City Council Meeting Packets
Regular MeetingColumbus, WI · January 4, 2022
Agenda
COLUMBUS COMMON COUNCIL – REGULAR MEETING
TUESDAY, JANUARY 4, 2022 – 6:30 PM
COLUMBUS CITY HALL
Join Zoom Meeting
https://us02web.zoom.us/j/83838621980?pwd=RGVOVERCOHRoeG9MUHkxUU1SZ2VlZz09
Meeting ID: 838 3862 1980 Passcode: 171222 Dial: 312 626 6799
Due to the ongoing COVID-19 Pandemic, the City continues to make efforts to minimize risk, including limiting in-person
attendance at meetings. The Tuesday, January 4 meeting will be held remotely, with only essential personnel in City
Hall. Members of the public wishing to view the meeting can do so on Zoom, on the City of Columbus Cable Channel 980,
City Hall courtyard, or by streaming the meeting live from the Columbus website. We are working to implement
additional technology measures to ensure the public has the opportunity to monitor the meetings. Citizens wishing to
make public comment at the meeting via Zoom, please email Pat Goebel at pgoebel@columbuswi.us by noon on
Tuesday, January 4. In your email, please include your name, address, and the Zoom profile name or phone number
you will be calling from.
1. Roll Call
2. Pledge of Allegiance
3. Notice of Open Meeting
4. Approve Agenda
5. Correspondence & Communications
Consent Agenda
1. Council & Committee of the Whole Minutes – 12/21/21
2. Approve Operator Licenses for 2021-2023 Licensing Period
New Business
1. Consider & take action on Resolution #1-22 "Authorized Representative To File Applications For
Financial Assistance From State of Wisconsin Environmental Improvement Fund"
2. Consider & take action on Ordinance #763-22 "An Ordinance To Create Chapter 104 Of The City
Code Of Ordinances Establishing A Stormwater Utility"
3. Consider & take action on Zoning Code amendment
4. Consider & take action on Knowles Nelson Stewardship Grant Appraisals
5. Consider & take action on temporary parking restrictions near Columbus Middle School
6. Consider & take action on Revised City Fee Schedule
7. Consider & take action on Crew Leader Position Description
8. Consider & take action on RFP for Salary Study and Structural Evaluation
9. Consider & take action on claims in the amount of $ 131,153.42
10. Report of City Officers – City Administrator, Mayor
11. Adjourn
COLUMBUS COMMON COUNCIL – REGULAR MEETING MINUTES
TUESDAY, DECEMBER 21, 2021 – 6:30 PM
COLUMBUS CITY HALL
1. Roll Call: the meeting was called to order at 6:30 pm by Mayor Arnold. Present via Zoom: Mayor Arnold,
Council President Gray, Alders: Albright, Motiff, Reid; Roelke excused, Clark absent; Staff in person: City
Administrator Ellefson, Deputy Clerk Fude; via Zoom: City Attorney Johnson, City Engineer Lietha, Lentz,
Schreiber, Weiner, Bledsoe, Hammer, Kaltenberg; Also Present via Zoom: Helen Klock
2. Pledge of Allegiance: Mayor Arnold led the Pledge of Allegiance.
3. Notice of Open Meeting: Noted as posted.
4. Approve Agenda: Motion by Gray, seconded by Reid to approve the agenda. Carried voice vote.
5. Correspondence & Communications: None
Consent Agenda: Motion by Motiff, seconded by Albright to approve the agenda. Carried voice vote. Council
and Committee of the Whole Minutes 12/7/21, Approve Operator Licenses for 2021-2023 Licensing Period:
Stephanie E. Banegas and Hunter R. Kammerud.
New Business:
1. Consider & take action on "Class B" Liquor & Fermented Malt Beverage License - Tea Time: Motion
by Motiff, seconded by Reid to approve "Class B" Liquor & Fermented Malt Beverage License – Tea Time.
Carried voice vote.
2. Consider & take action on Ordinance #761-21 "An Ordinance to Repeal & Recreate Section 34-1
Establishing the Aldermanic Districts for the City of Columbus" Motion by Motiff, second by Albright to
adopt Ordinance #761-21 "An Ordinance to Repeal & Recreate Section 34-1 Establishing the Aldermanic
Districts for the City of Columbus". This doesn't change the districts, it has updated the block numbers in
each ward. Carried voice vote.
3. Consider & take action on claims in the amount of $237,050.38: Motion by Albright, second by Motiff to
approve claims in the amount of $237,050.38. Roll call vote unanimous.
4. Report of City Officers – City Administrator: Tax collections are in full swing with 17% being received.
Taxes may be paid at City Hall in person, placed in the drop box, Farmers and Merchants Union Bank, and
on the website. City Hall will be closed on Friday, December 24th for Christmas and Friday, December 31st
for New Years. Mayor: Congratulated the Chamber of Commerce for a successful Small Business
Saturday and the Christmas Parade. Both were well attended and it was good to see all the holiday
decorations up both downtown and around the city. There is also a decoration contest. DPW Director
Lentz reviewed hours and procedures for the yard waste site as hours were extended after the last storm.
Mayor thanked everyone that attended the first listening session regarding the proposed Storm Water
Utility. The next listening session will be on January 25 at the Firemen's Park Pavilion. Also wanted to
thank everyone for all their hard work and effort and wish everyone a happy holiday.
5. Adjourn: Motion by Gray second by Motiff to adjourn at 6:44 pm. Carried voice vote.
Submitted by,
Jane Fude, Deputy Clerk
COLUMBUS COMMON COUNCIL – COMMITTEE OF THE WHOLE
TUESDAY, DECEMBER 21, 2021 – 6:45 PM
COLUMBUS CITY HALL
1. Roll Call: Council President Gray called the meeting to order at 6:51pm. Present via Zoom:
Council President Gray, Mayor Arnold, Alders: Albright, Motiff, Reid; Clark Absent, Roelke
excused; Staff: City Administrator Ellefson, Deputy Clerk Fude; via Zoom: Schreiber, City
Attorney Johnson, Bledsoe, Lentz, Kaltenberg, Weiner; Also Present via Zoom: Steve Black.
2. Notice of Open Meeting: Noted as posted.
3. Approve Agenda: Motion by Motiff to approve the agenda moving Item #7 before Item #6,
second by Arnold. Carried voice vote.
4. Citizen Comments: None
5. Department Reports: November 2021: DPW, Fire, Library, Lifestar, Police, Treasurer
7. Review Zoning Code amendment: Schreiber reviewed the zoning code amendment. This
will create a more efficient procedure. Council members reviewed and would like to have
council approval added to the process. Forward to 1/4/22 Regular meeting with change.
6. Review Stormwater draft ordinance: Ellefson gave a review of the listening session and
the ordinance details that clarifies the terms and billing procedures. Thank you to everyone
for their input. Forward to 1/4/22 Regular meeting.
8. Review Resolution authorizing representative for DNR Lead Service Line Funding –
Columbus W&L: Kaltenberg explained this is a standard resolution to appoint an authorized
representative to complete applications and answer questions. This is part of the application
process that is due by January 18, 2022. Forward to 1/4/22 Regular meeting.
9. Review temporary parking restrictions behind Columbus Middle School: Chief Weiner
and DPW Director Lentz have worked together to place and enforce temporary no parking
signs. It was decided to change the temporary signs to more permanent signs with winter
approaching. Temporary parking will end once construction is complete. Forward to 1/4/22
Regular meeting.
10. Review Revised City Fee Schedule: Fees were reviewed with minimal changes presented.
Would like to further review the Aquatic Center and Recycling Fees with department heads.
Forward to 1/4/22 Regular meeting with the exception of Aquatic Center and Recycling Fees.
Forward Aquatic Center and Recycling Fees to 1/4/22 COW meeting.
11. Review Ethics Committee draft ordinance: Discussion regarding political activity was held
on what to add and items to exclude. Motiff had also drafted a Code of Conduct. Guidelines
and expectations were discussed. Forward to 1/4/22 COW meeting.
12. Review Crew Leader Position Description: Kyle reviewed the changes to clarify the
position, education and experience. Forward to 1/4/22 Regular meeting.
13. Review RFP for Salary Study and Structural Evaluation: Recommendation is to review all
compensation but to exclude the Library, Police and Fire Department Structural evaluation at
this time. The salary study will serve as a benchmark to see how we compare with other
communities with comparable positions. Structural Evaluation will help day to day processes
run more efficiently. Forward to 1/4/22 Regular meeting.
14. Adjourn: Motion by Reid, second by Motiff to adjourn at 8:46 PM. Carried voice vote.
Submitted by,
Jane Fude, Deputy Clerk
People You Know … Service You Trust, Since 1896
950 Maple Avenue
Phone (920)623-5912
PO Box 228
FAX (920) 623-5923
Columbus, WI 53925
www.columbuswaterandlight.com
Email: cwl@columbuswaterandlight.com
TO: City Council
FROM: Michelle Kaltenberg, Co-Sup’t.
DATE: December 2, 2021
RE: Authorized Representative Resolution – DNR Lead Service Line Funding
As part of the potential DNR Lead Service Line Funding, the municipality applying for the funds must pass a
resolution for an Authorized Representative to complete the applications and answer questions. Because
awards are made to municipalities, I’m asking the City Council pass the attached Authorized Representative
Resolution. This resolution is from the DNR website.
Please contact me with any questions.
1-22
RESOLUTION #____ _____
By: City of Columbus
AUTHORIZED REPRESENTATIVE TO FILE APPLICATIONS
FOR FINANCIAL ASSISTANCE FROM
STATE OF WISCONSIN ENVIRONMENTAL IMPROVEMENT FUND
WHEREAS, it is the desire of the City of Columbus, Wisconsin, a municipal corporation, to file
several applications for state financial assistance for its Water Service facilities under the Wisconsin
Environmental Improvement Fund (ss. 281.58, 281.59, 281.60, and 281.61, Wis. Stats.);
WHEREAS, it is necessary to designate a representative for filing said applications;
BE IT THEREFORE RESOLVED by the City of Columbus of the City of Columbus that the Water
& Light, David Koenig is hereby appointed as the authorized representative for the City of Columbus for
the purpose of filing these applications, and that the representative is further authorizedand empowered to
do all things necessary in connection with said applications.
Adopted the 4th day of January 2022
City of Columbus
Columbia, WISCONSIN
_______________________________________
Mary Arnold, Mayor
Attest: _________________________________
Patricia Goebel, City Clerk
Date: _____________________________
EIF Reference Guide 1 of 1 December 2010
Authorized Representative Resolution
2022 AGENDA ITEM
Committee of the Whole Meeting date: ____December 21, 2021_______
Council Meeting date: _January 4, 2022___________
ITEM:_Storm Water Utility Ordinance _
DETAILED DESCRIPTION OF SUBJECT MATTER:
Attached is the proposed Storm Water Utility Ordinance discussed in December. If there
are no further questions, changes or amendments, the Ordinance is ready for final
consideration.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
Storm Water Utility Ordinance
ACTION REQUESTED OF COUNCIL:
Advise if there are any questions or comments regarding the Ordinance. Consider action to
adopt the Ordinance if there are no objections.
CITY OF COLUMBUS
763-22___
ORDINANCE ______
AN ORDINANCE TO CREATE CHAPTER 104 OF THE CITY CODE OF
ORDINANCES ESTABLISHING A STORMWATER UTILITY
The Common Council of the City of Columbus, Columbia County, Wisconsin does
hereby ordain as follows:
1. Chapter 104, Stormwater Utility, as set forth on the attached Exhibit A is hereby
approved by the Common Council of the City of Columbus and the City Clerk is
hereby directed to include the provisions of Chapter 104 in the City Code of
Ordinances.
January
4 day of _____________,
Adopted this _____ 2022.
CITY OF COLUMBUS
By: __________________________
Mary Arnold, Mayor
By: __________________________
Patricia Goebel, Clerk
G:\Administration\City Council\ORDINANCES\ORD.763.22 Storm Water Utility.docx
CHAPTER 104
Stormwater Utility
104-1 Establishment
104-2 Authority
104-3 Definitions
104-4 Rate Charges
104-5 Customer Classification
104-6 New Construction
104-7 City Credit Policy
104-8 Method of Appeal
104-9 Special Assessment Authority
104-10 Budget Excess Revenues
1
SEC. 104-1. – Establishment.
The City of Columbus finds that the management of stormwater and other surface water
discharge within and beyond the Crawfish River, Columbus Mill Pond, Robbins Creek,
Meadow Creek and Second Ward Creek (the “City Waterways”) is a matter that affects the
health, safety and welfare of the City, its citizens and businesses, and others in the surrounding
area. Failure to effectively manage stormwater affects the wastewater utility operations of the
City by, among other things, increasing the likelihood of infiltration and inflow in the sanitary
sewer or providing a more restrictive phosphorus effluent limit for the wastewater treatment
plant’s discharge into the Crawfish River. In addition, surface water runoff may create erosion
of lands, threaten businesses and residences with water damage, and create sedimentation and
other environmental damage in the City Waterways. Those elements of the City surface and
stormwater management system (“the System”) that provide for the collection of and dispose
of stormwater, reduction of sediment and nutrients in the City Waterways, and regulation of
groundwater are of benefit and provide services to all properties within the City of Columbus,
including property not presently served by the storm elements of the System. The cost of
operating and maintaining the System and financing necessary repairs, replacements,
improvements, and extensions thereof should, to the extent practicable, be allocated in
relationship to the benefits enjoyed and services received therefrom.
There is hereby established a City of Columbus Stormwater Utility. The operation of
the Stormwater Utility shall be under the supervision of the Common Council.
SEC. 104-2. – Authority.
The City, through the Stormwater Utility, may acquire, construct, lease, own, operate,
maintain, extend, expand, replace, clean, dredge, repair, conduct, manage and finance such
real estate and facilities as are deemed by the City to be proper and reasonably necessary for
the creation and maintenance of a system of storm and surface water management. These
facilities may include, without limitation by enumeration, surface and underground drainage
facilities, storm sewers, ditching, water courses, retaining walls and berms and ponds, best
management practices, and such other facilities as will support the System.
SEC. 104-3. – Definitions.
For the purpose of this chapter, the following definitions shall apply: Words used in the
singular shall include the plural, and the plural, the singular; words used in the present tense
shall include the future tense; the word “shall” is mandatory and not discretionary; the word
“may” is permissive. Terms not specifically defined herein shall have the meaning defined in
Wis. Admin. Code § NR 216.003 and as the same may be amended from time to time, if
defined therein; or if not therein defined, shall be construed to have the meaning given by
common and ordinary use, as defined in the latest edition of Webster’s Dictionary.
(a) Director. The term “Director” means the City Administrator, or his/her
designee.
(b) Developed Property. The term “developed property” means the real property
that has been altered from its natural state by the addition of any improvements
that may include a building, structure, impervious surface, and change in grade
or landscaping.
(c) Equivalent Runoff Unit (ERU). The term “ERU” means the statistical average
horizontal impervious area of “single family homes” within the City of
Columbus on the date of adoption of this ordinance. The horizontal impervious
area includes, but is not limited to, all areas covered by structures (including
auxiliary), roof extensions, patios, porches, concrete pavement, asphalt
pavement, gravel areas, driveways and sidewalks.
(d) Impervious Area or Impervious Surface. The term “impervious area or
impervious surface” means areas that have been paved, covered or compacted
to inhibit the natural infiltration of water into the soil or cause water to run off
the area in greater quantities or at an increased rate of flow from the present
under natural conditions as undeveloped property. Such areas may include, but
are not limited to, roofs, roof extensions, patios, porches, driveways, sidewalks,
pavement, gravel or storage areas, athletic courts and compacted surfaces.
Excluded from this definition are undisturbed land, lawn and fields.
(e) Two-Family Residential Unit. The term “two-family residential dwelling”
means a building designed for two separate dwelling units in which one
dwelling unit may have a roof, wall, or floor in common with another dwelling
unit. For purposes of this Chapter, duplex, twin-house, and two-flat dwellings
are considered to be two-family residential. A single-family dwelling with an
attached accessory dwelling unit is not a two-family dwelling.
(f) Dwelling Unit. The term “dwelling unit” means a room or group of rooms
providing or intended to provide permanent living quarters for not more than
one family.
(g) Residential Property. The term “residential property” means any lot or parcel
developed exclusively for residential purposes including, but not limited to,
single-family homes, manufactured homes, duplexes, multi-family apartments,
residential condominiums and townhouse living units.
(h) Non-Residential Property. The term “non-residential property” means any
developed lot or parcel not exclusively residential as defined herein, but not
limited to, transient rentals (such as hotels and motels), the owner of a mobile
home park or parcel, commercial, industrial, institutional, governmental
property and parking lots.
3
(i) Runoff. The term “runoff” means the surface water, including all types of
precipitation to include but not limited to rain and snow melt, which is inhibited
by impervious surfaces from naturally infiltrating into soil.
(j) Stormwater Facilities. The term “stormwater facilities” means all constructed
facilities or natural features used for collecting, including infiltration or
bioretention areas, storage and conducting stormwater to, through and from
drainage areas to the point of final outlet. Stormwater facilities collectively
constitute a stormwater system.
(k) Undeveloped Property. The term “undeveloped property” means that which has
not been altered from its natural state by the addition of any improvements, such
as a building, structure, impervious surface, change of grade or landscaping.
Agriculture cropland is classified as undeveloped property. A property shall be
considered residential property or non-residential property pursuant to this
ordinance at the time of installation of the first impervious surface on a parcel.
(l) Public Authorities. The term “public authorities” means schools, churches,
hospitals, city buildings, county buildings, state and federal buildings and any
other parcel of land that is tax exempt for real estate tax purposes.
(m) Operations and Maintenance. The term “operations and maintenance” means
labor, materials and chemicals used regularly, and work activities or
procedures that are established, commonplace, or repetitious, and are
performed or should be performed frequently or on a schedule to sustain the
functional integrity and efficiency of existing facilities and to provide upkeep
for prevention of early decline or failure, or are performed as needed in
response to minor emergencies, such as equipment and infrastructure repair or
replacement, and includes the following performed on a recurring basis
throughout the year to meet routine, daily functional needs. Including any of
the following:
(1) Operational maintenance activities related to continuing normal
performance of the functions for which an infrastructure item, assets or
item of equipment is intended, including activities to keep building
systems such as HVAC, lighting, and electrical utilities working
properly.
(2) Custodial maintenance activities, such as housekeeping duties,
rodent and pest control, and lawn mowing, snow removal, and trash and
recycling removal associated with general day-to-day care and cleaning
necessary to maintain constructed assets.
(3) Capital equipment and vehicle expenditures necessary to
4
accomplish the tasks, duties, and procedures of the utility.
(4) Capital project expenditures necessary to establish, repair or replace
stormwater assets and infrastructure.
(5) Office activities related to billing, collections, customer
communications, personnel, and other types of work activities that
support the administration of the assets and infrastructure.
(6) Routine walk-through and other surveillance activities associated
with identifying operational anomalies and ensuring all infrastructure
and assets are working as intended.
(7) Preventive maintenance, including scheduled service, repair,
inspection, adjustment, or replacement of parts, to keep equipment or
facilities in satisfactory operating condition, to avoid frequent
breakdowns and premature replacements, and to achieve the expected
life of constructed assets and installed building equipment, conducted
with a frequency of one year or less.
(8) Corrective maintenance, including unscheduled maintenance
repairs to correct deficiencies during the year in which they occur.
(9) Mobile equipment maintenance, including all corrective,
preventive, emergency, or replacement maintenance work done on
mobile equipment assets, except when performed at time of purchase
of used equipment to bring the purchased equipment to a fully
functional or improved condition, or both.
(10) Recurring maintenance, including preventive maintenance
activities that recur on a periodic and scheduled cycle of greater than 1
year, but less than 10 years.
(11) Emergency maintenance, including unscheduled activities and
repairs, such as repairing pipe breaks or blockages, or mechanical
malfunctions in aged or damaged infrastructure, typically initiated
within a very short amount of time from when a need is identified, to
correct an emergency need to prevent injury, loss of property, or human
health impacts, or to quickly return an asset to service, excepting
emergency repairs or replacement needed due to damage caused by
severe weather, cyber-attacks, or other unforeseen serious emergency
situations over which the municipality has no control.
SEC. 104-4. – Rate Charges.
(a) By this ordinance, the Common Council is establishing the rate charge upon
each parcel of residential property, non-residential property and undeveloped
property within the City of Columbus for the Stormwater Utility. The actual
charges to be imposed, the establishment of formulas for calculations of the
charges, the establishment of specific customer classifications and any future
changes in those rates, formulas, rate charges and customer classifications, may
be made by resolution of the Common Council. All rates established pursuant
5
to this ordinance will be fair and reasonable in accordance with the decision and
judgment of the Common Council. The current rates will be on file with the City
Clerk.
(b) Rate charges shall be used to share the costs of the Stormwater Utility. The rate
charges may include:
(1) Base Charge (BC). The Base Charge will be imposed on all residential,
non-residential and parcels owned by public Authorities in the City. The
Base Charge will be designed to reflect the fact that all parcels benefit
from the stormwater management activities of the City and that all
property contributes in some way to the stormwater discharge that must
be managed by the City. The BC will be designed to collect the
administrative costs of the Stormwater Utility. The BC collected
pursuant to this Chapter is not intended to replace any special
assessments made for stormwater facility construction or improvements
as part of a city project.
(2) The ERU Charge. This charge shall be imposed on all parcels that have
any developed impervious area. The ERU Charge will be designed on
the basis of a typical residential property. Other non-residential
properties will be charged multiples of the ERU Charge, based upon the
impervious area contributing to surface water runoff.
(3) Special Charge (SC). This charge may be imposed on parcels in an area
specially benefited by a particular stormwater management facility. The
SC area will be defined and developed to reflect the benefits/services in
a particular area that may not be appropriate to spread to parcels
throughout the City. The SC will be calculated on an ERU basis.
(c) The Common Council may make such other updates and revisions to customer
classifications as will be likely to provide reasonable and fair distribution of the
costs of the Stormwater Utility. In so doing, the Council may provide credits
against certain portions of the charges set forth above for facilities installed and
maintained by the property owner for the purpose of lessening the stormwater
flow or pollutant load from that given property. The maximum amount of credit
will not exceed 50% of the ERU charge.
(d) Columbus Water & Light (CWL) is hereby appointed as the collection agency
for the City of Columbus Stormwater Utility for all residential and
nonresidential property owners, and Public Authorities. Bills shall be prepared
monthly by the City or its agent and sent to the owner of each dwelling unit,
non-residential property, and parcels owned by public authorities served. The
City shall allocate among the properties served the actual cost of billing and
6
collecting.
(e) The bills for Stormwater Utility charges for residential properties and non-
residential properties shall be mailed to the individual dwelling unit designated
as the utility bill recipient for residential properties and the entity designated as
the utility bill recipient for non-residential properties. This billing shall not
relieve the owner of the property from liability for rental property in the event
payment is not made as required in this section. The owner of any property
served which is occupied by tenants shall have the right to examine collection
records of the City for the purpose of determining whether such rates and
charges have been paid for such tenants, provided that such examination shall
be made at the office at which the records are kept and during the hours that
such office is open for business.
(f) Stormwater Utility charges for Public Authorities shall be mailed to the entity
designated as the utility bill recipient for the parcel.
(g) If Stormwater Utility charges remain unpaid after a period of twenty (20) days
from the date of mailing of the monthly utility bill, such bill shall become
delinquent and shall incur late payment charges. Late payment charges shall be
applied consistent with current CWL policy. Unpaid charges shall be assessed
the same as the water utility bills.
SEC. 104-5. – Customer Classification.
(a) For purposes of imposing the stormwater charges, all lots and parcels within the
City are classified into the following five (5) customer classes:
(1) Residential – Single-Family.
(2) Residential –Two-Family
(3) Residential – Multi-Family.
(4) Non-Residential.
(5) Undeveloped.
(b) The Director or his designee shall prepare a list of parcels within the City of
Columbus, and assign a classification of residential, non-residential, or
undeveloped to each lot or parcel.
(c) The average square footage of impervious area of the ERU is established to be
equivalent to 3,600 square feet.
(d) The charges imposed for single-family residential properties shall be the rate for
one (1) ERU.
7
(e) The charges imposed for duplex residential properties or two unit residential
town houses shall be the rate for six-tenths (0.6) of one (1) ERU per each
individual dwelling unit existing on the property (ERU rate multiplied by the
number of dwelling units).
(f) The charges imposed for residential condominium plats with a maximum of two
dwelling units shall be the rate for six-tenths (0.6) of one (1) ERU per each
individual dwelling unit.
(g) The charges imposed for multi-family apartment, condominium and townhouse
residential properties that exceed two units per plat shall be the same as non-
residential properties.
(h) The charges imposed for non-residential properties shall be the rate for one (1)
ERU, multiplied by the numerical factor obtained by dividing the total
impervious area of a non-residential property by the square footage of one (1)
ERU. The numerical factor shall be rounded to the nearest whole number, with
a minimum factor of one (1). The formula is as follows:
ERU rate multiplied by rounded whole number of impervious surface area in square
feet divided by 3,600 square feet
(i) No charge is imposed for undeveloped properties.
(j) If for a nonresidential, multi-family apartment, condominium or town house
residential property exceeding two units, the charges imposed by calculating
one (1) ERU multiplied by the numerical factor obtained by dividing the total
impervious area for the property by the square footage of one ERU results in
something other than a whole number, the numerical factor should be rounded
down to the nearest whole number if the numerical factor is less than 0.5. The
numerical factor should be rounded up to the nearest whole number if the
numerical factor is 0.5 or greater. The minimum ERU factor is one (1).
(k) The Director shall be responsible for determining the impervious area, based
upon the best available information, including but not limited to aerial
photography, zoning administrator, and building inspector records, site plans,
building permit records, the property owner, tenant, or developer. The Director
may require additional information, as necessary, to make the determination.
Upon property owner’s written notification and request for alterations to
parcels, the Director shall review impervious area for possible additions or
deductions to be applied to the fee.
SEC. 104-6. – New Construction.
The owner shall be liable for stormwater charges, under this ordinance, for the
8
improvement from the date of water meter installation or upon any actual impervious area
constructed, whichever is sooner.
Sec. 104-7. – City Credit Policy.
The City of Columbus Common Council shall adopt a credit policy by resolution of the
Common Council to grant reductions to the ERU charge on a case-by-case basis.
SEC. 104-8. – Method of Appeal.
(a) The Stormwater Utility charge may be appealed, as follows:
(1) A written appeal shall be filed with the Director.
(2) Within thirty (30) days of payment, a written challenge to the stormwater
charge must be filed with the Director on behalf of the customer,
specifying all basis for the challenge, any supporting documentation, and
the amount of the stormwater charge the customer asserts is appropriate.
Failure to file a challenge within thirty (30) days of payment waives all
right to later challenge the charge.
(b) A property owner not satisfied with the Director’s decision can appeal to the
City Council for their review and action within thirty (30) days from the date of
the Director’s written decision. Both the property owner and Director may
supply additional written information to the Council. The Council may affirm,
reverse or modify the Director’s decision. The Council’s written decision shall
be provided to the Director and property owner. The Council’s determination is
final. Within thirty (30) days of the date of the Council’s written decision, the
property owner may appeal the decision to circuit court through a certiorari
action.
(c) If a refund is due to a customer, the refund can only be paid for amounts incurred
during the current calendar year.
SEC. 104-9. – Special Charge Authority.
In addition to any other method for collection of the charges established pursuant to
this ordinance for stormwater utility costs, the Common Council finds that these charges may
be levied on property as a special charge pursuant to Wis. Stat. § 66.0627. The charges
established hereunder reasonably reflect the benefits conferred on property and may be
assessed as special charges. The mailing of the bill for such charges to the owner will serve as
notice to the owner that failure to pay the charges when due may result in them being charged
pursuant to the authority of Wis. Stat. § 66.0627. In addition, the City may provide notice each
October of any unpaid charges to the Stormwater Utility, which charges, if not paid by
9
November 15, may be placed on the tax roll under Wis. Stat. § 66.0627.
SEC. 104-10. – Budget Excess Revenues.
The Stormwater Utility finances shall be accounted for in a separate Stormwater
Management Fund by the City. The Utility shall prepare an annual budget, which is to include
all operation and maintenance costs, administrative costs, depreciation costs, debt service and
other costs related to the operation of the Stormwater Utility. The budget is subject to approval
by the Common Council. The costs shall be spread over the rate classifications as determined
by the Council. Any excess of revenues over expenditures in a year will be retained by the
Stormwater Management Fund for subsequent years’ needs.
\\msnfs2\share\docs\WD\53481\107\A3937487.DOCX
10
2021 AGENDA ITEM
Committee of the Whole Meeting date: __December 21_________________
January 4, 2022
Council Meeting date: ______________________________
ITEM: _Review and discuss plan commission recommendation regarding a
proposed zoning text amendment to section 114-14 of the Columbus Zoning
Code.
SUBMITTED BY: _Matt Schreiber_________________________________
DETAILED DESCRIPTION OF SUBJECT MATTER:
On September 7th council approved a zoning map amendment to R4 Multifamily zoning
for parcels 11211-1512.06 and 11211-1512.07 at the request of the Applicant (Jim
Hartung and Steve Black). Subsequently the applicant requested a zoning text
amendment to 114-14 to allow for multiple principal buildings on one lot for multifamily
developments. The current code only allows multiple principal buildings on one lot with
the approval of a Planned Unit Development (PUD). The applicant has requested the
text amendment to provide an alternative to PUD zoning for Multifamily development.
Plan Commission held a public hearing and discussed that request at the December 9th
meeting. The Plan Commission had concerns with procedure, submittals and setbacks
between buildings for the proposed amendment. They tabled the item and held a
December 16th meeting to review revisions to the draft ordinance. The City Attorney
reviewed the draft ordinance and attended the December 16th meeting. The Plan
Commission made a recommendation that council approve the ordinance as presented
on December 16th.
The City Attorney has prepared a draft ordinance that is included in your packet.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED: Draft Ordinance, Plan
Commission Materials
ACTION REQUESTED OF COUNCIL: Discuss recommendation and move forward for
final action.
CITY OF COLUMBUS
764-22
ORDINANCE _________
AN ORDINANCE TO REPEAL AND RECREATE SECTION 114-14 OF
THE CITY OF COLUMBUS CODE OF ORDINANCES
REGARDING NUMBER OF PRINCIPAL BUILDINGS LIMITED
The Common Council of the City of Columbus, Columbia County, Wisconsin does
hereby ordain as follows:
1. Section 114-14 of the City Code of Ordinances entitled “Number of Principal Buildings
Limited” is hereby repealed and recreated to now read as follows:
114-14 Number of Principal Buildings Limited.
(1) No more than one principal building shall be located, erected or moved onto any
single lot of record in the City of Columbus except as provided in subs. (2), (3) or
(4), below. If approved, all principal buildings shall be at least 24 feet away from
other principal buildings. Principal buildings shall be at least 10 feet away from
detached accessory buildings.
(2) An owner or agent for owner of any lot of record with a non-residential use may
apply in order to allow more than one principal building on said lot. The Plan
Commission shall review the application and make recommendations to the
Common Council. Permission may be granted by the Common Council for the
location of more than one principal building on a lot of record at a meeting of the
Common Council duly called and held. The application shall consist of:
(a) Site plan as defined by 78-15(d)(2) and provide information regarding
building dimensions, and use of buildings; and distances between
buildings.
(b) Project narrative identifying the need for multiple buildings
(c) Summary of how the proposal meets the lot and building requirements for
the zoning district applicable to the lot.
(3) An owner or agent for owner of any lot of record with a multifamily residential
use may apply in order to allow more than one principal building on said lot. The
Plan Commission shall review the application and make recommendations to the
Common Council. Permission may be granted by the Common Council for the
location of more than one principal building on a lot of record at a meeting of the
Common Council duly called and held. The application shall consist of:
(a) Site plan as defined by 78-15(d)(2) and provide information regarding
building dimensions, and use of buildings; and distances between
buildings.
(b) Project narrative identifying the need for multiple buildings
(c) Summary of how the proposal meets the lot and building requirements for
the zoning district applicable to the lot.
(4) Multiple principal buildings permitted through the provisions of an approved
Planned Unit Development (PUD).
2. Severability. If any portion of this Ordinance or its application on any person or
circumstances is held invalid, the validity of this Ordinance as a whole or any other
provision herein or its application shall not be affected.
3. Effective Date. This Ordinance shall take effect immediately upon its passage and
posting as required by law.
4 day of
Adopted this ___ January
_____________, 2022.
CITY OF COLUMBUS
By: __________________________ By: __________________________
Mary Arnold, Mayor Patricia Goebel, Clerk
2
C:\Users\pgoebel\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\X2D8RNX4\ord re principal buildings limited w-Council
approval 122221 (A4357406x9DEB4).docx
CITY OF COLUMBUS
105 N. DICKASON BOULEVARD COLUMBUS, WISCONSIN 53925-1565
PHONE: 920.623.5900 FAX 920.623.5901 www.cityofcolumbuswi.com
Plan Commission Staff Report
Plan Commission Date: December 16, 2021
Agenda Item: 8a and 8b
Applicant: ACS RBHS, LLC
Property Address: NA
Parcel ID: NA
Zoning: NA
Future Land Use Map: NA
Summary
The applicant has recently been approved by council for a zoning map amendment to R4 Multifamily zoning
for parcels 11211-1512.06 and 11211-1512.07. With the approved rezoning the applicant has proposed to
develop a multifamily project that has multiple principal structures on a lot of record. Per 114-14:
“No more than one principal building shall be located, erected or moved onto any single lot of record that is
utilized or zoned for residential purposes in the City of Columbus except as permitted through the provisions
of an approved planned unit development district (PUD). At the sole discretion of the plan commission,
permission may be granted for the location of more than one principal building on lots not utilized or zoned
for residential purposes, provided such development is consistent with the purpose and intent of this chapter
and meets all other requirements set forth herein.”
The applicant has elected to apply for a zoning text amendment to section 114-14. The proposed amendment
would grant the authority to the plan commission to review and approve any multifamily developments that
would have more than one principal structure on a lot of record.
Staff has coordinated the review of the proposed zoning text amendments with the City Attorney.
Recommendation
Staff supports the zoning text amendments as presented at the 12-16-21 meeting.
Attachments
• Application Materials
ACS RBHS, LLC
October 13, 2021
City of Columbus
Attn: Matt Schreiber
RE: Lot 6 & 7, Columbus Commerce Center, Zoning Text amendment
Dear Matt,
Enclosed please find ACS RBHS, LLC’s application for a zoning text amendment for the
property it owns known as lots 6 & 7 in the Columbus Commerce Center (tax key
#11211-1512.06 and 11211-1507).
1. The property is currently zoned R4 and it is presently partially fallow and partially
farmed.
2. ACS is requesting the zoning text change for these lots to allow for the erection of
more than one building per lot. Section 114-14 of the zoning code currently
states that not more than one building can be erected on a residentially zoned lot.
3. ACS is requesting the zoning text change for these R4 lots as its intent is to create
multi-family housing upon the property. ACS recently had these parcels rezoned
from I1 to R4 for the purpose of a multi building development. Conceptual plans
for the development were submitted to the City during the rezone process
depicting multiple buildings on lot 6 and multiple buildings on lot 7. The
language in section 114-14 of the code does not seem to be consistent with the
conceptual structure of a muli-family development. Setbacks,
impervious/pervious surface ratios, ingress/egress, etc. all become issues when
requiring multiple lots within a multiple building development. Having a zoning
classification calling for higher density development does not seem commensurate
with having another part of the code restricting that higher density that the zoning
allows for.
Please feel free to call me with any questions.
Sincerely,
James A. Hartung, manager
ACS RBHS, LLC
Page 1 of 1
Lot 6 & 7 – Commerce Center – zoning text amendment application, Columbus, WI
2022 AGENDA ITEM
Committee of the Whole Meeting date: December 7, 2021
__________________________
January 4, 2022
Council Meeting date: ______________________________
Review & discuss appraisal services for Knowles-Nelson
ITEM: ____________________________________________ Stewardship Grant
__________
Matt Schreiber
SUBMITTED BY: ________________________________
DETAILED DESCRIPTION OF SUBJECT MATTER:
The city of Columbus was previously awarded $403,468 for a TAP grant to build bike
and pedestrian trails in Columbus. Because the TAP grant does not cover real estate
costs the city also applied to the DNR for funding to acquire Permanent Limited
Easements (PLE) for nine (9) parcels along the proposed trail.
The DNR has tentatively approved a Knowles-Nelson Stewardship Grant to assist with
the purchase of PLEs to complete the project as proposed. The first step in the
acquisition process is to complete a Narrative Appraisal Report as identified by the
DNR. The DNR provides a list of qualified appraisers and city staff has contacted
several appraisers to get an estimate for services to complete an appraisal for the nine
(9) parcels.
Staff was able to secure three bids with the lowest bidder being LA Duesterbeck at
$9,000. Staff recommends the lowest bidder because they have strong qualifications
and offer a 60 day turn around time.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
Estimates from bidders, Request for Estimates
ACTION REQUESTED OF COUNCIL: Take final action on the bids
From: Darcy Wopat
To: Matthew Schreiber
Subject: FW: Estimate of Services
Date: Thursday, December 23, 2021 12:00:49 PM
Attachments: Estimate for appraisal services.pdf
Good Afternoon Matthew,
Our bid for this assignment is $1,000 for each report with a 60 day turnaround time.
Also, Lauri Maldonis is no longer with our company, if you could please send any future requests to
appraisal@laduesterbeck.com, it would be greatly appreciated.
Thank you,
Darcy Wopat
L.A. Duesterbeck & Associates, Inc.
4539 Woodgate Drive, Suite C
Janesville, WI 53546
Phone: (608)743-4233 Ext. 8
Fax: (608)756-4404
darcy@laduesterbeck.com
This email and its attachments contain information belonging to L.A. Duesterbeck &
Associates, Inc. that may be confidential and/or legally privileged. This information is
intended only for use by the named recipient(s). If you are not the intended recipient, you are
hereby notified that any disclosure, copying, distribution, or taking of any action based on the
contents of this email is strictly prohibited. If you have received this email in error, please
notify the sender immediately by email or at the telephone number listed above, and delete all
copies of the original message and any attachments.
From: Matthew Schreiber <mschreiber@columbuswi.us>
Date: December 22, 2021 at 1:58:46 PM CST
To: Lauri Maldonis <lauri@laduesterbeck.com>
Subject: Estimate of Services
Laurie,
I am reaching out to see if you are anybody at LA Duesterbeck would like to submit an
estimate for appraisal services for this project. Thank you!
Matthew Schreiber, AICP
Director of Planning and Development
City of Columbus
105 Dickason Blvd
December 2, 2021
Matthew Schreiber, AICP
Director of Planning and Development
City of Columbus
105 Dickason Blvd
Columbus, WI 53925
SUBMITTED VIA EMAIL
Proposal for Real Estate Appraisal Services
9 Appraisal Reports
Properties in the City of Columbus
Columbia County, Wisconsin
Dear Mr. Schreiber:
CORRE, Inc. (CORRE) is pleased to present this bid to provide professional appraisal services
consisting of nine (9) appraisal reports.
CORRE Overview
CORRE is a full-service engineering firm known throughout Wisconsin for providing all-
encompassing real estate services. Based in Madison, CORRE has six offices throughout the state.
Since beginning operations in 2005, the firm has grown rapidly and attracted many experienced
engineers and specialists. Our extensive real estate division offers a diverse combination of
professionals and support staff, and our appraisers and acquisition agents routinely work seamlessly
between offices.
Appraisal Services and Expertise
CORRE ‘s real estate staff includes two Wisconsin Certified General Appraisers who are well-versed
and experienced in:
• Appraisals and review of appraisals
• Standard and unique land use valuation
• Easement Valuation
• Eminent domain appraisals
• Litigation assistance
• Wide range of appraisals from simple to complex
• Yellow Book appraisal process
December 2, 2021 │ Mr. Schreiber 2
Scope of Services
As a part of this project, CORRE will complete nine (9) Full Narrative Appraisal Reports of the
properties described below. It is our understanding the purpose of the appraisals is to estimate
market value to assist in the purchase of Permanent Limited Easements for a recreational trail and
the obtaining of grant funding.
The Appraisal Reports will be completed by a Wisconsin Certified General Appraiser and will comply
with the requirements of the Uniform Standards of Professional Appraisal Practice (USPAP) and
WDNR Appraisal Guidelines.
The appraisals will be completed by May 2, 2022, provided this proposal is accepted by December 17,
2021.
Key Staff
Ann Davis, MAI, CGA │Appraiser
Ms. Davis is a WI Certified General Appraiser with over 30 years of commercial real estate appraisal
experience and extensive experience in eminent domain appraisal for government and property
owners, including the Wisconsin Department of Justice appeals process. She has appraised a wide
variety of properties including office and retail buildings, warehouses, subdivisions, apartments, and
vacant land. For 23 years she was the Owner and President of Davis Appraisals, Inc. in Wauwatosa.
Cindy White, SR/WA, CGA │ Appraiser
Ms. White is a Senior Right of Way Agent (SR/WA), Certified General Appraiser, and a Wisconsin
Department of Transportation (WisDOT) Approved LPA appraiser. She offers real estate appraisal
and acquisition experience for both WisDOT and consulting firms and offers considerable knowledge
of the entire real estate process including appraisals and acquisition for both locally funded and
WisDOT projects. She is knowledgeable in WisDOT Department policy, federal and state regulations,
and Uniform Standards of Professional Appraisal Practice (USPAP). She is also a certified Yellow Book
Appraiser. Ms. White has appraised partial takings affecting commercial, industrial, residential, and
special purpose improved properties and vacant commercial, industrial, residential, and agricultural
land.
Kayla Foulk │ Appraiser- In-Training
Ms. Foulk is a recent addition to CORRE and is an Appraiser-In-Training. She has two years of
experience working as an appraiser trainee for a private firm specializing in appraisals for public
acquisitions and utility projects including right of way acquisitions for roadway improvements,
transmission lines, and pipelines. In addition, Kayla is an active member of the International Right of
Way Association, serving as the Education Committee Coordinator. She also serves as the IRWA-WI
Chapter website administrator.
Vanessa Helland │ Appraiser- In-Training
Ms. Helland is another new addition to our CORRE real estate team. She is a real estate appraiser
with seven years of experience working as an Assessor for the City of Eau Claire and as an Appraiser-
in-Training with a private firm. Her experience includes inspecting properties, computing and
preparing property value estimations, and researching properties using public records.
December 2, 2021 │ Mr. Schreiber 3
Project Bid
CORRE proposes to complete Appraisal Reports of the following properties for the lump sum fees
shown below:
Services Qty Total Cost
Appraisal Report – Parcel 1124 1 $2,800
Appraisal Report – Parcel 1124.4 1 $2,800
Appraisal Report – Parcel 1051.01 1 $2,800
Appraisal Report – Parcel 1032 1 $2,500
Appraisal Report – Parcel 1034 1 $2,500
Appraisal Report – Parcel 1033 1 $2,500
Appraisal Report – Parcel 1035 1 $2,500
Appraisal Report – Parcel 1036 1 $2,500
Appraisal Report – Parcel 1024.A 1 $2,500
Appraisal Reports 9 $23,400
We appreciate the opportunity to provide this proposal. Please don’t hesitate to contact me if you
have any questions. If you accept the terms of this appraisal assignment, please sign this letter below
and return it to me. We look forward to hearing from you.
Sincerely,
CORRE, Inc
Ann R. Davis, MAI, CGA
Real Estate Appraiser
adavis@correinc.com
608.826.6155
Accepted by: Approved by: CORRE, Inc.
By: By:
Name: Name:
Title: Title:
Date: Date:
From: Dustin Dolezalek
To: Matthew Schreiber
Subject: Re: Appraisal
Date: Thursday, December 16, 2021 1:34:37 PM
Hi Matthew,
Thanks for the extra info. I'm going to quote you an appraisal fee of $2,900/parcel, or $26,100
total, with delivery of all reports by the end of March 2022, assuming this package of work is
engaged by year's end, and staking for the PLEs and so forth is completed in a timely fashion.
All reports would conform to DNR agency guidelines, as well as Chapter 32.05 of state
statutes relative to eminent domain acquisitions. Please let me know if you'd like to proceed.
Take care.
Thanks,
Dustin Dolezalek, MAI
Wisconsin Certified General Appraiser #1808-10
Scott Appraisal, LLC
5025 Old Middleton Rd.
Madison, WI 53705
(608)274-6844
www.ScottAppraisalCo.com
Rate Us on Google!
On Wed, Dec 15, 2021 at 11:30 AM Matthew Schreiber <mschreiber@columbuswi.us>
wrote:
Dustin,
I was hoping for a bid by the end of the week. As far as time frame I was hoping to have them by
summer of 2022., the sooner would be better if possible.
I have attached the estimate request I had put together. In review of these sites it does not
appear to that any improvements will be impacted at all.
Matt
Estimate for Appraisal Services
The City of Columbus was tentatively awarded a Knowles-Nelson Stewardship Grant to assist with the
purchase of several Permanent Limited Easements within the City of Columbus. The city of Columbus is
looking to acquire a 20 foot wide Permanent Limited Easement to in order to complete recreational
trails throughout the city. Your firm was identified from a list of appraisers from the Wisconsin DNR.
The city is requesting an estimate for your services to complete a Narrative Appraisal report for the
following properties:
Parcel Owner Name Lineal
Number Feet
1124 Carriage Apartments LLC 279
1124.4 WHPC-NIBP Portfolio LLC 480
1051.01 Lange-Ostrander-Hurd Post #62 American Legion 454
1032 Klinger, Melanie 55
1034 Gillman, Carol J; Gillman, Christopher R 64
1033 Flannigan, Ryan 47
1035 Martinson, John F 50
1036 Senn, Gregory Paul 59
1024.A Senn, Greg 55
The estimates should reflect an appraisal as required by DNR, further details can be found here:
https://dnr.wi.gov/files/pdf/pubs/lf/lf0048.pdf
Please provide an estimate for your services and provide a project timeline. For any questions please
contact Matt Schreiber with the City of Columbus at (920) 623-5900 or mschreiber@columbuswi.us.
Enclosed are some GIS maps that show the location of the properties within Columbus.
Property Acquisition Map City of Columbus
105 N Dickason Blvd
Columbus, WI 53925
DISCLAIMER:
920-623-5900
This map is not a survey of the actual boundary of any property this map
depicts.
The City of Columbus does not guarantee the accuracy of the material contained here 4,800.00
in and is not responsible for any misuse or misrepresentation of this information or its
SCALE: 1 = 400' Print Date: 4/30/2021
derivatives.
Property Acquisition Map City of Columbus
105 N Dickason Blvd
Columbus, WI 53925
DISCLAIMER:
920-623-5900
This map is not a survey of the actual boundary of any property this map
depicts.
The City of Columbus does not guarantee the accuracy of the material contained here 9,812.50
in and is not responsible for any misuse or misrepresentation of this information or its
SCALE: 1 = 818' Print Date: 4/30/2021
derivatives.
2021 AGENDA ITEM
Committee of the Whole Meeting date: __December 21, 2021________
Council Meeting date: _____January 4, 2022__________
ITEM: Discussion on Temporary No Parking Zones in the S. Main Street area
behind the Columbus Middle School.
DETAILED DESCRIPTION OF SUBJECT MATTER:
A complaint from a resident who lives in this area regarding numerous parking issues and
congestion was verified by city staff. Monday thru Friday during the day vehicles in this
area are parked on both sides of the street for blocks, as well as encroaching on
driveways, blocking sidewalks and intersections, all in violation. The excessive amount of
vehicles are directly related to the construction at the Columbus Elementary School.
City ordinance 98-76(b) authorizes me to modify parking restrictions "for any limited
amount of time." With the assistance of DPW, one side of S. Main St, between W. School
St and Washington St, Fountain St between S. Main St and S. Birdsey, Richmond St fro
S. Main St to Dickson Blvd, and W. School St between S. Main St and S. Spring have
been posting No Parking 8a-300p to reduce the congestion. DPW also notified residents
in the area with door hangers of the changes.
Request to keep the signage in place until construction is completed, which is slated to
be the start of the 2022-2023 school year.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
See attached map of affected areas.
ACTION REQUESTED OF COUNCIL:
Discuss this issue and determine if the temporary signs are sufficient or if the council
would like to take formal and/or permanent action.
AGENDA ITEM
Committee of the Whole Meeting date: __December 21, 2021 _________
Council Meeting date: _January 4, 2022 _______
ITEM: _ City Fee Schedule____
DETAILED DESCRIPTION OF SUBJECT MATTER:
User fees are one of several means that Wisconsin counties, cities, villages, and towns use to
finance the cost of public services. The Wisconsin Blue-Ribbon Commission on State-Local
Partnerships for the 21st Century, more commonly known as the Kettl Commission, reports that
“municipalities ought to be encouraged to finance operations, where appropriate, from fee revenue
rather than from property taxes or state aids.”
The City of Columbus, through it’s various departments, compiles a fee schedule to help fund
services. The City’s fee schedule was last updated in 2016. These fees include charges such as
memberships to the aquatic center, building permits, dog licenses and liquor licenses, and rentals
of the pavilions/shelters in our City parks.
After speaking with all of our departments, and reviewing the prior fee schedule and comparing it to
what we have for expenses, I present a revised fee schedule for your approval, that more
accurately reflects the cost of doing business. Included in your packet will be the 2016 fee
schedule marked as “Exhibit A”, as well as the revised 2022 fee schedule marked as “Exhibit B”.
ACTION REQUESTED OF COUNCIL:
• To approve the revised fee schedule for 2022.
2021 AGENDA ITEM
Committee of the Whole Meeting date: ____December 21, 2021_______
Council Meeting date: _January 4, 2022______
ITEM:_Crew Leader Position Description_
DETAILED DESCRIPTION OF SUBJECT MATTER:
The Crew Leader position description has been revised in advance of recruitment.
The changes incorporated primarily clarify the duties so it will be easier for applicants
to understand the relevant duties and responsibilities. In the qualifications section,
the education requirement was reduced slightly, and additional experience
components were added to broaden the skills that would qualify a candidate for the
position.
We are also seeking approval to advertise immediately with the draft position
description in order to keep the process moving along.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
• Clean draft version of Position Description
ACTION REQUESTED OF COUNCIL:
Approve the Crew Leader position description.
POSITION
DESCRIPTION
Class Title: Department of Public Works Crew Leader
Department: Public Works
Location: Public Works Dept.
Date: Approved 1/4/2022
GENERAL PURPOSE
This position is responsible for scheduling maintenance & construction activities, as well as
working in the field as a member of the crew within the Public Works Department. The Crew
Leader is responsible to the Director of Public Works. The Crew leader is responsible for
assisting the maintenance crews and supervising their work, and may be delegated additional
day-to-day responsibilities in the Director’s absence.
SUPERVISION RECEIVED
Works under the close supervision of the Director of Public Works or their designee.
SUPERVISION EXERCISED
As directed, supervises the work of Public Works Maintenance Workers (I & II), as well as
Temporary laborers.
ESSENTIAL DUTIES & RESPONSIBILITIES
Able to perform all duties required of Public Works Maintenance Workers (I & II) and and
Temporary laborers.
Coordinates with the Director to schedule the daily & weekly jobs of the crew and make
necessary changes in case of emergencies or other higher priority jobs.
Assists Director with employee evaluation, development and discipline by providing feedback on
observations of their work activities and performance.
Gives work assignments and instructions to the crews each day and checks on the progress of the
work performed;
Works with any crew as needed to ensure completion of projects and assignments. Work performed
will be varied, and among other areas may include streets, sidewalks, storm sewer, public buildings
and spaces, forestry, parks, playgrounds, athletic fields, courts and facilities.
Coordinates with Director for scheduling maintenance and repair of all Public Works Department
vehicles, machinery & equipment;
Assists the Director of Public Works in budget preparation by recommending equipment
replacement, maintenance projects, street construction, sidewalk repair or service contracts for
the upcoming year;
Monitors or tracks current and anticipated budget expenditures in coordination with the other staff,
providing feedback to the Director on any overages, unanticipated expenditures, or other budgetary
difficulties.
Performs other miscellaneous duties as assigned by the Director of Public Works.
Attends safety related schooling and workshops
In coordination with the Director, receives and investigates citizen inquiries and takes or
recommends appropriate action in response;
Perform winter road maintenance by plowing of snow from traveled ways and by loading and
transporting plowed snow to designated dumpsites, applies traction sand and deicing materials to
compact snow and ice areas.
Assists in implementing safety programs with other City departments and ensures compliance with
state and local regulations; Directs yard waste, brush, snow removal, street sweeping, and de-icing
activities as season/weather dictates;
REQUIRED KNOWLEDGE, SKILLS, ABILITIES
Valid Wisconsin State CDL Class “B” License with air brakes endorsement.
To perform this job successfully, the person in this position must be able to perform each
essential duty satisfactorily.
Ability to use and operate construction equipment such as pick-up trucks, dump trucks,
bucket truck, front end loaders, backhoe, skid steer, compressors, jack hammers, pavement
marking equipment, leaf vacuums, mowing machines, snow plows, salt spreaders,
generators and other maintenance equipment.
Ability to communicate professionally, accurately and effectively with other City employees
and officers, government agencies, and the general public.
Ability to perform manual labor duties for extended periods of time, often under adverse
weather conditions.
Ability to lift and maneuver objects up to 75 pounds.
Knowledge of methods, materials, and equipment used in general maintenance work.
Knowledge of safe work practices.
Ability to work independently in absence of supervision.
Ability to cover rotating “on call” duties, and respond to the City within 30 minutes when
called in.
Ability to work nights, weekends, and holidays when attendance is required to perform
planned or unplanned public works duties
Regular, consistent and predictable attendance
TOOLS & EQUIPMENT USED
Hand tools, air compressor, jack hammer, 3/4 ton pick-up truck, dump trucks (up to 26,001 lbs.),
generator, concrete saw, concrete repair equipment, portable radio, pumps, pipe cutter, plumbing
tools, carpentry tools, pavement striping equipment, pavement roller, leaf vacuums, various grass
mowers, snow plows, snow blower, pavement restoration equipment, confined space entry safety
equipment, trench shoring safety equipment and other miscellaneous equipment.
EDUCATION AND EXPERIENCE GUIDELINES
Minimum of an Associates degree in Construction Management, Planning, or related
degree/certificate plus a minimum of one year in a supervisory capacity managing and
supervising utility and/or municipal construction projects and crews; or
Five years in a lead worker or supervisory capacity managing and supervising utility and/or
municipal construction projects and crews;
Experience performing snow removal, road construction, road maintenance or road surface
rating activities in a municipal or County setting is preferred.
Experience performing or documenting grant activities, budget planning and tracking, and
Ability to train and supervise the work of Maintenance Workers and Temporary Laborers in the
duties of their position; ability to communicate effectively verbally and in writing; ability to establish
and maintain effective working relationships with employees, customers, contractors, elected or
appointed officials, and the general public; ability to understand and carry out written and oral
instructions;
Experience with Microsoft Office Suite (Access, Excel, Word, etc.) AutoCAD, ArcView,
and GIS related software is preferred.
Working knowledge of Federal, State, and City laws and regulations for traffic signs, pavement
markings, and traffic safety;
One year minimum experience operating most of the following equipment and resources:
Personal computer, including word processing, and spreadsheets; telephone, copy and fax
machines, mobile radio, small engine and motorized equipment, hand and power tools;Recognize
underground and overhead utilities and understand their relationship to the safety of the working
environment.
PHYSICAL DEMANDS AND WORKING ENVIRONMENT
The conditions herein are representative of those that must be met by an employee to successfully
perform the essential functions of this job. Reasonable accommodations may be made to enable
individuals with disabilities to perform the essential job functions.
Environment: Exposure to extremes of temperatures, other outdoor conditions and noxious fumes
and odors when maintaining City equipment or property, and performing other required activities.
Exposure to moderate hazards when operating heavy equipment, snow plows or using power
tools. Exposure to long hours of driving in night conditions during snow removal operations.
Works with asphalt, crack sealing material, concrete, salt, oil, gasoline, diesel fuel, herbicides, paint,
traffic control signs, trash, weeds, tree limbs, dirt, rock, sand and gravel.
Physical: While performing the duties of this job, the employee is frequently required to walk; use
hands and fingers to handle or feel objects, tools or controls; climb or balance; stoop, kneel, crouch,
or crawl; and talk and hear. The employee is occasionally required to stand, sit, and reach with hands
and arms.
The employee must frequently lift and/or move up to 25 pounds and occasionally lift and/or move up
to 75 pounds. Specific vision abilities required by this job include close vision, distance vision, color
vision, peripheral vision, depth perception, and the ability to adjust focus.
Public Works employees have contact with the public and therefore are required to maintain a
professional appearance. Uniforms shall be clean and neat at the beginning of each workday. The
physical demands described here are representatives of those that must be met by an employee to
successfully perform the essential functions of this job. Reasonable accommodations may be made
to enable individuals with disabilities to perform the essential functions.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check, pre-
employment screenings; job related tests may be required.
The duties listed above are intended only as illustrations of the various types of work that may be
performed. The omission of specific statements of duties does not exclude them from the position if
the work is similar, related or logical assignment to the position.
The position description does not constitute an employment agreement between the employer and
employee and is subject to change by the employer as the needs of the employer and requirements
of the job change.
ACKNOWLEDGEMENT
I acknowledge that I have read the position description and requirements for the Public Works Crew
Leader position and I certify that I can perform these functions.
Applicant Signature Date
Management has the right to add or change these duties of the position at any time.
2022 AGENDA ITEM
Committee of the Whole Meeting date: __December 21, 2021_________
Council Meeting date: _January 4, 2022___________
ITEM:_Draft RFP for Operational and Compensation Assessment_
DETAILED DESCRIPTION OF SUBJECT MATTER:
Pursuing some of the items identified by the Public Administration Associates study
completed recently, staff have prepared a draft Request for Proposals that could be used to
select a firm to assess our operations and structure, as well as our compensation as
compared to similar communities. These activities could help address compensation
concerns, identify ways the City could improve workflow and workload, and detail any
opportunities they see to combine departments or staff to achieve greater efficiency and
effectiveness for internal and external customers.
In this updated draft document, compensation of all Full Time and Regular Part-Time
positions are targeted for evaluation, but the operational evaluation has been narrowed by
removing several Departments/operations.
LIST ALL SUPPORTING DOCUMENTATION ATTACHED:
Draft Request for Proposals
ACTION REQUESTED OF COUNCIL:
Review the draft RFP and determine if additional changes are desired, or if the RFP is ready
for publishing.
CITY OF COLUMBUS
WISCONSIN
Request for Proposal
OPERATIONAL AND COMPENSATION ASSESSMENT
Issued January 5, 2022
CITY OF COLUMBUS
OPERATIONAL AND COMPENSATION ASSESSMENT
January 5, 2022
The City of Columbus is seeking proposals from qualified individuals or firms to conduct an operational
and compensation assessment. The objective of the operational assessment is to evaluate the current
organizational structure, and make recommendations regarding best practices to organize the City’s
municipal departments and services to improve efficiencies and enhance both internal and external
customer service. Subsequent to the operational recommendations, conduct a compensation study for
current and recommended positions to ensure the City is competitive with comparable municipalities by
providing an equitable and effective compensation system. The individual or firm submitting a reply to this
request should have experience conducting organizational and compensation assessments in a local
government setting.
Three (3) copies of the proposal, and one digital copy, must be received no later than 3:00PM on Friday,
February 11, 2022. Proposals delivered or received after the submittal deadline shall be considered late
and rejected. There are no exceptions to this requirement. The Proposal must be placed in a sealed
envelope, plainly marked “Sealed Bid/Proposal for Operational and Compensation Assessment” and
addressed to:
Pat Goebel, City Clerk
City Hall
105 N Dickason Blvd
Columbus, WI 53925
Emailed submissions are not acceptable. Inquiries regarding this RFP should be directed to Kyle Ellefson,
City Administrator, at 920-623-5900, cityadministrator@columbuswi.us.
2
BACKGROUND
Community Info
The City of Columbus is located in southeastern Columbia County, with a small portion of the City located
in Dodge County. The portion of the City in Dodge County currently has no residents or taxable property
value. The most recent population estimate for Columbus is 5,540. The City is ideally located with easy
access to multiple state and federal highways, just 20 miles from the City of Madison. Columbus has a
historic downtown with multiple businesses and services, a significant industrial base, and a strong
residential real estate market.
Columbus operates under the mayor-council form of governance, with day-to-day operations overseen by
the appointed City Administrator. The City has multiple Departments providing services supported by the
General Fund, including Public Works, City Clerk’s Office, Treasurer’s Office, Senior Center, Recreation,
Police, Fire, Planning & Development, and Media. The Municipal Court and Library receive funding from
the City, but operate under their own Statutory Authority. The City also has electric, sewer and water
utilities.
Currently, the City has approximately 46 Full Time employees, 29 Regular Part Time employees, and up to
58 seasonal employees. In addition to those employees, the Fire Department also has approximately 41
paid on-call positions including 10 Officers. There are also seven unionized positions within the Police
Department that are included in the Full Time employee count.
Aside from the unionized positions, there is not a structured compensation plan or grid system in place for
employee compensation. Employee wages are usually adjusted as part of an annual budget process, and
occasionally through targeted evaluations of specific positions or employees.
SCOPE OF SERVICES
The City of Columbus is seeking proposals from qualified individuals or firms to conduct an operational
and compensation assessment. The objective of the operational assessment is to evaluate the current
organizational structure, and make recommendations regarding best practices to organize the City’s
municipal departments and services to improve efficiencies and enhance both internal and external
customer service. The following Departments/operations are excluded from the scope of the
organizational assessment: Police Department, Fire Department, Emergency Management, Municipal
Court, and the Library.
Additionally, once the operational assessment phase is complete, the City expects the individual or firm
selected to conduct a compensation study for current and recommended full time and regular part time
positions and structures to ensure the City is competitive with comparable municipalities by providing an
equitable and effective compensation system. Please note that the scope of the compensation assessment
should include existing positions within those Departments/operations excluded from the operational
assessment.
The individual or firm should complete other tasks deemed necessary for the accomplishment of a
complete and comprehensive outcome as described in the project objective. The individual or firm shall
3
expand on the tasks identified below, where appropriate, and provide suggestions that might lead to
efficiencies and enhance the results or usefulness of the work.
The Operational Assessment component shall consist of the following:
Examine the City’s current organizational structure, reporting relationships, span of control, and
staffing levels.
Review operational requirements, infrastructure, services, and ratios of staffing to population
served and other productivity measures.
Review operational functions and workflow processes
Identify operational gaps, inefficiencies, overlap and duplication of services, and assess the
efficiencies to be gained.
Propose options for a new organizational structure and recommended staffing levels, workload,
and span of control.
Identify suggested implementation phases and timeframes for options identified.
The Compensation Assessment component shall consist of the following:
Identify a suggested list of comparable municipalities to consider in the compensation study
Conduct marketplace research, including a salary survey considering not only the job title, but also
duties and responsibilities of the positions, to determine appropriate competitive compensation
relationships so the City can successfully recruit and retain highly qualified employees.
Analyze overall employee compensation spectrum, and recommend adjustments necessary to
ensure appropriate internal equity.
Provide job-related questionnaires if necessary to analyze the positions and validate their
comparability with selected compensation data.
Recommend a method or system for managing compensation, and provide a list of best practices
for keeping the policy current and equitable.
Provide a cost analysis for changes recommended, and propose a strategy for implementing the
compensation recommendations and plan over time.
Present and discuss draft findings and recommendations with management staff.
Present the assessment findings and recommendations at a regularly scheduled Common Council
meeting, or at another meeting of the City Council’s choosing.
SELECTION CRITERIA
The successful contractor will be selected after consideration of the following:
1. Proper submission and completeness of RFP.
2. Qualifications and capabilities of the individual or firm to provide the specified services, including
staff qualifications and experience.
3. Approach to the Scope of Services
4. Proposed Schedule
4
5. Overall cost of providing these services will be taken into consideration, but will not be most
important, significant, or determining factor.
6. Successful experience providing the requested services to municipalities of similar size.
7. Evidence of positive client interaction/service from previous or existing municipal clients.
FORM OF PROPOSAL
To be considered, three (3) copies of a proposal, and one digital copy, must be received at the City Clerk’s
Office, 105 N Dickason Blvd, Columbus, Wisconsin 53925 no later than 3:00PM on Friday, February 11,
2022. The Proposal must be placed in a sealed envelope, plainly marked “Sealed Bid/Proposal for
Operational and Compensation Assessment.”
All proposals shall be made as follows:
1. Cover Letter
2. A brief profile and history of the individual or firm; with an emphasis on any experience working
with municipal organizations.
3. Profiles of key personnel to be involved in the design and implementation of this project.
4. A listing of current and prior municipal government clients including contract information. This
should include the length of service and a general description of the services provided.
Municipalities listed may be contact for references.
5. A detailed description of the scope of work, methods, and procedures that will be employed to
complete the project. This should include the level of participation that will be required of City
staff or officials.
6. A full outline of the individual or firm’s job analysis and compensation methodology, including
study objective, end products, processes, and procedures.
7. An explanation of the criteria to be used for selecting the comparable municipalities or
organizations that will comprise the required marketplace research.
8. A detailed timeline identifying expected start and completion dates for each phase of the
assessment.
9. A detailed fee structure for services described in the proposed scope of work, including a total not-
to exceed cost for the complete study.
10. Any additional information which you/your firm feels necessary.
During the evaluation process, the City reserves the right to request additional information or clarifications
from proposers, or to allow corrections of errors or omissions. At the discretion of the City, contractors
submitting proposals may be requested to make oral presentations as part of the evaluation process.
The City reserves the right to reject any or all proposals, or any part thereof, to waive any formalities or
informalities, and to award the agreement to the proposer deemed to be in the best interest of the City.
The City also reserves the right to retain all proposals submitted and to use any ideas in a proposal
regardless of whether that proposal is selected. Submission of a proposal indicates acceptance by the
contractor of the conditions contained in this request for proposals, unless clearly and specifically noted in
the proposal submitted and confirmed in a contract between the City and the contractor selected.
5
SCHEDULE
January 5, 2022 RFP Released on website, submitted to relevant websites
February 11, 2022 Deadline for submission of proposals
February 2022 Staff review of proposals
February 2022 Interviews of applicants, if applicable
March 1, 2022 Staff recommendation to City Council
6
Get email alerts for Columbus
A daily email when new agendas and minutes are posted.