Technical Coordinating Meeting
Regular MeetingCleveland, TN · July 13, 2016
Agenda
1 of 51
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
Cleveland Urban Area MPO Technical Coordinating Committee
WEDNESDAY, JULY 13, 2016, 10:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND, TN
AGENDA
1. Call TCC meeting to order
2. Approval of meeting minutes— May 25, 2016 p. 2
3. New Business –
a. FTA 5303 Transit Planning Funds Proposal p. 4
b. Consider 2016 UPWP amendment p. 9
c. 2017 Unified Planning Work Program (UPWP) p. 36
d. 2017-2020 Transportation Improvement Program (TIP) p. 37
e. 2017 Transportation Alternatives grant p. 48
4. Old Business---none
5. Comments by federal, state, local agencies
6. MPO Coordinator/staff comments p. 50
7. Public comments
8. The next regular MPO meeting date is Wednesday, August 3, 2016 at 10 a.m.
9. Adjourn
2 of 51
TOM ROWLAND, CHAIRMAN
190 Church Street, N.E., P.O. Box 1519, Cleveland, TN
37364-1519
Phone (423) 479-1913 fax (423) 559 3373
http://clevelandtn.gov/index.aspx?nid=153
MPO Coordinator Greg Thomas, AICP
gthomas@clevelandtn.gov
MPO Technical Coordinating Committee
WEDNESDAY, MAY 25, 2016, 10:00 O’CLOCK AM, 2nd FLOOR CITY COUNCIL
MEETING ROOM, MUNICIPAL BUILDING, 190 CHURCH STREET NE, CLEVELAND, TN
MINUTES
1. Call MPO TCC meeting to order --- Chairman Tommy Myers called the meeting to
order and asked those present to sign in. The other TCC members in attendance were
Jonathan Jobe, David Sheely, and Brian Beck of the City of Cleveland, Tad Bacon of
Cleveland Utilities, Bently Thomas of Bradley County, Mary Lynn Brown and Ted Smith
of SETHRA/CUATS, Greg Thomas of City of Cleveland/Cleveland MPO, and Joren
Dunnavant of TDOT. Others in attendance included Allen Mincey of the Cleveland Daily
Banner, Seth Davis of TDOT, Jeanne Stevens of Parsons Brinkerhoff, and Brian Moran
and Corey Divel of the City of Cleveland.
2. Approval of meeting minutes— April 20, 2016--- Chairman Myers introduced the
item and called for discussion or a motion. Brian Beck moved that they be approved
and the motion was seconded by Tad Bacon and approved unanimously.
3. New Business
a. Public Hearing Draft 2040 Long-Range Transportation Plan --- It was noted that
the public hearing had been advertised for the MPO Executive Board meeting and
that this item was just informational for the TCC.
b. Consideration of Comments and Adoption of 2040 Long-Range Transportation
Plan--- Chairman Myers introduced the item and Greg Thomas gave the staff report.
Greg Thomas presented the staff report indicating that TDOT and Federal
comments had been responded to with changes including the FAST Act
requirements. Jeanne Steven from Parsons Brinkerhoff elaborated on the changes
made in response to State and Federal comments. Public meetings were held May
5, 2016 in Cleveland, Calhoun, and Charleston. Three comments were received:
one regarding Paul Huff Parkway resurfacing, the need for sidewalks in Calhoun,
3 of 51
and the need for a turn lane on US 11 at Highway 163. All of these comments were
consistent with the content of the 2040 RTP. Greg Thomas made a motion to
recommend the adoption of 2040 RTP to the MPO Executive Board. The motion was
seconded by Brian Beck and approved unanimously.
4. Old Business---none
5. Comments by federal, state, local agencies--- Jorren Dunnavant reported that
Deputy Commissioner Omishakin was interested in compiling a list of communities
that could benefit from the Safe Routes to School program but which would be
financially hard-pressed to participate. Joren though that the Calhoun sidewalks
might be a good project for this list.
6. MPO Coordinator/staff comments--- Greg Thomas addressed the updated MPO
Coordinators report that had been distributed. He mentioned that planning funds
(PL 112 and FTA 5303) would be combined in a consolidated planning grant but in
the meantime there would be approximately $100,000 in 5303 funds and the
proposal would be to do a revenue study for the CUATS system. Other uses could
be the a multimodal analysis of Georgetown Road and the CUATS Orange Route,
especially near Green Drive. He discussed the CMAQ grant application for the Park
and Ride lot at the Old Woolen Mill. He also mentioned working with Scott Allen at
FHWA and Jessica Wilson at TDOT on a safety analysis of the 25th Street corridor
for multi-modal issues. He discussed the content of the draft 2017-2020 TIP and the
attempts by staff to make sure that the local project priorities were included,
especially the request to have TDOT safety money for the 20th Street/Michigan
Avenue Road improvements at the intersection and the proposal to borrow forward
into future allocation to be able to get Adkisson Drive improvements under
construction. He described the proposed change to the 2013 Multi-modal Access
grant and the public input that had been received: taking 9th Street sidewalk out and
installing new sidewalk on Wildwood from 9th to 14th.
7. Public comments
8. The next regular TCC meeting date is Wednesday, July 13, 2016 at 10 a.m.
9. Adjourn
4 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: 5303 Transit Planning funds proposal
Update on 5303 transit planning funds--- TDOT will include PL (highway) and 5303
(transit) planning dollars into a consolidated planning grant beginning with the contract
for FY2015 5303 funds. It had been my understanding that TDOT was preparing to
issue one new contract with a December 2017 expiration date for the 5303 funds
totaling about $100,000 for FY 2011, FY 2013, and FY 2014, but that is not the case.
FY 2011 funds in the amount of $47,081 are in a contract that expired June 30, 2016,
but eligible expenses can be submitted for reimbursement through August 20, 2016.
Consultant expenses estimated to be reimbursable through FY 2011 5303 contract are
$37,292. Any remaining funds, estimated at $9789 less any allowable staff expenses,
will be distributed at the Commissioner’s discretion and the MPO could ask that this
distribution be to Cleveland.
FY 2013 funds in the amount of $29,895 are in a contract set to expire December 31,
2017. A spending plan for 5303 funds was submitted to TDOT Multi-modal which
included, among other things, a revenue study for CUATS. A proposed scope for the
revenue study (attached) was developed by Parsons Brinkerhoff with a view toward
completing this work under the existing on-call contract for transportation planning
services. PB proposes to complete this work for $29,100 which is about equal to the
amount of the FY 2013 contract for 5303 funds that will expire December 31, 2017. Staff
recommends that the revenue study work be authorized.
A contract has been requested for the FY 2014 funds in the amount of $32,867 and it
will expire December 31, 2017. A second part of the 5303 spending plan proposed to
TDOT Multi-modal was study and design of multi-modal solutions for a portion of our
busy Georgetown Road corridor. The project area would follow the path of our CUATS
Orange Route that crosses US 11 SR2 Keith Street on 17th Street and turns right on
Georgetown Road crossing 20th Street near Stuart School and entering a congested
residential area and going through two sharp curves at Peerless Road and Westside
Drive before entering a commercial area that extends to the intersection with SR60 25th
Page 1 of 2
5 of 51
Street and beyond. Sidewalks, roadway improvements, and treatments of key
intersections would be part of the study. Evaluation of Utility and ROW constraints
through the collection of survey data where needed and the development of other
information to supplement what we know about this area, including existing and
projected traffic, would be part of the study. The corridor features mixed income and
lower-income housing, a day labor pick up area, difficult transit and school bus service
due to high traffic volume and lack of sidewalks (this is our heaviest school bus pick up
area), etc. Staff proposes the development of a project scope and budget for the study
and design work described herein, one that would utilize the remaining 5303 funds and
other resources if available.
Page 2 of 2
6 of 51
IDENTIFICATION OF TRANSIT REVENUE OPPORTUNITIES
SCOPE OF WORK
BACKGROUND/PURPOSE
During the development of revenue projections for the MPO’s 2040 Regional Transportation Plan, it became
evident that recent TDOT policy changes will significantly impact the level of funding available to the Cleveland
Urban Area Transit System (CUATS):
The state has revised the formula for suballocating FTA-5307 funds among small transit agencies in
Tennessee. One of the changes is to place greater weight on the amount of local/non-federal funds that
the transit agency receives. CUATS lost federal funds to other agencies on the basis of this change and
potentially other factors related to operating characteristics.
TDOT no longer makes state urban operating assistance (UROP) funds available unless a transit agency
has already drawn down all of its available federal funds. Historically, transit agencies in Tennessee
used UROP funds as part of the match for those federal funds, with a ratio of 50% federal, 25% state
(UROP), and 25% local match. Now CUATS must match federal funds at a dollar for dollar ratio. Based
on recent budgets it appears CUATS may no longer have enough matching funds to be able to access
the same level of federal funds that have been used for operations and capital expenses, much less tap
into any of the previously available state funds.
The 2040 RTP completed a high-level analysis of expected revenue and costs to continue operations at current
service levels during the next 20 to 25 years. The resulting financial picture leaves little room to implement any
of the new transit services or amenities proposed by local officials and members of the public during the
planning process. The 2040 RTP recommended investigating several sources of additional revenue, including a
possible fare increase and additional private contracts. It also recommended that CUATS reconsider its current
boundary for paratransit services in an effort to contain costs.
The MPO and CUATS now seek to follow up on the plan’s recommendations through a report that will:
(1) Investigate sources of new revenue and quantify the amount that might be obtained from each,
(2) Identify whether there are any possible ways to reduce costs without reducing current services.
TASK 1: SOURCES OF NEW/ADDITIONAL REVENUE
WSP|Parsons Brinckerhoff will explore the following potential sources of new and/or additional revenue:
A. Forming more partnerships with agencies who receive grant funds that are eligible to be used for their
clients’ transportation costs. CUATS already has such a contract with the TennCare program to provide
7 of 51
transportation for its clients. There are other agencies and programs (e.g. Veterans Administration and
TANF) that may offer similar opportunities.
B. Increasing fixed-route fares. WSP|PB will evaluate the potential for increasing CUATS’ fixed route fares,
including a review of peer agencies and consideration of balancing revenue gains against possible losses in
ridership as a result of the fare increase. The fare study will also include analysis of ability to pay among
various transit-dependent populations in order to help establish fares at a level that does not price out the
people who most need transit.
C. Increasing paratransit fares. One concept mentioned in the 2040 RTP is for CUATS to consider charging one
rate for a defined area (e.g. within ¾ mile of their fixed routes), with a higher rate charged for people who
live outside that boundary. WSP| PB will investigate the likely impact of such a two-tiered system on both
paratransit ridership and revenue.
D. Increasing local government contributions. WSP|PB will collect information on the amount and proportion
of local funds provided for transit in peer cities, including both similar sized cities throughout the south and
other cities of various sizes throughout Tennessee. An estimate will also be made of the amount of
federal/state funds being lost to other transit agencies in Tennessee due to having a lower percentage of
local funding support.
E. Potential Non-Profit Funding Sources. WSP|PB will investigate the potential for not for profit entities
(community charitable foundations, religious organizations, and the charitable contributions of for-profit
businesses in the area) to provide grants to help support fixed-route and paratransit operations. WSP|PB
will identify potential donors and provide conceptual estimates of the potential level of support possible
from such sources. WSP|PB also will discuss the potential for creating a non-profit entity to support transit
service in the area, and the possible participation of non-profit entities in assisting CUATS in providing transit
service in the area.
TASK 2: POTENTIAL TO STRENGTHEN THE SYSTEM AND REDUCE COSTS WITHOUT REDUCING SERVICE
A. Improving fixed route efficiency and other system metrics. WSP|PB will meet with CUATS staff to discuss
what fixed route changes were implemented following the study completed in 2013, and will review the
subsequent performance data to identify other potential operating changes and their likely effect on
ridership and costs. Potential actions to be evaluated will include the elimination of flag stops, increasing
the frequency of service, and improving sidewalks and passenger amenities at stops.
The state’s formula for allocating 5307 funds to small urban transit agencies will also be reviewed and
compared to CUATS’ current performance metrics to identify operating decisions that could be impacting
the agency’s ability to receive more federal support.
B. Evaluate the paratransit service boundary. As noted in the 2040 RTP, CUATS currently offers paratransit
service to a much larger area than the minimum required 3/4 mile distance from its fixed routes. If CUATS
retracts the boundary, riders in the area would still be in the service area for SETHRA’s demand-response
service – which serves not only those with disabilities, but also the general public. WSP|PB will use recent
trip data from CUATS to evaluate the percentage of trips that would be shifted and the resulting impact on
operational costs.
2/3
8 of 51
C. Evaluate Alternative Service Models.
WSP|PB will evaluate the potential impact of the reorganization of responsibilities among CUATS and
SETHRA. The evaluation will be based on interviews with CUATS and SETHRA staff and a review of agency
ridership, budget, and related data.
Technological innovations like Uber and Lyft, which have become more prominent in recent years, could
offer potential alternatives to public transit service for some trip types, times and areas, potentially reducing
transit costs while expanding the ability for travelers to make trips from areas and at times that cannot be
provided by CUATS. WSP|PB will work with CUATS to explore ways in which these services could be
integrated with transit service to reduce transit costs. In addition, WSP|PB will explore the ways in which
volunteer services could be put to use to provide some trips, and how volunteer activities could be
integrated with CUATS services to provide expanded transit service at lower cost.
3/3
9 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: 2016 UPWP Amendment
Staff has proposed the 2016 UPWP amendment that is attached. The 2016 UPWP
amendment is necessary to correct the UPWP by adding in a PL-112 funds carryover
balance that was previously unaccounted for and to correct the amount of Section 5303
funds in the UPWP. The amendment will be necessary in order to seek reimbursement
of those 5303 funds in the expired FY 2011 contract as addressed elsewhere in the staff
report for the July 13, 2016 MPO meeting.
The proposed UPWP amendment has been advertised and submitted to TDOT as
required. Following a public hearing on this matter, it is proposed that the UPWP
Amendment be adopted by the MPO.
Page 1 of 1
10 of 51
PUBLIC HEARING on Adoption of Amendment to 2016
Unified Planning Work Program (UPWP)
July 13, 2016
Today’s meeting includes a Public Hearing to hear public comments on the
proposed amendment to the MPO’s 2016 Unified Planning Work Program (UPWP)
which is proposed for adoption.
I declare the public hearing to be open.
Is there anyone here who would like to offer any comments on this item?
….Receive Comments
Is there anyone else here who would like to speak on this item?
….Receive Comments, or
Seeing none, I declare the public hearing to be closed
11 of 51
12 of 51
13 of 51
14 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
III. On-going Challenges, Accomplishments,
and Proposed Work Tasks….
C. Work Tasks for 2016-2017 UPWP….
Work Task I --- ADMINISTRATIVE ACTIVITIES
Responsible Agencies
The responsible agencies include the Tennessee Department of Transportation (Long
Range Planning Division, the Local Program Development Division, and Multimodal
Transportation Resources Division) and the Cleveland Urban Area Metropolitan Planning
Organization.
Purpose
To manage and administer the transportation planning program and ensure the
participation and cooperation with all involved agencies, citizen groups, and
individuals is a transparent and public process.
Previous Work
The MPO staff arranged, advertised, conducted and recorded all of the MPO Executive
Board and TCC meetings during FY2014-FY2015. The MPO staff prepared quarterly
billings for the 2014-2015 fiscal years. Each year the MPO staff prepares and manages
the Unified Planning Work Program (UPWP) and attends various Federal Highway
Administration and Tennessee Department of Transportation training sessions.
TDOT Multimodal Transportation Resources will administer correspondence and
telephone contacts regarding river transportation, urban public transit, rail service,
ridesharing, and transportation systems management. Representatives of this office will
participate in MPO meetings; distribute federal guidelines and requirements; conduct
seminars and work sessions; provide advice and assistance concerning feasibility of river
transportation development; review study documentation and reports; administer funds
for port development. This office will coordinate FTA's Section 5303 and other transit
funding programs serving the MPO area.
FY2016-FY2017 Tasks
1. Develop and oversee work schedules and study agreements, coordinate activities
of the MPO Executive Board and TCC and provide information upon request.
Page 1 of 22
15 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
2. Develop and maintain agreements with appropriate parties of the planning
process and update Prospectus and By-laws when needed, and any other
amendments to bring the document(s) into compliance. This will include the
means for remaining proactive; ensure compliance with ADA legislation; and ways
to seek out the underserved. Organizational and outreach activities for the Title VI
Program will continue throughout the year and the MPO will update as needed the
Annual Title VI compliance report.
3. Develop the FY2018-FY2019 Unified Planning Work Program for MPO Executive
Board adoption and submittal to TDOT, FHWA, and FTA.
4. Make amendments to the FY2016-FY2017 UPWP as required.
5. Encourage a cooperative and open transportation planning process through the
participation of interested individuals, organizations, and local/state governments.
6. Participate in the Association of Metropolitan Planning Organizations and
Tennessee Association of MPO Coordinators meetings.
7. Serve as a source of state and federal policy review, study documentation and
reports, and otherwise coordinate with TDOT Multimodal Transportation Resources
and the SETHRA as operators of the local transit system CUATS regarding FTA funds
and FTA programs 49 CFR 5309, 5303, 5307 and 5310.
8. The MPO staff will provide data and transportation planning assistance for
transportation projects enhancing modal choice, including project proposal
development for competitive grant applications under various sources including
Safe Routes to Schools and Transportation Alternatives funds.
9. The MPO staff will collaborate with officials at the Cleveland Urban Area Transit
System (CUATS), SETHRA’s transit system in the Cleveland Urbanized Area, to pursue
any transit grants available and to ensure a comprehensive and collective
approach to transportation planning is practiced to guarantee the citizens public
transportation.
10. The Long Range Planning Division of TDOT will work jointly with the MPO to establish
the administrative and technical procedures required, prepare contractual
agreements as required, attend all study meetings, distribute special and annual
reports and study documents, review and analyze individual transportation
planning projects and studies, and undertake general administrative activities. The
MPO will continually look for guidance from the Long Range Planning Division at
TDOT on all issues pertaining to the MPO.
Products
Products of the MPO staff include minutes of MPO meetings, monthly meeting packets,
quarterly progress reports, various contracts and agreements, files and records as
required, and the UPWP. Additionally, MPO staff will perform all work necessary to
Page 2 of 22
16 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
maintain an ongoing transportation planning program that meets FTA, FHWA and TDOT
requirements and regulations.
Figure 6: Task I Product Schedule
Product Schedule
FY2018-FY2019 Unified Planning Work Program Winter/Spring/Summer 2017
Amendments/Adjustments to the UPWP As needed
Quarterly Invoices and Reports Quarterly
Administration and Coordination of meetings On-going task
Work Task II--- LONG RANGE TRANSPORTATION PLANNING
Responsible Agencies
The responsible agencies include the Cleveland Urban Area Metropolitan Planning
Organization; City of Cleveland, Bradley County; and the Tennessee Department of
Transportation, Long Range Planning Division.
Purpose
The Cleveland Area Metropolitan Planning Organization, in conjunction with Bradley
County, City of Cleveland, the City of Charleston, the Town of Calhoun, McMinn
County, SETHRA, FTA, FHWA, and TDOT, will work to prepare the 2040 Regional
Transportation Plan for adoption and amend the adopted plan as needed. Major
activities for the MPO beginning in FY2016-FY2017 will be the adoption process for the
2040 RTP, continued participation TDOT’s new Statewide Long Range Plan, and
preparation for the implementation of Performance Based Planning and programming.
Previous Work
The MPO hired consultants to work with staff in the development of the 2040 RTP. TDOT
has worked with the MPOs to help with model development, freight planning and ITS
development and implementation. The MPO, working with consultants, developed
amendments to the 2035 RTP as needed to implement various projects.
FY2016-FY2017 Tasks
1. The MPO staff will continue the on-going management of the 2035 RTP and the
development, adoption, and implementation of the 2040 RTP. This effort will
Page 3 of 22
17 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
address the needs of passengers and freight encompassing highway
transportation, transit, and non-motorized modes.
2. Work will continue on model development, ITS architecture and planning and
assistance with freight planning as needed.
3. The MPO will remain proactive by addressing problems before they arise, by creating
a planning network with consistent up to date data and projections to use in the
travel demand model and other plans that will show a clearer picture of future
needs within the MPO planning area boundary.
4. The MPO will continue to manage the updates and maintenance of the new travel
demand model to ensure the accuracy of the data and to ensure that the most
recent data is available for input into the model.
5. The MPO will continually update the Environmental Justice portion of the RTP to
incorporate changes in the TIP and future projects, and to reflect available data
from the 2010 Census.
6. FHWA has developed INVEST (Infrastructure Voluntary Evaluation Sustainability
Tool), a web-based collection of voluntary best practices. The evaluation criteria in
INVEST address the “triple bottom line” principles of sustainability (social,
economic, environmental) across three key areas of transportation planning:
systems planning, project development criteria, and operations and maintenance
criteria. The MPO will utilize the Systems Planning (SP) portion of INVEST for
evaluation of the RTP.
7. The MPO will continue coordinate with TDOT in the development of TDOT’s new
Statewide Long Range Plan.
8. The MPO will coordinate with TDOT in various aspects of MAP-21 required
performance management that affect long range planning by the MPO and
which contain reporting requirements applicable to the MPO.
Page 4 of 22
18 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Products
A continually updated Long-Range Transportation Plan for the Cleveland, Tennessee
MPO Area.
Figure 7: Task B Product Schedule
Product Schedule
Regional Transportation Plan Amendments As needed
New Long Range Transportation Plan (2040 RTP) Complete Spring 2016
Administration and coordination of meetings required
As needed
for the RTP amendment or adjustment process
Develop and Implement Performance Based Planning
and Programming approach for MPO in cooperation On-going
with TDOT
Work Task III --- TRANSPORTATION IMPROVEMENT PROGRAM
Responsible Agencies
The responsible agencies include the Tennessee Department of Transportation, Long
Range Planning Division; and the Cleveland Urban Area Metropolitan Planning
Organization.
Purpose
The Cleveland Area Metropolitan Planning Organization, in conjunction with Bradley
County, City of Cleveland, FTA, FHWA, and TDOT, will continue to work collaboratively
to manage the FY2014-FY2017 Transportation Improvement Program (TIP) and
coordinate with local agencies to ensure the advancement of projects in the TIP. These
agencies will also work to develop and implement the FY2017-FY2020 TIP. All work to be
completed on this task will be in compliance with the MPO adopted Public Participation
Plan, to ensure that public involvement is included in the end products.
Previous Work
The MPO Executive Board adopted the FY2014-FY2017 TIP in October 2013. In FY2014-
FY2015, working with Parson Brinkerhoff, MPO staff processed TIP amendments and
adjustments to ensure successful management of the 2014-2017 TIP and effective
implementation of projects programmed in the TIP, and it is expected that staff will
continue to process amendments and adjustments to the 2014-2017 TIP and 2017-2020
TIP as needed.
Page 5 of 22
19 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
FY2016—FY2017 Tasks
1. The MPO will amend and adjust the FY2014-FY2017 TIP as needed.
2. The MPO will review proposed projects by TDOT, local implementing agencies,
CUATS, and private developers for transportation, for Title VI impacts, and
consistency with the RTP.
3. The MPO will be addressing the requirements of 24 CFR 450.322 that pertain to the
annual listing of obligated projects. The MPO will monitor projects that are
programmed in the TIP to ensure proper funding and priorities are being met.
4. The MPO will develop the 2017-2020 TIP
Products
Products will include any amendments and adjustments to the FY2014-FY2017 TIP and
the development and adoption of the 2017-2020 TIP.
Figure 8: Task C Product Schedule
Product Schedule
Amendments / Adjustments to the TIP On-going task
Listing of Obligated Projects Spring 2016 and 2017
MPO Project Priority List for TDOT Winter 2016 and 2017
Administration and Coordination of meetings for the
On-going task
TIP process
Develop 2017-2020 TIP Winter, Spring, Summer 2016
Work Task IV--- TRANSIT PLANNING
Responsible Agencies
The responsible agencies include Tennessee Department of Transportation, Project
Planning Division and Multimodal Transportation Resources Division; Cleveland Urban
Area Metropolitan Planning Organization, City of Cleveland, City of Charleston, Town of
Calhoun, Bradley County, McMinn County, and the Southeast Tennessee Human
Resources Agency.
Purpose
Page 6 of 22
20 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
The Cleveland Area Metropolitan Planning Organization will work in partnership with
Bradley County, City of Cleveland, FTA, and SETHRA, to address the transit needs of the
population within the MPO planning boundary.
Previous Work
The MPO adopted the Transit Plan in 2006 that was developed for the MPO by a
consultant. The MPO integrated the Plan into the Regional Transportation Plan (RTP)
that was adopted in August 2008. The MPO worked closely with SETHRA on the
Cleveland Depot Project. The MPO and SETHRA met with PB Americas, Inc. to gather
data with the purpose of reviewing and analyzing the existing transit system, to make
recommendations as part of the development of the Transit System Plan element of the
2035 RTP. A Transit System Plan that recommends improvements to the existing system,
projects future ridership and identifies potential future extensions of the system has been
adopted as part of the 2035 RTP process. Working with PB Americas, Inc. and SETHRA,
during FY2012 and FY2013 a route study was prepared to evaluate issues with existing
routes, to suggest propose route changes and additions, and to consider bus stop
locations and signage improvements. In FY2014 and FY2015, MPO and CUATS staff
coordinated on the development and submittal of Multimodal Access grant
applications to TDOT including what would be the systems first bus shelters. MPO and
CUATS staff have worked through the University of Tennessee SCI program to further the
process of bus shelter planning for the system during FY2015.
FY2016-FY2017 Tasks
All work to be completed on this task will be in compliance with the MPO adopted Public
Participation Plan, to ensure that public involvement is included in the end products.
1. The MPO will continue to work closely with the Southeast Tennessee Human
Resources Agency (SETHRA) to develop a transit network that meets the needs of
the public within the MPO boundary. Work will consist of, but is not limited to the
following; studies needed to provide better routing of buses, changes of bus routes
to meet the needs of the ridership, location of future transfer facilities and stops,
the need for any additional routes, public notification of proposed transit changes.
2. The MPO will continue to collaborate and assist the Cleveland Urban Area Transit
System and SETHRA in the development of a plan for improving bus stops with
features such as shelters, benches, and improved signage.
3. The MPO staff will assist with any additional updating of the Human Service
Coordination Plan required by MAP-21 or subsequent legislation (the last update
was done in 2012 and a new region-wide update is underway in 2015 under the
auspices of TDOT’s Multimodal Division). Activities for this task will be provided
primarily by the MPO Staff or consultants, the Tennessee Department of
Page 7 of 22
21 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Transportation’s Division of Multimodal Transportation Resources, in conjunction
with the Southeast Tennessee Human Resources Agency (SETHRA).
4. The MPO staff, CUATS staff and others will work cooperatively in the 2040 RTP
planning process to consolidate the bicycle/pedestrian plan and the transit plan
into a coordinated multimodal planning document. Work will include coordinated
planning for multi-modal facilities in and near corridors served by transit routes.
Products
A continuously updated Transit Systems Plan that serves the current needs of the
population within the MPO planning area boundary.
Product Schedule
Work tasks are a continuing collaborative effort with SETHRA and CUATS. The MPO will
update or amendment the Human Services Plan as needed.
Figure 9: Task D Product Schedule
Product Schedule
Updated Plan for bus stop improvements Fall 2015
Updates to the Transit Systems Plan and related
On-going task
bicycle and pedestrian planning
Updates to the Human Services Plan On-going task
Consolidation of Transit and Bike/Ped plans Spring 2016
Work Task V --- Data Collection
Responsible Agencies
The responsible agencies include the Tennessee Department of Transportation;
Cleveland Urban Area Metropolitan Planning Organization; Cleveland Utilities Electric
Division, and others.
Purpose
To maintain the current inventory of data and conduct studies appropriate to planning
for transportation system design and operations within the MPO planning boundary.
Page 8 of 22
22 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Previous Work
Data was gathered from a multitude of sources for the development of the 2035 Long
Range Transportation Plan. Traffic volumes have been collected at 109 annual cycle
count stations. Special count data was collected for design projects as required.
Accident data from Tennessee Department of Safety was coded and filed. High
hazard accident data was furnished for safety studies as needed. In FY 2015 this process
is being updated in preparation of the 2040 RTP
FY2016—FY2017 Tasks
All work to be completed on this task will be in compliance with the MPO adopted Public
Participation Plan, to ensure that public involvement is included in the end products.
1. Continue to collect traffic count data at 109 annual cycle count stations or
project-specific traffic counts will be conducted by the City of Cleveland and
Bradley County and the MPO will request any special traffic counts as needed for
planning and design projects from TDOT.
2. Maintain accident file and furnish high hazard listings and other safety data as
required.
3. Travel time studies will be conducted if needed for special studies.
4. Working in conjunction with Cleveland Utilities Electric Division, the entity which
maintains the traffic signal system and carries out traffic engineering functions
within the city, the MPO will evaluate corridors in order to maintain traffic flow and
mitigate congestion. The resulting information will inform the transportation
planning process. Maintaining traffic flow and mitigating congestion will help to
address climate change by helping to reduce stopping and starting and by
helping to reduce idle time.
5. Work in cooperation with TDOT in the update of the Cleveland MPO ITS
Architecture.
6. Work with TDOT and local agencies regarding other aspects of planning for
operations including extreme weather (e.g. dense fog is a particularly serious issue
for the MPO that involves a fog detection and closure system on I-75 that must be
part of ITS and transportation operations). Other concerns could include
maintenance of pavement and bridges and vulnerability of transportation systems
to flooding (a new flood study is presently being produced), especially as these
may be exacerbated by climate change. To this end, and subject to resource
Page 9 of 22
23 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
availability and any necessary approvals, the MPO would participate in TDOT’s
“Tennessee Extreme Weather Project”.
7. Implement a program to collect and analyze sidewalk inventory and condition
data, sidewalk and bicycle improvement needs data from citizen input and
demographic data, pedestrian and bicycle count data, and pedestrian and
bicycle accident data, in order to inform the development of a better multimodal
transportation system.
Products
A constantly updated database of information to use in the planning process and
system design of the roadway network of the MPO planning boundary will be
developed. Average Daily Traffic, peak hour volume, vehicle classification, directional
distribution, and other traffic data will be collected and stored for future planning and
design studies. Vehicle miles of travel on functionally classified systems will also be
collected. High hazard lists, collision diagrams, and other accident data will be
collected from Police Services. Updated data will be sent to TDOT for the TDOT TRIMS
File. The MPO conducts counts of pedestrians and bicycles on a limited basis. Accident
data is collected by the police department and is available to the MPO. Work is a
continuing project. Data generated in this process will lend quantitative description to
existing and emerging operational issues in the transportation system, such as additional
travel time delay and congestion. TDOT has proposed to utilize a contractor to update
the ITS Architectures of the smaller MPOs including Cleveland; CUAMPO will be
coordinating with TDOT in the update effort.
Product Schedule
Work tasks are a continuing collaborative effort with TDOT, SETHRA and CUATS, the
Chattanooga TPO, the Cities of Cleveland and Charleston, Bradley County, the Town of
Calhoun, McMinn County, and various state and local agencies.
Page 10 of 22
24 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 10: Task E Product Schedule
Product Schedule
On-going (special counts as
Traffic Counts
needed)
Accident data collection On-going task
Travel time studies As needed
ITS Architecture Update TDOT Schedule
Planning for Operations On-going task
Pedestrian and Bicycle data On-going task
Page 11 of 22
25 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
IV. Financial Tables…. (OLD TABLES)
Figure 11: Task I Administration Activities Funding Resources—FY2016 OLD
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $53,153 $0
State $0 $0
Local $13,288 $0
TDOT (SPR)
Federal $10,554 $0
State $2,636 $0
Total $79,631 $0
Figure 13: Task II Long Range Transportation Planning Funding Resources—FY2016 OLD
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $56,747 $0
State $0 $0
Local $14,187 $0
TDOT (SPR)
Federal $21,989 $0
State $5,489 $0
Total $98,412 $0
Page 12 of 22
26 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 15: Task III Transportation Improvement Program Funding Resources—FY2016 OLD
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $38,205 $0
State $0 $0
Local $9,551 $0
TDOT (SPR)
Federal $0 $0
State $0 $0
Total $47,756 $0
Figure 17: Task IV Transit Planning Funding Resources—FY2016 OLD
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $10,000 $27,141
State $0 $3,393
Local $2,500 $3,393
TDOT (SPR)
Federal $0 $0
State $0 $0
Total $12,500 $33,927
Page 13 of 22
27 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 19: Task V Transportation Data—FY2016 OLD
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $8,000 $0
State $0 $0
Local $2,000 $0
TDOT (SPR)
Federal $3,218 $0
State $805 $0
Total $14,023 $0
Page 14 of 22
28 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 21. Funding Sources by Category (FY2016) OLD
Section
Reserve TDOT State Local
Local FHWA 5303
Category PL 112 Funds SPR Totals4
Match2 SPR3 5303 5303
(PL-112)1 Match3 Funds
Match Match
I.
Administration $53,153 $54,000 $13,288 $10,554 $2,636 $0 $0 $0 $79,631
Activities
II. Long-
Range
$56,747 $57,000 $14,187 $21,989 $5,489 $0 $0 $0 $98,412
Transportation
Plan
III. TIP $38,205 $54,433 $9551 $0 $0 $0 $0 $0 $47,756
IV. Transit
$10,000 $1,500 $2,500 $0 $0 $27,141 $3,393 $3,393 $46,427
Planning
V.
Transportation
Systems $8,000 $1,500 $2,000 $3218 $805 $0 $0 $0 $14,023
Operations
Planning
TOTALS $166,105 $168,433 $41,526 $35,761 $8,930 $27,141 $3,393 $3,393 $286,249
NOTES:
1. Yellow highlighted areas represent the programming of Reserve PL-112 funds.
2. Match amounts not calculated for PL Reserve
3. Grey shaded areas are funds used by TDOT
4. Totals do not include PL Reserve funds
Page 15 of 22
29 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 22. Agency Funding Sources by Category (FY2016) OLD
TDOT TOTAL State
FHWA FTA MPO/Local
TASK SPR FHWA 5303 TOTALS 2
SPR1 5303 MATCH3
MATCH PL 112 Match
I.
Administration
Activities $10,554 $2,636 $53,153 $0 $0 $13,288 $79,631
II. Long-
Range
Transportation
Plan $21,989 $5,489 $56,747 $0 $0 $14,187 $98,412
III. TIP $0 $0 $38,205 $0 $0 $9,551 $47,756
IV. Transit
Planning $0 $0 $10,000 $27,141 $3,393 $5,893 $46,427
V.
Transportation
Systems
Operations
Planning $3,218 $805 $8000 $0 $0 $2,000 $14,023
TOTALS 2 $35,761 $8,930 $166,105 $27,141 $3,393 $44,919 $286,249
NOTES:
1. Grey shaded areas are funds used by TDOT
2. Figures include any applicable local match for FTA funds as well
Figure 23. Total Funding by Agency (FY2016) OLD
Federal Transit
Federal Highway Administration
Administration
AGENCY TDOT Section 5303 5303 TOTALS
Local FHWA
PL 112 SPR 5303 State Local
Match SPR1
Match1 Funds Match Match
TDOT-
PD/PT/WRD $0 $0 $35,761 $8,930 $0 $3,393 $0 $48,084
MPO $166,105 $41,526 $0 $0 $27,141 $0 $3,393 $238,165
TOTALS $166,105 $41,526 $35,761 $8,930 $27,141 $3,393 $3,393 $286,249
NOTES:
1. Grey shaded areas are funds used by TDOT
Page 16 of 22
30 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
IV. Financial Tables…. (NEW TABLES)
Figure 11: Task I Administration Activities Funding Resources—FY2016 NEW
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $125,867 $0
State $0 $0
Local $31,467 $0
TDOT (SPR)
Federal $10,554 $0
State $2,636 $0
Total $170,524 $0
Figure 13: Task II Long Range Transportation Planning Funding Resources—FY2016 NEW
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $134,006 $16,740
State $0 $2,092
Local $33,502 $2,093
TDOT (SPR)
Federal $21,989 $0
State $5,489 $0
Total $194,986 $20,925
Page 17 of 22
31 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 15: Task III Transportation Improvement Program Funding Resources—FY2016 NEW
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $90,469 $0
State $0 $0
Local $22,617 $0
TDOT (SPR)
Federal $0 $0
State $0 $0
Total $113,086 $0
Figure 17: Task IV Transit Planning Funding Resources—FY2016 NEW
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $23,634 $25,110
State $0 $3,138
Local $5,909 $3,139
TDOT (SPR)
Federal $0 $0
State $0 $0
Total $29,543 $31,387
Page 18 of 22
32 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 19: Task V Transportation Data—FY2016 NEW
MPO FHWA PL - 112 and Local Match FTA - 5303
Federal $19,361 $0
State $0 $0
Local $3,872 $0
TDOT (SPR)
Federal $3,266 $0
State $817 $0
Total $27,316 $0
Page 19 of 22
33 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 21. Funding Sources by Category (FY2016) NEW
Section
Reserve TDOT State Local
Local FHWA 5303
Category PL 112 Funds SPR Totals4
Match2 SPR3 5303 5303
(PL-112)1 Match3 Funds
Match Match
I.
Administration $125,867 $54,000 $31,467 $10,554 $2,636 $0 $0 $0 $170,524
Activities
II. Long-
Range
$134,006 $57,000 $33,502 $21,989 $5,489 $16,740 $2,092 $2,093 $215,911
Transportation
Plan
III. TIP $90,469 $54,433 $22,617 $0 $0 $0 $0 $0 $113,086
IV. Transit
$23,634 $1,500 $5,909 $0 $0 $25,110 $3,138 $3,139 $60,930
Planning
V.
Transportation
Data Systems $19,361 $1,500 $3,872 $3218 $805 $0 $0 $0 $28,224
Operations
Planning
TOTALS $393,337 $168,433 $97,367 $35,761 $8,930 $41,850 $5,230 $5,232 $587,707
NOTES:
1. Yellow highlighted areas represent the programming of Reserve PL-112 funds.
2. Match amounts not calculated for PL Reserve
3. Grey shaded areas are funds used by TDOT
4. Totals do not include PL Reserve funds
Page 20 of 22
34 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Figure 22. Agency Funding Sources by Category (FY2016) NEW
TDOT TOTAL State
FHWA FTA MPO/Local
TASK SPR FHWA 5303 TOTALS 2
SPR1 5303 MATCH3
MATCH PL 112 Match
I.
Administration
Activities $10,554 $2,636 $125,867 $0 $0 $31,467 $170,524
II. Long-
Range
Transportation
Plan $21,989 $5,489 $134,006 $16,740 $2,092 $35,595 $215,911
III. TIP $0 $0 $90,469 $0 $0 $22,617 $113,086
IV. Transit
Planning $0 $0 $23,634 $25,110 $3,138 $9,048 $55,699
V.
Transportation
Data Systems
Operations
Planning $3,218 $805 $19,361 $0 $0 $3,872 $27,256
TOTALS 2 $35,761 $8,930 $393,337 $41,850 $5,230 $102,599 $587,707
NOTES:
1. Grey shaded areas are funds used by TDOT
2. Figures include any applicable local match for FTA funds as well
Figure 23. Total Funding by Agency (FY2016) NEW
Federal Transit
Federal Highway Administration
Administration
AGENCY TDOT Section 5303 5303 TOTALS
Local FHWA
PL 112 SPR 5303 State Local
Match SPR1
Match1 Funds Match Match
TDOT-
PD/PT/WRD $0 $0 $35,761 $8,930 $0 $5,230 $0 $49,921
MPO $393,337 $97,367 $0 $0 $41,850 $0 $5,232 $537,786
TOTALS $393,337 $97,367 $35,761 $8,930 $41,850 $5,230 $5,232 $587,707
NOTES:
1. Grey shaded areas are funds used by TDOT
Page 21 of 22
35 of 51
Cleveland Proposed 2016 UPWP Amendment 06252016
Page 22 of 22
36 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: 2017 UPWP Update
Staff has submitted a revised draft of the 2017 UPWP update after receiving and
responding to comments from TDOT and FHWA/FTA. The draft 2017 UPWP update
has been recommended for approval by TDOT as of July 1, 2016 and the FHWA/FTA
concurrence is expected to be forthcoming. Staff proposes that the 2017 UPWP
Update, FHWA/FTA concurrence in TDOT’s recommendation for approval, be released
for public review and scheduled for adoption after the public hearing August 3, 2016.
Staff further proposes that the MPO Technical Coordinating Committee recommend the
2017 UPWP Update to the MPO Executive Board.
Page 1 of 1
37 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: 2017-2020 TIP
The draft 2017-2020 TIP was distributed internally at TDOT for review on June 10,
2016. TDOT comments are expected on or before July 30, 2016. After changes in
response to TDOT comments, the draft TIP would go for review by FHWA/FTA. After
revisions for Federal comments, the draft TIP would go out for public review and
comment before adoption by the MPO. As discussed in the MPO Coordinators Report
from the May 25, 2016 meeting, staff attempted to meet TIP financial constraint
requirements while getting the construction of two important projects, Adkisson Drive
widening and 20th Street/ Michigan Avenue Road intersection improvements, underway
during the TIP period. In order to do that, staff explored with TDOT the possibility of
using HSIP funds at 20th/ Michigan Avenue Road and borrowing forward into the FY
2021 allocation of USTP funds for Adkisson Drive. But these solutions were not
possible. The TIP project list in the draft now under review by TDOT is attached.
Page 1 of 1
38 of 51
39 of 51
40 of 51
41 of 51
42 of 51
43 of 51
44 of 51
45 of 51
46 of 51
47 of 51
48 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: 2017 Transportation Alternatives Grant application
Applications for the 2017 Transportation Alternatives (TA) grant are due to TDOT on
October 3, 2016. The application, the instructions, and the budget template are
available at https://www.tn.gov/tdot/topic/tap . The MPO must review any TA grant
application from within the MPO area. A design public involvement meeting must be
held prior to submittal of the application. The last MPO meeting prior to the submittal
deadline is September 14, 2016. There are several eligible activities including
rehabilitation of historic transportation structures like the railroad depot, but most
applications tend to focus on these two eligible categories:
1. Pedestrian and Bicycle Facilities
All facilities must be hard-surfaced, ADA compliant and provide adequate
connectivity. Multi-modal facilities must be a minimum of 10-feet wide. TA
funds can be used for sidewalks, walkways or curb ramps; bike lane striping,
wide paved shoulders, bike parking and bus racks; traffic calming; off-road
trails; bike and pedestrian bridges and underpasses; ADA compliance
2. Safe Routes for Non-Drivers
Access and accommodation for children, older adults and individuals with
disabilities
In order to submit the application by the October 3, 2016 deadline, staff is encouraging
MPO member local governments to submit project ideas by the August 3, 2016 MPO
meeting. MPO staff will be asking for some direction in the development of an
application(s) by that time. Local governments desiring t submit an application will need
to bear the application development costs and be able to manage the project meeting
TDOT requirements for locally managed projects. Possibilities include a Greenway
Page 1 of 2
49 of 51
Extension, Cleveland sidewalks (Inman Street, 25th Street, Georgetown Road, South
Lee Highway, Paul Huff Parkway, and North Lee Highway are all areas that have been
mentioned in the past), McMinn County/Calhoun sidewalk (SR 163, US 11), Bradley
County/Charleston (extension of sidewalk on US 11).
Page 2 of 2
50 of 51
MEMORANDUM
TO: MPO Executive Board and TCC
FROM: Greg Thomas, AICP, MPO Coordinator
DATE: July 11, 2016
SUBJECT: MPO Coordinators Report
1. Plans for the 2013 Multi-modal Access Grant have been developed by Miller-McCoy
Engineers and submitted to TDOT. The plans were reviewed by City engineering staff
and a field review is scheduled with TDOT’s Bicycle and Pedestrian Coordinator to go
over the plans and the change in the project scope recommended in the May 25, 2016
MPO meeting (deleting sidewalk construction on 9th Street, adding sidewalk
construction on Wildwood from 9th to 14th Street, and adding pedestrian crossings at 9th
and Wildwood and at Blackburn Road and Dalton Pike). Pending TDOT approval of a
contract amendment for the revised project description, and following necessary
submittals, staff will be seeking Notice to Proceed for ROW acquisition.
2. Staff submitted a CMAQ application for a park and ride lot with a connector bus
service at the Old Woolen Mill. TDOT has acknowledged receipt of the application and
review is underway. Announcement of project selection is expected in September 2016.
3. Staff has received word from TDOT that the 2015 Multi-modal Access grant
application for the 25th Street corridor was not successful. This project would have
extended sidewalk from where it now ends on Peerless Road to near the Rite Aid on the
corner of 25th and Keith while providing pedestrian crossings and a transit shelter.
4. A meeting of the SR60 Corridor Management Committee has been scheduled for
July 27, 2016 at 11:00 a.m. in the Cleveland City Council meeting room 190 Church
Street NE.
5. TDOT has announced training sessions around the state regarding ADA transition
plans. MPO staff has shared this information with member jurisdictions. MPO staff and
City of Cleveland staff are scheduled to attend the training July 29, 2016 in
Chattanooga.
Page 1 of 2
51 of 51
6. SETHRA/CUATS have submitted the ridership report below for the fiscal year ended
June 30, 2016:
Fixed
Route
Fiscal Fiscal
Month Fiscal Yr Fiscal Yr Fiscal Yr Year Year FISCAL YR
(11/12) (12/13) (13/14) (14/15) (15/16) (16/17)
July 6411 6539 7986 8184 9,058
August 8133 8454 8364 9091 9,553
September 7405 6919 7513 9643 9,774
October 6867 7847 9500 11,587 10,101
November 6475 7614 7876 7779 8,081
December 6313 6908 8073 8885 9,085
January 6500 7712 6969 8116 8095
February 6704 7588 7433 6458 9,271
March 7760 7998 8,806 7,998 10,087
April 6913 9044 8686 7,945 9,735
May 7178 8909 8965 7,845 10,683
June 6305 7340 8229 8756 11,559
Total 82964 92,872 98400 102287 115,082
Demand
Response
Month Fiscal Yr Fiscal Yr Fiscal Yr Fiscal Yr Fiscal YR FISCAL YR
(11/12) (12/13) (13/14) (14/15) (15/16 (16/17)
July 1951 2131 1930 2268 2,121
August 2191 2285 1907 2206 1957
September 2211 2012 1883 2268 1992
October 2152 2248 2120 2405 2,139
November 1775 1521 1785 1992 1856
December 1751 1402 2,090 1514 1,986
January 1947 1683 1930 2140 1956
February 1877 1753 1860 1694 2,145
March 2124 1795 2,260 2283 2374
April 1969 1921 2317 2,059 2220
May 2060 2020 2161 1,961 2155
June 2028 1683 2335 2229 2,422
Total For
Fiscal Year 24036 22454 24578 25019 25,323
Page 2 of 2