Light & Power and Environmental Services Committee
Regular MeetingCulpeper, VA · November 26, 2025
Agenda
Light & Power and Environmental Services
Committee Agenda
Wednesday, November 26, 2025 at 9:30 AM
Economic Development Center, Council Meeting Room
803 South Main Street, Culpeper
Page
1. 1. CALL TO ORDER
By Chairwoman Schmidt
2. PREVIOUS MEETING MINUTES 4-7
For Reference Only - Minutes from October 2025
10-29-2025 LP ES Committee Special.pdf
3. APPROVAL OF AGENDA
Motion to approve or amend the agenda.
4. PUBLIC COMMENTS
Members of the public may address the committee on matters relevant to town
government at this time.
Those who wish to speak are requested to Sign-In at the door.
State your name and address for the record.
Each speaker shall have three (3) minutes and shall comply with the Citizen
Participation Policy.
For groups present, you are requested to have a spokesperson.
Questions should be directed to the Chair.
5. ITEMS REFERRED BY COUNCIL OR INDIVIDUAL MEMBERS
6. SPECIAL ITEMS & PRESENTATIONS
7. LIGHT & POWER ITEMS
Page 1 of 33
7.1 Departmental Activities 8-9
OCTOBER 2025 LP Activities CDH.pdf
7.2 Financial Summary 10 - 13
Copy of LP Financial Summary OCTOBER 2025.pdf UTILITY
REPORT JULY 25 JUNE 2026.pdf YEARLY REVENUE COMPARISON
FY2026.pdf YEARLY VMEA BILLING FY24 FY2025 FY2026 W-KWH
COST - Copy.pdf
8. ENVIRONMENTAL SERVICES ITEMS
8.1 Departmental Activities 14 - 17
Environmental Services Monthly Report for October 2025 111225.pdf
8.2 Financial Summary 18 - 19
WATER AND WASTEWATER FINANCIAL 111325.pdf
8.3 Tap Sales Report 20 - 30
Tap Fee Report 2025-2026 11.11.2025.pdf
8.4 R/R Re: Award of Contract to Stantec for a Reclaim Water 31 - 32
System Rate Study
Motion to approve the award of contract and budget transfer.
8.5 R/R Re: Purchase of Automated Bulk Water Filling Station 33
Motion to approve.
8.6 Designation of Consent Agenda Items
9. TOWN & COUNTY INTERACTION COMMITTEE
9.1 Potential Items for Discussion at Next Interaction Committee
Meeting
10. ADJOURNMENT
Adjournment of Meeting
Committee Members:
Janie Schmidt (Chairwoman), Pranas A. Rimeikis, Jon D. Russell & William M. Yowell
Page 2 of 33
Note: Members of the Town Council who are not members of the committee may be in
attendance at the committee meeting. If so, and if a quorum of council is present, then the
meeting will be a special meeting of council in addition to being a committee meeting, pursuant
to the Virginia Freedom of Information Advisory Council Attorney Opinion, AO-03-14. Only
business matters to be considered are the committee’s recommendations to the council unless
specifically noted in this public notice.
Page 3 of 33
10-29-2025 Light & Power and Environmental Services Committee & Special Council Meeting
9:30 a.m. Economic Development Center, 803 S. Main Street
The purpose of this meeting was to consider Light & Power and Environmental Services Committee
matters; however, members of the Town Council who were not members of the committee were in
attendance and participated in the discussion, resulting in a special meeting of council.
Committee Members Present: Chairwoman Janie Schmidt, Pranas A. Rimeikis, Jon D. Russell, William M.
Yowell
Committee Members Absent: None
Also Present: Frank Reaves Jr., Council Member; Christopher D. Hively, Town Manager; Courtney O.
Strawser, Records Management Specialist; Jim Hoy, Public Services Director; Mike Stover, Director of
Light & Power; Chris Heggan, Assistant Director of Light & Power; Andrew Hopewell, Director of
Planning & Community Development
CALL TO ORDER
Chairwoman Schmidt called the meeting to order at 9:30 a.m.
PREVIOUS MEETING MINUTES
For Reference Only – Minutes from September 2025
There were no changes to the minutes.
APPROVAL OF AGENDA
Mr. Rimeikis moved, Mr. Russell seconded, approval of the agenda as presented. The motion carried by
voice vote.
PUBLIC COMMENTS – None
ITEMS REFERRED BY COUNCIL OR INDIVIDUAL MEMBERS – None
SPECIAL ITEMS & PRESENTATIONS – None
LIGHT & POWER ITEMS
Departmental Activities – The committee received the report.
Financial Summary – The committee received the report.
Discussion Item: Discussion Item: Battery Energy Storage System (BESS) Location
Mr. Stover presented the item, noting that over the past year VMEA had been working on installing two
Battery Energy Storage Systems (BESS), with one site planned in Harrisonburg and the other in
Manassas. Due to issues at the Manassas site, the project was no longer feasible.
VMEA members subsequently reached out to the Town of Culpeper, as the next largest locality capable
of supporting the power load, to install the BESS. The system would be located behind the control house
within the fenced area at the Light & Power facility and consist of three storage containers with
transformers and switchgear, running underground to tie into one of the substation feeder circuits. The
units would operate in conjunction with the Town’s generators.
At this time, VMEA was working with its engineering staff and contractor to evaluate the site for
suitability.
Page 4 of 33
Light & Power and ES Committee
October 29, 2025 – Page 2 of 4
Mr. Hively clarified that this arrangement would allow the Town to receive the same benefits as if the
system were installed in Manassas. He further noted that if Dominion’s power was expected to go down
with 24 hours’ notice, the system could be charged in advance to provide additional power to the Town.
It was the consensus of the committee for staff to proceed with coordinating the installation and
evaluation of the proposed Battery Energy Storage System (BESS) at the Light & Power facility.
R/R Re: Generator Sound Attenuation Project
Mr. Stover presented the report and recommendation stating after discussion and receiving direction
from the Committee, staff requested bids from three companies for the installation of four sound
attenuation plenums on the four generators at Light & Power to reduce the noise as recommended by
the Sound Study.
One bid was received from Carter Machinery for a cost of $123,974. No bids were received from the
other companies.
There are two options available for consideration:
1. Do not proceed with the installation due to the Town’s exemption.
2. Accept the quote from Carter Machinery for material and installation of the four plenums at a
cost of $123,974.
There is no cost associated with Option #1 and a cost of $123,974 for Option #2.
It was recommended that Council approve an FY26 budget transfer of $123,974 from Light & Power
Reserves to expenditure line 50095700-53239, R&M Engines, to cover the cost of the Generator Sound
Attenuation Project.
Mr. Yowell moved, Mr. Russell seconded, approval of the report and recommendation for submission to
council as presented. The motion carried by voice vote.
Designation of Consent Agenda Item – R/R Re: Generator Sound Attenuation Project
ENVIRONMENTAL SERVICES ITEMS
Departmental Activities – The committee received the report.
Mr. Hoy provided an update on the TOC X2A groundwater well at McDevitt Drive and Technology Drive,
noting staff had received approval from the Virginia Department of Health’s Office of Drinking Water to
introduce it into the potable system. He added that staff was testing the SCADA system for remote
control capabilities and anticipated the well would be operational by the end of November.
Mr. Hoy also provided an update on the standing water services agreement with STACK, executed in
August, to provide reclaimed water from the Water Pollution Control Facility for cooling purposes. He
noted the project was approaching 90% design completion for the reclaimed water system, with final
design expected by the end of the week. The full package was anticipated to be submitted to
Department of Environmental Quality (DEQ) for review and approval within the next few weeks.
Mr. Hoy further advised that staff would present a report and recommendation next month for approval
to conduct a rate study for the reclaimed water utility. He noted that a consultant experienced in rate
study development had been identified to help determine a fair and equitable rate.
Page 5 of 33
Light & Power and ES Committee
October 29, 2025 – Page 3 of 4
Lastly, Mr. Hively provided an update on the dam seepage analysis, noting it had been completed with
favorable results and submitted to DEQ for review. He advised the findings would be considered during
next year’s VPDES permit review and would allow an increase in capacity from 1.25 to 2 million gallons
per day.
Financial Summary – The committee received the report.
Tap Sales Report – The committee received the report.
R/R: Reduced Tap Privilege Fees for Existing Structures
Mr. Hopewell presented the report and recommendation stating at the September 24, 2025 Committee,
staff discussed the potential of modifying the Tap Privilege Fee Assessment Policy as it relates to existing
dwellings. At that time, staff identified that there are approximately 50 existing dwellings within the
Town limits and approximately 130 existing dwellings in the County's current Water & Sewer Service
Area that are not connected to public water and/or public sewer. The majority of the Town properties
are situated within developed portions of the Town that do not have water and/or sewer lines in close
enough proximity to make it economically feasible for the property owners to connect to the public
system. The County area is less well developed. There are concerns that as time passes and the public
infrastructure expands, newer constructed homes may become eligible to connect to the public system
and take advantage of a discounted rate.
The current language within the Tap Privilege Fee Assessment Policy would offer these homes a
discount to connect, as the language presently reads:
Existing single-family dwellings with permitted well and/or septic systems may purchase taps at 50% of
the prevailing rate.
Staff believes the original intent of the reduced tap fee was to incentivize existing homes with failing
systems to convert to public provision of water and sewer. After more than 20 years, it is staff's belief
that those properties that wanted and needed to make the transition, have done so and it may now be
time to remove this provision. To this end, there are two potential modifications for consideration.
1. Remove the existing language related to the discount for existing dwellings.
2. Limit the eligibility to dwellings that were eligible when the Settlement Agreement was finalized.
If this option is desired, the language could read:
Single-family dwellings that were already constructed and within Town limits or within the
County Water and Sewer Service Area on March 28, 2012 with permitted well and/or septic
systems may purchase taps at 50% of the prevailing rate.
From an administration and simplicity perspective, staff recommends option #1.
There is presently no anticipated financial impact, however, if additional homes wish to convert in the
future, there would be an increase in revenue in the amount of $8,250 per home (utilizing present tap
fee amounts) as a result of removing the 50% reduction for the conversion of existing homes.
It was recommended that Council remove the existing language within the Tap Privilege Fee Assessment
Policy related to the discount for existing dwellings.
Mr. Russell moved, Mr. Yowell seconded, approval of the report and recommendation for submission to
council as presented. The motion carried by voice vote.
Page 6 of 33
Light & Power and ES Committee
October 29, 2025 – Page 4 of 4
Designation of Consent Agenda Item – R/R: Reduced Tap Privilege Fees for Existing Structures
TOWN & COUNTY INTERACTION COMMITTEE
Potential Items for Discussion at Next Interaction Committee Meeting on January 23, 2026 – None
ADJOURNMENT
The meeting adjourned at 10:16 a.m.
Page 7 of 33
Substations/Generation/Metering
Peak Shaving Summary:
• 2 - Generation runs for the month of October.
• Monthly generation credit: $100,986.82.
Activities:
• Normal maintenance completed on all units: checked all fluid levels, checked for any alarm
codes, and cleaned up any dust and oil seepage.
• Continue cross training of L&P personnel on the generator’s operations.
• Performed visual inspection on Fire Extinguisher’s & Eye Stations.
• Continued mapping of electrical system with GIS department.
• Performed monthly DEQ inspection.
• Performed various Lineman Training (Pole top rescue, forklift, chainsaw & cyber security).
Substation:
• Monthly station inspection was completed.
• Cleaned transformer containment pits and Storm Water retention pond.
• Maintained standby batteries in control house.
• Vegetation management.
• Removed some old trees around part of the substation & planted new ones.
Distribution
Distribution Activities:
• Completed service disconnects for non-payment.
• Tree trimming was completed in various locations around town.
• Overhead and underground line maintenance, upgrade lines, replacing old infrastructure at
Various locations around Town.
• Continue to maintain equipment and fleet.
• Cleaned and organized material yard and buildings.
• Conducted monthly Construction and Safety meetings within our department.
• Disconnected and reconnected house service for upgrades-various locations.
• Continuing electrical infrastructure at Laurel Park.
• Continuing electrical infrastructure at The Greens.
• Pole replacement at (113 Spring St.).
• Continuing traffic control upgrades.
• Mapping & tagging for GIS one- line diagrams.
• Removed two old poles across from (1081 Oaklawn Drive).
• Replaced damaged street light on (James Madison Hwy.).
• Replaced pole & transformer bank at (Chandler & East St.).
• 3 demo services (110, 126, 130 West Williams St.).
• Re-routed primary at (Zeuswyn Drive).
• Installed ballards around transformer at (East Spencer St.) for protection.
• Commissioned new breaker for Laurel Park.
• Re-located transformer at Lightfoot Apartments.
Trouble Calls – Summary:
• 2- Street lights reported out or malfunctioning, repaired.
• 2 -Street lights reported to Dominion Energy and Rappahannock Electric.
• 1- No power – (116 West Chandler St.)-squirrel-refused & removed k-mate.
• 1- Part power – (684 Hunters Rd.)-underground cable fault feeding the pedestal-repaired the
fault & restored power.
Page 8 of 33
• 1- Other – Damaged street light - (James Madison Hwy.)-car accident-removed pole & shut off
street light.
• 1 - No power – (510 South West St.)-stinger wire came out of k-mate-replaced wire & removed
the k-mate.
• 1 – No power – (Bell Avenue)- primary fault-repaired, restored power.
New Services:
• 6- Residential -3304, 3313, 3317, 3324, 3329, 3320 Apricot Drive.
• 0- Commercial
Page 9 of 33
FINANCIAL SUMMARY
OCTOBER 2025
LIGHT & POWER FUND
FY26 FY26 FY25
REVENUES MTD YTD YTD
Sale of Power $ 1,260,443 $ 6,240,934 $ 5,807,873
Utility Fees $ 19,163 $ 75,789 $ 75,675
Service Connection Charges $ 5,500 $ 33,000 $ 330,000
Interest Income $ 18,293 $ 90,235 $ 83,941
Sale of Salvage/Surplus $ - $ 738 $ 723
Time & Material Charges $ - $ 387 $ 855
Pole Permits & Rental Charges $ - $ 75 $ -
Insurance Claims / Recovery $ - $ - $ 25,999
Street Light Recovery $ 34,068 $ 34,068 $ -
TOTAL REVENUE $ 1,337,467 $ 6,475,226 $ 6,325,066
EXPENDITURES FY26 FY26 FY25
MTD YTD YTD
Purchased Power $ 839,036 $ 4,256,361 $ 3,427,664
Salaries & Benefits $ 191,699 $ 856,583 $ 803,859
Services $ 161,290 $ 663,890 $ 704,846
System Improvements $ 15,544 $ 457,928 $ 436,641
Materials & Supplies $ 22,803 $ 80,213 $ 87,273
Other $ 3,239 $ 63,059 $ 71,372
PILOT $ 40,248 $ 160,992 $ 163,984
Debt Service $ - $ 217,359 $ 207,727
TOTAL O&M EXPENDITURES $ 1,273,859 $ 6,756,385 $ 5,903,366
NET SURPLUS (DEFICIT) NOT INCLUDING CAPITAL EXPENSE $ 63,608 $ (281,159) $ 421,700
TOTAL CAPITAL EXPENSE $ 2,301 $ 19,118 $ 28,816
NET SURPLUS (DEFICIT) $ 61,307 $ (300,277) $ 392,884
For informational purposes only - amount of open encumbrances at end of current month $ 937,153
FY26 Begin Bal Net Activites Ending Balance OCTOBER 2025 Activity
L&P CASH & INVESTMENTS $ 9,869,721 $ (354,056) $9,515,665 $ 157,763
L&P Accounts Receivable $ 1,175,866 $ 14,982 $ 1,190,848 $ (163,462)
Outstanding Debt Service Balance $ 1,707,000 $ (195,000) $1,512,000 $ -
CONNECTED SERVICES 6087 PURCHASED KWH $0.0788
NEW SERVICES ADDED 6 SOLD KWH $0.1381
Page 10 of 33
TOWN OF CULPEPER - MONTHLY REVENUE REPORT - October 2025 1
ELECTRIC # CONNECTIONS #CONNECTIONS SERVICES KWH KW-DEM RKVA CONSUMP TOTAL GROSS REV
TYPE BILLED ADDED KWH'S SALES REVENUE REVENUE TAX REVENUES TOTAL PER kWh
Residential (50000) 5299 5275 4,170,368 659,891.63 659,891.63 659,891.63 0.1582
Small General Serv (51000) 676 666 955,367 160,205.20 160,205.20 160,205.20 0.1677
Med Gen Svc(52000) 88 87 1,109,121 122,701.85 24,161.31 146,863.16 146,863.16 0.1324
Large Gen Svc(53000) 9 9 1,357,504 67,420.99 52,645.78 107.45 120,174.22 120,174.22 0.0885
Industrial Power (53100) 1 1 998,400 50,714.80 67,502.40 57.60 118,274.80 118,274.80 0.1185
Time of Use - ON PK (54000) 7 7 223,784 22,688.60 17,534.03 40,222.63 40,222.63 0.1797
Time of USE - OFF PK (54200) 7 7 318,791 3,299.48 3,299.48 3,299.48 0.0103
Traffic Controls (56200) 9,952 623.47 623.47 623.47 0.0626
AMR / Consumption Tax (57000) 11,083.72 11,083.72
TOTALS 6087 6052 0 9,143,287 1,087,546.02 161,843.52 165.05 11,083.72 1,249,554.59 1,260,638.31 0.1367
ADJUSTMENTS AND CONSUMPTION TAX CALCULATIONS:
Prior month adjmts: RES
DOM
Adjusted consumption tax
Consumption tax billing recap
0.00 ROUNDING DIFFERENCE
STREET AND YARD LIGHTS # CONNECTIONS TAXABLE TAXABLE
TYPE #CONNECTIONS BILLED MULT TOTAL KWH KWH UNITS RATE REVENUES
LED (56000) 1203 1,191 30 35,730 8,730 291 15.15 18,043.65
TOTAL ST/YD LTS 1203 1,191 35,730 8,730 291 $18,043.65 18,043.65 0.5050
7,243 13.66
TOTAL ELECTRIC 9,179,017 11,097.38 1,267,598.24 1,278,681.96 $0.1381
ELECTRIC ADJUSTMENTS: SOLAR (500002) 70 70 27,132 ($2,015.14)
1,265,583.10
Page 11 of 33
YEARLY ELECTRIC SALES REVENUE COMPARISON
FISCAL YEAR 2026 FISCAL YEAR 2025
MONTH REVENUE MONTH REVENUE
DIFFERENCE
JULY $ 1,705,907.51 $ 106,780.84 JULY $ 1,599,126.67
AUGUST $ 1,814,142.60 $ 153,271.49 AUGUST $ 1,660,871.11
SEPTEMBER $ 1,465,849.97 $ (2,262.64) SEPTEMBER $ 1,468,112.61
OCTOBER $ 1,267,598.24 $ 169,122.32 OCTOBER $ 1,098,475.92
NOVEMBER $ - $ - NOVEMBER $ 1,026,775.23
DECEMBER $ - $ - DECEMBER $ 1,087,767.03
JANUARY $ - $ - JANUARY $ 1,262,084.37
FEBRUARY $ - $ - FEBRUARY $ 1,369,201.35
MARCH $ - $ - MARCH $ 1,117,765.15
APRIL $ - $ - APRIL $ 1,060,037.52
MAY $ - $ - MAY $ 1,132,035.87
JUNE $ - JUNE $ 1,274,051.75
YTD TOTAL $ 6,253,498.32 $ 426,912.01 YTD TOTAL $ 15,156,304.58
BUDGET $ 17,809,629.00 BUDGET $ 16,594,817.00
BALANCE $ 11,556,130.68 BALANCE $ 1,438,512.42
Page 12 of 33
YEARLY VMEA BILLING FY24 FY2025 FY2026 W-KWH COST - Copy
FISCAL YEAR 2026 EXCESS EXCESS VMEA
MONTH BILLING KWH KW DEMAND CHARGE GEN. CREDIT COST/KWH
JULY $ 1,212,913.74 11,791,495 28,551 $ 113,014.87 $0.10286
AUGUST $ 1,102,539.01 11,249,989 26,859 $ 93,632.84 $0.09800
SEPTEMBER $ 831,594.97 9,751,637 21,374 $ 93,523.46 $0.08528
OCTOBER $ 659,913.85 8,365,828 16,215 $ 100,986.82 $0.07888
NOVEMBER $ - 0 0 $ -
DECEMBER $ - 0 0 $ -
JANUARY $ - 0 0 $ -
FEBRUARY $ - 0 0 $ -
MARCH $ - 0 0 $ -
APRIL $ - 0 0 $ -
MAY $ - 0 0 $ -
JUNE $ - 0 0 $ -
TOTALS $ 3,806,961.57 41,158,949 92,999.00 0.00 $ - $ 401,157.99 0.09249
BUDGET $ 10,726,137.00
FISCAL YEAR 2025 EXCESS EXCESS VMEA
MONTH BILLING KWH KW DEMAND CHARGE GEN. CREDIT COST/KWH
JULY $ 972,069.94 13,252,460 29,292 $ 15,686.73 $0.07335
AUGUST $ 931,851.19 12,225,459 28,547 $ 10,964.45 $0.07622
SEPTEMBER $ 656,514.95 9,025,747 16,946 $ 6,294.25 $0.07274
OCTOBER $ 652,832.70 8,351,341 17,520 $ 8,176.44 $0.07817
NOVEMBER $ 566,771.72 8,203,123 13,483 $ 7,556.98 $0.06909
DECEMBER $ 667,715.08 9,834,511 16,357 $ 11,271.56 $0.06790
JANUARY $ 747,650.71 11,003,924 20,682 $ 16,529.01 $0.06794
FEBRUARY $ 661,101.05 9,015,460 19,604 $ 8,830.81 $0.07333
MARCH $ 604,404.80 8,301,583 14,799 $ 6,238.23 $0.07281
APRIL $ 790,209.28 8,568,325 22,015 $ 22,627.19 $0.09222
MAY $ 819,645.56 9,314,235 21,645 $ 16,266.72 $0.08800
JUNE $ 1,017,465.35 12,084,400 29,261 $ 149,700.22 $0.08420
TOTALS $ 9,088,232.33 119,180,568 250,151.00 0.00 $ - $ 280,142.59 0.07626
BUDGET $ 9,549,455.00
FISCAL YEAR 2024 EXCESS EXCESS VMEA
MONTH BILLING KWH KW DEMAND CHARGE GEN. CREDIT COST/KWH
JULY $ 1,301,263.98 13,104,828 27,788 $ 13,081.62 $0.09930
AUGUST $ 1,182,250.76 12,097,663 23,567 $ 11,679.93 $0.09773
SEPTEMBER $ 1,029,894.79 9,755,704 28,898 $ 8,598.81 $0.10557
OCTOBER $ 775,466.42 8,010,745 19,853 $ 10,221.72 $0.09680
NOVEMBER $ 713,998.62 8,005,707 16,942 $ 13,542.85 $0.08919
DECEMBER $ 747,946.91 8,938,950 16,395 $ 10,029.17 $0.08367
JANUARY $ 826,043.29 9,729,920 19,463 $ 12,406.60 $0.08490
FEBRUARY $ 706,661.00 8,397,775 15,937 $ 7,809.34 $0.08415
MARCH $ 648,527.74 8,021,621 13,079 $ 7,253.11 $0.08085
APRIL $ 714,112.23 7,970,757 21,351 $ 9,811.19 $0.08959
MAY $ 805,430.62 9,543,258 23,967 $ 14,823.46 $0.08440
JUNE $ 822,476.53 11,801,551 23,022 $ 8,292.77 $0.06969
TOTALS $ 10,274,072.89 115,378,479 250,262.00 0.00 $ - $ 127,550.57 0.08905
BUDGET $ 10,731,000.00
Page 13 of 33
ENVIRONMENTAL SERVICES DEPARTMENT COMMITTEE REPORT
OCTOBER 2025
Water Treatment Plant (WTP) Operations Summary:
Water Plant (4.0 MGD Capacity) Oct YTD
Raw Water Treated (MG): 45 443
Average Daily Raw Water Flow (MGD): 1.4 1.5
Max Raw Water Flow (MGD): 1.7 2.8
Water Produced (MG): 45 445
Average Daily Finished Flow (MGD): 1.4 1.5
Max Daily Finished Flow (MGD): 1.8 2.5
Bulk Water Sales (MG): 0.24 5.0
Average pH (su): 7.3 7.5
Average Chlorine (mg/L): 2.1 2.1
Average Turbidity (NTU): 0.05 0.05
Max Average Turbidity (NTU): 0.06 0.06
Partnership Turbidity (95%) (NTU): 0.07 0.07
Chandler Street Wells
Well Water Produced (MG): 14 167
Average Daily Water Produced (MGD): 0.44 0.55
Max Daily Flow (MGD) 0.44 0.74
Rockwater Park Well
Well Water Produced (MG): 0.0 1.5
Average Daily Water Produced (MGD): 0.0 0.01
Max Daily Flow (MGD) 0.0 0.16
Nalles Mills Wells
Well Water Produced (MG): 16 124
Average Daily Water Produced (MGD): 0.52 0.40
Max Daily Flow (MGD) 0.52 0.55
X2A
Well Water Produced (MG): 0.45 0.45
Average Daily Water Produced (MGD): 0.01 0.01
Max Daily Flow (MGD) 0.06 0.06
Sports Complex Well
Well Water Produced (MG): 0.0 0.0
Average Daily Water Produced (MGD): 0.0 0.0
Max Daily Flow (MGD) 0.0 0.0
Total Well Water Produced (MG): 30 262
Total Water Plant Water Produced (MG): 45 400
Page 14 of 33
TOTAL WATER PRODUCED (MG): 75 662
AVERAGE DAILY WATER PRODUCED (MGD): 2.4 2.4
Distribution Positive Bacteria: 0 0
Safety Incidents: 0 0
Regulatory Violations: 0 0
NOTES: Lake Culpeper 30 inches below the overflow as of 11/10/25.
Wastewater Pollution Control Facility (WPCF) Operations Summary:
Wastewater Plant (6.0 MGD Capacity)
OCT YTD
Average Daily Flow (MGD): 2.8 3.3
Max Daily Flow (MGD): 3.5 6.8
Total Flow (MG) 87 987
Rainfall (in): 1.4 30
Centrifuged output (MGD): 0.56 6.2
Centrifuged output (dry metric tons): 55 557
Septage received (gal): 178550 1486707
Bio-solids land applied (wet tons): 480 2496
Average pH (su): 7.5 7.4
Minimum DO (mg/L): 8.2 7.8
Average TSS (mg/L) (QL=1): <QL <QL
Average BOD (mg/L) (Dec – May) (QL=2): --- <QL
Average CBOD (mg/L) (Jun – Nov) (QL=2): <QL <QL
Average Ammonia (mg/L) (QL=0.20): --- <QL
Average TKN (mg/L) (QL=0.50): 0.70 0.65
Average Total Nitrogen (mg/L): 1.3 1.1
Average Total Phosphorus (mg/L): 0.028 0.032
Wastewater discharge violations 0 0
Overflows and Bypasses 0 0
Pre-Treatment Violations: 0 0
WTP Maintenance Summary:
Closed LCA; cleaned paddle boards, canoes, and kayaks
Replaced check valve on pump #2 at HPZ pump station
Painted the new DelPac coagulant room and mounted skid with pumps
Used a floor grinder to clean chlorine room floor and painted with epoxy
Cleaned sludge out of Lagoon A and B
Installed new pond fountain at Yowell Meadow Park
Page 15 of 33
WPCF Maintenance Summary:
Replaced electrical controls and sump pump in the NPW vault with new equipment
Removed failing NPW #2 vertical turbine pump and replaced it with a submersible well pump
Replaced electric motor on drain pump #1
Installed four new electric heaters in sludge building garage to protect the new
centrifuge
Water Distribution Summary:
Cleared/cut utility right of ways and easements
Installed water service tap at 421 Wayland Road
Relocated water meter service for E. Spencer Street Improvement project
UDF performed in the following areas:
Belle Avenue Area
East Business District Area
Northridge Area
Repaired 8” water main break at 118 Elizabeth Street
Installed water service tap at 326 Lesco Blvd
Water utility demos at 110, 126, and 130 W Williams St
Repaired fire hydrant on E. Culpeper Street
Replaced/reprogrammed AMR MTU’s, billing reads, disconnect, etc.
Wastewater Collection Summary:
Installed sewer service tap at 421 Wayland Road
Installed sewer service tap at 151 Saunders Street
Installed sewer service tap at 12518 Sherwood Forest Drive
Installed sewer service tap at 326 Lesco Blvd
Cleared/cut utility right of ways and easements
Sewer jetted troubled areas
Projects Summary:
Water Pollution Control Facility (WPCF) Digester and Headworks Project
WW Associates has completed construction plans and a project manual for the WPCF digester and headworks project.
Staff compiled this information into a bid package and worked with Town procurement to advertise an invitation to
bid for construction of this project on May 25, 2022. A pre-bid meeting was held on June 15, 2022, with prospective
bidders. Construction bids were opened at 2 pm, Thursday, July 14, 2022. Based on the bids received, Council
awarded MEB the project construction contract at their September 13, 2022, meeting. A preconstruction meeting with
MEB was held on November 10, 2022, with a notice to proceed issued on December 1, 2022. The new Alfa Laval
centrifuge was delivered on February 10, 2023 and MEB has been on site multiple times completing pre-construction
surveys. In June 2023, MEB continued mobilization and completed demolition of the RAS pump station and
secondary clarifiers to accommodate retrofit of new aerobic digester equipment in existing basins. From July 2023
through June 2024, MEB continued retrofit of the former secondary clarifiers for conversion to new aerobic digesters,
installed yard piping, converted primary clarifier valves and initiated scope of work for installing new centrifuge. Two
new headworks screens were installed and placed into service in February 2024. Three new blowers were installed for
supplying the new aerobic digesters in April 2024. The new motor control center and programmable logic control
cabinet for the new centrifuge were installed in the biosolids building in May 2024. Acceptance testing and the 30 day
trial run for the new centrifuge has been completed. Installation of groundwater dewatering system for the aerobic
digesters has been completed and is operating. The retrofit of pressure relief valves for the aerobic digesters was
completed in October 2025 allowing performance testing of new aerobic digesters with WPCF biosolids.
Page 16 of 33
Drought Response
Completed distribution system connection for TOC X2A in March 2025—completed VDH sanitary inspection in
August 2025. Completed compliance sampling and analysis in October 2025 for TOC X2A needed for activating
the well for public use. TOC X2A has been released for operation with public water distribution.
Completed bore and jack installation of raw water line for well TOC X4B in February 2025 and installed well
pump in August 2025. Pumping and testing of well TOC X4B started in October 2025 and will continue through
the fall and winter.
Water Pollution Control Facility (WPCF) Reclaim Water System
Following approval by Council, the Town and Stack executed a services agreement in August 2025 for providing
reclaim water from the WPCF to Stack for data center cooling.
Currently, staff is reviewing 90% design plans prepared by Stack’s consultant for the water reclaim system. Once
finalized, the design plans require review and approval by DEQ in accordance with WPCF permit modification
requirements.
Staff has developed a report and recommendation for a rate study for reclaim water services necessary in
determining a fair rate structure. Once approved by Council, staff will retain consulting services to proceed with a
rate study.
O = dissolved oxygen TSS = total suspended solids
BOD = biological oxygen demand; CBOD = chemical biological oxygen demand
TKN = total Kjeldahl nitrogen BNR = biological nutrient removal
MTU = meter transmitting unit RAS = return activated sludge
WAS = waste activated sludge PM = preventive maintenance
IPS = intermediate pump station UDF = unidirectional flushing
VFD = variable frequency drive
Page 17 of 33
FINANCIAL SUMMARY
Oct-25
WATER FUND
REVENUES FY26 FY26 FY25
MTD YTD YTD
Metered Sales $ 393,358 $ 1,587,949 $ 1,513,093
Utility Fees $ 22,544 $ 86,853 $ 91,682
Utility Charges $ 9,289 $ 20,873 $ 12,116
Revenues from Use of Money $ 16,827 $ 81,557 $ 80,624
Miscellaneous $ 1,277 $ 10,809 $ 12,303
TOTAL O&M REVENUE $ 443,296 $ 1,788,042 $ 1,709,817
Tap Fee & Misc Capital Revenue $ 163,655 $ 537,000 $ 846,750
CARES Act Funding / ARPA Funds $ - $ - $ -
TOTAL CAPITAL REVENUE $ 163,655 $ 537,000 $ 846,750
TOTAL REVENUE $ 606,951 $ 2,325,042 $ 2,556,567
EXPENDITURES Water Treatment Water Distribution Water Fund
Dept. 3700 Dept. 3800 TOTAL
FY26 FY26 FY26 FY26 FY26 FY26 FY25
MTD YTD MTD YTD MTD YTD YTD
Personnel $ 85,999 $ 398,930 $ 77,835 $ 348,492 $ 163,835 $ 747,422 $ 666,245
Services $ 136,245 $ 440,522 $ 30,415 $ 91,251 $ 166,660 $ 531,773 $ 483,497
Other Charges $ 43,161 $ 205,476 $ 1,929 $ 10,419 $ 45,090 $ 215,896 $ 193,866
Miscellaneous $ - $ 2,666 $ 424 $ 24,733 $ 424 $ 27,399 $ 24,850
Materials / Supplies $ 23,950 $ 234,604 $ 3,749 $ 22,684 $ 27,699 $ 257,288 $ 278,708
Capital Outlays $ 42,828 $ 53,657 $ 8,008 $ 139,592 $ 50,836 $ 193,249 $ 96,425
CARES Act / ARPA Expenses $ - $ - $ -
PILOT $ 12,600 $ 50,399 $ 48,044
Debt Service $ - $ 48,331 $ 53,011
TOTAL O&M EXPENSES $ 332,183 $ 1,335,855 $ 122,361 $ 637,172 $ 467,144 $ 2,071,757 $ 1,844,647
NET SURPLUS (DEFICIT) EXCLUDING CAPITAL PROJECTS $ 139,807 $ 253,284 $ 711,920
TOTAL CAPITAL PROJECTS EXPENSE $ 10,589 $ 80,313 $ 336,750
NET SURPLUS (DEFICIT) $ 129,218 $ 172,971 $ 375,170
For informational purposes only - amount of open encumbrances at end of current month $ 839,236
FY26 Begin Bal Net Activities Ending Balance Oct 2025 Activity
WATER CASH & CASH INVESTMENTS $ 8,633,768 $ 198,578 $ 8,832,346 $ 224,411
Water Accounts Receivable $ 324,517 $ 44,225 $ 368,742 $ (26,052)
Outstanding Debt Service Balance $ 4,678,000 $ (15,000) $ 4,663,000 $ -
Page 18 of 33
FINANCIAL SUMMARY
Oct-25
WASTEWATER FUND
REVENUES FY26 FY26 FY25
MTD YTD YTD
Metered Sales $ 482,134 $ 1,933,126 $ 1,813,037
Utility Fees $ 31,896 $ 126,961 $ 106,712
Utility Charges $ 13,126 $ 26,227 $ 11,814
Revenues from Use of Money $ 17,446 $ 91,236 $ 86,153
Miscellaneous $ - $ 3,589 $ 3,287
TOTAL O&M REVENUES $ 544,602 $ 2,181,139 $ 2,021,003
Tap Fee & Misc Capital Revenue $ 270,000 $ 625,000 $ 1,315,000
CARES Act Funding / ARPA Funds $ - $ - $ 996,398
TOTAL CAPITAL REVENUE $ 270,000 $ 625,000 $ 2,311,398
TOTAL REVENUE $ 814,602 $ 2,806,139 $ 4,332,401
EXPENDITURES WW Treatment WW Collection Wastewater Fund
Dept. 4700 Dept. 4800 TOTAL
FY26 FY26 FY26 FY26 FY26 FY26 FY25
MTD YTD MTD YTD MTD YTD YTD
Personnel $ 146,223 $ 682,242 $ 46,264 $ 200,024 $ 192,487 $ 882,266 $ 857,476
Services $ 150,447 $ 552,434 $ 4,347 $ 9,181 $ 154,794 $ 561,615 $ 487,734
Other Charges $ 53,234 $ 165,036 $ 1,470 $ 11,505 $ 54,704 $ 176,542 $ 192,703
Miscellaneous $ 545 $ 17,354 $ - $ - $ 545 $ 17,354 $ 17,124
Materials / Supplies $ 82,576 $ 299,169 $ 3,332 $ 21,500 $ 85,907 $ 320,669 $ 171,353
Capital Outlays $ 30,954 $ 563,110 $ 631 $ 1,258 $ 31,585 $ 564,368 $ 115,091
CARES Act / ARPA Expenses $ - $ - $ -
PILOT $ 14,505 $ 58,019 $ 56,464
Debt Service $ - $ 742,250 $ 730,250
TOTAL O&M EXPENSES $ 463,978 $ 2,279,345 $ 56,043 $ 243,469 534,526 $ 3,323,083 $ 2,628,196
NET SURPLUS (DEFICIT) - NOT INCLUDING CAPITAL PROJECTS $ 280,076 $ (516,944) $ 1,704,205
*Note: These amounts to be partially offset by ARPA proceeds on a quarterly basis.
TOTAL CAPITAL PROJECTS $ - $ 216,529 $ 1,163,002
NET SURPLUS (DEFICIT) $ 280,076 $ (733,473) $ 541,203
For informational purposes only - amount of open encumbrances at end of current month $ 1,338,633
FY26 Begin Bal Net Activities Ending Balance Oct 2025 Activity
WASTEWATER CASH & CASH INVESTMENTS $ 10,295,682 $ (997,794) $ 9,297,888 $ 373,381
Wastewater Accounts Receivable $ 476,355 $ 70,553 $ 546,908 $ (15,622)
Outstanding Debt Service Balance $ 10,175,000 $ (545,000) $ 9,630,000 $ -
Page 19 of 33
Water and Wastewater Tap Information
Number Number of
FY25-26 Name of Develpment or of Water Amount Wastewater County
Month Applicant Location Meter Size Taps Due Taps Amount Due (Y/N)
Oct Just Getting By LLC 326 Lesco Blvd 5/8 1 $ 3,250 1 $ 5,000 N
DRB Homes Northern View Rd Lot 6, 27 5/8 2 $ 13,000 2 $ 20,000 Y
Williams Mill - Lots 36, 44-
Shea Homes LP 45, 77, 80-81, 83 5/8 7 $ 45,500 7 $ 70,000 Y
Shea Homes LP Williams Mill clubhouse 2-inch 1 $ 75,000 1 $ 120,000 Y
NVR/Ryan Homes Kite Acres Lot 4, 47, 58 5/8 3 $ 19,500 3 $ 30,000 Y
Richmond American
Homes Greens at Culpeper - Lot 52 5/8 1 $ 6,500 1 $ 10,000 N
DRB Homes Lincoln Circle Pl Lot 18 5/8 1 $ 6,500 1 $ 10,000 Y
Sub Total 16 $ 169,250 16 $ 265,000
Sept NVR/Ryan Homes Kite Acres Lot 6, 46, 51 5/8 3 $ 19,500 3 $ 30,000 Y
Shea Homes LP Williams Mill - Lots 34, 47 5/8 2 $ 13,000 2 $ 20,000 Y
DRB Homes Lincoln Circle Pl Lot 10 5/8 1 $ 6,500 1 $ 10,000 Y
DRB Homes Northern View Rd Lot 22 5/8 1 $ 6,500 1 $ 10,000 Y
Christopher Marner 515 Radio Lane 5/8 1 $ - 1 $ - N
Milagro Martizez 15264 Nalles Mill Road 5/8 -1 $ (3,250) -1 $ (5,000) Y
Sub Total 7 $ 42,250 7 $ 65,000
Aug NVR/Ryan Homes Kite Acres Lot 30, 56-57 5/8 3 $ 19,500 3 $ 30,000 Y
Williams Mill - Lots 37-38,
Shea Homes LP 43, 46, 49-50, 53, 84 5/8 8 $ 52,000 8 $ 80,000 Y
Milagro Martizez 15264 Nalles Mill Road 5/8 1 $ 3,250 1 $ 5,000 Y
Alvaro Sandi 615 Second St 5/8 1 $ 6,500 1 $ 10,000 N
1.5 in
Shea Homes LP Williams Mill - irrigation (2) 2 in. 2 $ 112,500 0 $ - Y
Sub Total 15 $ 193,750 13 $ 125,000
W - 1.5 in
Jul Lifepoint Church 15064 Success Dr S - 1 in. 1 $ 37,500 1 $ 20,000 Y
614 Second St
Just Getting By LLC 616 Second St 5/8 2 $ 13,000 2 $ 20,000 N
SAB Investments LLC 151 Saunders St 5/8 0 $ - 1 $ 5,000 N
NVR/Ryan Homes Willow Shade Lane Lot 8 5/8 1 $ 6,500 1 $ 10,000 Y
Laurel Park Phase 1B2 Lots
NVR/Ryan Homes 162-163, 167, 170, 172 5/8 5 $ 32,500 5 $ 50,000 N
NVR/Ryan Homes Kite Acres Lot 29 5/8 1 $ 6,500 1 $ 10,000 Y
DRB Homes Lincoln Circle Pl Lot 11 5/8 1 $ 6,500 1 $ 10,000 Y
DRB Homes Northern View Rd Lot 21 5/8 1 $ 6,500 1 $ 10,000 Y
Williams Mill - Lots 35, 39,
Shea Homes LP 100 5/8 3 $ 19,500 3 $ 30,000 Y
1 11/11/2025
Page 20 of 33
Water and Wastewater Tap Information
Number Number of
FY25-26 Name of Develpment or of Water Amount Wastewater County
Month Applicant Location Meter Size Taps Due Taps Amount Due (Y/N)
Sub Total 15 $ 128,500 16 $ 165,000
Grand Total 53 $ 533,750 52 $ 620,000
NOTES
July 2025 - Lifepoint Church purchased additional water tap capacity for irrigation
July 2025 - 151 Saunders St already has perviously established water service
August 2025 - 15264 Nalles Mill Road - existing residential property in County (this was subsequently voided and refunded in September 2025)
September 2025 - 515 Radio Lane is a recently split parcel that was previously connected as part of the combined parcel and now seeking connection
directly to water and sewer. No additional tap fee assessed.
2 11/11/2025
Page 21 of 33
FISCAL YEAR SUMMARIES
Fiscal Year Water Wastewater
25-26 Taps Amount Due Taps Amount Due
July Total 15 $ 128,500 16 $ 165,000
August Total 15 $ 193,750 13 $ 125,000
September Total 7 $ 42,250 7 $ 65,000
October Total 16 $ 169,250 16 $ 265,000
November Total
December Total
January Total
February Total
March Total
April Total
May Total
June Total
Fiscal Year 53 $ 533,750 52 $ 620,000
Fiscal Year Water Wastewater
24-25 Taps Amount Due Taps Amount Due
July Total 13 $ 84,500 13 $ 130,000
August Total 61 $ 396,500 61 $ 610,000
September Total 1 $ 3,250 2 $ 15,000
October Total 51 $ 362,500 51 $ 560,000
November Total 11 $ 71,500 12 $ 120,000
December Total 17 $ 179,000 18 $ 290,000
January Total 10 $ 65,000 11 $ 105,000
February Total 5 $ 29,250 4 $ 35,000
March Total 19 $ 123,500 19 $ 190,000
April Total 24 $ 156,000 24 $ 240,000
May Total 29 $ 188,500 29 $ 290,000
June Total 41 $ 266,500 41 $ 410,000
Fiscal Year 282 $ 1,926,000 285 $ 2,995,000
Fiscal Year Water Wastewater
23-24 Taps Amount Due Taps Amount Due
July Total 10 $ 65,000 10 $ 100,000
August Total 24 $ 156,000 24 $ 240,000
September Total 7 $ 42,250 6 $ 55,000
October Total 8 $ 60,500 8 $ 90,250
November Total 15 $ 97,500 15 $ 150,000
December Total 43 $ 279,500 42 $ 420,000
January Total 7 $ 45,500 7 $ 70,000
Page 22 of 33
February Total 17 $ 110,500 17 $ 170,000
March Total 3 $ 16,250 4 $ 30,000
April Total 17 $ 110,500 17 $ 170,000
May Total 6 $ 35,750 6 $ 55,000
June Total 10 $ 65,000 12 $ 110,000
Fiscal Year 167 $ 1,084,250 168 $ 1,660,250
Fiscal Year Water Wastewater
22-23 Taps Amount Due Taps Amount Due
July Total 1 $ 3,250 1 $ 5,000
August Total 1 $ 6,500 2 $ 22,500
September Total 0 $ 46,000 0 $ 40,500
October Total 5 $ 29,250 5 $ 45,000
November Total 2 $ 13,000 1 $ 10,000
December Total 15 $ 91,000 15 $ 140,000
January Total 2 $ 13,150 2 $ 17,500
February Total 6 $ 39,000 6 $ 60,000
March Total 35 $ 227,500 35 $ 350,000
April Total 0 $ - 0 $ -
May Total 5 $ 32,500 5 $ 50,000
June Total 2 $ 9,750 2 $ 15,000
Fiscal Year 74 $ 510,900 74 $ 755,500
Fiscal Year Water Wastewater
21-22 Taps Amount Due Taps Amount Due
July Total 7 $ 45,500 8 $ 80,000
August Total 3 $ 19,500 3 $ 30,000
September Total 3 $ 19,500 3 $ 30,000
October Total 6 $ 56,000 8 $ 95,500
November Total 7 $ 45,500 7 $ 70,000
December Total 8 $ 52,000 8 $ 80,000
January Total 24 $ 120,250 24 $ 185,000
February Total 8 $ 52,000 8 $ 80,000
March Total 12 $ 78,000 12 $ 120,000
April Total 13 $ 61,750 3 $ 30,000
May Total 2 $ 13,000 2 $ 20,000
June Total 12 $ 71,500 7 $ 60,000
Fiscal Year 105 $ 634,500 93 $ 880,500
Fiscal Year Water Wastewater
20-21 Taps Amount Due Taps Amount Due
July Total 8 $ 75,500 9 $ 115,500
August Total 17 $ 107,250 17 $ 165,000
September Total 4 $ 26,000 4 $ 40,000
October Total 2 $ 13,000 2 $ 20,000
November Total 7 $ 42,250 7 $ 65,000
December Total 6 $ 39,000 6 $ 60,000
January Total 2 $ 13,000 2 $ 20,000
February Total 2 $ 13,000 2 $ 20,000
March Total 1 $ 6,500 1 $ 10,000
April Total 0 $ - 1 $ 5,000
May Total 14 $ 45,500 15 $ 75,000
June Total 1 $ 6,500 1 $ 10,000
Page 23 of 33
Fiscal Year 64 $ 387,500 67 $ 605,500
Page 24 of 33
Fiscal Year Water Wastewater
19-20 Taps Amount Due Taps Amount Due
July Total 7 $ 45,500 7 $ 70,000
August Total 5 $ 41,000 5 $ 60,250
September Total 5 $ 56,000 5 $ 70,000
October Total 7 $ 69,000 7 $ 100,500
November Total 3 $ 19,500 3 $ 30,000
December Total 3 $ 19,500 3 $ 30,000
January Total 11 $ 87,000 9 $ 100,250
February Total 9 $ 58,500 9 $ 90,000
March Total 11 $ 71,500 11 $ 110,000
April Total 9 $ 58,500 9 $ 90,000
May Total 36 $ 130,150 35 $ 185,000
June Total 9 $ 58,500 9 $ 90,000
Fiscal Year 115 $ 714,650 112 $ 1,026,000
Fiscal Year Water Wastewater
18-19 Taps Amount Due Taps Amount Due
July Total 10 $ 73,500 10 $ 110,250
August Total 11 $ 71,500 11 $ 110,000
September Total 8 $ 52,000 8 $ 80,000
October Total 14 $ 114,500 13 $ 160,500
November Total 11 $ 71,500 12 $ 115,000
December Total 6 $ 39,000 6 $ 60,000
January Total 5 $ 32,500 6 $ 55,000
February Total 12 $ 78,000 12 $ 120,000
March Total 12 $ 78,000 12 $ 120,000
April Total 15 $ 97,500 15 $ 150,000
May Total 7 $ 45,500 7 $ 70,000
June Total 9 $ 61,900 10 $ 97,500
Fiscal Year 120 $ 815,400 122 $ 1,248,250
Fiscal Year Water Wastewater
17-18 Taps Amount Due Taps Amount Due
July Total 12 $ 78,000 12 $ 120,000
August Total 15 $ 97,500 15 $ 150,000
September Total 5 $ 32,500 5 $ 50,000
October Total 13 $ 84,500 13 $ 400,500
November Total 10 $ 103,500 10 $ 150,750
December Total 10 $ 65,000 9 $ 90,000
January Total 14 $ 91,000 14 $ 140,000
y EVHS Press Boxes 14 $ 91,000 14 $ 140,000
March Total 22 $ 143,000 22 $ 220,000
April Total 8 $ 52,000 8 $ 80,000
May Total 21 $ 139,906 20 $ 200,000
June Total 8 $ 52,000 8 $ 80,000
Fiscal Year 152 $ 1,029,906 150 $ 1,821,250
Page 25 of 33
Fiscal Year Water Wastewater
16-17 Taps Amount Due Taps Amount Due
July Total 6 $ 44,250 5 $ 60,250
August Total 1 $ 6,500 1 $ 10,000
September Total 2 $ 13,000 2 $ 20,000
October Total 3 $ 19,500 3 $ 30,000
November Total 6 $ 39,000 6 $ 60,000
December Total 3 $ 19,500 4 $ 40,000
January Total 9 $ 58,500 10 $ 95,000
February Total 5 $ 37,750 3 $ 30,000
March Total 139 $ 474,500 139 $ 730,000
April Total 5 $ 32,500 5 $ 50,000
May Total 6 $ 39,000 5 $ 50,000
June Total 9 $ 75,500 9 $ 110,500
Fiscal Year Total 194 $ 859,500 192 $ 1,285,750
Fiscal Year Water Wastewater
15-16 Taps Amount Due Taps Amount Due
July Total 12 $ 78,000 12 $ 120,000
August Total 16 $ 104,000 16 $ 160,000
September Total 16 $ 104,000 16 $ 160,000
October Total 12 $ 78,000 12 $ 120,000
November Total 3 $ 19,500 3 $ 30,000
December Total 14 $ 91,000 14 $ 140,000
January Total 11 $ 71,500 11 $ 110,000
February Total 10 $ 65,000 10 $ 100,000
March Total 18 $ 113,750 17 $ 170,000
April Total 6 $ 39,000 5 $ 50,000
May Total 12 $ 78,000 12 $ 120,000
June Total 10 $ 75,218 11 $ 112,500
Fiscal Year Total 140 $ 916,968 139 $ 1,392,500
Fiscal Year Water Amount Due Wastewater Amount Due
July Total 7 $ 48,906 7 $ 72,500
August Total 10 $ 65,000 10 $ 95,000
September Total 13 $ 84,500 13 $ 130,000
October Total 8 $ 52,000 8 $ 80,000
November Total 3 $ 19,500 5 $ 40,000
December Total 9 $ 52,000 9 $ 80,000
January Total 9 $ 58,500 8 $ 80,000
February Total 4 $ 34,500 4 $ 50,250
March Total 8 $ 52,000 8 $ 80,000
April Total 12 $ 78,000 13 $ 125,000
May Total 13 $ 89,750 11 $ 110,000
June Total 10 $ 65,000 10 $ 100,000
Fiscal Year Total 106 $ 699,656 106 $ 1,042,750
Page 26 of 33
Fiscal Year Water Wastewater
13-14 Taps Amount Due Taps Amount Due
July Total 4 $ 26,000 5 $ 45,000
August Total 9 $ 58,500 9 $ 90,000
September Total 8 $ 52,000 8 $ 80,000
October Total 8 $ 60,500 9 $ 95,250
November Total 17 $ 119,156 16 $ 172,750
December Total 9 $ 58,500 9 $ 90,000
January Total 7 $ 45,500 7 $ 70,000
February Total 6 $ 39,000 7 $ 65,000
March Total 24 $ 156,000 23 $ 230,000
April Total 13 $ 84,500 13 $ 130,000
May Total 20 $ 130,000 20 $ 200,000
June Total 8 $ 52,000 8 $ 80,000
Fiscal Year 133 $ 881,656 134 $ 1,348,000
Fiscal Year Water Wastewater
12-13 Taps Amount Due Taps Amount Due
July Total 5 $ 32,500 5 $ 50,000
August Total 7 $ 45,500 7 $ 70,000
September Total 8 $ 45,500 6 $ 60,000
October Total 5 $ 32,500 6 $ 55,000
November Total 11 $ 71,500 11 $ 110,000
December Total 4 $ 26,000 4 $ 40,000
January Total 7 $ 45,500 7 $ 70,000
February Total 4 $ 34,500 3 $ 45,000
March Total 14 $ 91,000 14 $ 140,000
April Total 11 $ 71,500 11 $ 110,000
May Total 19 $ 123,500 21 $ 200,000
June Total 3 $ 19,500 4 $ 35,000
Fiscal Year Total 98 $ 639,000 99 $ 985,000
Fiscal Year Water Wastewater
11-12 Taps Amount Due Taps Amount Due
July Total 4 $ 32,500 3 $ 40,000
August Total 12 $ 78,000 12 $ 120,000
September Total 9 $ 58,500 9 $ 90,000
October Total 8 $ 52,000 8 $ 80,000
November Total 4 $ 26,000 4 $ 40,000
December Total 4 $ 26,000 5 $ 45,000
January Total 3 $ 19,500 3 $ 30,000
February Total 9 $ 58,500 9 $ 90,000
March Total 7 $ 45,500 8 $ 75,000
April Total 6 $ 39,000 6 $ 60,000
May Total 26 $ 169,000 26 $ 260,000
June Total 7 $ 45,500 7 $ 70,000
Fiscal Year Total 99 $ 650,000 100 $ 1,000,000
Page 27 of 33
Fiscal Year Water Wastewater
10-11 Taps Amount Due Taps Amount Due
July Total 3 $ 26,000 3 $ 40,000
August Total 3 $ 26,000 3 $ 40,000
Septenber Total 2 $ 13,000 2 $ 20,000
October Total 0 $ - 0 $ -
November Total 5 $ 29,250 4 $ 40,000
December Total 7 $ 58,500 7 $ 90,000
January Total 4 $ 32,500 4 $ 50,000
February Total 13 $ 97,500 13 $ 150,000
March Total 2 $ 13,000 2 $ 20,000
April Total 6 $ 42,250 6 $ 65,000
May Total 10 $ 110,432 8 $ 90,028
June Total 11 $ 71,500 11 $ 110,000
Fiscal Year Total 66 $ 519,932 63 $ 715,028
Fiscal Year Water Wastewater
09-10 Taps Amount Due Taps Amount Due
July Total 1 $ 9,750 1 $ 15,000
August Total 3 $ 29,250 3 $ 45,000
September Total 0 $ - 0 $ -
October Total 2 $ 13,000 2 $ 20,000
November Total 0 $ - 0 $ -
December Total 4 $ 39,000 4 $ 60,000
January Total 1 $ 6,500 1 $ 10,000
February Total 2 $ 13,000 2 $ 20,000
March Total 8 $ 55,250 8 $ 85,000
April Total 3 $ 19,500 3 $ 30,000
May Total 3 $ 19,500 3 $ 30,000
June Total 7 $ 48,750 8 $ 90,000
Fiscal Year Total 34 $ 253,500 35 $ 405,000
Fiscal Year Water Wastewater
08-09 Taps Amount Due Taps Amount Due
July Total 1 $ 6,500 1 $ 10,000
August Total 2 $ 13,000 1 $ 15,000
September Total 1 $ 6,500 1 $ 10,000
October Total -7 $ (45,500) -7 $ (70,000)
November Total 0 $ - 0 $ -
December Total 0 $ - 0 $ -
January Total 1 $ 6,500 2 $ 15,000
February Total 0 $ - 0 $ -
March Total 0 $ - 0 $ -
April Total 6 $ 39,000 7 $ 70,000
May Total 2 $ 13,000 1 $ 15,000
June Total 1 $ 61,840 1 $ 66,760
Fiscal Year Total 7 $ 100,840 7 $ 131,760
Page 28 of 33
Fiscal Year Water Wastewater
07-08 Taps Amount Due Taps Amount Due
July Total 4 $ 35,750 5 $ 60,000
August Total 14 $ 100,750 14 $ 155,000
September Total 4 $ 47,486 6 $ 61,904
October Total 46 $ 326,670 47 $ 498,380
November Total 3 $ 22,750 4 $ 40,000
December Total 3 $ 19,500 4 $ 40,000
January Total 1 $ (14,670) 1 $ (8,380)
February Total -29 $ (177,710) -29 $ (273,400)
March Total 4 $ 41,618 4 $ 58,352
April Total 4 $ 26,000 5 $ 55,000
May Total 0 $ - 0 $ -
June Total 1 $ 6,500 1 $ 10,000
Fiscal Year 55 $ 434,644 62 $ 696,856
Fiscal Year Water Wastewater
06-07 Taps Amount Due Taps Amount Due
July Total 28 $ 187,750 29 $ 286,500
August Total 30 $ 223,302 30 $ 335,028
September Total 12 $ 99,802 12 $ 148,028
October Total 44 $ 308,750 44 $ 475,000
November Total 14 $ 188,944 14 $ 249,306
December Total 10 $ 77,684 10 $ 116,676
January Total 10 $ 96,236 10 $ 118,704
February Total 10 $ 65,000 10 $ 100,000
March Total 17 $ 120,250 17 $ 185,000
April Total 27 $ 234,722 27 $ 338,408
May Total 39 $ 296,472 40 $ 451,704
June Total 20 $ 159,250 20 $ 236,000
Fiscal Year 261 $ 2,058,162 263 $ 3,040,354
Fiscal Year Water Wastewater
05-06 Taps Amount Due Taps Amount Due
July Total 36 $ 187,500 36 $ 262,500
August Total 49 $ 261,605 49 $ 366,505
September Total 35 $ 256,209 35 $ 347,061
October Total 21 $ 117,500 22 $ 171,500
November Total 46 $ 252,500 46 $ 353,500
December Total 29 $ 130,000 29 $ 161,000
January Total 79 $ 469,130 77 $ 621,380
February Total 13 $ 75,000 14 $ 112,000
March Total 56 $ 415,075 56 $ 552,155
April Total 39 $ 212,500 39 $ 297,500
May Total 61 $ 329,105 62 $ 468,005
June Total 42 $ 235,000 42 $ 329,000
Fiscal Year 506 $ 2,941,124 507 $ 4,042,106
Page 29 of 33
Fiscal Year Water Wastewater
04-05 Taps Amount Due Taps Amount Due
July Total 32 $ 160,000 24 $ 168,000
August Total 40 $ 163,760 23 $ 161,000
September Total 55 $ 275,000 43 $ 301,000
October Total 74 $ 294,500 47 $ 329,000
November Total 37 $ 185,000 37 $ 259,000
December Total 12 $ 60,000 7 $ 49,000
January Total 31 $ 155,000 32 $ 224,000
February Total 12 $ 60,000 12 $ 84,000
March Total 79 $ 408,552 77 $ 552,028
April Total 63 $ 316,605 63 $ 443,505
May Total 48 $ 272,104 47 $ 362,056
June Total 70 $ 262,368 68 $ 363,352
Fiscal Year 553 $ 2,612,889 480 $ 3,295,941
Fiscal Year Water Wastewater
03-04 Taps Amount Due Taps Amount Due
July Total 0 $ - 1 $ 5,000
August Total 10 $ 104,570 9 $ 76,725
September Total 10 $ 65,286 10 $ 75,714
October Total 19 $ 95,000 20 $ 100,000
November Total 22 $ 110,000 22 $ 110,000
December Total 26 $ 130,000 26 $ 130,000
January Total 32 $ 168,210 12 $ 155,000
February Total 15 $ 76,605 84 $ 424,505
March Total 64 $ 460,916 56 $ 432,724
April Total 93 $ 433,240 71 $ 385,000
May Total 46 $ 230,000 47 $ 269,000
June Total 32 $ 160,000 27 $ 189,000
Fiscal Year 369 $ 2,033,827 385 $ 2,352,668
Fiscal Year Water Wastewater
02-03 Taps Amount Due Taps Amount Due
July Total 14 $ 37,240 13 $ 49,920
August Total 16 $ 42,560 16 $ 61,440
September Total 13 $ 37,240 12 $ 46,080
October Total 9 $ 23,940 9 $ 34,560
November Total 16 $ 42,560 17 $ 65,280
December Total 77 $ 204,820 79 $ 303,360
January Total 224 $ 595,840 225 $ 864,000
February Total 72 $ 196,200 73 $ 282,640
March Total 0 $ - 0 $ -
April Total 2 $ 17,368 1 $ 5,000
May Total 0 $ - 0 $ -
June Total 3 $ 15,000 4 $ 20,000
Fiscal Year 446 $ 1,212,768 449 $ 1,732,280
Page 30 of 33
Agenda Item Summary
Committee:
Environmental Services Committee
Title:
R/R Re: Award of Contract to Stantec for a Reclaim Water System Rate Study
Background:
In accordance with the Reclaimed System Design and Construction Water Services Agreement (WSA), the
Town of Culpeper Water Pollution Control Facility (WPCF) will be providing reclaimed water from treated
effluent to the Culpeper Technology Campus (STACK) for use in cooling systems. A rate study is necessary for
determining the cost of providing reclaimed water and determining a fair rate for delivering this new utility
service.
After consulting with other regional water utilities, Town staff has identified Stantec as the most qualified
consultant for performing the reclaimed water rate study. In accordance with the executed WSA, STACK will
reimburse all Town costs associated with the rate study plus an additional 5% to cover Town overhead.
Stantec has provided a proposal for conducting the reclaimed water rate study with a corresponding cost of
$42,375. This Stantec proposal is covered under a Prince William County Service Authority contract and is
rideable by other public agencies. To provide flexibility in the event of a change order, staff is requesting
$50,000 for a total not to exceed cost for this rate study.
Financial Impact:
There is no overall financial impact as the developer will reimburse the cost of the rate study, and a nominal
5% overhead recovery.
Recommendation:
Page 31 of 33
That Council approves the award of contract to Stantec for a not-to-exceed amount of $50,000 to conduct a
reclaimed water system rate study and authorizes the Town Manager to execute the associated contract
documents.
Further, that Council approves an FY26 budget amendment to Wastewater Capital project 09040, Reclaimed
Water Rate Study expenditures of $50,000 and a corresponding budget amendment to Wastewater Capital
revenue line 45561, Developer Contributions of $50,000.
Page 32 of 33
Agenda Item Summary
Committee:
Environmental Services Committee
Title:
R/R Re: Purchase of Automated Bulk Water Filling Station
Background:
The bulk water filling system will be relocated from the Water Treatment Plant to the Water Pollution Control
Facility and replaced with the purchase of an automated system to improve overall safety and security at the
Water Treatment Plant. Although this capital purchase was included in the FY26 Water Treatment operating
budget, it requires an affirmative vote of Council as a new capital asset with a total cost that exceeds $30,000.
Staff assessed three vendors:
1. Flowpoint Environmental Systems Inc. - $66,730.46
2. EleMech - $72,330.00
3. Franklin Miller - $96,932.00
and determined that Flowpoint Environmental Systems, Inc. be selected as the lowest cost
option.
Financial Impact:
The financial impact is $66,730.46 to the FY26 Water Treatment department budget which has adequate
funding.
Recommendation:
That Council approve the purchase of the Flowpoint Environmental Systems Inc. automated bulk
water filling station for $66,730.46, to be funded through the FY26 Water Treatment department budget.
Page 33 of 33