Historic District Commission
Regular MeetingChapel Hill, NC · December 13, 2022
Minutes
Town Hall
TOWN OF CHAPEL HILL 405 Martin Luther King Jr.
Boulevard
Historic District Commission Chapel Hill, NC 27514
Meeting Minutes
Chair Sean Murphy Josh Gurlitz
Vice-Chair Duncan Lascelles Nancy McCormick
Deputy Vice-Chair Polly van de Velde Anne Perl De Pal
Brian Daniels David Schwartz
Tuesday, December 13, 2022 6:30 PM RM 110 | Council Chamber
Language Access Statement
Opening
Roll Call
Anya Grahn-Federmack, Liaison to Commission, Charnika Harrell, Liaison to
Commission, Kevin Hornik, Counsel to Commission
Present 6 - Chair Sean Murphy, Deputy Vice-Chair Polly van de
Velde, Brian Daniels , Nancy McCormick, Anne Perl De
Pal , and David Schwartz
Excused 2 - Vice-Chair Duncan Lascelles, and Josh Gurlitz
Secretary reads procedures into the record
Commission Chair Reads Public Charge
Approval of Agenda
Commissioner Van de Velde asked to add a presentation by Preservation North
Carolina (PNC) to the agenda. The Commission unanimously approved the update.
Preservation Chapel Hill Update
Don Tise, a Preservation Chapel Hill board member, presented a video of the
history of the Strayhorn House in Carrboro. He also gave an update on
Page 1 of 14
Historic District Commission Meeting Minutes December 13, 2022
Preservation Chapel Hill’s work to help preserve the house and other projects.
Announcements
Chair Murphy announced the meeting would end at 10:30 p.m.
Petitions
Approval of Minutes
1. October 11, 2022 Action Minutes [22-0885]
Commissioner Schwartz asked staff to correct a spelling error in the minutes
for the October 11, 2022, meeting. A motion was made by Commissioner Van
de Velde, seconded by Perl de Pal, to approve the October 11, 2022, meeting
minutes with the correction. The motion carried by a unanimous vote.
Information
2. Administrative Certificate of Appropriateness [22-0886]
Approvals and Maintenance Memos
Commissioners expressed concern about the staff approvals for stone wall
reconstruction and generator installation. Grahn explained that staff approved
the stone wall reconstruction because the applicant proposed to use the same
materials and methods as the original wall. She also explained that staff can
approve generators not visible from the street.
New Business
3. 504 East Franklin Street [22-0887]
Grahn-Federmack explained that the applicant proposed modifications to the
rear elevation. She also said the house was protected by a preservation
easement with Preservation North Carolina (PNC).
There were no disclosures.
Alan Haig, the property owner, said the proposed changes consisted of a new
rear entrance, a new staircase on the side of the house, a new door and
balcony railing on the third-floor dormer, and replacing the existing vinyl
awnings with louvered wood shutters. He stated that no changes were
proposed to the front of the house.
Haig presented photos and elevations of the existing conditions and proposed
changes. He said the improvements were to make the back of the house as
Page 2 of 14
Historic District Commission Meeting Minutes December 13, 2022
appealing as the front. He said the stained and torn awnings would be
replaced with new shutters that match existing shutters on the house. He was
not sure when the vinyl awnings were added. He explained that a staircase
would be added to the side on the house where no landing existed. He said
there was no railing for the door in the third-floor dormer and that the door
would be replaced with a glass door and railings to create a balcony. Haig
said the railing would not extend to the edge of the roof. He also said the attic
was converted to an office and bedroom and the existing door was below the
finished floor. He said the door was not visible from the street. He also
presented examples of French doors proposed for the dormer.
Commissioner Daniels asked if the side staircase and rear pergola would be
visible from Franklin St and for clarification on the materials for both.
Haig said the staircase would be made of wood, and that it was proposed to
alleviate a safety concern. He also stated it would be visible from Franklin
Street. Haig explained the pergola would be an expanded version of the rear
porch, and that it extended to the edge of the chimney. He said the porch
would have a brick foundation and wooden beams. He stated the pergola
would be visible from Battle Lane.
Commissioner Perl de Pal asked for details about the Preservation North
Carolina (PNC) preservation easement. Haig said the covenants protect a lot
of the interior elements. Grahn-Federmack was sworn in to provide testimony,
and she explained that she understood the easement also applied to exterior
changes and that PNC would review the changes concurrently. She also
pointed out that enforcing PNC easement is outside of the Commission’s
purview. Haig confirmed that PNC reviewed the application materials.
Commissioner Schwartz asked if there were photos from Franklin Street to
help determine what would be visible. Haig presented a photo of the front of
the house and reiterated that he did not believe the pergola would be visible.
Commissioner Perl de Pal was concerned that the new door in the third-floor
dormer was taller than the adjacent windows and would disrupt the
continuous header. She found the header to be a significant architectural
feature of the dormer. Chair Murphy asked if the dormer was original to the
house. Haig believed it was original, but he was not sure. Haig also reiterated
his safety concern because the existing door had no railing.
Page 3 of 14
Historic District Commission Meeting Minutes December 13, 2022
Commissioner McCormick said rear entrances were traditionally subordinate
to front entrances. She asked if the rear entrance could be scaled back. Haig
said the front entrance was rarely used because it had the original lock and
parking was in the rear. He said guests were confused as to where to enter,
and the proposed rear entrance would be more clearly defined and located
where guests could be comfortably received. He also found the proposed
entrance matched the aesthetic of the front.
Commissioner Van de Velde asked if there was a building code concern with
the door in the third-floor dormer. Murphy mentioned that the Building
Department would confirm compliance. Counsel Hornik reiterated that building
code compliance would happen after the Certificate of Appropriateness.
Schwartz asked if the applicant considered adding a masonry staircase to the
first-floor door instead of wood. Haig said a masonry staircase would block
light to the basement windows below the door. He also stated his architect
advised that a landing was required by building code. Schwartz asked if the
addition was original. Haig explained the original house had four rooms and
the additions consisted of previously converted porches.
Haig offered to install the landing and staircase flush with the house to make it
less visible from Franklin Street. The Commission expressed support for this
modification.
Perl de Pal was concerned about the metal railings proposed on the first-floor
stairs and patio. Haig said metal was proposed because it matched what was
existing, but a wood railing was proposed for the balcony. Perl de Pal
suggested looking at other houses in the Franklin-Rosemary Historic District
and thought wood railings were more appropriate throughout.
There was no public comment.
Commissioner Daniels was concerned that the new staircase and the pergola
would be visible from Franklin Street. He preferred the staircase be hidden
behind the chimney. He was also concerned about the size and scale of the
pergola. He said the pergola was not original and thought it would disrupt the
historic nature of the house. Commissioner Van de Velde agreed and thought
the pergola should be pulled in to mitigate visibility concerns.
Commissioner Perl de Pal agreed with previous comments about the staircase
Page 4 of 14
Historic District Commission Meeting Minutes December 13, 2022
and pergola. Perl de Pal reiterated her concern with the new door in the
third-floor dormer. She said the dormer had a strong architectural header that
wrapped around the dormer sides and the proposed glass door disrupted that
continuity. She believed the existing door was a window originally, and that
the applicant should convert it back to a window or keep the height of the new
glass door the same. Van de Velde agreed with Perl de Pal’s comment about
the continuous header, but she said the door is existing and may need to
comply with building code. She was concerned an operable window may not
comply.
Chair Murphy summarized the concerns voiced by commissioners. He
restated that the applicant agreed to turn the staircase. He said aligning the
pergola with the corner of the house could alleviate visibility concerns. He
also said the door on the third-floor dormer was not visible from the street,
and that the building code may require a door for the interior space. Perl de
Pal suggested a custom design for the third-floor door that does not
compromise the horizontal banding.
Haig said he and his wife made significant investments in the house. He said
he could make the change to the staircase but preferred to consult with his
wife about the changes to the pergola.
Hornik recommended the commission continue this hearing until the January
10, 2023 meeting to give the applicant time to work with their architect to
address the Commission’s feedback. Haig asked if they could add landscape
to screen the pergola. Murphy advised that the Commission would need to
see it before approving it. Hornik reiterated that the motion had to be based
on the evidence presented during the hearing.
A motion was made by Commissioner Van de Velde, seconded by Perl de Pal,
to continue this item to the January 10, 2022 meeting, so the commission can
review the changes to the staircase, pergola, and door in the third-floor
dormer. The motion carried by a unanimous vote.
4. 313 E. Franklin Street [22-0888]
There were no disclosures.
Anne Wooten spoke on behalf of the Chi Omega Sorority. Wooten explained
the history of the house before introducing the project’s architect, Jim
Spencer.
Page 5 of 14
Historic District Commission Meeting Minutes December 13, 2022
Spencer presented a photo of the existing house. He described this part of
the historic district as more institutional than single-family residential as
houses were modified for students in the 1960s and 1970s. He said the
center addition that connected the historic Woolen and Patterson houses was
approved in the 1960s and constructed in the 1970s. He described the
addition as being more modern but sympathetic to the Craftsman style of the
two historic houses. He said it was visually distinct from the Patterson House
by a brick fire wall. He also pointed to the screened terrace in the center
addition that blocks the front part of the house. He stated the center addition
was sympathetic to the Craftsman style of the two houses.
He explained that this project aimed to create an outdoor gathering space and
make the house more accessible. He described the need to replace existing
building materials. He said the roof and siding had been patched many times.
He also pointed out that some of the windows were in disrepair and the
proposal included a restoration/replacement strategy.
Spencer said the sorority was seeking approval to remove the exterior
portions of the firewall and fire escapes from the house to create a more
residential feel for the house. He explained fire sprinklers were installed in
1998 and the fire wall and fire escapes were no longer needed. They were
working with the Fire Marshal to obtain approval to remove them.
Spencer presented the existing site plan and described the existing
conditions. He mentioned that a portion of the existing porch on the Woolen
House was enclosed, but he was not sure when. He said a copy of the 1970
site plan showed the enclosed porch. He also believed that a rear porch on
the Patterson House was previously enclosed, but he was not sure when.
Spencer presented a site plan of the proposed modifications. He described a
new entrance on the center addition. He stated that the entrances to the
historic houses would be maintained. He said accessibility ramps would be
added to the side of the Patterson House and at the rear of the building
behind the Woolen House. He explained the existing cedar shingle siding
would be replaced with fiber cement siding for longevity. He also said all
roofing materials would be replaced with a standing seam metal roof and
pointed out that nearby houses had metal roofs.
He presented elevations and described the modifications for each portion of
Page 6 of 14
Historic District Commission Meeting Minutes December 13, 2022
the house. He said the windows on the Woolen House were in various states
of deterioration, and they would be replaced with simulated divided light
windows. The accessibility ramp would lead to a rear entrance on the Woolen
House. He said the existing door was half-step below grade and would need
to be moved up to match the finished level of the ramp. He mentioned that a
storage shed would be removed and replaced with two windows. He said the
fire escapes on the Woolen house would be removed because they were in
bad condition and posed a safety hazard for students.
Spencer described the changes to the center addition. He explained the
existing terrace would be replaced with a new porch to create an open
gathering space. He said it would have a stone foundation to match the
Woolen House. He also stated all windows on the center addition would be
replaced and French doors would be added in the middle of the center
addition. He said the roof over the new porch would be standing steam metal.
He said they propose to remove a portion of the firewall and put siding over it.
Spencer described the changes to the Patterson House. He said the roof and
shingles would be replaced like on the Woolen House. He said the existing
wood windows were in reasonable condition and would be restored.
He presented a rendering of the house with the proposed improvements. He
shared that the color of the center addition was still being discussed, but the
idea was to differentiate it from the Woolen and Patterson houses.
Commissioner Daniels asked if the improvements were meant to unify the
center porch with one of the historic houses or to distinguish it. Spencer
clarified that the project aimed to unify the building, while maintaining a
distinction between the center addition and two historic houses. Spencer
thought the one of the defining characteristics of the Franklin-Rosemary
Historic District was the openness of houses and porches as viewed from the
street. Spencer said the porch floor would be continuous through the two
houses and center addition, but the roof pitch above the center porch would
be different. Daniels asked if different materials were used for the center
porch, and Spencer explained the center addition would have stone flooring
and wood columns with a different column design than those on the Woolen
and Patterson houses. Spencer mentioned that the building was
non-contributing on the National Register because of the center addition, but
he thought it made sense for the building to appear unified at the street.
Page 7 of 14
Historic District Commission Meeting Minutes December 13, 2022
Commissioner McCormick asked about the change in roofing materials for the
entire building. She said the standards call for in-kind replacements. Spencer
said the existing roof is not original to the building, and that it was changed to
composite shingle at some point. He agreed with McCormick’s point about
using a different material, but thought the standards spoke more to residential
uses while this was a more institutional use. He also said the sorority was
open to replacing the top roof with shingles and the porch roofs with metal.
Commissioner Perl de Pal asked if they considered replacing the wood
shingles with cedar as the standards also call for in-kind replacement of
shingles. Spencer said fiber cement shingles were preferred over wood for
maintenance and financial reasons. He also understood that it would be
acceptable according to the Designs Standards if different materials were
visually like the existing.
Perl de Pal asked if they considered using newer style windows on the center
addition and wood frame with storm windows on the historic houses. Spencer
said they could match the light patterns and muntin style with new wood clad
windows which was preferred, but they would consider other options
presented by the Commission.
Perl de Pal asked about the location of the accessibility ramp on the side of
the house. Spencer felt strongly that the accessibility ramp needed to be
visible from Franklin Street. He said the rear accessible ramp was the primary
accessible entry, but someone would not know that coming from Franklin
Street. He also said the ramp was placed where they thought it would have
the least visual impact. He explained that side of the house has heavy existing
vegetation. Perl de Pal asked if they could incorporate the ramp into the grade
and landscaping.
Commissioner Schwartz was concerned about the window changes. He said
the Design Standards discouraged changing the size of windows, removing
windows, and changing window materials. Spencer thought the Standards
should apply differently to non-contributing institutional buildings and
contributing single-family buildings. He said the proposal was an effort to
incorporate the Craftsman elements into the center addition and unify the
building. He thought the commission should consider how new technology
allowed contemporary materials to match the aesthetic of historical structures.
Commissioner McCormick asked if there was a picture of the front parlor
addition on the Patterson House. Spencer presented an elevation that
showed the parlor. He said the goal was to make the parlor feel more open.
Page 8 of 14
Historic District Commission Meeting Minutes December 13, 2022
He did not think the existing windows were original. He said the window
change would be screened by the existing tree. He also clarified that the
proposal was to replace two existing windows with three larger windows.
Schwartz asked about the windows to be removed. Spencer said the windows
on the rear needed to be reconfigured for the ramp and elevator. He said the
windows that would be removed for the elevator were part of the 1970s
renovation.
Perl de Pal asked about the removal of the shingle banister on the center
porch. Spencer said they were removed to create more openness to the front
of the house. He also said they were okay with keeping them, but the banister
would need to be reconstructed due to its current deteriorated condition.
Chair Murphy asked about the removal of the fire escapes. Counsel Hornik
said the Commission only needed to determine if their removal was not
incongruous. Hornik also said any changes deemed necessary by Fire
Marshal would need to be reviewed by the Commission.
Commissioner Van de Velde thought it was important for the side ramp to be
visible. Commissioner Daniels expressed concern about how the windows,
pillars, materials of the center addition relate to the historic houses.
Chair Murphy stated the center addition would remain. Daniels thought other
changes could be made so the building feels like one structure. Hornik
reminded the commissioners of the congruity standard.
There was no public comment.
Commissioner McCormick was concerned about replacing the entire roof with
metal and the proposed shingle materials. Commissioner Perl de Pal said
houses in the Historic District typically have metal roofs over porches. Perl de
Pal said many applicants tried to replace shingles with Hardi plank, and if they
allowed people to change materials, the Standards would become obsolete.
Commissioner Schwartz asked how other commissioners felt about the
change in window materials. Commissioner Van de Velde thought the
applicant was making a good effort to restore windows that could be restored
and replacing others with custom windows. Chair Murphy said the
Commission has approved aluminum clad windows, and that these were
modern materials that could be made to match historic windows.
Page 9 of 14
Historic District Commission Meeting Minutes December 13, 2022
Counsel Hornik reiterated that the Commission must base their decision on
the congruity standard. Perl de Pal said the applicant had not identified the
exact windows that would be restored or replaced, and that they had not
received any evidence of damage. Hornik said the Commission could move to
approve the portions of the application they found were not incongruous and
continue the remaining items to another meeting. He also said they could
deny the application and allow the applicant to return with a substantial
modification.
A motion was made by Commissioner Daniels, seconded by Van de Velde,
that the application was not incongruous with the special character of the
district, provided the applicant replace the upper roofing materials with
shingles and the porch materials with metal, and to grant the Certificate of
Appropriateness (COA). Schwartz requested a friendly amendment about the
window pattern on the front of the house, but Daniels declined. The motion
failed with a vote of 4 to 2.
Aye: 4 - Chair Sean Murphy, Deputy Vice-Chair Polly van de Velde,
Brian Daniels , and Nancy McCormick
Nay: 2 - Anne Perl De Pal , and David Schwartz
Excused: 2 - Vice-Chair Duncan Lascelles, and Josh Gurlitz
A second motion as made by Commissioner Schwartz, seconded by Daniels,
that the application was not incongruous with the special character of the
district, provided the applicant only replace the porch roofing materials with
metal and the upper floors with shingles and that the parlor windows be
replaced to match the existing 12-1 pattern. Hornik cautioned the
Commissioner about adding design changes as a condition in the motion. Perl
de Pal asked about including a condition about the ramp, but Schwartz
declined. The motion carried by a vote of 5 to 1.
Aye: 5 - Chair Sean Murphy, Deputy Vice-Chair Polly van de Velde,
Brian Daniels , Nancy McCormick, and David Schwartz
Nay: 1 - Anne Perl De Pal
Excused: 2 - Vice-Chair Duncan Lascelles, and Josh Gurlitz
A third motion was made by Commissioner Perl de Pal, seconded by
McCormick, to continue the hearing for the parlor windows to the January 10,
2023 meeting. The motion carried by a unanimous vote.
Page 10 of 14
Historic District Commission Meeting Minutes December 13, 2022
A fourth motion was made by Commissioner Schwartz, seconded by Murphy,
to grant a COA for the portions of the application approved in the second
motion. The motion carried by a unanimous vote.
5. 311 McCauley Street [22-0889]
There were no disclosures.
Margaret Sheridan, the applicant, presented photos of the existing house and
a site plan. She explained that the house was converted from an apartment to
a single-family residence in 2015. She said this application was for a shed
that was installed during the pandemic and that she did not realize a
Certificate of Appropriateness was needed.
Sheridan stated the shed was made of wood, simply detailed, and painted to
match the house. She said the siding was vertical and not horizontal like the
house. She said the shed was in the rear and was not visible from the street.
She explained the whole backyard was gravel and they had converted a
portion of the gravel driveway back to grass.
There was no public comment.
A motion was made by Commissioner Perl de Pal, seconded by Van de Velde,
that the application was not incongruous with the special character of the
district and to grant the Certificate of Appropriateness (COA). The motion
carried by a unanimous vote.
6. 312 McCauley Street [22-0890]
There were no disclosures.
Jim Spencer explained that the existing multifamily building was constructed
around 1969. He proposed to add wood siding over the existing plywood
siding in the center of the building, construct shed rooflets over the entry
doors, and to stain the brick. He said he was not sure how to apply the
Design Standards to a non-contributing building. He stated the original
proposal was to paint the brick, but the request was to stain it in a contrasting
color. He described that the rooflets would be simple and modern.
Commissioner Perl de Pal asked about the staining material. Spencer said
they were using Stain Tac Define and that it would be used to stain the brick
surface and not the mortar. Commissioner Schwartz asked if there was a
Page 11 of 14
Historic District Commission Meeting Minutes December 13, 2022
picture of what the brick would look like after applying the stain. Spencer
presented the proposed elevation that shows the painted brick. He said the
stain would have different transparency levels.
There was no public comment.
A motion was made by Commissioner Daniels, seconded by Perl de Pal, that
the application was not incongruous with the special character of the district
and to grant the Certificate of Appropriateness (COA). The motion carried by
a unanimous vote.
7. 405 Ransom Street [22-0892]
Grahn-Federmack explained that the application proposed changes to the
front walkways and reconstructing a porch.
Chair Murphy disclosed that he was a personal friend of the applicant.
Kurt Ribisl, the owner, said there is a covenant on the property by
Preservation Chapel Hill. He presented a photo of the house from c. 1924. He
said the previous owner removed the deteriorated front porch fifteen to twenty
years ago.
Ribisl presented a photo of the existing house. He said he wanted to repair
the stone wall on the front of the property, replace deteriorated concrete front
steps with mortared natural stone, replace the crumbling concrete front
walkway with mortared natural stone, and add a stone pathway.
He presented a photo of the damaged stone wall. He said the wall along the
driveway would be dry stacked and the wall at the front left of the driveway
would be rebuilt as a mortared stone wall. He said the front steps would be
mortared stone and presented a photo for steps in the Gimghoul District. He
said the front walkway would be replaced with a mortared stone walkway with
Tennessee flagstone.
He said a three-foot mortared stone walkway would be built on the side of the
house to connect the front and side porches. He presented historic photos
and pointed out that there was a path and steppingstones still in existence.
He said the application included building a new portico and widow’s walk. He
presented a photo of the existing front porch and described the damage of the
Page 12 of 14
Historic District Commission Meeting Minutes December 13, 2022
wood deck. He said the proposed porch would be a three-pillar structure for
the rebuilt porch. He also said there would be a membrane roof and the roof
would be slanted.
Commissioner Schwartz was concerned that the proposed Tennessee
Flagstone for the walkway was lighter than existing stones in the districts.
Ribisl said the photo was a sample and he would choose colors that
complement the district for the walkway.
A motion was made by Commissioner Van de Velde, seconded by Schwartz,
that the application was not incongruous with the special character of the
district and to grant the Certificate of Appropriateness (COA). The motion
carried by a unanimous vote.
8. 109 Fraternity Court [22-0891]
A motion was made by Commissioner Daniels, seconded by Perl de Pal, to
continue the hearing for 109 Fraternity Court to the January 10, 2023
meeting. The motion carried by a unanimous vote.
Adjournment
Next Meeting - January 10, 2023
Order of Consideration of Agenda Items:
1. Staff Presentation
2. Applicant’s Presentation
3. Public Comment
4. Board Discussion
5. Motion
6. Restatement of Motion by Chair
7. Vote
8. Announcement of Vote by Chair
Public Charge: The Advisory Body pledges its respect to the public. The
Body asks the public to conduct themselves in a respectful, courteous
manner, both with the Body and with fellow members of the public.
Should any member of the Body or any member of the public fail to
observe this charge at any time, the Chair will ask the offending
person to leave the meeting until that individual regains personal
control. Should decorum fail to be restored, the Chair will recess the
meeting until a genuine commitment to this public charge is observed.
Page 13 of 14
Historic District Commission Meeting Minutes December 13, 2022
Unless otherwise noted, please contact the Planning Department at
919-968-2728; planning@townofchapelhill.org for more information on
the above referenced applications.
See the Advisory Boards page http://www.townofchapelhill.org/boards
for background information on this Board.
Page 14 of 14
Agenda
Town Hall
TOWN OF CHAPEL HILL 405 Martin Luther King Jr.
Boulevard
Historic District Commission Chapel Hill, NC 27514
Meeting Agenda
Chair Sean Murphy Josh Gurlitz
Vice-Chair Duncan Lascelles Nancy McCormick
Deputy Vice-Chair Polly van de Velde Anne Perl De Pal
Brian Daniels David Schwartz
Tuesday, December 13, 2022 6:30 PM RM 110 | Council Chamber
Language Access Statement
Opening
Roll Call
Secretary reads procedures into the record
Commission Chair Reads Public Charge
Approval of Agenda
Announcements
Petitions
Approval of Minutes
1. October 11, 2022 Action Minutes [22-0885]
Attachments: October 11, 2022 Action Minutes
Information
http://www.townofchapelhill.org Page 1 of 3 Printed on 11/28/2022
Historic District Commission Meeting Agenda December 13, 2022
2. Administrative Certificate of Appropriateness [22-0886]
Approvals and Maintenance Memos
Attachments: Administrative Certificate of
Appropriateness and Maintenance Memo
Summary
New Business
3. 504 East Franklin Street [22-0887]
Attachments: Staff Memo
History
Application Materials- Part 1
Application Materials Part 2
4. 313 E. Franklin Street [22-0888]
Attachments: Staff Memo
Application Materials Part 1
Application Materials Part 2
5. 311 McCauley Street [22-0889]
Attachments: Staff Memo
Application Materials
6. 312 McCauley Street [22-0890]
Attachments: Staff Memo
Application Materials Part 1
Application Materials Part 2
7. 405 Ransom Street [22-0892]
Attachments: Staff Memo
Application Materials
8. 109 Fraternity Court [22-0891]
Attachments: Staff Memo
Application Materials
http://www.townofchapelhill.org Page 2 of 3 Printed on 11/28/2022
Historic District Commission Meeting Agenda December 13, 2022
Adjournment
Order of Consideration of Agenda Items:
1. Staff Presentation
2. Applicant’s Presentation
3. Public Comment
4. Board Discussion
5. Motion
6. Restatement of Motion by Chair
7. Vote
8. Announcement of Vote by Chair
Public Charge: The Advisory Body pledges its respect to the public. The Body
asks the public to conduct themselves in a respectful, courteous manner, both
with the Body and with fellow members of the public. Should any member of the
Body or any member of the public fail to observe this charge at any time, the
Chair will ask the offending person to leave the meeting until that individual
regains personal control. Should decorum fail to be restored, the Chair will
recess the meeting until a genuine commitment to this public charge is observed.
Unless otherwise noted, please contact the Planning Department at
919-968-2728; planning@townofchapelhill.org for more information on the
above referenced applications.
See the Advisory Boards page http://www.townofchapelhill.org/boards for
background information on this Board.
http://www.townofchapelhill.org Page 3 of 3 Printed on 11/28/2022
Get email alerts for Chapel Hill
A daily email when new agendas and minutes are posted.