea. Motion passed.
Walk-Ins
Donna Murphy (Chagrin Plaza Building Owner) and Dave Cerveny presented these plans. Donna
said that they want to add a new awning over Juicy Lucy’s window facing Bell Road since they have
a problem with water getting into Juicy Lucy’s building. She said everything will match the existing
awning. Dave said it would be a shed awning and would have no writing on it. The Board said they
would be supportive of the new awning.
Meeting Adjourned 10:01
_________________________________________________
Wendy Naylor (Acting Chairman) Date
Agenda
CITY OF DALHART, TEXAS
SPECIAL CITY COUNCIL MEETING
SUNDAY, MAY 22, 2022
http://www.dalharttx.gov
Rita Blanca Coliseum, 2222 FM 281, Dalhart, Texas
Notice is hereby given of the Regular Meeting of the City Council of the City of
Dalhart, Texas to be held at Rita Blanca Coliseum on May 22, 2022 at 4:30 p.m.
The following business will be considered:
PRAYER
REGULAR AGENDA
1. For the purpose to hold a Meet and Greet of Prospective City Manager
Candidates.
CERTIFICATION
I certify that the above Notice of Meeting was posted at the front door of the
Dalhart City Hall no later than the 19th day of May, 2022 before 5:00 p.m.
____________________________________
Wendy Kleynhans, City Secretary
NOTICE: The Dalhart City Hall is wheelchair accessible. Access to the building
and special parking are available at the west entrance facing Rock Island Street.
Requests for accommodations or interpretive services must be made at least 48
hours in advance of the meeting by contacting the City Secretary’s Office at (806)
244-5511, Ext.3202 or by FAX (806) 244-4414. Braille is not available. The City
of Dalhart reserves the right to convene into Closed Session under Government
Code 551.071-551.074 and 551.086.
Get email alerts for Chagrin Falls
A daily email when new agendas and minutes are posted.