Town Council
Regular MeetingChesapeake Beach, MD · March 12, 2024
Agenda
-
TOWN COUNCIL INFORMATIONAL
WORK SESSION AGENDA
March 12, 2024
Starting at 6:00 PM
I. Call to Order and Roll Call
II. Pledge of Allegiance
III. Informational discussion on the following:
1. Chesapeake Beach Water Reclamation Treatment Plant (CBWRTP) Geotechnical
Study
2. Saddle Replacement Project
3. Opioid Abuse Awareness Coalition Sculpture Project
4. Bayside History Museum Request for Funding
5. FY25 Utility Fund Budget
6. FY25 Water Park Budget
7. Discussion on alternate recreational offerings for Town residents
IV. Closed Session – Town Council to meet in closed session under the Statutory
Authority of the General Provisions Article § 3-305(b) “To consult with counsel
to obtain legal advice”.
V. Council Lightning Round
VI. Adjournment
8200 BAYSIDE ROAD, P.O. BOX 400 CHESAPEAKE BEACH, MARYLAND 20732
(410) 257-2230 (301) 855-8398
To: The Honorable Mayor and Town Council From: Holly Wahl, Town Administrator
Subject: Chesapeake Beach Water Reclamation Treatment Plant (CBWRTP) Geotechnical Study
Date: March 7, 2024
I. BACKGROUND:
Through the continued work on the design project at the Chesapeake Beach Water Reclamation Treatment Plant
(CBWRTP) for the Headworks Improvements with McCrone, it has been identified that additional investigative
work will need to be performed to identify the conditions of the soils and water table in the proposed wetwell.
Due to the proximity of this proposed location to the existing Clarifier #1, the subsurface conditions will need to
be evaluated. There is concern that dewatering work for the installation of the wetwell may cause structural
issues with the clarifier. This work is detailed in the Proposal for Geotechnical Services provided by Geo-
Technology Associates, Inc. submitted to McCrone (shown as Exhibit A).
II. FISCAL IMPACT:
The work will be billed by McCrone to the Town as a change order as part of the Town of Chesapeake Beach
Headworks Improvement Project for a cost not to exceed $25,000. Funds would be expended through the FY24
Capital Improvements line item from the CBWRTP.
Exhibit A
GEO-TECHNOLOGY ASSOCIATES, INC.
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
A Practicing GBA Member Firm
January 26, 2024
McCrone Engineering
20 Ridgely Avenue, Suite 201
Annapolis, Maryland 21401
Attn: Ms. Natalia S. Dunlap
Re: Proposal for Geotechnical Services
Proposed Wet Well
Chesapeake Beach Water Reclamation Plant
Calvert County, Maryland
Dear Natalia:
Geo-Technology Associates, Inc. (GTA) is pleased to submit this Proposal to McCrone
Engineering (“Client”) for the work (“Work”) described in detail in the Scope of Services section
of this Proposal. The work will be performed for the wet well planned for the Chesapeake Beach
Reclamation Plant at 8550 Bayside Road in the Chesapeake Beach area of Calvert County,
Maryland.
GTA’s understanding of the proposed improvements and existing site conditions is based
on the following information:
Based on correspondence with Client representative, GTA understands that the proposed
wet well is planned to have interior dimensions of 12.5 feet by 15 feet and bottom elevation
at 25 feet below existing ground surface. Grit and screening structures are planned on top
of the wet well. The sheeting/shoring area will be approximately 18.5 feet by 21 feet.
The plan titled Wastewater Treatment Plant, Enhanced Nutrient Removal Upgrade, dated
September 15, 2011. This plan depicts layout, utility alignment and profiles, architectural
drawings, and structural details of the existing facility.
The plan titled Secondary Clarifiers, dated July 7, 2016, prepared by Dutchland, Inc. This
plan depicts details of two existing clarifier tanks adjacent to the proposed wet well
location.
To characterize subsurface conditions, GTA will perform one Standard Penetration Test
(SPT) boring and install one groundwater monitoring well in the vicinity of the proposed wet well.
Laboratory testing and engineering analysis will be provided, and a geotechnical report
summarizing the results and preliminary recommendations will be generated for this project.
GTA’s scope of services is detailed in the following section.
14280 Park Center Drive, Suite A, Laurel, MD 20707 (410) 792-9446 (301) 470-4470
Abingdon, MD Baltimore, MD Laurel, MD Frederick, MD Waldorf, MD New Castle, DE Georgetown, DE Somerset, NJ
NYC Metro York, PA Quakertown, PA Beaver Falls, PA Malvern, OH Sterling, VA Nashville, TN Charlotte, NC Raleigh, NC
Visit us on the web at www.gtaeng.com
McCrone Engineering
Re: Chesapeake Beach Water Reclamation Plant – Proposal for Geotechnical Services
January 26, 2024
Page 2
SCOPE OF SERVICES
This proposal is limited exclusively to the work described in this Scope of Services section.
Services not expressly described shall be considered excluded from the scope of services. If Client
requests additional services, such services will be billed as discussed in the Additional Work
section of this Proposal. GTA proposes to perform the following services:
Task 1 – Geotechnical Exploration and Report
Perform a site visit, notify Miss Utility, and retain a Private Locator in an attempt
to clear underground utilities in the area of explorations.
Mobilize a truck- or track-mounted SPT drill rig to the project site. Unless
otherwise advised, it is assumed that GTA has permission to enter the site at the
most convenient location.
Perform one SPT boring to a depth of 60 feet below existing grade, or prior refusal,
using a mud-rotary drilling method. GTA will field locate the exploration location
using tape measurements from existing site features. GTA requests for Client to
field locate the proposed boundaries of the sheeting/shoring system prior to GTA’s
drilling activities so that GTA can plan the borings within the proposed
sheeting/shoring area.
GTA anticipates that the exploration will likely encounter groundwater. GTA will
install a groundwater monitoring well adjacent to the boring location to a depth of
30 feet below existing grade. GTA will equip the monitoring well with a flush-
mount cover and install a datalogger to continuously monitor groundwater for a
duration of about one week in an effort to estimate tidal groundwater depth changes.
o Note that abandonment of the monitoring well will be required prior to or
during installation of the wet well. Monitoring well abandonment is not
included in the scope of this Proposal.
Wet spoils will be generated during drilling. After completion of drilling, GTA
will spray down the work area in an attempt to clear excess of spoils. Additional
cleanup effort, if required, can be provided as an additional service under Task 2 of
this Proposal.
Spoils (and grout, if needed) will be used to backfill the SPT borehole. The borehole
will be patched with quick-setting concrete.
o Excess drilling spoils, if present, will be left on-site in nearby vegetated
areas. Alternatively, if Client requests off-site disposal of drilling spoils,
those costs are included in Task 1B of this Proposal.
McCrone Engineering
Re: Chesapeake Beach Water Reclamation Plant – Proposal for Geotechnical Services
January 26, 2024
Page 3
Provide a staff geologist/engineer to coordinate and log explorations.
Perform limited laboratory testing to evaluate the general engineering
characteristics of the site subsoils. This testing may include grain size testing,
plasticity testing, and soil moisture content testing.
Prepare a geotechnical engineering report that includes the results of our field
explorations and laboratory analyses, and our preliminary recommendations for the
proposed wet well.
Task 1A – Groundwater Drawdown Evaluation (if required)
Due to proximity of the site to the Chesapeake Bay, GTA anticipates that
groundwater will be encountered in the boring and that dewatering will be required during
wet well construction. Depending on the depth of groundwater, dewatering activities may
cause groundwater drawdown beneath the adjacent existing structures. Rapid drawdown
will cause changes in the pore pressure and effective stresses of the soils supporting the
existing structures and may cause foundation settlement. If groundwater is encountered in
the boring, GTA will perform the following services:
Collect up to four Shelby Tube samples for laboratory testing.
Perform limited laboratory testing on the Shelby Tube samples, including grain size
analysis, plasticity testing, unit weight testing, soil moisture content testing,
permeability testing, and triaxial shear with pore pressure testing.
Perform a groundwater drawdown analysis to estimate drawdown-induced
settlement beneath the adjacent existing structures. The results of the laboratory
testing and drawdown analysis will be incorporated into the geotechnical
engineering report included in Task 1.
Tasks 1B – Off-Site Disposal of Drilling Spoils (if requested)
If acceptable to the Client, GTA can leave the spoils generated from drilling on-site for no
additional fee. However, if requested by the Client prior to mobilization, GTA can dispose of
excess drilling spoils off-site. GTA will collect samples from the soil and wastewater generated
by the field explorations and submit them for waste characterization analysis and taken off-site for
disposal at a permitted facility. The cost of the characterization testing and disposal will depend
on the quantity of spoils and wastewater generated by the explorations, and the types/levels of
contamination (if present) in the spoils and wastewater. These factors cannot be accurately
projected in advance of the explorations. Task 1A includes a suggested allowance for off-site
disposal of spoils, based on GTA’s prior experience with similar projects. However, the actual
disposal fee will be billed as described in the Fees and Payments section of this Proposal.
McCrone Engineering
Re: Chesapeake Beach Water Reclamation Plant – Proposal for Geotechnical Services
January 26, 2024
Page 4
Task 2 – Additional Services
GTA will attend meetings and provide additional consultation as requested by the Client.
Additional site cleanup effort, if required, will be billed as an additional service.
FEES AND PAYMENTS
GTA’s fee is for the work described in the Scope of Services section of this Proposal, at the
location described. Based on currently available information, the fee for the Work listed in the
Scope of Services will be as follows:
COST SUMMARY
Task 1 Geotechnical Exploration and Report $16,000.00
Task 1A Groundwater Drawdown Evaluation (if required) $6,700.00
Task 1B Off-site Disposal of Drilling Spoils (if requested)* $4,000.00
(Suggested Allowance)
Task 2 Additional Consultation and Meetings Hourly
*Task 1A fee is based on the assumption that the spoils and wastewater will not be environmentally impacted and will not exhibit signs
of contamination. If the spoils are suspected to be contaminated, additional characterization testing and higher disposal fees will likely
be required, and the fee for this task will be adjusted accordingly.
Changed conditions or additional requirements may result in an adjustment to estimated
fees.
ADDITIONAL WORK
Experience indicates that certain additional items of work may be required or necessary
which GTA cannot presently determine or estimate. For this reason, the fee for these items is not
included in our fee estimate.
For Client’s reference, the following are some of the services that may be required as
additional work to complete the work, but that are expressly excluded from the Scope of Services.
Exploration stakeout by a Licensed Surveyor.
Delay time, if unable to access boring locations for reasons beyond the control of
GTA.
Damage to underground utilities if Miss Utility is notified.
Water source for drilling, if necessary.
Environmental characterization testing, other than that included in Task 1A for
drilling spoil disposal.
Construction monitoring.
Site restoration other than backfilling, grouting, and patching exploration holes
once.
Sediment and erosion control.
McCrone Engineering
Re: Chesapeake Beach Water Reclamation Plant – Proposal for Geotechnical Services
January 26, 2024
Page 5
Contracted heavy machinery to provide access to heavily wooded areas.
Cost of equipment damaged while drilling through rubble or debris.
Permit acquisition. Such permits may include, but are not limited to right-of-way
entry permits, grading permits, sediment and erosion control permits.
Correction work due to inaccurate information supplied by Client or its agents.
Meeting attendance.
Traffic Control.
Pavement Design.
Fees for additional work shall be in addition to any fees for the work described in the Scope
of Services section. GTA’s fees for additional work will be billed on an hourly time and material
basis in accordance with the rates set forth herein and the attached Fee Schedule. The hourly rates
are subject to periodic review and change by GTA. Changes in our rate schedule will be reflected
in your monthly invoices.
GENERAL CONDITIONS
The attached General Provisions, dated August 2022, are incorporated herein by reference
and made part of this Proposal. Please sign the Acceptance and return one original to our office.
Your verbal authorization for GTA to proceed acknowledges your acceptance of the terms of this
Proposal, including the General Provisions and Fee Schedule attached hereto.
Geo-Technology Associates, Inc. welcomes the opportunity to be of assistance to you and
we look forward to working with you on this project. If you have any questions, please do not
hesitate to contact this office at any time.
Sincerely,
GEO-TECHNOLOGY ASSOCIATES, INC.
Andres Villarreal, Ph.D.
Project Geotechnical Professional
Benjamin T. Dinsmore, P.E.
Vice President
\\laurel-data\docs\Proposals\User Files\Villarreal\2024\Chesapeake Beach Water Reclamation Plant\GEO Proposal - Chesapeake Beach.docx
Attachments:
Fee Schedule GTA 00-23 (1 page)
August 2022 General Provisions (3 pages)
GBA Publication “Important Information About This Geotechnical Engineering Proposal” (3 pages)
McCrone Engineering
Re: Chesapeake Beach Water Reclamation Plant – Proposal for Geotechnical Services
January 26, 2024
Page 6
ACCEPTANCE:
The undersigned represents that he/she accepts this Proposal and is authorized to sign and bind
McCrone Engineering.
Signature Name (please print)
Date Title
Please indicate any preference of correspondence contacts below.
INVOICING: Mail Email Both
Accounts Payable Contact Name Direct Phone Number
Billing Address Email Address
GEO-TECHNOLOGY ASSOCIATES, INC.
FEE SCHEDULE*
Technical Fees Rate
Admin Staff $50.00 /Hour
Technician $70.00 /Hour
Structural Technician, MARTCP/DOT Technician $90.00 /Hour
Senior Technician $100.00 /Hour
Field Professional/Scientist, Assistant Project Manager $140.00 /Hour
Staff Engineer, Staff Professional/Scientist, Project Manager $155.00 /Hour
Project Engineer, Project Professional/Scientist $200.00 /Hour
Senior Engineer, Senior Professional/Scientist, Senior Project Manager $250.00 /Hour
Associate $280.00 /Hour
Principal/Vice President $325.00 /Hour
Travel Mileage $0.75 /Mile
Nuclear Gauge Equipment Fee (Soils) $58.00 /Day
Nuclear Gauge Equipment Fee (Asphalt) $90.00 /Day
Admin Fee for Processing/Distributing Daily Reports for Construction Observation $250.00 /Month
Photo ionization detector (PID) / Multigas Meter Equipment Fee $240.00 /Day
Core Drill Rig with Bit and Generator Equipment Fee $550.00 /Day
Floor Flatness Equipment Fee $550.00 /Day
Trimble GPS Equipment Fee $470.00 /Day
Windsor Probe Strength Test Rental (set of 3 Shots) $135.00 / Set
Subcontracted Work Cost + 25%
ASTM Unit
Laboratory Fees Designation Price
Soil
Moisture Content D-2216 $12.00 /Each
Atterberg Limits D-4318 $170.00 /Each
Wash #200 D-1140 $85.00 /Each
Grain Size Analysis D-6913 $130.00 /Each
Grain Size with Hydrometer D-422 $210.00 /Each
Proctor - Standard D-698 $200.00 /Each
Proctor - Modified D-1557 $230.00 /Each
California Bearing Ratio (CBR) D-1883 $650.00 /Each
One Dimensional Consolidation D-2435 $950.00 /Each
Direct Shear Test - Granular Soils (3 points) D-3080 $675.00 /Each
Direct Shear Test - Fine Grained Soils (per point) USACOE EM 1110-2,
(Peak or Fully Softened/Residual) Modified $650.00 /Each
Unconfined Compression Test (Soil) D-2166 $200.00 /Each
Triaxial Compression UU (1 point) D-2850 $255.00 /Each
Triaxial Compression CU w/PP (3 points) D-4767 $1,325.00 /Each
Unit Weight C-29 $90.00 /Each
Specific Gravity of Soils D-854 $255.00 /Each
Permeability of Granular Soils (constant head) D-2434 $625.00 /Each
Permeability of Soils (flexible wall) D-5084 $675.00 /Each
Loss on Ignition (Organic Content) D-2974 $120.00 /Each
PH D4972 or G-51 $70.00 /Each
Resistivity G-57 $170.00 /Each
Corrosion Series various $350.00 /Each
Topsoil Testing (basic nutrients, texture, and soluble salts) various $185.00 /Each
Soil Admixture Design including Compression Testing various $1,375.00 /Each
Compression Testing of Soil Cement Specimens D-1633 $50.00 /Each
Soil Admixture Design - Preparation of Specimen D-1632 $250.00 /Each
Soil Cement Proctor w/ 7-day Breaks D-558 $800.00 /Each
Freeze/Thaw Testing of Soil Cement D-560 $1,300.00 /Each
Wet/Dry Testing of Soil Cement D-559 $1,300.00 /Each
GSA, Atterberg, Proctor various $500.00 /Each
LA Abrasion C-535 $450.00 /Each
Sodium Sulfate Soundness C-88 $325.00 /Each
Organic Impurities C-40 $165.00 /Each
Specific Gravity Asphalt Cores D2726 or D-1188 $65.00 /Each
Rock Unconfined Compression Test D-7012 $200.00 /Each
Concrete
Cylinders 4 x 8 C-39 $18.00 /Each
Cylinders 6 x 12 C-39 $24.00 /Each
Mortar/Grout Cube 2 x 2 C-780 $28.00 /Each
Concrete Cylinders Prep -- $68.00 /Hour
Grout Prism C-1019 $75.00 /Each
Concrete Flexural Beam C-293 $120.00 /Each
* This fee schedule is valid through December 2023 and is subject to change thereafter.
Fee Schedule: GTA 00-23
To: The Honorable Mayor and Town Council From: Holly Wahl, Town Administrator
Subject: Proactive Saddle Replacement Project
Date: March 7, 2024
I. BACKGROUND:
Public works staff spends hundreds of hours every year repairing failed saddles costing the Town both direct
and indirect costs. These hours are never planned and are always an emergency response requiring an “all
hands-on deck” response from Public Works. The work to address failed saddles is time intensive requiring
repair of the failed line and removal of the wet material before the hole can be backfilled and then asphalt
installed.
There are several reasons for the failures, some are caused by (i) stray currents, (ii) electrical panels inside the
home grounded in some form to the copper water line, and (iii) a possible magnetic field around underground
utilities that latches onto copper laterals. In all these cases the current travels along the copper (metal) water line
to the main C-900 (plastic) water main. At that point the current can no longer travel and finds the weakest
metal which is the saddle.
Public works has also proactively changed out saddles in a phased in approach with an estimated $2,000,000 in
direct cost savings.
II. FISCAL IMPACT:
The Fishing creek wet well upgrade was budgeted at $350,000.00; however, the Town expended $100,000 by
replacing portions of the wet well rather than a complete replacement. The cost savings were made possible by
Public Works staff completing all of the above ground repairs in house by 1) installing new controls and panels
at higher elevations 2) raising the pump lift and crane foundation to the same elevation as the wet well door, 3)
taking the station offline to enter the wet well and change out all the interior plumbing and hardware, and 4)
changing all plumbing and checking valves in the dry vault.
Town staff is requesting to utilize the $250,000 in savings from the Fishing Creek wet well project to complete
additional saddle replacements not to exceed the savings of $250,000. Funding will come from the Utility Fund
FY24 Capital Improvement line item utilizing funds that are available through the cost savings made available
through American Rescue Plan Act funding.
To: The Honorable Mayor and Town Council From: Holly Wahl, Town Administrator
Subject: Opioid Abuse Awarness Sculpture Project
Date: March 7, 2024
I. BACKGROUND:
The Twin Beach Opioid Abuse Awareness Coalition provided a call for artists in November of 2022 seeking
public art dedicated to those we have lost and those who continue to struggle to opioids. A project was selected;
however, there are other submissions that the Twin Beach Opioid Abuse Awareness Coalition is interested in
seeking to commission one of the artists to construct a sculpture to place in a public space of the Town of
Chesapeake Beach.
II. FISCAL IMPACT:
This project is expected to cost $35,000 in capital funds from the FY25 General Fund budget for the Town
Council’s review and consideration.
To: The Honorable Mayor and Town Council From: Holly Wahl, Town Administrator
Subject: Bayside History Museum
Date: March 7, 2024
I. BACKGROUND:
The Bayside History Museum is requesting funding in FY25 for two display cases as outlined in Exhibit A per
the March 4, 2024, request from Grace Mary Brady, President of the Museum.
II. FISCAL IMPACT:
Town Council to review the proposed cost outline (see Exhibit A). The proposed cost of $15,325 covers
both sections for a preservation case for the Twin Beach Deputies Law Enforcement uniform as well as the
North Beach Volunteer Fire Department (NBVFD) historical content for display and public access.
Exhibit A
Bayside History Museum
4025 4th Street, North Beach, Maryland
410-610-5970
baysidehistorymuseum@hotmail.com
www.baysidehistorymuseum.org
March 4, 2024
TO: Mayor & Town Council
Town of Chesapeake Beach
FROM: Grace Mary Brady, President
Bayside History Museum
RE Budget request
In 2026 the Bayside History Museum will provide new exhibits for 2 anniversaries:
Celebration of North Beach Volunteer Fire Department Incorporation in 1926. 1926 – 2026.
Celebration and recognition of the 250 Anniversary of the American Revolution. 1976 – 2026.
The Bayside History Museum has partnered with Huntingtown High School AP students under
the supervision of Mr. James to create a new display for the American Revolution. We have
met at the school and Mr. James is bringing the class to the museum this Saturday, March 9 th so
that they can start designing their display. It will be wonderful to feature an exhibit created by
students from one of our local high schools.
Our Budget request is to build new display cabinets to hold the voluminous collection of
NBVFD memorabilia (see attached cost). This company built the display cases at
Huntingtown High School which are absolutely beautiful.
If you have any questions, please don’t hesitate to call me at 410-257-7777.
attachment
WOODWORKING BY DESIGN, LLC
920 KEITH LANE, UNIT 1
OWINGS, MD 20736
410-257-0092 SHOP wwbd@comcast.net
PROPOSAL
March 1, 2024
Bayside History Museum
- Grace Mary Brady (President)
Scope of Services:
• Fabricate and Install Custom-Built Showcase Cabinets (30” deep).
▪ Unit built to specifications and drawings provided.
▪ Unit constructed of ¾” maple wood plywood.
▪ All trims are constructed of hardwood maple stock.
▪ Includes a 12” Base Board for flooding purposes.
▪ Unit includes two 5’ wide and 85” tall wooden frames.
▪ Includes all the glass for the shelves and casing.
▪ All measurements and design will be finalized before creation.
▪ Finished in a lacquer of customers choice.
▪ Price includes installation. $10,375.00
• Fabricate and Install Custom-Built Showcase Cabinets (9” deep).
▪ Unit built to specifications and drawings provided.
▪ Unit constructed of ¾” maple wood plywood.
▪ All trims are constructed of hardwood maple stock.
▪ Includes a 12” Base Board for flooding purposes.
▪ Unit includes two 44” wide and 82” tall wooden frames.
▪ Includes all the glass for the shelves and casing.
▪ All measurements and design will be finalized before creation.
▪ Finished in a stain lacquer of customers choice.
▪ Price includes installation. $4,950.00
(Note: Granite, Appliances, Electrical, and Plumbing supplied by others.)
PAYMENT SCHEDULE IS AS FOLLOWS:
A 1/3 deposit is required to book. Another 1/3 of the payment is due upon delivery. The remaining balance is
due upon completion of the project. (checks and credit cards are acceptable forms of payment)
Respectfully Submitted,
Gregory Brittain
Drawings are close in resemblance but could vary in design and scale.
Acceptance______________________________________ Date: _________________________
1
FY25 Budget
Utility Fund
FY21 FY22 FY23 FY24 FY25
BUDGET ACTUAL BUDGET ACTUALS BUDGET ACTUALS BUDGET BUDGET
REVENUES
400-430130 Transfer In - General Fund 500,000 313,325 188,542 - - 1,600,000 - -
400-430140 Transfer In - Fund Reserves 1,494,681 500,000 - - 425,184 - 206,776 -
400-430150 Transfer In - Fund Reserves - Restricted - - - - - - 1,200,000 -
400-440010 Sewer Usage Charges 701,083 666,842 692,923 654,880 783,480 752,542 750,000 1,091,168
400-440020 Sewer Miscellaneous Income - - - - 1,000 50 - -
400-440040 Sewer Penalties & Interest 1,368 453 - 1,942 2,000 2,312 20,000 20,000
400-441010 Water Usage Charges 275,937 259,887 279,968 251,871 348,380 294,641 300,000 432,856
400-441020 Processing Fees & Fines 2,160 870 1,000 2,280 2,000 7,810 50,000 77,418
400-441030 Water Penalties and Interest 3,284 1,079 - 2,720 2,000 3,019 16,000 16,000
400-450000 Investment Interest 8,208 1,380 2,000 3,642 1,500 108,779 10,000 59,234
400-460000 Fixed Fee 489,660 491,489 492,052 501,510 562,898 580,261 1,047,402 1,601,200
400-460050 Infrastructure Fees 16,488 49,121 46,357 33,276 18,000 610 18,000 1,000
400-460100 Sewer Capital Connection Fee 324,000 846,000 270,000 540,000 360,000 198,000 400,000 255,000
400-460200 Water Capital Connection Fee 108,000 282,000 90,000 180,000 120,000 66,000 200,000 127,500
400-461000 Tower Site Rental - - - - - - 130,504 134,348
400-430130 Gain on Sale - - - - - 8,500 - -
TOTAL REVENUES: 3,924,869 3,412,446 2,062,842 2,172,121 2,626,442 3,622,524 4,348,682 3,815,724
EXPENSES
400-6700-625300 Interest Expense - Sewer - - - (1,256) - - - -
400-6700-820100 Depreciation - Sewer - - - 686,677 - 687,539 - -
400-6850-601000 Salaries & Wages - - - - - - 176,989 575,246
400-6850-602400 Continuing Education - - - - - - 5,000 6,500
400-6850-610500 Taxes & Benefits - - - - - - 88,495 290,212
400-6850-662200 Meter Repairs & Maintenance - 404,440 38,000 9,383 - - 25,000 25,000
400-6850-662300 Meters - MXU's 38,000 36,970 - - 43,000 48,220 - -
400-6850-715100 Water Plant Repairs & Maintenance - - 15,000 403,553 30,000 75,455 35,000 95,000
400-6850-715500 Water Testing 435,000 262,101 10,000 9,698 13,000 5,763 18,000 18,000
400-6850-719200 Principal - DHCD 2010 Bond 10,000 8,784 - - - - - -
400-6850-820400 Depreciation - Water 1,257,800 1,257,800 - 170,466 - 145,705 - -
400-6900-621400 Engineering & Professional Fees - 170,466 6,000 5,023 6,000 7,464 37,500 54,000
400-6900-621501 Safety 5,000 2,743 6,500 3,469 7,500 14,040 15,000 17,000
400-6900-625300 Interest & Administrative Expense - LT Debt 6,500 4,578 76,319 125,136 70,948 64,990 65,520 60,034
400-6900-626001 Pump Station Repair 99,407 99,406 40,000 34,451 50,000 62,662 50,000 50,000
400-6900-630500 Supplies 45,000 42,201 25,000 23,844 30,000 32,658 44,000 50,000
400-6900-631500 Postage 25,000 16,225 4,500 3,897 4,500 5,394 6,000 10,608
400-6900-632400 Miss Utility Fees 4,500 4,465 1,500 1,390 1,500 1,278 2,000 2,000
400-6900-632500 Line Repairs & Maintenance 1,500 1,440 95,000 60,367 95,000 86,694 75,000 90,000
400-6900-632800 Banking Fees 70,000 69,926 5,000 9,890 8,000 18,898 50,000 58,000
400-6900-670000 TPF Fixed / Capital Costs 5,000 3,670 767,141 507,240 946,010 789,857 1,322,265 1,057,759
400-6900-670100 TPF Variable 694,029 581,596 378,663 286,247 421,395 413,732 509,898 472,253
400-6900-687500 Utilities 325,905 325,905 70,000 71,870 70,000 102,609 86,000 120,000
400-6900-717600 Miscellaneous 70,000 65,011 500 (31) 500 (19,426) 500 500
400-6900-780000 Insurance 186,675 186,674 15,002 13,583 15,002 18,153 17,000 53,612
400-6900-801000 Capital Projects - - - - - - 1,200,000 185,000
400-6900-840500 Connection Fee Reimbursement 313,325 313,325 - - 300,000 - - -
DEBT SERVICE
400-6900-719300 Principal - 2014 - ENR 500 (390) 188,542 - 190,427 - 192,331 194,254
400-6900-748100 Principal - 2008 SRF Loan 280,884 280,884 283,975 - 287,098 - 290,256 293,449
400-6900-748300 Principal - ARRA Loan (2009) 35,842 35,842 36,200 - 36,562 - 36,928 37,297
TOTAL EXPENSES: 3,924,869 4,185,408 2,062,842 2,424,897 2,626,442 2,561,685 4,348,682 3,815,724
SURPLUS/DEFICIT: - (772,962) - (252,776) - 1,060,839 - -
Capital Budget - UF
FY25 - FY29
PROJECT FUND FY25 FY26 FY27 FY28 FY29
Fishing Creek Wet Well UF - - - - -
Meters & MXUs UF 35,000 35,000 35,000 35,000 35,000
Richfield Station Wet Well Generator UF 100,000 - - - -
Harbor Road Well House UF - - 450,000 - -
Vacuum Trailer UF 50,000 - - - -
Valley View Wet Well Generator UF - - - 125,000 125,000
TOTAL CAPITAL 185,000 35,000 485,000 160,000 160,000
New Rate Schedule Effective July 1, 2024
APPENDIX A
FEE & RATE SCHEDULE
WATER & SEWER SYSTEM
TOWN OF CHESAPEAKE BEACH, MARYLAND
WATER / SEWER PLAN REVIEW FEES:
Review / Preliminary Plans
• Public Water and Sewer $ 300.00
• Private Water or Sewer $ 250.00
Minor Subdivision Plan (1-7 Lots)
• Public Water and Sewer $ 750.00 + $75.00/Lot
• Private Water or Sewer $ 500.00 + $50.00/Lot
Resubmitted plans that do not adequately address
all comments are subject to an additional charge of
50% of Review Fee.
Major Subdivision Plan (>7 Lots)
• Public Water and Sewer $ 1,500.00 + $150.00/Lot
• Private Water or Sewer $ 1,425.00 + $950.00/Lot
Minor Site Plan (1-7 Lots)
• Public Water and Sewer $ 190.00 + $150.00/EDU
• Private Water or Sewer $ 135.50 + $92.00/EDU
Major Site Plan (>7Lots)
• Public Water and Sewer $ 2,250.00 + $225.00/EDU
• Private Water or Sewer $ 1,800.00 + $180.00/EDU
Administrative Water/Sewer Application Fee $ 200.00
To be collected with Submittal of any water and/or sewer
construction plans/connection application/permit request.
Public Sewer Pump Station Plan $ 2,500.00
Injector Pump Station Plan $ 250.00/EDU
WATER / SEWER RATES - BILLED QUARTERLY:
Range Water Sewer
(per 1,000 total gal. Billed Quarterly) $3.27/Tg $9.07/Tg
range 1 to 4000
(per 1,000 total gal. Billed Quarterly) $3.34/Tg $9.28/Tg
Range 4001 to 8000
(per 1,000 total gal. Billed Quarterly) $3.42/Tg $9.49/Tg
Range 8001 to 15000
(per 1,000 total gal. Billed Quarterly) $3.49/Tg $9.68/Tg
>15000
Sewer Use without Water Service – To be determined
based on average usage per EDU by the State of
Maryland.
Quarterly Fixed Fee – Water (minimum of one per $ 50.00/EDU
use)
Quarterly Fixed Fee - Sewer (minimum of one $ 100.00/EDU
per use)
OTHER CONNECTION FEES:
Water Meters/Hydrants
Standard 5/8” x 3/4” Outdoor Radio Read Water $ 500.00
Meter
Larger meter will be priced on a case-by-case basis.
Standard 5/8” x 3/4” Indoor Radio Read Water $ 500.00
Meter
Larger meter will be priced on a case-by-case basis.
Meter Installation Fee $ 200.00
Fee is included in a connection permit application.
Fire Hydrants & Meters
Short-Term 5/8” x 3/4” Meter Rental (60 days or $ 1,250.00
less reapplication and associated fee must be made
after each 60-day term). Includes $500 refundable
deposit.
Temporary Fire Hydrant Meter $ 100.00 Application Fee
(meter provided by Town)
Private Fire Hydrant Fee (one time) $ 500.00/hydrant
Hydrant Meter Rate/1,000 gallons $ 10.00/Tg
Submeters $ See Appendix ‘E’
Capital Contribution Charges
One time charge before time of connection
Water $ 10,000.00/EDU
Sewer $ 20,000.00/EDU
Illegal Water/Sewer Connection Fee $ 1,000/day until illegal
connection is removed
INSPECTION AND TESTING FEES:
Individual Water & Sewer Connection Inspection $ 216.00
per EDU
Individual Water or Sewer Connection Inspection $ 144.00
per EDU
Individual Grinder or Injector Pump Inspection $ 360.00
(Additional)
Re-Inspection Fee/Visit per EDU $ 72.00
Water and/or Sewer Infrastructure Inspection 10% of Town approved
Engineers Cost Estimate
Meter Test
5/8” to 2” $ 150.00
3” to 4” $ 180.00
6” and greater $ 360.00
TAP FEES:
Tap Connection Inspection Fee-Sewer $ 300.00/EDU
Tap Connection Inspection Fee-Water $ 300.00/EDU
Emergency Water and Sewer Repairs (private $ 240.00
systems) Minimum + actual cost to
Town to make repair.
Scheduled (48 hours’ notice) water turn off/on $ 40.00 per event
Unscheduled (less than 48 hours’ notice) water turn $ 75.00 per event
off/on
UTILITY PAYMENTS:
Credit Card Processing Fee: 3%
ECheck Processing Fee: $ 1.95/transaction
UTILITY BILLING FEES:
RETURNED CHECK/ACH/CREDIT CARD FEE: $ 50.00
UTILITY BILLING INTEREST RATE: 8%
ADMINISTRATIVE LATE FEE: $ 50.00
BONDING:
All work within the public right-of-way including work on water and sewer facilities, both to existing facilities
and for new facilities, will require a bond to be posted in an amount approved by the Town Engineer plus a 50%
contingency. (Bonding will be required prior to a permit to perform work is issued).
The Town may enact an Infrastructure Protection Ordinance which when and if effective, the associated Permit
fees and bonds will be applicable. The purpose for the Infrastructure Protection Permit is to ensure the Town’s
infrastructure is protected from damage by private construction activity.
FY25 Budget
Water Park
FY21 FY22 FY23 FY24 FY25
BUDGET ACTUALS BUDGET ACTUALS BUDGET ACTUALS BUDGET BUDGET
REVENUES
500-430130 Reserves Allocation 108,716 - 368,322 - 311,858 - - 121,000
500-432200 Miscellaneous Grants - - - - - - - 600,000
500-450110 Parties 30,000 17,349 5,517 38,923 17,500 13,137 39,183 -
500-450120 Daily Admissions 750,000 369,732 559,200 698,681 717,500 576,592 861,947 -
500-450130 Group Events 60,000 14,104 17,290 8,130 12,000 12,887 13,008 -
500-450135 Miscellaneous Income 500 749 500 1,326 500 28,837 500 -
500-450140 Ticket Fees - - - - - 16,002 - -
500-450160 Rentals - Cabanas and Lockers 60,000 36,509 25,000 50,475 45,000 36,101 48,392 -
500-450165 Rentals - Pavilions 1,000 461 500 1,598 1,000 472 1,000 -
500-450170 Retail Store Sales 350,000 181,244 175,000 277,765 260,000 228,819 314,858 -
500-450175 Season Passes 55,000 160,221 80,000 212,129 130,000 146,955 410,629 -
500-450190 Swim Lessons 12,000 17,269 7,000 22,936 13,000 12,847 23,800 -
500-495000 Investment Interest 12,000 867 1,500 2,076 1,000 61,697 2,000 10,000
TOTAL REVENUES: 1,439,216 798,506 1,239,829 1,314,039 1,509,358 1,134,347 1,715,317 731,000
COST OF GOODS SOLD
500-6925-542500 Cost of Goods Sold 135,000 71,876 70,000 121,979 103,174 106,707 135,943 -
EXPENSES
500-6925-602000 Salaries and Wages 516,877 333,416 390,057 438,857 479,120 377,983 516,261 -
500-6925-602010 Administration - TCB 218,182 161,546 229,091 226,486 240,000 225,102 280,767 -
500-6925-602050 FICA 67,478 37,001 51,687 44,611 56,856 40,208 59,777 -
500-6925-602100 Medical and Life Insurance 47,794 47,507 66,894 57,521 73,583 53,287 92,653 -
500-6925-602300 Retirement 30,785 30,785 40,500 33,037 42,525 30,778 56,153 -
500-6925-623900 Professional Fees 50,000 48,016 36,000 58,076 50,000 93,050 110,000 32,000
500-6925-632800 Bank & Credit Card Fees 40,000 38,517 35,000 56,717 70,000 32,045 55,000 2,000
500-6925-633000 Marketing 35,000 17,621 25,000 17,633 25,000 13,113 25,000 3,000
500-6925-637000 Education & Travel 12,000 (1,838) 10,000 5,000 15,000 23,764 15,000 -
500-6925-665603 Pool Supplies 42,500 26,875 38,000 43,082 38,000 43,433 50,000 -
500-6925-684600 Chemicals 35,000 27,304 38,000 32,583 48,000 24,264 30,863 -
500-6925-685200 Repairs & Maintenance 100,000 22,700 65,000 74,628 75,000 63,191 75,000 3,000
500-6925-685220 Landscape Maintenance 8,600 4,995 8,600 4,850 8,600 13,275 12,000 -
500-6925-687500 Utilities 55,000 49,419 70,000 56,201 70,000 85,560 98,400 50,000
500-6925-741000 Capital Projects 25,000 23,266 26,000 (3,650) 69,500 12,319 57,500 600,000
500-6925-780000 Insurance 20,000 20,000 40,000 36,787 45,000 50,683 45,000 41,000
500-6925-820000 Depreciation - 101,926 - 105,919 - 102,692 - -
TOTAL EXPENSES: 1,439,216 1,060,932 1,239,829 1,410,317 1,509,358 1,391,453 1,715,317 731,000
SURPLUS/DEFICIT: - (262,427) - (96,278) - (257,106) - -
To: The Honorable Mayor and Town Council From: Holly Wahl, Town Administrator
Subject: Alternate Recreational offerings for Town Residents
Date: March 7, 2024
I. BACKGROUND:
Council Vice President Fink requests that the Town Council consider exploring opportunities to offer
recreational amenities to Town residents through a reimbursement model. It is proposed that Town residents can
receive reimbursement from the Town for a set amount of $50 per household as a contribution towards any
Calvert County Parks and Recreation activity to promote health and general wellness.
II. FISCAL IMPACT:
Estimating that all households are single family households and participate in the offering, the General Fund
expenditure would be approximately $125,000 accounting for a $50 reimbursement per household.
Considerations:
1) Households that are not primary residential dwellings with renters, estimated at approximately 500
dwellings.
2) Dwellings with more than one family residing in the dwelling.