Advisory Planning Commission
Regular MeetingCollege Park, MD · December 3, 2020
Minutes
ADVISORY
CITY OF COLLEGE PARK PLANNING COMMISSION
ADVISORY PLANNING COMMISSION
8400 BALTIMORE AVENUE, COLLEGE PARK, MARYLAND 20740
TELEPHONE: (240) 487-3538
ADVISORY PLANNING COMMISSION
Approved Minutes of Meeting
December 3, 2020
(Due to COVID-19 Pandemic, this was a Virtual Meeting)
Members Present Absent
Stephanie Stullich, Chair x
Santosh Chelliah, Vice-Chair x
Ben Flamm x
James McFadden x
Daejauna Donahue x
Vernae Martin x
Also Present: Planning Staff – Terry Schum, Miriam Bader and Theresheia Williams;
Attorney - Susan Cook; Terrapin Main Street Team – Richard Greenberg, Stuart Schooler,
Aaron Schooler, Matthew Tedesco and Joe DiMarco
I. Call to Order and Amendments to Agenda: Stephanie Stullich called the
meeting to order at 7:31 p.m.
II. Approval of the Agenda: Vernae Martin moved to approve the agenda as
published. Santosh Chelliah seconded. Motion carried 6-0-0.
III. Approval of Minutes:
Santosh Chelliah moved to adopt the minutes of November 5, 2020, after the
correction on page 3, paragraph 5, changing “razed” to “raised.” Vernae Martin
seconded. Motion carried 6-0-0.
IV. Public Remarks on Non-Agenda Items: There were no Public Remarks on Non-
Agenda Items.
V. Presentation: Conceptual Site Plan CSP-20002, Terrapin House
A proposal to rezone the property to MUI (Mixed-Use-Infill) to
allow for a mixed-use development consisting of 160-175
multifamily units and 10,000-15,000 square feet of
commercial/retail space
Applicant: Terrapin Main Street, LLC
Location: Northeast quadrant of the intersection of Baltimore Avenue
and Hartwick Road
Stephanie Stullich informed the attendees of the meeting procedures and how
questions or comments could be submitted through the Zoom platform.
Advisory Planning Commission Minutes
December 3, 2020 – Page 2
Terry Schum gave a brief description of the Terrapin Main Street project. The
proposed project is a Conceptual Site Plan application that the City recently
received on referral from M-NCPPC. The project involves the redevelopment of the
area east of Route One, south of R.J. Bentley’s and north of Hartwick Road and
west of Yale Avenue. The proposed project requires an assemblage and rezoning
which will include the existing Shopping Center, a single-family dwelling behind
the shopping center and a small apartment building known as Yale House, all
purchased by the owner, Richard Greenberg. The proposed project will be
multifamily housing with 175 dwelling units and ground-floor retail. The project is
tentatively scheduled for a Planning Board public hearing on January 21, 2021. The
City Council will be scheduling their review in advance of the Planning Board
hearing.
Ms. Schum introduced the property owner and applicant, Richard Greenberg, and
his Land Use Attorney, Matthew Tedesco Mr. Tedesco introduced the other team
members present, Aaron Schooler, Stuart Adams and Joe DiMarco, Civil Engineer.
Mr. Tedesco gave a PowerPoint presentation on the Terrapin House project. He
stated that they appreciate the opportunity to work with the City to get more
information and feedback from the community. The Conceptual Site Plan
application has been accepted. He stated that all the properties have been purchased
by the owner. The Yale House is zoned R-18 and the single-family home is R-55 all
of which are in the Development District Overlay Zone (DDOZ). The goal is to
rezone the four lots so that it’s all one cohesive infill development but there is no
proposal for actual redevelopment at this time. One of the reasons for filing the
Conceptual Site Plan is to balance out all the properties into a single zone since they
are now under one ownership. He stated that the renderings are not necessarily what
would be built, the slides of the conceptual site plan are to start a dialogue with the
City and community on what parameters and framework to work upon. The
Conceptual Site Plan allows them the ability to set parameters so that when they do
move forward with the Preliminary Plan and Detailed Site Plan, they would have
conceptually laid out some flexibility to accommodate a development that everyone
can be proud of and have an interest in.
Stephanie Stullich, Chair, thanked Mr. Tedesco for his presentation and asked APC
Members and the audience if there were any questions. In addition to APC
members and staff, there were 5 members of the Applicant’s team and 23 members
of the public attending the meeting. The questions and answers and comments are
summarized below.
1. Question from Stephanie Stullich: Do you have an approximate timeline for
the project?
Answer by Matthew Tedesco: There is no definite date yet. Even after the
Conceptual Site Plan is approved, there will still be about another year for other
entitlements and applying for the permits.
2. Question from Vernae Martin: Do the PowerPoint renderings show
underground parking for residential and commercial?
Advisory Planning Commission Minutes
December 3, 2020 – Page 3
Answer by Richard Greenberg: Yes, the renderings show parking for
residential and commercial.
3. Question by Vernae Martin: Are the residential units all rental and what size
will they be?
Answer by Stuart Schooler: The units will all be rentals. The size of the units
will be dictated by market demand.
4. Question from Vernae Martin: Has there been any thought to having
designated affordable housing units within the residential portion of the
development?
Answer by Stuart Schooler: The actual breakdown has not been discussed at
this time.
5. Question by Santosh Chelliah: What will the height of the building be?
Answer by Matthew Tedesco: We will adhere to the maximum height of the
Development District Standards, which is six stories, so it would not be higher
than that.
6. Question by Santosh Chelliah: What percentage of the existing retail will be
retained?
Answer by Stuart Schooler: It is too far in advance to answer that because we
don’t know how many tenants are planning to stay, but we are not planning to
ask any of the tenants to leave.
7. Question by Stephanie Stullich: How long will businesses be inoperable during
construction?
Answer by Stuart Schooler: For a building of this size, construction from
demolition to groundbreaking would take around 18 months.
8. Question from Stephanie Stullich: Do you know how much time is left on the
leases?
Answer by Richard Greenberg: They are all over the board with all different
timeframes.
9. Question from Terry Schum: Can someone discuss the proposed vehicular
access to the property?
Answer by Richard Greenberg: The main vehicular entry point into the garage
would probably be from Yale Avenue and the pedestrian access would be Route
1 and/or Hartwick Road.
Advisory Planning Commission Minutes
December 3, 2020 – Page 4
10. Question from Michelle Taylor-Bible: I purchased my home two years ago
at Hartwick Road and Calvert Road. I love living in historic College Park and
a college town. With all the tall buildings being built, it is starting to make the
City look dark and claustrophobic. I am concerned about the deliveries to
retail spaces in College Park and would like to know how deliveries will be
addressed in the area of the proposed development? I love walking through the
neighborhoods. There is no character and no one is taking pride in the history
of the City. The developer should embrace College Park and include some
character in his project.
Answer by Richard Greenberg: We have not decided on one particular user
group that would be the end-user of this building. We are early in the process
and market research has not been conducted. Currently, there is no loading
dock for the retail as it exists today, so as for deliveries, loading and unloading
for future retail, I don’t see any negative changes. As we get more detailed and
start looking at garages, traffic circulation, etc., we will do everything we can
to explore all options available.
11. Question from Robert Schnabel: I am extremely disappointed in all the
recent buildings that have been going up in College Park directly next to the
Old Town Historic District. This has been an assault on the local historic
district. These buildings that occupy an entire block are totally out of scale with
what should be there. I suggest that the design be changed with regard to use
because we are inundated with student housing. I recommend that this project
not be allowed to go forward because I think many problems are going to be
associated with it. The recent flooding problem on Knox Road was a truant
waterway, and this is occurring frequently. Our property was flooded recently
and we were pumping water out of our basement. Climate change is going to
bring about an incredible amount of more rainfall and flooding. We need a
huge improvement in dealing with runoff problems.
Answer by Matthew Tedesco: A lot of the things Mr. Schnabel commented
on are things that can be worked on when we get to the point of design and the
Detailed Site Plan. Some of the items referenced can be incorporated into the
design as we move forward.
12. Question from Jason Azevedo: At this stage of the design conceptual phase,
is it inclusive of any analysis about flooding and what the impact would be of
introducing so much impermeability to that site? There are already increasing
flooding issues within the Calvert Hills and Hartwick Road areas that
experience pretty quick flooding in normal storm events. Introducing more
impermeability could exacerbate that which has been of increasing concern
with more and more development happening. Has there been any discussion on
what your thoughts are about stormwater management to not exacerbate the
flooding issue? I would encourage the developer to take on a much more
conservative track than what the code may require.
Advisory Planning Commission Minutes
December 3, 2020 – Page 5
Answer by Matthew Tedesco: Because this is a Conceptual Site Plan, the
Department of Permitting Inspections and Enforcement (DPIE) does not
require a stormwater concept plan because, at this stage, no development can
occur. With the Preliminary Plan and Detailed Site Plan, we are required to get
approved by DPIE before the application is accepted. When we are at the
stormwater concept plan phase DPIE will require a 100-year attenuation for the
100-year storm on this development. Prince Georges County and the State of
Maryland are quite extensive - when it comes to stormwater management, it's
one of the most restrictive and requires retention for quality and quantity
control. The Yale House and the single-family house have no stormwater
systems, so with the redevelopment, we would actually be improving the
current situation because most of these properties that are under redevelopment
have no stormwater controls. Having redevelopment does promote a better
situation and improvement to what’s there on infill redevelopment sites.
13. Question from Stephanie Stullich: If Prince George’s is so robust, why is the
problem getting worse? There is more development and the flooding problems
in this area of College Park have gotten worse over the past 10 years. I think we
have had three 100-year storms in the past 10 years.
Answer from Matthew Tedesco: Each of these new sites that take an existing
100 percent impervious area that has no stormwater quality control and
introduces a redevelopment project that holds back, attenuates, and discharges
those events at a controlled rate, is an improvement. There are a lot of upstream
issues. In our estimation, each of these projects does contribute a small part by
not making it worst and by actually improving water control on these sites that
don’t currently have any.
Answer from Joe DiMarco, Civil Engineer: Prince George’s County
requires100-year retention and attenuation on-site for flood management
purposes. The proposed development adds a building that covers the better
portion of the site and in doing so introduces impervious surface. We would
then collect the drainage that hits the rooftop of that surface as well as other
areas on the site and actually bring it to an underground retention vault system
or large pipe system which would hold it back and slowly release that so that
we're not exacerbating any of the flooding conditions which are well known for
the downtown area.
Answer from Stuart Schooler: The retail building is almost 100% impervious
and the existing apartment building is almost 100% impervious. The 100-year
storm has not been occurring 1% of the time if you look at the past 10 years.
We will have to look at more mitigation attenuation like green roofs on the roof
for this building because the pervious surface, almost everything else is paved.
We will have to look at some underground retention measures.
Advisory Planning Commission Minutes
December 3, 2020 – Page 6
14. Question from Jeanne Jennings: I have lived in College Park for 37 years and
have suffered through several flooding issues during the last 10 years. I also
agree that the architecture should be something rather distinctive that would be
in line with College Park’s architecture. Also, to have the family-owned
businesses on Route One have to evacuate during construction and return seems
difficult. It would be nice if the City could offer some kind of economic or
relocation assistance to the family-owned businesses during the relocation
process.
Answer by Richard Greenberg: I can't dictate what the market is going to
look like in the next two to four years. We will do what we can to keep
businesses that desire to remain in place. It is no different than what we are
doing today with businesses that are struggling to remain open through the
pandemic. I will pledge now that we will continue to do our best and keep
everybody afloat and prospering and in business.
15. Question from Eric Sussman (chat): What can we expect in terms of traffic
study and mitigation? Traffic on and around Baltimore Avenue and this area
can be a nuisance. An example is the backups that form eastbound on Knox
Road at Baltimore Avenue. Will you be able to work with authorities to
examine traffic and advocate for improvements where possible? For example,
upgraded technology that improves timing. It is also worth noting that there is a
severe lack of loading zones for the current businesses on Baltimore Avenue.
There is an increased need for loading zones due to the use of rideshare and
delivery services. Can we expect that building residents will be eligible for
street parking permits?
Answer by Matthew Tedesco: Traffic impact analysis is required at the time of
subdivision which would be the next step in the process after the conceptual site
plan. In addition, the sector plan requires a traffic analysis to be done at the time
of the detailed site plan.
Answer by Terry Schum: Loading is required to be provided as part of the
project so it needs to be shown on a plan. Because this is a conceptual site
plan, we haven't seen those details yet, but I assume that at least one loading
zone would need to be incorporated into the project and that might be within the
building itself. As far as residential parking permits, it would be highly unusual
for the City Council to allow residents of a project like this to obtain on-street
parking permits. Parking is expected to be provided for the residents within the
building itself.
Answer by Stephanie Stullich: Generally, that has been the case with other
large developments. They've been required to provide parking for their
residents and to the extent, they generally don't provide sufficient parking for all
of the residents. The residents may not need parking to be provided if they are
for example walking to the University for school or work but in any case that is
expected to not have a parking impact on the neighborhood. The neighborhood
does have permit parking precisely because of these kinds of concerns.
Advisory Planning Commission Minutes
December 3, 2020 – Page 7
Answer by Terry Schum: The State Highway Administration (SHA) controls
the signal timing for all the intersections in College Park. If changes are made at
one intersection it usually prompts changes to others. Sometimes those changes
are successful and sometimes they’re not. The intersection of Hardwick Road
and Baltimore Avenue will be upgraded fairly soon as a result of another
development project taking place on the west side of Route 1. It will be
upgraded to a full signalized intersection. Right now, it's only a pedestrian-
activated red light that stops vehicles along Baltimore Avenue. The upgrade is
definitely coming soon to that intersection but I can’t speak to a corridor-wide
signal timing study.
16. Question from Dan Oates (chat): Have the developers considered pursuing
owner-occupied units, for example, condominiums rather than rental units or
some mix for this project? We have already seen a huge number of new
apartment buildings built or under construction in College Park recently. It
would be positive to have more owner- occupied housing available that is more
acceptable in the community.
Answer by Richard Greenberg: The market report has not been done. We
don't know what this end product is going to be. We do believe it's going to be a
mixed-use project but whether it will be renter, buyer student, or graduate we
just can't answer that question today.
17. Question from Don Jennings: In the slide for the concept of the building,
what do the white blocks represent? Are they just placeholders?
Answer from Matthew Tedesco: The white blocks indicate where there is
approved or ongoing redevelopment.
Comments
1. John Payne (chat): Thank you for the presentation I like the general concept
of residential over retail I think that is what downtown College Park needs. I
would like for the developers to do everything they can to preserve space for
Toms and Northwest Chinese and other local non-chain businesses. I have a
strong preference against by-the-bed student housing. I personally think the
proposed scale is appropriate with step down for the residential area.
2. Stu Adams: I definitely agree with preserving the locally-owned small
businesses that are currently here. I really want to emphasize owner-occupancy
we're seeing thousands upon thousands of rental units coming online in this area
with very few owner-occupancy potentials. I suggest relocating the small home
to another location. It shows the character of College Park and the historical
nature of the neighborhood.
Advisory Planning Commission Minutes
December 3, 2020 – Page 8
3. Anahi Espindola: By allowing all these new developments, the local
population is less trustful of the decision-makers. Every time there is a new
project, they are introduced to the residents as attractive until they are built.
The residents start believing that financial gain is more important than keeping
the residents happy. It seems that they are trying to make all of Downtown
College Park just a series of blocks. There is a negative feedback from the
community, but the project is developed anyway. There has to be a very honest
discussion for the general plan of what we want for the City.
4. Madeline Zilfi: I have lived in College Park almost all my life - my family has
had six generations live in College Park. I really feel that we have started down
a path where we are taking away the quaint college town that we had envisioned
that has been here for more than 100 years. I love that house on the corner every
time I drive by it I just enjoy looking at it I don't care if a single-family lives
there or a few kids live there it is representative of College Park. It's like a
Canyon driving down route one. We are losing the soul of College Park. I feel
like my father and all the other ancestors would just roll over in their graves. It
used to be that the civic associations and the College Park council had some
weight but now they are just rolling over and doing whatever somebody wants.
VI. Update on Development Activity Terry Schum reported on the following:
Aspen Maryland – This student housing project is proposed at the intersection of
Guilford Drive and Knox Road. There are three existing buildings on either side of
the street. The north and southside of Knox Road have been assembeled by one
property owner, an out of town developer of student housing. They are proposing
9-story buildings on each side of the road. that would also have a small amount of
ground-floor retail. The developer will present the Preliminary Plan of Subdivision
application to the City Council on December 8th and that will be followed up with a
Detailed Site Plan application later in the month. In the Preliminary Plan, they have
to address the floodplain on the property. There is also a stormwater management
concept plan that has to be figured out at this stage and any right-of-way or
easement issues are typically addressed at this time.
VII. Other Business: There was no Other Business.
VIII. Adjourn: There being no further business, Ben Flamm moved to adjourn the
meeting. James McFadden seconded. The meeting was adjourned at 9:23 p.m.
Minutes prepared by Theresheia Williams
Agenda
College Park Advisory Planning Commission
Virtual – Zoom Meeting
December 3, 2020
7:30 p.m
AGENDA
I. Call to Order and Amendments to the Agenda
II. Approval of the Agenda
III. Approval of Minutes
IV. Public Remarks on Non-Agenda Items
V. Presentation: Conceptual Site Plan CSP-20002,Terrapin House
A proposal to rezone property to MUI (Mixed-Use-Infill) to allow for
a mixed-use development consisting of 160-175 multifamily units and
10,000-15,000 square feet of commercial/retail space
Applicant: Terrapin Main Street LLC
Location: Northeast quadrant of the intersection of Baltimore Avenue
and Hartwick Road
VI. Update on Development Activity
VII. Other Business
VIII. Adjourn
Advisory Planning Commission is inviting you to a scheduled Zoom meeting.
Topic: Advisory Planning Commission
Time: Dec 3, 2020 07:30 PM Eastern Time (US and Canada)
Please download and import the following iCalendar (.ics) files to your calendar system.
Monthly:
https://zoom.us/meeting/tJ0scu2pqz4tH9b_YOhhhDto5OYItIv2WRNh/ics?icsToken=98tyKuChrz4uG9G
QtxyFRox5BY_4LOvwmCVagvpfoybKCyhbRhf5Y817G6ZWBorn
Join Zoom Meeting
https://zoom.us/j/99154155752
Meeting ID: 991 5415 5752
One tap mobile
+13017158592,,99154155752# US (Washington D.C)
Dial by your location
+1 301 715 8592 US (Washington D.C)
Meeting ID: 991 5415 5752
Find your local number: https://zoom.us/u/ay4rO3g9L
Possible closed session pursuant to MD. Code Ann General Provisions
Article 33-305C(B)(7) to consult with Counsel to obtain legal advice.