Stormwater Committee
Regular MeetingChesapeake, VA · February 27, 2023
Minutes
Stormwater Committee Meeting
February 27, 2023
Human Resources Training Room
1. Call to Order: The meeting was called to order at 6:04 PM.
2. Roll Call: Roll was called by Barbara Brumbaugh. In Roger Baxter’s
absence, Markiella Moore, the Committee Vice Chair, acted as Committee Chair.
Committee Members in Attendance:
Markiella Moore (Acting Committee Chair)
Todd Reigle
Traycie West-Pinkoski
Michael Poyner
Kevin Walker
Crystal Bloom (PW Asst City Engineer)
Cory Wolfe (Assistance City Attorney)
Barbara Brumbaugh (PW Environmental Program Manager)
Absent Committee Members
Roger Baxter (Committee Chair)
Vic Nicholls
Mario Aponte
Michael Battle
Laura Mae (Alternate)
Others in Attendance:
Ross Brockwell – (PW Operations Administrator)
Jannelle Logan – (PW Stormwater Engineer IV)
Citizens in Attendance:
None
3. Meeting Minutes
Minutes from the January 2023 meeting were approved.
-1-
4. PW Operations Report – Ross Brockwell
o Ross noted that roadside ditch calls increased due to rain events.
o There are backlogs in a few Operations categories due to staff shortages
and equipment issues.
o Mike P. asked where debris from ditch cleaning is dumped. Typically it goes
to the Higgerson Buchanan Construction Demolition Debris (CDD) landfill.
Some is sidecast where allowed and appropriate.
o Structure cover 1 of 2 was past the service goal.
o Ditch and pipe work was mostly on time.
o Mike P. asked about the sidewalk category. These are repairs, not really
related to stormwater.
o Ross showed before and after photos of some recent jobs including:
Pleasant Ridge Rd lead ditch; Prescott Circle off George Washington
Highway. Markiella asked if this was a CSR, it was and there was a prior
project at this location so Ops tries to do maintenance here.
o Ross showed another RC mower video. Markiella asked where it was
cutting. It was a BMP.
o Kevin asked what a “BMP” is, it is a stormwater management/treatment
facility.
o The remote controlled mowers are a lot easier than a bobcat. There is a
smaller footprint and a lower training threshold.
o Todd asked if 25 is a typical number of cave-ins. Yes it is.
5. Engineering Update, Dominion Blvd Drainage – Janelle Logan
o Janelle put together a presentation about drainage under Dominion Blvd as
a result of the bridge construction and whether there were any impacts to
adjacent neighborhoods. Markiella requested this information at the
January meeting.
o She presented an overview of the area. This area includes drainage to the
Southern Branch of the Elizabeth River.
o The drainage of Fernwood Farms, Dominion Lakes, and Dominion Pines
were shown. The southern portions of these subdivisions drain directly to
the Elizabeth River.
o Kevin asked if these neighborhoods would be approved today. Crystal said
that by today’s standards the finished floor elevation needs to be 2 feet
above base flood elevation and the road height would be higher.
o Janelle showed that pre and post development drainage stayed the same.
The original box culvert was replaced with triple box culverts which were
lowered 5 inches. The culverts are submerged and added additional
drainage capacity. There were no impacts to the upstream areas.
o Mike P. asked what percentage of additional capacity was added. Janelle
said that the original water surface elevation was 6 feet and it was lowered
to 5 feet 6 inches. Crystal noted that the model accounts for tidal flow.
o Markiella mentioned that she understood that an outfall ditch near Pinewood
Run was closed off. Janelle asked where it was located. This was unclear.
-2-
o Markiella asked if the City has a wetlands staff person and whether they
were consulted during this review. They were not.
o Markiella asked what “upstream” means. This is the upstream
(neighborhood) side of the culverts. She asked if tidal flooding was
considered. It was in tailwater.
o Markiella noted that a developer wanted to build on Pinewood Run but her
understanding is that the area is now in a Chesapeake Bay Preservation
Act (CBPA) area due to the replacement of the Dominion culverts and the
fact that water now comes up in the ditches and backs up in the street.
o Kevin asked what drove this Dominion analysis. Markiella requested it at
the January meeting because residents are concerned about flooding.
o Kevin asked what will happen now that the analysis is done (note: the
culvert work was done years ago, the analysis and presentation were at the
request of the Committee). Markiella believes that lowering and enlarging
the culverts is causing the flooding.
o Mike P. asked if the culvert opening was increased due to upsizing the
culverts. Crystal said yes, that is always looked at.
o Todd asked if water stays longer. Crystal noted that there has always been
an opening with the original culvert under Dominion Blvd so it really hasn’t
had an impact.
o Todd asked how long the original culvert has been there. No one is sure.
Todd noted that the culvert was moved north of the original one.
o Mike P. asked if a hurricane hit the Southern Branch of the Elizabeth River
whether there is any way to slow or stop the flow with gate valves. Crystal
said that products are out there and Janelle noted that it would only be
useful at certain elevations. Once the road is overtopped by water a gate
valve won’t work.
o Traycie asked if the CBPA/RPA boundary is driven from a manmade BMP.
o Crystal pulled up the CBPA map in the area and showed it.
6. MS4 Update – Barbara Brumbaugh
o No update this month.
7. Bylaws Update – Corey Wolf
o The revised bylaws will be distributed prior to the next meeting.
o The Clerk’s Office must approve them prior to a vote by the Committee.
8. Old Business/New Business
o None
-3-
The meeting was adjourned at 6:51 pm.
Minutes approved by the Committee _____________________________
Date _____________________________
-4-
Agenda
Agenda
Chesapeake Stormwater Committee
February 27, 2023 – HR Training Room
1. Call to Order
2. Roll Call
3. Approval of Meeting Minutes, 1/23/23
4. Citizen Comments
5. PW-Operations Report
6. PW Engineering Update
7. MS4 Program Update
8. Unfinished and New Business
9. Adjourn