Board of Historic & Architectural Review
Regular MeetingChesapeake, VA · March 2, 2023
Minutes
Meeting Minutes
Historic and Architectural Review Board (HARB)
March 2, 2023
Public Safety Operations Center
ROLL CALL
HARB Members Present: Chair Joe Maguire, Frank Lilley, and Gerald Martin
Staff: Adam Lantz, City Attorney – City Attorney’s Office; Carlos Rodrigues, Code Enforcement Officer – Developments
and Permits; Marvin Hodges, Senior Planner – Planning Department; Nat McCormick, Community Design Manger –
Planning Department, J. Harbin, Director – Chesapeake Land Bank Authority, and Kevin Finn, Recording Secretary –
Planning Department.
Vice Chair J. Maguire called the meeting to order at 5:32 p.m.
MINUTES
Approval of February 2, 2023 regular meeting minutes, motion to accept minutes made by G. Martin and seconded
by F. Lilley, all members present voting for.
COMMITTEE REPORTS
None
ADMINISTRATIVE APPROVALS
K. Finn reported four (4) administrative approval.
ZONING REPORT
C. Rodriquez provided an update on several properties within the District, including 1106 Park Avenue and 1219 Decatur
Street. J. Maguire asked about 1221 Park Avenue and K. Finn stated that the installation of the fence was approved by
the Planning Department administratively. The fence shielding the structure located in the rear of the property could not
be taken under consideration given the Guidelines.
CONSENT AGENDA
None
REGULAR AGENDA
1406 Seaboard Avenue
Original Request
• After-the-fact replacement of metal roof with architectural shingles, in black;
• Motion to have the applicant remove the asphalt shingles and to produce a metal roof in keeping with the
Historic Guidelines made by G. Martin. Following a discussion with the A. Lantz and K. Finn, the motion was
amended on the floor to the following.
• Motion to deny application as presented made by G. Martin and seconded by F. Lilley, all members present
voting for.
PUBLIC INPUT
None
LEGAL GUIDANCE
A. Lantz discussed the ability of Board members to attend meetings remotely. Individual members may participate
remotely as long as a quorum of members are physically present at the meeting. The remote participant does not count
towards establishing a quorum. A. Lantz went on to discuss that if the Board felt it was necessary, allowing remote
1
attendance could be added to the bylaws. Any changes to the bylaws would also need to be reviewed by the City Clerk's
Office and approved by City Council.
OLD AND NEW BUSINESS
N. McCormick informed the Board that the City is still conducting its review of the responses submitted for the South
Norfolk Design Guidelines Update. Interviews will be conducted mid-March.
N. McCormick also stated that three public input opportunities will be held for the South Norfolk Municipal Building. The
date and locations of the opportunities are still being discussed and staff will provide those dates when made available. J.
Maguire asked whether the Board could review those comments ahead of time and staff would discuss this with the City
department handling the project.
K. Finn provided an update on 1230 Chesapeake Avenue and the replacement of the architectural shingles, which were
installed without a COA, with a new standing seam metal roof. F. Lilley asked about the front door and staff stated that the
property owner would be required to replace the front door with an approved replacement as stated in their COA.
K. Finn mentioned to staff that the initiating resolution to discuss the removal of the COA requirement for exterior changes
made to the Caleb Williamson House at the Arboretum are progressing and that request should be heard by City Council
in April.
K. Finn introduced J. Harbin, the new Director the Chesapeake Land Bank Authority. The Board went on to discuss
previous frustrations with the Lank Bank, the administration of the South Norfolk Residential Rehabilitation Grant Program,
and other responsibilities and projects administered by the Land Bank outside of the grant program. Staff stated that they
would be holding meetings to discuss improvements to the grant program and other functions of the Land Bank.
ADJOURNMENT:
Motion to adjourn the meeting made by J. Maguire and seconded by F. Lilley, with all members present voting
for.
Meeting adjourned at 6:38 PM
MEETING MINUTES APPROVED: __4/7/23______
2
Agenda
South Norfolk
Historic & Architectural Review Board
MARCH 2, 2023
Board of Historic and Architectural Review
March 2, 2023
Public Safety Operations Center
2130 S. Military Highway
5:30 PM
A. Call To Order
B. Roll Call
C. Approval of the February 2, 2023, regular meeting minutes
D. Committee Reports
E. Administrative Approvals
F. Zoning Report
G. Old and New Business
H. Consent Agenda
I. Regular Agenda Items
1. 1406 Seaboard Avenue
After-the-fact replacement of metal roof with architectural shingles, in black
J. Public Input
K. Legal Guidance
L. Adjournment
These applications and related documents are available for public review on the Planning Department’s website through the
following link: https://www.cityofchesapeake.net/government/Boards-Commissions/full-listing/08sn-historic-archit-review-
board/Agendas--Marked-Agendas--and-Minutes.htm
The City of Chesapeake will provide reasonable accommodations and services necessary for sensory-impaired and disabled
persons by contacting Municipal Facilities Maintenance Division, Dept of Public Works at 757-698-4230 at least three-working
days in advance and language assistance to individuals with limited English proficiency to the extent possible by contacting
the Planning Department at 382-6176 at least 10 days in advance of this meeting. *While this is not a public hearing, the
public and any one or several members of the Chesapeake City Council may choose to attend.
Meeting Minutes
Historic and Architectural Review Board (HARB)
February 2, 2023
Public Safety Operations Center
ROLL CALL
HARB Members Present: Chair Joe Maguire, Vice Chair Marilee Peterson, Frank Lilley, and Gerald Martin
Staff: Joshua Johnson, Legal Counsel – City Attorney’s Office; Adam Lantz, City Attorney – City Attorney’s Office; Carlos
Rodrigues, Code Enforcement Officer – Developments and Permits; Pamela Witham, Code Compliance Inspector 3 –
Development and Permits; Marvin Hodges, Senior Planner – Planning Department; and Kevin Finn, Recording Secretary
– Planning Department.
Vice Chair J. Maguire called the meeting to order at 5:33 p.m.
MINUTES
Approval of January 5, 2023 regular meeting minutes, motion to accept minutes made by F. Lilley and seconded by
M. Peterson, all members present voting for.
COMMITTEE REPORTS
None
ADMINISTRATIVE APPROVALS
K. Finn reported one (1) administrative approval.
ZONING REPORT
None
OLD AND NEW BUSINESS
G. Martin asked for an update on the Verizon facility at 1414 Guerriere Street and the proposed construction of an above-
ground storage tank. K. Finn updated the Board that he has been in correspondence with the applicants who are proposing
to either locate the tank within the existing structure or relocate the tank to the rear of the property but have it remain
underground. F. Lilley requested that Code Enforcement research the addition of a retaining wall to a newly constructed
home 1219 Decatur Street. Lastly, J. Johnson informed the Board that he will not longer be serving as legal counsel and
introduced his replacement, Adam Lantz.
CONSENT AGENDA
None
REGULAR AGENDA
1013 Jackson Avenue
Original Request
• Install solar panels on roof;
• Motion to continue the application due to a lack of information on the solar panel’s size, color, and how they
will be mounted made by M. Peterson. Motion was not seconded and died on the floor.
• Motion to deny application as presented made by M. Peterson and seconded by F. Lilley, all members present
voting for.
PUBLIC INPUT
None
LEGAL GUIDANCE
None
1
ADJOURNMENT:
Motion to adjourn the meeting made by M. Peterson and seconded by F. Lilley, with all members present voting
for.
Meeting adjourned at 5:53 PM
MEETING MINUTES APPROVED: ________
2
1406 Seaboard Avenue
PLN-CAPP-2023-009
1406 Seaboard Avenue
Year Built: 1910 (Contributing)
Project Planner: Kevin Finn, Senior
Planner
Applicant: Curtis Wilson
Property Owner: Curtis Wilson
Public Hearing Date: March 2, 2023
Staff Report Date: February 14, 2023
After-the-Fact: ☒ Yes ☐ No
Project Description: After-the-fact replacement of metal roof with architectural shingles,
in black
Key South Norfolk Local Historic District Design Guidelines:
Roofs
• 1) Retain, maintain, and repair historic roof forms and materials including roof
shape, slope, overhang and other distinguishing historic features (pg. 30)
• 4) If overall deterioration is beyond the possibility of repair, substitute materials
may be used. Select substitute materials that will best support the historic
character of the building and the district. Match original materials whenever
possible (pg. 31)
Additional Notes from Planning Department:
Planning Department has no additional comments on this application.
(757) 382-6176 | CityOfChesapeake.net | Planning@CityOfChesapeake.net | 306 Cedar Road, Chesapeake, Virginia 23322
City of Chesapeake
Department of Planning
Record Summary for Certificate of Appropriateness
Record Detail Information
Record Type: Certificate of Appropriateness Record Status: Pending Board Review File Date: February 13, 2023
Record Number: PLN-CAPP-2023-009 Expiration Date:
Description: Record Name: 1406 Seaboard Ave
Change Metal Roof to architect shingles ( Black) Parent Record Number:
Address: 1406 SEABOARD AVE, CHESAPEAKE, VA 23324
Owner Information
Primary Owner Name Owner Address Owner Phone
Yes WILSON CURTIS 1406 SEABOARD AVE, CHESAPEAKE, VA 23324 223
Parcel Information
Parcel No:
1340000002770
Contact Information
Name Organization Name Contact Type Phone
Curtis Wilson WILSON CURTIS Applicant (757) 541-3715
Address
1406 SEABOARD AVE, CHESAPEAKE, VA 23324 223
Application Specific Information
NATURE OF THE APPLICATION
Description Replace Metal Roof with architectural Shingles
Zoning Sign Off No
Economic Hardship No
PLANNING STAFF TO COMPLETE
Application After-the-Fact -
After-the-Fact Fee Paid -
Approved Administratively -
Approving Planner -
Approval Date -
Certificate Number -
See supplemental submittal requirements -
Board Approved Certificate Number -
Page 1 of 3 PLN-CAPP-2023-009
I, _______________, hereby grant permission for City Staff & -
members of the Historic Architectural Review Board to enter
my site to view exterior areas related to theis Certificate of
Appropriateness Application.
Structure Designation -
GENERAL INFORMATION
Year Structure Built 1910
Is this an After-the-Fact application? Yes
$250 After the Fact fee, if required. CHECKED
One original delivered to the Planning Department OR a copy CHECKED
attached to the on-line application
One disk containing all photos OR photos attached to on-line UNCHECKED
application
? Completed and notarized power of attorney form if the UNCHECKED
applicant is not the property owner.
NEW CONSTRUCTION
Completed application form. UNCHECKED
Surveyed site plan (including proposed buildings, UNCHECKED
structure(s), parking, etc.)
Front and side elevations UNCHECKED
Samples UNCHECKED
Arrangement of proposed exterior lighting. UNCHECKED
Photographs of the property and adjoining or opposite UNCHECKED
properties.
ADDITIONS TO EXIST. STRUCTURES
Completed application form. UNCHECKED
Surveyed site plan or city tax map UNCHECKED
Elevations UNCHECKED
Photographs of the existing structure and property. UNCHECKED
Samples, photos, and brochures UNCHECKED
Arrangement of proposed exterior lighting. UNCHECKED
Proposed signs with appropriate detail as to character and UNCHECKED
location.
ALTERATIONS OR REPAIRS
Completed application form. CHECKED
Written description of work to be performed CHECKED
Photographs of the building/structure. CHECKED
2 quotes each are required for the following: UNCHECKED
Photos numerically keyed UNCHECKED
RELOCATIONS
Completed application form UNCHECKED
Page 2 of 3 PLN-CAPP-2023-009
Photographs of the building or structure to be relocated and UNCHECKED
adjacent properties.
Photographs of the premises to which the building or UNCHECKED
structure will be relocated.
Written description of reasons for the relocation and the UNCHECKED
proposed use of the vacated property.
DEMOLITIONS
Completed application form UNCHECKED
Photographs of the building or structure to be demolished to UNCHECKED
illustrate its state of disrepair.
Written report on condition of building or structure. UNCHECKED
Written description of work to be performed UNCHECKED
SPECIAL POWER OF ATTORNEY
Special Power of Attorney attached UNCHECKED
METAL ROOFS
Explanation UNCHECKED
Info required to replace metal roof with metal roof. UNCHECKED
Picture UNCHECKED
Specification Sheet UNCHECKED
Roof color sample UNCHECKED
Info required to replace metal roof with architectural shingles. CHECKED
Quotes UNCHECKED
Roof color sample (asphalt) CHECKED
Page 3 of 3 PLN-CAPP-2023-009
Current photo of architectural shingle roof
Photos of metal roof from 2019
Photo of damaged metal roof
Metal roof in 2020
Shingle roof in 2022
Shingle Roof Quote
QUOTE DETAILS
Description
Material
GAF TIMBERLINE HDZ:
offers the look people love, now with LayerLock®Technology and the StainGuard Plus™ Algae Protection Limited Warranty.
GAF PRO START STARTER:
are made with a high-quality, properly positioned adhesive applied at the factory to help prevent shingle blow-off.
GAF SEAL-A-RIDGE:
offer protection at the high stress areas of your roof (hips and ridges) against leaks and blow-off. DuraGrip Self-Seal adhesive
is factory-applied to help seal each piece tightly and reduces the risk of blow-off.
GENERIC ICE & WATER:
provides a secondary line of defense to keep water that can get behind shingles from infiltrating further to help ensure the
longevity of your roof.
GAF FELTBUSTER:
an upgrade for typical asphalt felts that helps provide long lasting protection against wind-driven rain from infiltrating under
your shingles.
Flashings and Fasteners
DRIP EDGE:
metal flashing that protects the eaves of your home and prevents rain from going behind the gutters and/or fascia potentially
causing damage.
1-1/4" COIL NAILS:
used to fasten down the material that is to be installed. These come in various lengths and are used in multiple applications.
PLASTIC CAPS:
are a recommended best practice installation by housewrap and roofing underlayment, because caps help seal out moisture
that can penetrate sidewall and roofing fabrics. Caps provide better holding power than a nail or staple alone, and that means
reduced blow-offs and lateral slippage!
STEP FLASHING:
is a rectangular piece of flashing bent 90 degrees in the center. It is used for roof-to-wall flashing. Multiple pieces of the
flashing will be installed in layers with shingles to ensure the water flows away from the wall.
L FLASHING:
protects your home from moisture infiltration where your wall meets your roof. L shaped flashing is a versatile, general use
flashing used where a uniform or strengthened finish is needed on a 90° surface.
Vents
GAF COBRA RIDGE VENT:
exhaust vent for roof ridge that allows heat and moisture to escape from the attic space at the ridges of the home.
PLUMBING JACK:
used to seal around plumbing vents that penetrate through the roof decking. These have a flange that is secured to the deck
and the roofing material is installed to create a positive lap ensuring a proper seal.
GOOSENECKS:
is the finishing touch on the roof for an exhaust fan to help reduce moisture, odors, and prevent mildew in a bath or kitchen.
Quote subtotal $8,925.00
Total $8,925.00
est. $117.81/mo
9.99% over 120 payments for qualified borrowers
Get email alerts for Chesapeake
A daily email when new agendas and minutes are posted.