Muyni
← Back to Columbus

Committee of the Whole Meeting Packets

Regular Meeting

Columbus, WI · April 19, 2022

Agenda

Agenda

COMMITTEE OF THE WHOLE AGENDA COLUMBUS COMMON COUNCIL TUESDAY APRIL 19, 2022 – 6:40 PM COLUMBUS CITY HALL Join Zoom Meeting: https://us02web.zoom.us/j/83474730310?pwd=QXJ2dnBUUkRyRVQ5UzR0ZjRMQ2s3dz09 Meeting ID: 834 7473 0310 Passcode: 958745 312 626 6799 1. Roll Call 2. Notice of Open Meeting 3. Approve Agenda 4. Citizen Comments • Council meetings are open for in-person attendance, face coverings are recommended but not required. Members of the public wishing to attend the meeting can do so in-person, on Zoom, on the City of Columbus Cable Channel 980, or by streaming the meeting live from the Columbus website. Citizens wishing to make public comment at the meeting via Zoom, please email Pat Goebel at pgoebel@columbuswi.us by noon on Tuesday, April 19 . In your email, please include your name, address, and the Zoom profile name or phone number you will be calling from. 5. Department Reports – March 2022 • DPW, Fire, Library, Lifestar, Police, Treasurer 6. Review CSA donation of lights to Meister Park 7. Review MOU / Contract Fireman's Park rental agreement 8. Review Remote Meeting Attendance Ordinance 9. Review Storm Water Utility Fee Referendum Results Review 10. Review Plan Commission recommendation for a Zoning Map amendment for Prairie Ridge Hospital 11. Review Plan Commission recommendation for CSM for Prairie Ridge Hospital 12. Review CHLPC recommendation to select an architect to complete the Rest Haven project 13. Convene to closed session per § 19.85(1)(g) to confer with legal counsel for the governmental body who is rendering oral or written advice concerning strategy to be adopted by the body with respect to litigation in which it is or is likely to become involved. 14. Reconvene to open session 15. Convene to closed session per § 19.85(1)(c) to consider employment, promotion, compensation, or performance evaluation data of any public employee over which the governmental body has jurisdiction or exercises responsibility, specifically City Administrator's review. 16. Reconvene to open session 17. Adjourn CITY COUNCIL REPORT FOR APRIL 19, 2022 MEETING LEVEL OF STAFFING - AS OF 03/31/2022 31 Paid on Call Firefighters - Non-Probationary Members 3 Paid on Call Firefighters - Probationary Members 1 Fire Chief 35 Total Active Members 5 Vacant Firefighter Positions 0 Hiring Process 0 Eligibility List Full staff level for active fire personnel is 40 INCIDENT RESPONSES March 2022 Alarm End City Rural # of Run # Alarm Date Time Time Incident Location Incident Incident Incident Type F.F. 22-031 03/04 09:19 09:30 110 Stuart Street X Fire Alarm 1 22-032 03/07 22:40 23:00 W950 Hwy 16 X Fire Alarm 4 22-033 03/12 01:34 06:00 720 West James St X CO Issue 9 1550 Farnham 22-034 03/17 07:01 09:15 X CO Alarm 4 Street 151 NB 118 22-035 03/20 08:58 10:10 X MVA 9 Overpass 16/Johnson 22-036 03/22 14:50 16:45 X MVA 17 Intersection SB Possible Gas 22-037 03/23 13:03 13:45 437 West Mill St X 5 Leak 22-038 03/29 13:01 13:22 577 West Avalon X Lift Assist 4 EMS Assist – 22-039 03/29 18:47 19:00 632 West Seldon St X 6 CPR Fire Alarm 22-040 03/31 17:19 17:32 110 Stuart Street X 11 Activation Current Monthly Total: 10 Total Runs by Month: Jan 16 July Feb 14 Aug Mar 10 Sep Apr Oct May Nov June Dec Year to date total 40 Last Year at this time 37 TRAININGS, MEETINGS, AND COMMUNITY ACTIVITIES MARCH 2022 03/01 Regular monthly training - Driver Training 03/03 Fire Fighter 1 – Pardeeville FD – FF Jennings & FF K Killian Entry Level Fire – Lake Mills – FF Emerson 03/07 Officers Meeting 03/08 Regular Department Meeting Training - Peer Support Presentation 03/10 Fire Fighter 1 – Pardeeville FD – FF Jennings & FF K Killian 03/11 WI State FF Association Conference – Lt Fox 03/12 WI State FF Association Conference – Lt Fox Fire Fighter 1 – Pardeeville FD – FF Jennings & FF K Killian 03/16 Training - Peer Support Presentation 03/17 Fire Fighter 1 – Pardeeville FD – FF Jennings & FF K Killian 03/18 ICS 300 – FF Lamont 03/19 DCARI Training – Fire Origin Matrix – Lt. Fox ICS 300 – FF Lamont, Quamme and Retzlaff 03/20 ICS 300 – FF Lamont, Quamme and Retzlaff 03/22 Amtrak Power Point Presentation from Amtrak – 31 Members attended 03/24 Training Division Meeting DNR Refresher – 4 members attended Entry Level Firefighter – Lake Mills – FF Emerson 03/26 Instructors Class on line – Delaney, Dykstra, Fox, Olson and Retzlaff 03/29 Monthly Training – Ropes 03/31 Entry Level Firefighter – Lake Mills – FF Emerson Scott Hazeltine – Columbus Fire Chief TO: Columbus Area EMS District Board Members FROM: Matt Jaeger DATE: April 1, 2022 SUBJECT: March 2022 Lifestar responded to 72 911 calls for the month of March in the CAEMS area that were paged out via Columbia County Dispatch. Lifestar requested Rio EMS for mutual aid once for a call in the Town of Columbus to assist with a multi vehicle, multi-injury accident. Lifestar was requested for two intercepts with Rio EMS. Below is the monthly breakdown by municipality: • City of Columbus – 39 • Village of Fall River – 11 • Village of Lowell – 1 • Village of Reeseville – 1 • Town of Calamus – 0 • Town of Columbus – 6 • Town of Elba – 0 • Town of Fountain Prairie – 4 • Town of Hampden – 2 • Town of Otsego – 2 • Town of Portland – 3 • Town of York – 0 • Intercepts – 2 • Auto ALS – 0 • Mutual Aid Given – 0 • Mutual Aid Rec’d - 1 Lifestar met response time guidelines for the entire month. Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec TOTAL Calamus 1 1 0 2 Columbus, City 50 35 39 124 Columbus, Town 5 5 6 17 Elba 6 4 0 10 Fall River 12 19 11 42 Fountain Prairie 0 2 4 6 Hampden 3 2 2 7 Lowell 4 4 1 9 Otsego 0 0 2 2 Portland 1 0 3 4 Reeseville 5 7 1 13 York 0 1 0 1 TOTALS 87 80 69 236 Auto ALS 0 1 0 1 Intercepts 0 0 2 2 Mutual Aid Given 2 0 0 2 Mutual Aid Rec’d 0 1 1 2 MONTHLY TOTALS 89 82 72 243 Respectfully, Matt Jaeger Critical Care Paramedic Director of Ambulance Operations COLUMBUS POLICE DEPARTMENT 159 S. Ludington St. Columbus, WI. 53925 920-623-5919 (Main) 920-623-5930 (Fax) April 13, 2022 Mayor Arnold Members of the Common Council Columbus Police and Fire Commission: RE: POLICE DEPARTMENT ACTIVITY REPORT, March 2022 Attached is the monthly report for the Columbus Police Department. Please feel free to contact me at any time if you have questions. Chief Dennis Weiner www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police COLUMBUS POLICE DEPARTMENT 159 S. Ludington St. Columbus, WI. 53925 920-623-5919 (Main) 920-623-5930 (Fax) PERSONNEL The department is not fully staffed. Current staffing as of April 13, 2022: Authorized by Budget Actual Sworn Officers Full-time sworn police positions: 10 9* (Position breakdown) Patrol Officer 6 5 Sergeant 1 1 Lieutenant 2 2 Chief 1 1 Clerical Office Manager (full-time) 1 1 Clerk (full-time) 1 1 * Includes 2 recent hires who have not completed training Current personnel: Name Date of Hire Chief Dennis Weiner 2/18/2008 Lieutenant Roger Witthun 12/17/2001 Lieutenant Brad Konkel 06/13/2021 Sergeant Riley Vogel 05/30/2017 Officer Matt Schultz 12/23/2002 Officer Kelly Towne 02/02/2004 Officer Dillon Donahue 05/13/2020 Officer Julia Knoll 01/03/2022 Officer Brian Johnson 01/07/2022 Officer vacant Office Manager Erika Kellar 02/04/1999 Public Safety Clerk Bonnie Langsdorf 09/30/2006 www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police COLUMBUS POLICE DEPARTMENT 159 S. Ludington St. Columbus, WI. 53925 920-623-5919 (Main) 920-623-5930 (Fax) PERSONNEL: On March 12 we tested and interviewed 5 candidates for the vacant officer position. A total of 8 applications were received. We moved 3 forward for background investigations. One (1) withdrew 2 days after the test, another failed the background investigation, which leaves us with 1 remaining. That candidate was interviewed by the Police and Fire Commission on March 30, who approved her for further consideration. I made her a conditional job offer on April 8. After consideration she declined and chose to stay where she is currently working. We will wait a month or so and post again to fill this vacancy. We are still looking for crossing guards, including substitutes. A substitute with limited availability has been hired, which has been a help. The school district has been providing a staff member to assist at Selden St/Fuller St as needed, which has also helped tremendously. Officer Knoll is nearing the end of her local training and it is going very well. We anticipate her being on solo patrol sometime in late April. Officer Johnson, who is currently in the police academy, has successfully completed phase 2 of the 3 phase academy program. He graduates May 13 and will begin his local training on May 16. FLEET: I received notice from Ford that the microchip for the squad we ordered in October has been received, installed, and the vehicle has been turned over to the 3rd party transporter for delivery. We hope to see it sometime this month. The current gas prices will definitely have a substantial adverse effect on my fuel line item in the budget. I will definitely be over budget by fall. Ironically, when fuel prices neared $1 per gallon a few years ago and remained low, I returned several thousand dollars at the end of the year. TRAINING: All officers trained with the Rio and Fall River Police Departments on Active Shooter situations and scenarios, using pistols and rifles converted to use Simmunition ammunition, whose bullet tips are soft plastic and contain a colored marking liquid to show where you hit. When hit, it will sting but not injure. We were fortunate enough to secure the use of an abandoned high school, now privately owned, in a nearby community to do this training in. This provided a training experience as realistic as it gets, with all the dynamics of a school, such as hallways, stairwells, closets, dark areas, etc. It was taught by 2 of our staff members who have attended instructor level training. The training was outstanding. Chief Weiner, Lieutenant Witthun and Lieutenant Konkel attended Legal Update/Employment Law Update in Hartford. Sergeant Vogel attended the Wisconsin Traffic Safety Officers Association conference. Officer Schultz attended Blue Life Support Network training. This training relates to law enforcement officers and their spouses mental health related to the job. TRAFFIC ENFORCEMENT: During March 2022, officers issued 88 traffic citations, 117 warnings and 11 municipal ordinance citations. www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police COLUMBUS POLICE DEPARTMENT 159 S. Ludington St. Columbus, WI. 53925 920-623-5919 (Main) 920-623-5930 (Fax) NOTABLE INCIDENTS: Officers responded with EMS to a residence for a reported 28 year old pulseless non breathing person. Officers arrived first, recognized signs of drug use, and administered 2 nasal doses of Narcan. The 28 year old began breathing and became conscious. He admitted using Fentanyl, a synthetic opioid which is 50 times stronger than heroin and 80-100 times more stronger than morphine. MARCH 2022 CALL SUMMARY Nature of Call Total Calls Received ----------------------------- -------------------- 911 HANG UP 12 ACCIDENT WITH FATALITY 1 ACCIDENT HIT AND RUN 3 ACCIDENT PROPERTY DAMAGE ONLY 6 ACCIDENT WITH PERSONAL INJURY 1 ASSIST ANOTHER AGENCY 7 BANK ALARM 1 BURGLAR ALARM 8 FIRE ALARM 2 MEDICAL ALARM 2 ANIMAL COMPLAINTS 4 ANIMAL BITE 3 BACKGROUND INVESTIGATION 1 BATTERY 1 CHILD CUSTODY 1 CHILD SEXUAL ASSAULT 1 CITIZEN ASSIST 6 CIVIL 2 COMPLIANCE CHECKS 2 CONTROLLED 2 DISORDERLY CONDUCT 5 DEATH INVESTIGATION 3 DISABLED VEHICLE 13 DOMESTIC ABUSE 4 DOMESTIC WITH INJURY 1 DRIVING COMPLAINT 11 EMS CALL 7 EXTRA PATROL 43 FIRE GAS LEAK/CARBON MONOXIDE 2 FIREWORKS 2 FOOT PATROL 5 GAS DRIVE-OFF 3 JUVENILE INCIDENT 4 LOST AND FOUND 3 MUTUAL AID 2 NOISE COMPLAINT 3 www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police COLUMBUS POLICE DEPARTMENT 159 S. Ludington St. Columbus, WI. 53925 920-623-5919 (Main) 920-623-5930 (Fax) OUT WITH PERSON 6 OPEN DOOR 4 ORDINANCE VIOLATION 2 DRUG OVERDOSE 5 OWI 2 PARKING VIOLATION 10 SECURITY 122 SLIDE OFF 1 SUSPICIOUS 8 THEFT 2 THREAT 2 TIPS/LEADS 1 TRAFFIC CONTROL 7 TRAFFIC STOP 154 TRUANCY 1 UNWANTED PERSON 1 VEH LOCKOUT 5 WARRANT 3 WELFARE 8 ------------------------------------------------------------------------ Total Calls: 521 www.cityofcolumbuswi.com Dennis R. Weiner, Chief of Police CITY OF COLUMBUS FOR MEETING OF: April 19, 2022 REQUEST FROM/DEPARTMENT: Recreation Department AGENDA ITEM/REQUEST: Meister Park improvement from CSA *************************************************** DESCRIPTION AND SCOPE OF PROJECT/ITEM WITH KEY ISSUES NOTED: The CSA (Columbus Softball Association) seeks approval from City Council members to allow their association to fundraise for lights in Meister Park; specifically around diamond one. The Recreation committee discussed this project at our last meeting; all members are in support of their efforts for park improvements. The Recreation committee is thrilled for an addition such as this because it can open up opportunities for adult softball leagues for evening play. The CSA has successfully fundraised for two scoreboards, fence capping and a flagpole at Meister Park previously. Teddy Decker (CSA President) has been working with Dave from Water & Light to formulate a plan. Should council members approve the project, a light study will be organized to best determine the costs and will allow planning of electrical needs for this project. Enclosed is a map where light poles may positioned; a light study will best determine those needs. When the light study is complete, financial findings will be shared with city council members. PREVIOUS ACTION TAKEN (IF APPLICABLE): BUDGET AND FINANCING INFORMATION: Account #: _________________________ Department: __________________________ Acct. # Approved Budget: ______________ Current Balance in Acct #: ________________ Remaining Balance in Acct #: _______________ (after approval) CSA FUNDRAISING PROJECT, MEISTER PARK CITY OF COLUMBUS FOR MEETING OF: April 19, 2022 REQUEST FROM/DEPARTMENT: DPW & Recreation AGENDA ITEM/REQUEST: MOU approval for the Fourth of July committee *************************************************** DESCRIPTION AND SCOPE OF PROJECT/ITEM WITH KEY ISSUES NOTED: Here is a little history on the rental contract with the Fourth of July committee. In 2018, the Recreation Committee requested of council that the Fourth of July committee have a separate park rental contract specifically for their Fourth of July celebration. Prior to this suggestion, only a Pavilion contract was submitted for approval; not only was the Pavilion being used but the open shelters and grounds were as well. Council approved the park rental contract drafted by Attorney Johnson. Prior to 2018, no monetary payment was made to the city for their use of the shelters and grounds. Instead, the committee made many large donations of picnic tables and benches to City of Columbus parks. At the same meeting, council also approved the recommendation from the Recreation committee that payment of $500 be made to the city for their use of the park. Discussions with the Fourth of July was executed before any items were brought to council. In 2020, the Recreation Committee recommended an increase in costs for use of the open shelters and grounds. The committee acknowledged that the group provides an event for our community that many people have come to love and we felt a gradual increase in costs was fair; we did recommend to council that year 2021 payment of $1,000 be paid and year 2022 payment of $1500 be made to cover the costs of utilities. At this particular meeting, council agreed to move forward (approve) the $1,000 cost increase for 2021, but wanted more information on utility costs. Amy Jo agreed to work with Water and Light to get those numbers. This was the year of COVID; agendas were long and were zoom. The agenda item was pushed back to the first of the year (2021) and for whatever reason the request of the $1500 fee was never brought back for approval. Current year 2022. Jerry from DPW has worked with the Fourth of July committee to create a MOU that specifically puts in place an understanding of the committee’s obligations and the city’s. Attorney Johnson thought combining the MOU and the approved Park rental agreement was wise. Tonight we are asking for approval of the MOU and for the rate increase of $1500 be approved for future years. Enclosed are the findings from the 2019 study. Water and Light continues to charge the same amount for usage in 2022 as they did in 2019. PREVIOUS ACTION TAKEN (IF APPLICABLE): Fireman's Park 4th of July year to year usage comparable 2020 2019 usage Total Building / Area Name usage kwh kwh Difference Rate difference Pavilion 320 360 40 0.1141 $4.56 Scout Cabin 20 56 36 0.1141 $4.10 Beer Bldg. electric 8 171 163 0.1141 $18.59 Open Shelters 82 588 506 0.1141 $57.73 Rest Haven 198 495 297 0.1141 $33.88 Beer Bldg. Water 137 724 587 0.1141 $66.97 FP green space 0 362 362 0.1141 $41.30 FP entrance 71 1334 1263 0.1141 $144.10 3254 $371.23 MEMORANDUM OF UNDERSTANDING This Memorandum of Understanding is by and between the City of Columbus (hereinafter “City”) and the Columbus 4th of July Organization, Inc. (hereinafter “Organization”). WHEREAS, the City owns and maintains Fireman’s Park located at 1049 Park Avenue in the City of Columbus (hereinafter “Fireman’s Park”) for general community use, rental by local organizations, and seasonal events; and WHEREAS, Organization desires to use Fireman’s Park and certain facilities within the Park for the purpose of holding its 4th of July celebration in 2022; and WHEREAS, City and Organization do hereby understand and agree as follows: 1. Organization shall pay to City a $_______________ ($1,000) deposit within three days of the execution of this Agreement (or when the contract is requested of the Recreation Department. It is recommended that when an event ends, create a contract immediately for the next year). This deposit is to ensure compliance with the terms of this Agreement. If Organization does not comply with the terms of this Agreement to the City’s satisfaction, the City, in its sole discretion, shall be allowed to withhold all or part of the deposit to defray the costs of repairing damage and otherwise returning the Park to its condition prior to the event being held. If Organization complies with the terms of this Agreement, the total deposit shall be returned. City shall provide Organization in writing with an itemized list of damages within 10 days of the conclusion of the event for which it will be withholding some or all of the deposit. 2. Organization shall have exclusive use of Fireman’s Park beginning July ____, 2022, and concluding July ____, 2022. (dates will vary depending on how the holiday falls)During this period, Organization shall be allowed within the Park between the hours of 6:00 a.m. and 10:00 p.m. On the date of the actual event, Organization may be in the Park until midnight. 3. This Agreement shall apply to all facilities and grounds located within Fireman’s Park. Organization is not responsible for damage caused to other public facilities during the term of this Agreement. 4. Within 3 days of the execution of this Agreement, Organization shall pay to City the sum of $1000.00 (see notes)as rent for the use of Fireman’s Park during the period specified in paragraph 2 above. The rent paid by Organization shall be non-refundable unless the City completely cancels the organization’s use of Fireman’s Park pursuant to section 13 below. 5. Organization and the City shall inspect Fireman’s Park 3 weeks and 1 week before the date Organization takes possession of the Park pursuant to Section 2 above and shall inspect all facilities and grounds for the purpose of documenting the condition of the facilities and grounds prior to Organization taking possession of the Park. Up to the date Organization takes possession of the Park, the City shall perform and maintain basic maintenance of the facilities and grounds. 6. Organization shall notify the City Director of Public Works at least 2 weeks in advance of the event as to what equipment Organization will request be provided by City, such as barricades, trash receptacles and other needed equipment for its event. The City shall provide Organization with the requested materials. 7. Organization shall be responsible for pick up, set up, take down and return of all equipment and materials requested from the City. 8. Organization shall not make any alterations to the facilities or grounds without the written consent of the City Director of Public Works. 9. Organization shall provide all dumpsters for the event, shall be responsible for the removal of all trash and debris, and shall remove all dumpsters from the Park within 2 business days of the end of the event. 10. Organization agrees to be responsible for any damage to any facility within the Park while Organization is in possession of the Park. Upon conclusion of the event, Organization shall return the Park and all facilities to the City in broom clean condition. 11. Prior to taking possession of Fireman’s Park, Organization shall obtain and maintain a third-party liability insurance policy with a minimum coverage of $1 million per injury, naming the City as an additional insured and shall provide the City with a certificate of insurance confirming the insurance is in place. 12. Organization shall indemnify and hold City harmless against any and all causes of action which may arise from Organization’s use of the Park during the event. If City is required to bring legal action, or defend itself against legal action based on the negligence or intentional act of Organization, Organization shall indemnify City for all reasonable attorney fees incurred by City. 13. City reserves the right to cancel and/or alter the event, if necessary, to impose and enforce orders, rules and regulations relating to conduct of persons and the use of property necessary to protect the public peace, health and safety, to preserve lives and property and to ensure cooperation with other emergency government activities. 14. At the beginning of the event term, Organization shall be provided with keys to all facilities it will be using. All keys to the facilities shall be returned to the City upon the end of the event. Organization shall not create or allow to be created, any duplicate keys to any of the facilities. 2 G:\Recreation\4th of July\2022\memorandum of understanding 040522 (A4493217x9DEB4) draft version.docx CITY OF COLUMBUS Date: __________________, 2022. Date: __________________, 2022. ____________________________ ____________________________ Mary Arnold, Mayor Patricia Goebel, Clerk COLUMBUS 4th OF JULY ORGANIZATION, INC. Date: __________________, 2022. ____________________________ ____________________________. Authorized Representative 3 G:\Recreation\4th of July\2022\memorandum of understanding 040522 (A4493217x9DEB4) draft version.docx 2022 AGENDA ITEM Committee of the Whole Meeting date: ____April 19, 2022_______ Council Meeting date: ____________ ITEM:_Remote Meeting Attendance Ordinance_ DETAILED DESCRIPTION OF SUBJECT MATTER: During the Pandemic, Zoom has become a routine way for members of the City Council to attend and participate in meetings. The League of Wisconsin Municipalities has noted that: “While communities are not legally obligated to allow governmental body members or the public to attend meetings remotely, many have chosen to do so because of positive experiences with remote attendance during the pandemic. Municipal governing bodies may adopt ordinances or policies outlining the circumstances under which governmental body members and the public may attend meetings remotely.” If the City would like to continue offering this option to the City Council, the League recommends adopting an Ordinance to formally establish this practice outside of any emergency or temporary Orders. Attorney Johnson has drafted an Ordinance for the Council’s review, and will be available to discuss any questions the Council may have. LIST ALL SUPPORTING DOCUMENTATION ATTACHED:  Remote Meeting Attendance Ordinance ACTION REQUESTED OF COUNCIL: Determine if the Ordinance is appropriate, and offers the City Council sufficient flexibility to attend meetings remotely. CITY OF COLUMBUS ORDINANCE _________-___ AN ORDINANCE TO CREATE SECTION 2-55 OF THE CITY OF COLUMBUS CODE OF ORDINANCES RELATING TO REMOTE ATTENDANCE AT MEETINGS The Common Council of the City of Columbus, Columbia County, Wisconsin does hereby ordain as follows: 1. Section 2-55 of the City Code of Ordinances is hereby created to read as follows: 2-55 Remote Attendance at Meetings. (a) In exceptional circumstances as determined by the Mayor for a Common Council meeting, the Council President for a meeting of the Committee of the Whole, or chair of the applicable board, committee or commission, meetings may be held on a case-by-case basis virtually or otherwise with remote attendance as described in this section. Virtual meetings and remote attendance are only authorized when the chair of the meeting determines that health, safety, welfare, family, or work circumstances warrant a virtual meeting or remote attendance by a member. Virtual meetings and remote attendance should not be authorized solely for convenience, or due to vacation, travel, or seasonal relocation of one or more members of the body. For meetings that include quasi-judicial action requiring due process, the chair must consult the City attorney before authorizing a virtual meeting or remote attendance. (b) If circumstances leading to one or more members of the body seeking to attend remotely are widely shared by others in the public, the chair should consider providing a similar remote attendance option for the general public. Such option must be provided to citizens in a timely manner as part of the meeting agenda notice. (c) A member of the body seeking to attend remotely shall notify the City Clerk of the request at least 48 hours in advance of the meeting. The City Clerk shall as soon as practical notify the chair of the meeting. The chair shall decide whether to grant the request at least 24 hours in advance of the meeting. The chair's determination shall be final. Such attendance is only permitted if systems allow the remote member to hear the proceedings and be heard in the meeting room. If visual information is presented at the meeting, the information shall be distributed, or systems must allow remote attendees to view what is presented. (d) Members of the body attending remotely shall have all powers of participation, including counting toward a quorum and having the opportunity to vote. If visual information is presented at the meeting, members appearing remotely must have C:\Users\pgoebel\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\X2D8RNX4\ord re remote attendance at meetings option 2 030122 (A4449269x9DEB4).docx the opportunity before or during the meeting to view what is presented or be prohibited from voting on the matter. (e) Upon direction of the chair, a body may on a case-by-case basis conduct an entirely virtual meeting, in which no member of the body is present at City Hall, subject to the requirements of this section. The public shall be given access to the system implementing the virtual meeting platform. Information about access to the meeting shall be provided to citizens in a timely manner as part of the meeting agenda notice. Best efforts shall be used to ensure that members of the public lacking access to the virtual meeting platform are provided alternative reasonable methods to attend. 2. Severability. All Ordinances or parts of Ordinances in conflict herewith are hereby repealed. If any portion of this Ordinance or its application on any person or circumstances is held invalid, the validity of this Ordinance as a whole or any other provision herein or its application shall not be affected. 3. Effective Date. This Ordinance shall take effect immediately upon its passage and posting as required by law. Adopted this ___ day of _____________, 2022. CITY OF COLUMBUS By: __________________________ By: __________________________ Mary Arnold, Mayor Patricia Goebel, Clerk 2 C:\Users\pgoebel\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\X2D8RNX4\ord re remote attendance at meetings option 2 030122 (A4449269x9DEB4).docx 2022 AGENDA ITEM Committee of the Whole Meeting date: ____April 19, 2022_______ Council Meeting date: ____________ ITEM:_Stormwater Utility Update _ DETAILED DESCRIPTION OF SUBJECT MATTER: On Tuesday, April 5th, the Stormwater Utility Fee Referendum failed 409 Yes to 603 No. The Stormwater Utility still exists as created previously, but any fees collected to address stormwater would reduce our property tax levy limit by the same amount, reducing or eliminating most benefits of a stormwater utility. With stormwater remaining a significant issue for the community, the Council has nearly every option available to them at this time, and staff are prepared to move in whatever direction is decided. Several of the options are listed below:  Do nothing. Address stormwater at the same level we have for the past few decades.  Pursue the referendum again this fall  Collect the Stormwater Utility Fee and incur the levy penalty, requiring the elimination of approximately $150,000 in current expenditures.  Eliminate approximately $150,000 in current expenditures and redirect those funds to stormwater improvements.  Prioritize stormwater funding in future borrowings, reducing the debt available for street, building and other capital projects. LIST ALL SUPPORTING DOCUMENTATION ATTACHED:  List of potential projects and roughly estimated costs ACTION REQUESTED OF COUNCIL: Determine what actions or information, if any, the Council would like to see regarding this issue. City of Columbus Storm water 4/12/2022 Project Scope Est. Costs Repair, mowing, inspection, spot Annual ‐ Storm water basin maintenance removal of sediment $35,000 4 year rotational includes cleaning Annual ‐ Inlet cleaning and repairs to inlets $35,000 remove sediment, restore drainage, Annual ‐ Repair endwalls repair damage to endwalls $15,000 Upgrade and replacement of storm Capital ‐ Reoccuring Street Reconstruction sewer system every two years $100,000 Remove 48 inch CMP and install open rock lined channel with pedestrian Capital ‐ Firemans Park Culvert Removal bridge $715,000 Capital ‐ Creek Dredging Upper Reach of 2nd Ward Creek $250,000 Remove sediment, improve drainage Capital ‐ Ditch dredging Commercial and repair driveway culverts $50,000 Capital ‐ Flood area Nina Drive Improve drainage to lessen flooding $30,000 Remove material in remaining areas Capital ‐ Maple Ave ditch dredging of the ditch $25,000 Reconfigure inlets, structures and Capital ‐ Repair storm sewer on Commercial pipes to correct drainage $75,000 Remove sediment, improve drainage Capital ‐ Contenential Drive ditch dredging and repair driveway culverts $50,000 Improve ditch line, drainage, replace Capital ‐ Lewis Street Drainage driveway culverts $50,000 Repair discharge pipe from end of N. Capital ‐ North Water Street Drainage water street to River $100,000 Capital ‐ Replace James Street Box Culvert Increase capacity under James Street $350,000 Replace aged pipe from Waterloo Capital ‐ Replace storm Sewer Waterloo Street to River $600,000 Retrofit ponds on Kestrel phase 2 to Capital ‐ Upgrade Kestrel ponds increase flood storage $150,000 Capital ‐ 2nd Ward Creek Bypass At Avalon Road $150,000 Capital ‐ Create flood storage West of Priarie Ridge Health $1,000,000 2022 AGENDA ITEM Committee of the Whole Meeting date: __April , 2022 19___________________ Council Meeting date: ___________________________ ITEM: _Zoning Map Amendment for parcel 11211-1508.13___________ SUBMITTED BY: __Matt Schreiber _____________________________ DETAILED DESCRIPTION OF SUBJECT MATTER: Columbus Community Hospital Inc (DBA Prairie Ridge Health) has applied for a zoning map amendment for parcel 11211-1508.13. The amendment would change the zoning from RD Rural Development to B2 Highway Commercial. Parcel 11211-1508.13 is an 8.2 acre parcel of land that is adjacent to the Prairie Ridge Hospital located at 1515 Park Ave (parcel 11211-1192.1). The applicant has applied to combine parcels 11211-1508.13 and 11211-1192.1 into one parcel via a Certified Survey Map (CSM). The zoning designations for the properties are different and before a CSM could be approved it requires a zoning map amendment. As a result the applicant has applied to change the zoning on parcel 11211-1508.13 to be consistent with the zoning designation for parcel 11211-1192.1. The plan commission has reviewed this application and recommended approval at the April 14th meeting. Please note that the applicant has no immediate plans for this property. The applicant has received a variance previously for lot coverage requirements. The completion of the zoning map amendment and CSM would allow them to meet code. LIST ALL SUPPORTING DOCUMENTATION ATTACHED: Plan Commission Materials ACTION REQUESTED OF COUNCIL: Review and consider recommendation from plan commission CITY OF COLUMBUS 105 N. DICKASON BOULEVARD COLUMBUS, WISCONSIN 53925-1565 PHONE: 920.623.5900 FAX 920.623.5901 www.cityofcolumbuswi.com Plan Commission Staff Report Plan Commission Date: April 14, 2022 Agenda Item: 8a, 8b, 8c Zoning Map Amendment and CSM Applicant: Columbus Community Hospital Inc Property Address: 1515 Park Ave Parcel ID: 11211-1508.13 Zoning: RD Future Land Use Map: Gateway Business Area Summary The applicant purchased an adjacent parcel to their facility in in 2019. The applicant is seeking to combine parcel 11211-1508.13 with parcel 11211-1192.1 which is home to Prairie Ridge Hospital. To allow for the lot combination parcel 11211-1508.13 needs to be rezoned to B2- Highway Commercial be consistent with the zoning for parcel 11211-1192.1. This proposal is accompanied by a CSM which will combine parcels 11211-1192.1 and 11211-1508.1. Recommendation The proposed rezoning is consistent with the Comprehensive plan and staff recommends approval of the zoning map amendment. Adjacent Land Existing Land Use Zoning Designation Future Land Use Designation North Hospital B2 Gateway Business South Vacant RD Gateway Business East Vacant Land/ Park Ridge RD Gateway Business West Vacant Land RD Gateway Business Attachments • Location Map Hello Matt, This zoning application is for combining the parcel we recently purchased (11211-1508.3) and combining it with the parcel we currently own (11211-1192.1). I have attached the proposed CSM from Grothman and Associates for your review. Thanks, Matt Yaroch Director of Support Services 1515 Park Avenue, Columbus, WI 53925 p 920.623.1225 I c 920.382.0378 I myaroch@PrairieRidge.Health 2022 AGENDA ITEM Committee of the Whole Meeting date: __April , 2022 19___________________ Council Meeting date: ___________________________ ITEM: _CSM to combine parcel 11211-1508.13_and 11211-1192.1__________ SUBMITTED BY: __Matt Schreiber _____________________________ DETAILED DESCRIPTION OF SUBJECT MATTER: Columbus Community Hospital Inc (DBA Prairie Ridge Health) has applied for a zoning map amendment for parcel 11211-1508.13. As discussed during the zoning map amendment, the applicant needed to change the zoning to allow for parcel 11211- 1508.13 and 11211-1192.1 to be combined. The plan commission has reviewed this application and recommended approval at their April 14th meeting. Please note that the applicant has no immediate plans for this property. The applicant has received a variance previously for lot coverage requirements. The completion of the zoning map amendment and CSM would allow them to meet code. LIST ALL SUPPORTING DOCUMENTATION ATTACHED: Plan Commission Materials ACTION REQUESTED OF COUNCIL: Review and consider recommendation from plan commission CITY OF COLUMBUS 105 N. DICKASON BOULEVARD COLUMBUS, WISCONSIN 53925-1565 PHONE: 920.623.5900 FAX 920.623.5901 www.cityofcolumbuswi.com Plan Commission Staff Report Plan Commission Date: April 14, 2022 Agenda Item: 8a, 8b, 8c Zoning Map Amendment and CSM Applicant: Columbus Community Hospital Inc Property Address: 1515 Park Ave Parcel ID: 11211-1508.13 Zoning: RD Future Land Use Map: Gateway Business Area Summary The applicant purchased an adjacent parcel to their facility in in 2019. The applicant is seeking to combine parcel 11211-1508.13 with parcel 11211-1192.1 which is home to Prairie Ridge Hospital. To allow for the lot combination parcel 11211-1508.13 needs to be rezoned to B2- Highway Commercial be consistent with the zoning for parcel 11211-1192.1. This proposal is accompanied by a CSM which will combine parcels 11211-1192.1 and 11211-1508.1. Recommendation The proposed rezoning is consistent with the Comprehensive plan and staff recommends approval of the zoning map amendment. Adjacent Land Existing Land Use Zoning Designation Future Land Use Designation North Hospital B2 Gateway Business South Vacant RD Gateway Business East Vacant Land/ Park Ridge RD Gateway Business West Vacant Land RD Gateway Business Attachments • Location Map 2022 AGENDA ITEM Committee of the Whole Meeting date: __April , 2022 19________________________ Council Meeting date: __________________________ ITEM: __Review and approve architectural services for the Resthaven Project__ SUBMITTED BY: _Matt Schreiber__________ DETAILED DESCRIPTION OF SUBJECT MATTER: The HLPC met on March 16th and made a recommendation of Design Coalition, for the Architect work on the Rest Haven Project. Design Coalition & Roger Smith has worked for the City of Columbus and CHLPC on the Pavilion ADA project. For more information please see the proposal review packet that the HLPC used to make their final decision. For specific questions regarding the selection process members from the HLPC will be in attendance. If council moves the recommendation forward to council a draft contract for services would be included for approval. LIST ALL SUPPORTING DOCUMENTATION ATTACHED: Proposals Review Packet ACTION REQUESTED OF COUNCIL: Review the recommendation and move to council for final action. 1 of 14 Resthaven Project CHLPC Architectural Submittal Review The CHPLC has received bids from Architectural firms to develop plans for the resthaven building renovation. The bids for services were based on the scope of work that was approved by city council in October 2021. The CHLPC received four (4) bids for this project, the bids are identified below and attached to this document. Please note that after the initial submission, Melissa Destree withdrew their bid. Firm Name Bid Page Design Coalition Inc. – Melissa Destree, AIA IIDA Withdrawn 3-4 Design Coalition Inc. – Roger Smith $8,800 5-8 InSite Consulting Architects – Stephen Mar-Pohl AIA, NCARB $23,850 9-12 Paul Pyfferoen $3,145 13-14 Per the resthaven subcommittee meeting minutes from March 3, 2022 the subcommittee reviewed the proposals that were submitted for the project. Based on the review of the proposals the subcommittee unanimously recommended Roger Smith to complete the work. Please see the subcommittee recommendation on page 2. 2 of 14 March 14, 2022, The Subcommittee has worked diligently over the past few months contacting Architects, site showings, and providing a list of needed improvements. We appreciate all the time put into this by the Architects. We received all the final proposals. We had our subcommittee meeting March 3, 2022, we went through each proposal. We compared pros, cons, and figures of each Proposal. Our recommendation is Design Coalition, for the Architect work on the Rest Haven Project. Design Coalition & Roger Smith has worked for the City of Columbus and CHLPC on the Pavilion ADA project. Their Proposal was most reasonable for services rendered. Respectfully submitted, Ruth Hermanson Rest Haven Subcommittee Madam Chair CHLPC 3 of 14 December 2, 2021 City of Columbus Ruth Hermanson Columbus Historic Landmarks & Preservation Commission 105 N. Dickason Boulevard Columbus, WI 53925 Re: Rest Haven Park Shelter Toilet Room Renovation DD’s, Building CD’s, Bidding & CA Dear Ruth, Thank you for the opportunity to provide the CHLPC with this letter of proposal. This letter is intended to serve as a proposal to provide Architectural and Engineering Services to prepare Construction Drawings for the Rest Haven shelter toilet room renovation. The design drawings will be brought through Construction Drawings, Cost Estimating, Bidding, Construction Administration and As-Built services with details as follows: Project Scope and Basic Services: Destree Design Architects, Inc. and Hein Engineering Group will provide Construction Drawing Services for Architectural, Plumbing, Mechanical and Electrical for the Toilet room renovation, including Construction Drawing Set with Specifications. Project Contacts: Architect/Interior Designer Melissa Destree, AIA Destree Design Architects, Inc. Engineer Mike Hein Hein Engineering Group Scope 1 = Toilet Room Renovation Architectural Services & Project Management: Lump Sum $12,500 Design Development & Construction Drawings o City Provided Survey and Existing Shelter Building drawings o Site Visit and Field Measure existing space o Shelter Modifications • Renovate to create new ADA toilet rooms and related spaces • Trash Enclosure Phototype at this location • Outdoor Shower • Minimal Parking Lot work as it is related to accessible path to new shelter only • Clean Beach treatment equipment room – rough-in and coordination for MEP connections and piping from beach o Neighborhood meeting with presentation Drawings – o Finalize all material selections o Final Code review o Finalize elevations, plans and details o A/E generated Estimate of Probable Cost o Prepare Owner Review set for comments (electronic) • 99% Review – 1 sets of Drawings o Prepare Material Specifications (Front end specs by City of Columbus) o Two (2) Design Virtual Meetings with City o Prepare CD’s for site 4 of 14 o Coordinate and Submit to CHLPC and State Historic Preservation Office (SHPO) o Coordinate MEP Bidding/Construction Admin o Assist City with additional information during Bidding o Submit drawings for review to DSPS or equal o Construction Administration o Shop Drawings o Site Meetings (4 site visits, estimated every 3 weeks during active construction) o Compliance statement MEP services Hein Engineering Group: Lump Sum $5,500 • Design Development Drawings • Construction Documents with MEP Specifications • 2 site visits • Shop drawings • CA services with submittal to State Reimbursables: (4%+/-) $ 800 • Review sets and submittal printing • Does not include municipal or submittal fees Total Services Scope 1: Lump Sum $18,800 (Reimbursable expenses are included in the Lump Sum) Scope 2 = Master Planning Services: (building Interior overall/ exterior maintenance) Lump Sum $6,000 Architectural services Destree Design Architects: ($3,500) • Schematic Design scope narrative to address CHLPC additional renovation and preservation items for the structure. MEP services Hein Engineering Group: ($2,500) • Schematic Design recommendations for the Meeting Hall and related spaces Mechanical/Electrical, preliminary plan, cost estimate Additional services: Additional work is based on hourly rates as approved by the Client in writing. Including but not limited to the following: • Change in Scope of Project • Front End Specifications • Site or Landscape modifications • Owner approved additional requested meetings • Fire Sprinkler System • Additional Neighborhood Meetings (Hourly) • Renderings Approval: If you find this proposal to be acceptable, provide a contract and return to Destree Design Architects, Inc. Contact me if you have questions or are requesting a revision to the proposal. We look forward to working with you. Regards, Melissa Destree, AIA, IIDA Destree Design Architects, Inc. 5 of 14 Design Coalition, Inc. 2088 Atwood Avenue Madison, WI 53704 (608) 246-8846 (voice) (608) 246-8670 (fax) contact@designcoalition.org www.designcoalition.org Jan 11, 2022 PROPOSAL FOR ARCHITECTURAL SERVICES Remodeling for RestHaven Facility 1049B Park Avenue Columbus, Wisconsin Carolyn Fredericks and Ruth Hermanson CHLPC Columbus, Wi Carolyn and Ruth, Thank you for inviting us to provide you with a proposal for architectural services for the RestHaven project. I enjoyed meeting with you, and discussing ideas for the project. We would certainly welcome the chance to work with you and CHLPC again. Below we provide descriptions for our architectural services based on our on-site meeting and our understanding of the project scope. To summarize what I understand to be the scope of service you require: architectural design and planning services for accomplishing the project scope we discussed on site and which you describe in your 4/8/21 list (not repeated here), for remodeling the existing toilet/shower rooms and aspects of the other existing spaces at the RestHaven facility, with provision of stamped architectural drawings and specifications for obtaining a building permit and executing construction of the work. Also included will be a formal bidding process with all of the relevant City of Columbus guidelines, the selection of a builder with the architect’s assistance, and construction administration services through to the project’s completion. In more detail... We’re understanding that this scope includes these architectural services: • Investigation and measuring of existing conditions, and preparation of to-scale base drawings of the existing building for design work; Proposal to CHLPC Remodeling for RestHaven Facility Jan 11, 2022 Design Coalition Architects, Madison, WI !1 of !4 6 of 14 • Research and analysis of applicable zoning and building codes, and communications with government officials on your behalf to identify the relevant issues that will impact your project; • Preparation of design level drawings and outline specifications with material selections for review with you and for your feedback, prior to proceeding; • Preparation of construction drawings and specifications, to be the basis of the construction contract with a general contractor; • Preparation of the bidding packet, including a sample Owner-Contractor Agreement, and conducting the formal bid process (advertising, coordination with plan services, distribution of materials, issuing addenda if needed, coordinating bid opening, etc). Process also anticipates a City Council review process similar to the Fireman’s Park Pavillion project; • Submittal and communications necessary to secure a building permit from the State of Wisconsin. We understand that the building is on the National Historic Register, and as the proposed scope of work is interior, we anticipate a straightforward review and approval process similar to that for the Fireman’s Park Pavilion. Our proposed fee does provide limited time for review and approval of new windows if necessary; • Communications with you, other CHLPC folks who you identify, construction team members, and City officials. 9 hours of meeting/communication time is included in our proposed fee; • Structural design and consulting is not anticipated to be required, and therefore is not included in the architectural fee; • Construction-phase administration & observation by a registered architect during the construction phase of the project. This includes services such as: -regular communication/meetings with you and construction team members (e.g. the general contractor, vendors/suppliers, etc.); -observation of the construction via regular site visits (frequency to be determined, based on stage of the construction progress); -coordination of shop drawings and other submittals; processing of change orders (if any), and payment requests from the General Contractor; -submittal of completion/compliance statements to the City. Proposed Fee: $8,800 Proposal to CHLPC Remodeling for RestHaven Facility Jan 11, 2022 Design Coalition Architects, Madison, WI !2 of !4 7 of 14 Assumptions and some services not included in Proposed Fee: Our description above of the project scope and our estimate of fees follow the assumptions as we discussed them together in mid-December. The estimate above also includes the following assumptions: • Existing kitchen is to remain as is and is not part of the scope of work. • Alterations to existing roof cavity (insulation and ventilation) is not part of the of project scope. Services to analyze and design improvements to existing conditions will considered as additional service. • Heating/Ventilating/Air Conditioning, electrical, plumbing, and other systems will be designed, specified and submitted for permits by the installing subcontractors in communication with you and us. Design costs for those systems are therefore not included in the architectural fee. We’ve assumed that subcontractors with knowledge, integrity and experience will be selected, and we have accordingly included in our fee reasonable coordination and communication time with the subcontractors and general contractor to facilitate this. Concept descriptions of one or more heating systems, as well as specific plumbing and lighting fixtures will be included in our specifications for bid, and is part of our proposed fee. This common process —usually dubbed “design-build”— means that detailed planning for portions of the project is actually started only after the builder is identified and under contract, and is appropriate for straightforward and limited projects such as this one. • Evaluation of the existing heating, cooling and ventilating equipment and requirements, and all energy calculations, submittals and permits will be handled by the HVAC subcontractor as part of their design-build responsibilities. Therefore these services are not included in the architectural fee. • We understand that it is only building contractors, not architects, who have a daily, working knowledge of current construction costs; this is especially the case in design-build situations. Accordingly, we do not provide preliminary construction cost estimates. • Unforseen and unknown issues outside of the basic project scope as presented above, which present themselves during the course of the project and involve significant re-designing, additional meetings and so on would be handled as additional services. • We anticipate using the Standard Owner-Architect Agreement form (AIA B104), and for construction, the Standard Owner-Contractor Agreement form (A105) and General Conditions (A205), which are appropriate for this scale of project. Proposal to CHLPC Remodeling for RestHaven Facility Jan 11, 2022 Design Coalition Architects, Madison, WI !3 of !4 8 of 14 Services following are not included in the proposed fee, and if you need them from us they would be handled as additional services, billed on the normal hourly fee basis: • Services made necessary by re-designs due to the requirements of governing regulations, or changes in your requirements due to budget or other constraints, or modifications proposed by building contractor(s); multiple bidding processes and/or negotiations with building contractor(s). • Assistance to you in applying for additional zoning and other entitlement permits, including preparation of submittal materials, communications/meetings with government staff, revision of materials, etc,. • Preparation of 3D computer and other models. • Site design, playground design and/or landscape architecture, land surveying, geotechnical, civil engineering, utility coordination, and similar services. • Such special systems as building security systems, communications/intercoms/AV/ computers as required, will be designed and specified by the installing subcontractor(s) in communication with you and us. • Presentations to and meetings with regulatory bodies, citizen groups, etc. Our current hourly fees are: $108 for Registered Architect, $80 for Draftsperson; direct costs such as postage and drawing reproductions are billed as reimbursable expenses, with 10% added to direct costs for bookkeeping. Mileage will be billed at $0.55 per mile, with travel time billed at half rate. Agreement Form If this proposal seems acceptable to you, please let me know and we can proceed to draft an Owner-Architect agreement form for you to look over. Carolyn and Ruth, I would very much look forward to the opportunity to work again with you and CHLPC. Please let me know if you have any questions or concerns about this proposal or the attached materials. Respectfully submitted, Roger Smith, Architect Proposal to CHLPC Remodeling for RestHaven Facility Jan 11, 2022 Design Coalition Architects, Madison, WI !4 of !4 February 16, 2022 9 of 14 Ms. Ruth Hermanson – CHLPC Chairperson 105 N. Dickason Blvd. Columbus, WI 53925 RE: Proposal for Architectural Services for the Design Phase of the Resthaven Renovation Project Dear Ms. Hermanson, We thank you for the opportunity to provide the following proposal for architectural services for the design of the Resthaven Renovation Project. InSite Consulting Architects (ICA) proposes to perform the following design phase services. Engineering services that may be required once the process begins will follow once the scope is fully defined: PROPOSED SCOPE OF WORK This proposed scope of work is intended to illustrate the architectural design work that will be required to properly complete the design of the Resthaven Renovation Project. 1. Predesign/Scope Verification: Review all proposed project scope items: • Historic Restoration of Building Enclosure and Character Defining interior elements • MEP Upgrades • Accessibility Upgrades • Renovated Toilet Facilities Deliverables ❖ Scope Report ❖ Program Budget Time Frame ➢ 6 weeks +/- depending on final scope 2. Historical Research: Perform essential research required to properly inform the renovation process. This research may include the following items: • Review of existing drawings, specifications, shop drawings, or other documentation relating to the original construction and alterations completed after the building was first occupied Deliverables ❖ Historic Brief Time Frame ➢ This work will be completed concurrently with Item 3 below ➢ 6 weeks +/- 10 of 14 3. Existing Condition Survey (detailed): ICA will perform all field work necessary to form a complete understanding of the physical condition of the existing historic Structure. Invasive and noninvasive methods may be used during this portion of the work. • Building Enclosure o Roofing o Walls o Windows o Doors o Ornamental Detailing • MEP o Mechanical HVAC (None) o Electrical o Plumbing • Interiors o Ceilings o Floors o Walls o Windows o Doors o Cabinetry/Millwork o Trim and other Historically Pertinent Finishes Deliverables ❖ Existing Condition Survey Report Time Frame ➢ This work will be completed concurrently with Item 2 above ➢ 6 weeks +/- 4. Schematic Design/Design Development • Schematic Design/Best Course of Action • Design Development/finalize base system design criteria Deliverables ❖ SD/DD Design Report Time Frame ➢ Work begins after work included above ➢ 4 weeks +/- 5. Bidding Documents • Develop a comprehensive set of bidding documents based on the findings in items above Deliverables ❖ Bidding Documents: one printed copy (1/2 size), one e-copy Time Frame ➢ Work begins upon approval of DD Documents ➢ 6 weeks +/- 11 of 14 6. Regulatory • Historical Jurisdiction (as required) • State Historical Society Review Deliverables ❖ Approval Letters (COA) by others Time Frame ➢ Work begins After CDs are complete ➢ 60 Days are expected for Regulatory Review 7. Bidding/Negotiation • Bid the Scope of Work Deliverables ❖ Bid Tabulation Time Frame ➢ TBD 8. Contract Negotiation • Assist Owner with Contract Negotiation Deliverables ❖ Review Owner’s drafted Contract Time Frame ➢ TBD NOTE: No Contract Administration (CA) services are included in this proposal. It is our practice to develop a CA proposal once the contractor has been selected and all Contracts fully executed. We do this because the resources of contractors are highly variable and it is impossible to determine what the project needs will be at this time. PROPOSAL Resthaven Renovation Project – Columbus, Wisconsin Phase Terms Cost Design Lump Sum** $23,850 Subtotal $23,850 Total Fee Estimate $23,850* * Reimbursable expenses are not included in the Total Fee Estimate. The recommended budget for reimbursable costs on this project is $1,325. **We can provide a T&M NTE (Time and Materials Not-to-Exceed) proposal if you wish We believe that this proposal is comprehensive. In our experience the project will follow along a path as we have described. Minor deviations in scope and time should be expected. We will keep you informed as required regarding project scope. 12 of 14 If you have any questions, please do not hesitate to contact me directly. Best regards, InSite Consulting Architects Stephen E. Mar-Pohl, AIA, NCARB President Accepted By: ___________________________ Date: ______________________ Owner 13 of 14 Paul andrew Pyfferoen Architect Paul Andrew Pyfferoen, AIA 435 South Main Street Columbus, Wisconsin 53925 paulandrewpyfferoenaia@gmail.com _____________________________________________________________________________________________ Proposal Form This Proposal is made on: 17 February 2022. Between the Owner: and the Architect: CHLPC c/o City of Columbus Paul A. Pyfferoen, AIA Fireman’s Park Arts and Crafts Rest Haven 435 South Main Street Columbus, WI 53925 Columbus, Wisconsin 53925 I am pleased to have the opportunity to put in a proposal to design an ADA upgrade to the bathrooms which are located within the 1923 Fireman’s Park Arts and Crafts Rest Haven, along with other required updates. I propose a fixed-fee of $3,145.00 (three-thousand one hundred and forty-five dollars). Please find the following detailed proposal for your consideration. Description of Project: It is understood that the project is as follows: Developing “As-Built” drawings for base drawings of Fireman’s Park Arts and Crafts Rest Haven: Creating Construction Documents (Drawings and Specifications) for ADA updates, to both interior and exterior – of the 1923 Fireman’s Park Arts and Crafts Rest Haven. Interior:  Updates to existing toilet rooms: o Re-design/re-configure toilet room/s layout, to facilitate both ADA (Americans with Disability Act) compliance, and functionality for “family-assisted” stalls; o Upgrade plumbing fixtures to be ADA compliant; o Employ long-lived toilet room partitions, which require low levels of maintenance (i.e., stainless- steel materiality); o Remove, salvage, and safely store existing hand dryers for reinstallation;  Design for existing windows (of unknown materials), which are covered, to be exposed; consider methods for keeping glass free from vandalism;  Design considerations for new lighting fixtures (in the style of “Arts and Crafts”) to be implemented in keeping with the original design of the building, and considering methods to keep them free of vandalism;  Design considerations for “Auto-on/Auto-off” lighting fixtures;  Re-design/re-configure existing storage room;  Design considerations for new electrical outlet locations;  Design considerations for ADA (electric powered doors);  Prepare construction documents outlining possible methods to repair: o Great Room Ceiling;  As unknowns occur, there may be miscellaneous items that need to be addressed – and the nature of “unknown”, they are not able to be precisely planned/designed for (i.e. any replacement door that is in poor shape, or wood structure under soffit areas, etc…) 14 of 14 Paul andrew Pyfferoen Architect, LLC Paul Andrew Pyfferoen, AIA 586 River Rd. No. 8 Columbus, Wisconsin 53925 paulandrewpyfferoenaia@gmail.com _____________________________________________________________________________________________ Exterior:  Prepare construction documents outlining possible methods to: o Cleaning and filling of exterior joints between concrete sidewalk and building and design considerations for repairing and painting soffits. Perimeter Wall:  Perimeter Wall repairs (at base/floor) may require the analysis of a professional engineer, as the damage/repairs may need to be exploratory demolition to ascertain what is causing its “heaving”. HVAC design is not included herein; Construction Administration shall be considered an extra cost and will be an hourly rate of $75.00. Site Visits: (2) site visit meetings will be included: excess meetings will be an extra cost of $75.00 per meeting. Staff/City/CHLPC Meetings: (2) meetings will be included: excess meetings will be an extra cost of $75.00 per meeting. Renderings will be included, (3) 24x36 rendered drawings will be included; any additional will be paid for by CHLPC at printer’s cost (BPI Madison). Engineering Services: Shall be anticipated for “Great Room” perimeter, to be hired and selected by CHLPC.

Get email alerts for Columbus

A daily email when new agendas and minutes are posted.

Report an issue with this meeting