Chevy Chase View Town Council
Regular MeetingChevy Chase View, MD · November 20, 2024
Minutes
COUNCIL OF CHEVY CHASE VIEW
Work Session to Discuss Stormwater Management and Capital
Improvement Review of the 65% Schematics
Date: November 20, 2024
Place: Meeting was held at 10401 Connecticut Ave., Suite 103
Present: Ed Tarbutton; Chair, Nancy Somerville, Pete Marks,
Tommy George and Helen Trybus, Council members
Ron Bolt, Legal Counsel for Town, appearing remotely
Jason Azar, Clark/Azar & Associates, presenting remotely
Denise Hitt, Town Manager
Elizabeth Rembold, Assistant Town Manager
Others Present: Ron Sharrow, 4013 Glenridge Street; Remotely
Present - Mary Spencer,4112 Glenrose Street; Steven Beckman, 4020
Everett Street
Called Meeting to Order: 6:03 p.m. by Ed Tarbutton, Chair
Jason Azar provided a detailed explanation of the 65 percent
schematic drawings. Clark/Azar’s team has worked to identify
opportunities for additional green infrastructure after removing
previously proposed elements that would have negatively impacted
trees. The current schematics reflect what Jason considers to be a
viable plan.
Clark/Azar’s next step involves initiating the permitting process
with relevant agencies to determine their acceptability. As
currently drawn, the schematics are ready for submission to
Montgomery County DOT, Maryland State Highway Administration, and
WSSC. Following feedback/discussion with affected residents,
revisions will be considered, and an updated cost estimate will be
provided.
Dresden Street (Cedar Lane to Summit Avenue): The plan remains
similar to what was previously presented. A more in-depth
discussion with the residents will occur prior to moving forward.
Specifically at the right-of-way at 4217 Dresden, two bioretention
planter boxes for water filtration are proposed to be installed.
Water line relocation is necessary because the water line needs to
be five feet off the facility. Modification to storm drain piping
that currently exists will also be necessary and a manhole will
need to be installed.
Questions were raised relating to the timing of a water line
relocation as it relates to street work. A private contractor
will perform the movement of the water line after approval from
WSSC. Two items get processed through WSSC:
• water line relocation
• review plans in the area of their service
After submitting the initial plan, it typically takes 45 days
before a response from WSSC. Following that, there is a back-and-
forth process to refine the plans.
If we submit the plans after Thanksgiving, we can expect the first
round of comments by January and the second round by February. At
that point Chevy Chase View may be ready to move forward with
obtaining bids.
Further significant work in this section entails driveway aprons
replacements as needed, curbs, and mill/overlay.
Dresden Street (Summit Avenue to Connecticut Avenue): The
Council discussed the replacement of the current sidewalk with
Jason, focusing on factors such as cost, appearance, and
sustainability. While an immediate decision is not required,
these considerations will need to guide the eventual choice.
The Council will gather more information and consider the
factors carefully before deciding the best path forward for
sidewalk replacement.
Jason discussed the feasibility of small rain gardens in the areas
near 4004 and 4000 and 3908 Dresden Street. He believes the three
rain gardens will create a combined 226 cubic feet of storage.
Additional storm drain systems are included on this section of
Dresden Street connecting to the system on Connecticut Avenue.
There are a total of five proposed inlets. Further, the new curb
systems will also tie into Connecticut Avenue system.
Nancy suggested conservation landscape in the area that has a
collection of trees. The location of the swale is to be
considered. The road does not currently pitch towards the swale
in that area, Jason suggested a modified cross section to be more
of a traditional crown to make the swale area more useful.
Opportunities exist in the middle section of Dresden. If we want
to head down the road of conservation landscape, we will need to
change the lay of the road to create a more traditional crown –
sending water towards swale.
Everett Street (storm drain) near Connecticut Avenue: There is an
existing inlet in the back of the residence at 4001 Everett
Street. The proposed plan increases the size of the inlet and
installs elliptical pipes under the driveway to create substantial
flow. An easement with the homeowner as well as an agreement
between the Town and Montgomery County is necessary.
The increased size of the inlet will facilitate faster drainage.
Even if the pipe can handle flow, the inlet capacity remains an
issue. A normal rain event would not result in ponding, but a very
heavy rainfall could still cause ponding.
We will reach out to the homeowners to let them know the proposed
plan and determine if they would be agreeable to proceeding.
Agreement on an easement with the homeowner is needed prior to
submission with MDOT. We would then need to work with the County
on an agreement, which would include the Town’s responsibility for
maintenance of the stormwater facility.
Glenridge Street (Gartrell Place to Connecticut Avenue): Due to
the necessary revisions to avoid removal of larger mature trees,
Jason suggested a proposed rain garden in two areas near 4026 and
4018 Glenridge Street. Jason estimated that the total capacity of
the proposed rain gardens is 204 cubic feet.
Ron Sherrow has documented water flow on Glenridge and has asked
that the flow be considered when accounting for green
improvements.
In addition to the above proposed green infrastructure, the gray
infrastructure improvements will include the installation of curbs
and gutters, necessary replacement of driveway aprons, and the
mill/overlay of the road. The timing of this work will be
coordinated with WSSC’s completion of the water main replacement.
Council Members and the Town Manager will reach out to the
affected residents.
The Council and Jason discussed the next step which will be to
seek agency feedback and preliminary approval after Thanksgiving.
The length of that process will determine when the town can bid
out the job, select a contractor, and then commence work.
Work Session concluded 7:04 pm
Get email alerts for Chevy Chase View