Planning Commission - Work Session
Regular MeetingCulpeper, VA · March 26, 2026
Agenda
Planning Commission - Work Session Agenda
Thursday, March 26, 2026 at 9:00 AM
Economic Development Center, Council Meeting Room
803 South Main Street, Culpeper
Page
1. CALL TO ORDER
2. CALL OF ROLL
3. APPROVAL OF AGENDA
4. APPROVAL OF MINUTES 3
PC Work Jun 29 2023.pdf
2-26-2026 PC WS minutes.pdf
5. UNFINISHED BUSINESS
5.1 Zeuswyn Rezoning
6. DISCUSSION ITEMS
6.1 Capital Improvements Plan 8
FY2027-FY2031 CIP.pdf
6.2 Zoning of Church and Civic Properties 21
The below attachment was added 3/24/2026 at 7:43 am
Church Location Series.pdf
6.3 Comprehensive Plan Update 28
Discussion on Draft Vision Statement
Discussion on Draft Comprehensive Plan Chapters
WORKING DRAFT VISION STATEMENT.pdf
7. OTHER BUSINESS
8. FOLLOW-UP ITEMS
9. PLANNING DIRECTOR DISCUSSION
Page 1 of 28
9.1 April Planning Commission Meetings
10. PLANNING COMMISSIONER DISCUSSION
11. ADJOURNMENT
Page 2 of 28
Minutes
Town of Culpeper Planning Commission
Work Session
June 29, 2023
803 S. Main St., Economic Development Center, Culpeper, VA 22701
Call to Order
Chairman Fitzsimmons called the meeting to order at 9:00 a.m.
Call of Roll
Members Present:
John Cerio
Ian Fitzsimmons
John Flanagan (9:03)
Jeffery Mitchell
Members Absent:
Meaghan Taylor
Staff Present:
Andrew Hopewell, Director of Planning and Community Development
Sandra Puryear, Planning and Zoning Assistant
Pranas Rimeikis, Town Council Member
Other Present:
Steve Plescow, Representative
Jim Treptow, Property Owner
Approval of Agenda
Motion: By Mr. Cerio, to approve the agenda as presented
Seconded: By Mr. Mitchell
Vote: Approved, 3-0, 2 Absent
Approved of Minutes
Motion: By Mr. Cerio to approve as presented
Seconded: By Mr. Mitchell
Vote: Approved, 3-0, 2 Absent
Unfinished Business
None
Discussion Items
REZ-3957-2023 Rezoning of Parcels to Industrial District (M2):
Mr. Fitzsimmons stated his understanding this is a meeting to preview information about
the site and the Commission is not taking any votes todays. Mr. Hopewell stated yes that is
Planning Commission Work Session 1
Minutes – June 29, 2023
Page 3 of 28
correct as the application was previously presented to the Commission. Mr. Hopewell stated
the applicant took the previous feedback and revised their application which is what is
being presented today. Mr. Hopewell stated the applicant will let the applicant go over the
changes they made to the application. Mr. Plescow went over the significant changes to the
application in detail. Mr. Plescow stated the one of the big previous concerns was the
setbacks from the cemetery and the residential areas and they reduced the number of
buildings so they could provide bigger buffers. Mr. Plescow went over the proposed phasing
plan. Mr. Plescow went over the view shed from the cemetery and the proposed use of
vegetative buffering to surround the property. Mr. Plescow went over the proposed cross-
sections. Discussion occurred regarding the type of landscaping being proposed and the
possibility of using a variety of trees. Discussion occurred regarding the power for the
proposed substation and the buildings. Discussion occurred regarding the proposed size of
the buildings to include the footprint and height. Discussion occurred regarding the
proposed noise that could be produced to include the generators and the air handling units.
Mr. Hopewell stated staff is currently reviewing the proposed proffer in reference to the
noise and the applicant is working with staff to best address the noise standards.
Discussion continued regarding appropriate noise levels and when the noise study would be
completed. Mr. Plescow went over the proposed rendering views from several locations to
include the landscaping and berms. Mr. Treptow stated if they were to build the approved
residential use on the property then there would be back yards that are 50’ away from the
neighboring data center. Mr. Treptow stated the proposed data center provides a larger
buffer than the neighboring data center. Mr. Plescow went over the proposed proffer
statement. Mr. Plescow asked the Commission if there were any new issues that may need
to be addressed. Discussion occurred regarding the difference between the Town and
County sound standards. Discussion occurred regarding what the proposed rezoning would
do to the future housing need for the Town. Mr. Fitzsimmons went over a couple of the
citizen’s comments that the Commission has received and it is reasonable to respond to the
comments whether they are ill founded or reasonable. Mr. Hopewell asked about moving the
application to a public hearing next month. Mr. Fitzsimmons stated he does not have any
problem with the application being presented at the next regular meeting.
Other Business
None
Follow Up Items
None
Planning Director Discussion
None
Planning Commissioner Discussion
None
Adjournment - The meeting adjourned at 10:51 am.
_______________________ ______________________________
Date Chairman
Planning Commission Work Session 2
Minutes – June 29, 2023
Page 4 of 28
Minutes
Town of Culpeper Planning Commission
Work Session
February 26, 2026
803 S. Main St., Economic Development Center, Culpeper, VA 22701
Call to Order
Mr. Clements called the meeting to order at 9:00 am
Call of Roll
Members Present:
John Cerio
James Clements
Ian Fitzsimmons
Janie Schmidt
Members Absent:
John Flanagan
Others Present:
Al Caldwell, on behalf of Zeuswyn Properties, LLC
Staff Present:
Andrew Hopewell, Director of Planning and Community Development
Kelli Carmichael, Planning and Zoning Assistant
Approval of Agenda
Motion: By Mr. Fitzsimmons, to amend the agenda with the following items:
strike the approval of the June 2023 minutes from the agenda as
there are not a sufficient number of members at today’s meeting
that were present during that meeting to approve the minutes
retroactively,
add the Zeuswyn Rezoning Case REZ-6265-2026 discussion to
Unfinished Business
Seconded: By Ms. Schmidt
Vote: Approved 4-0, 1 Absent
Approval of Minutes
Motion: By Ms. Schmidt, to approve the February 17, 2026 minutes as
presented
Seconded: By Mr. Fitzsimmons
Vote: Approved 4-0, 1 Absent
Comments and Correspondence from Citizens, Visitors and Delegations in the
Audience on Items Not Scheduled for Public Hearing.
None.
Unfinished Business
Case REZ-6265-2026: Mr. Clements opened discussion amongst the Commissioners.
Planning Commission Work Session 1
Minutes – February 26, 2026
Page 5 of 28
Mr. Cerio expressed concerns with the current condition of Zeuswyn Drive.
Mr. Fitzsimmons expressed his position in favor of the rezoning request in noting that the
property’s positioning on the edge of Town along route 29 and business route 15, makes it
less disruptive to the Town’s transportation in terms of access to visitors coming off of route
29 and business route 15.
Ms. Schmidt expressed her agreement with Mr. Fitzsimmons’ points in favor of the rezoning
request.
Mr. Clements noted the following findings of fact:
The property is located along a major arterial outside of the downtown;
The property is identified as “General Commercial Mixed Use” on the future land-use
map and because of other development in that area more commercial services are
needed in this area;
By increasing housing on the southside of town and concentrating commercial on the
north end of town, we are increasing pressure on our two-lane Main Street
bottleneck;
The applicant requested a change to mixed use zoning. Our concerns were about
residential development and our solution may turn out now not to be one;
Many neighbors have voiced opposition to this project;
This request occurred outside of the timeline parameters of the UDO process and
had it been included originally; we would have had this discussion before the new
zoning map went to Town Council;
The size of this property is much larger than any of the other properties we discussed
during the UDO process and it is unique in that way;
The impacts of an unconditional rezoning are significant;
The potential cost to taxpayers of a rezoning without any mitigation are also
significant, especially as it relates to high density residential.
Mr. Clements expressed his opposition of an unconditioned rezoning of the property.
Discussion ensued.
Motion: By Mr. Cerio, to recommend denial of the rezoning request
There was no second.
With the Commission unable to come to a recommendation in light of public opposition, Mr.
Hopewell suggested canceling the March 10th public hearing before Town Council to allow
Mr. Caldwell the opportunity to provide proffered conditions with his request to mitigate the
potential of some of the expressed anticipated impacts, should they wish to do so. Mr.
Caldwell agreed to cancel the March 10th public hearing to meet with Staff on this topic. Mr.
Hopewell will provide an update at the regular meeting of his conversations with the
Applicant.
Discussion Items
Comprehensive Plan Update: Mr. Hopewell presented a draft timeline to the Commission.
The Commission held discussion and drafted a vision statement. Mr. Hopewell will email
the Commissioners the draft for them to make edits to discuss during next month’s work
session.
Planning Commission Work Session 2
Minutes – February 26, 2026
Page 6 of 28
Other Business
None.
Follow Up Items
None.
Planning Director Discussion
Staff will meet with the Applicant for the rezoning Case-REZ-6265-2026 and bring the results
to the Planning Commission as next month’s work session.
At next month’s regular meeting, Staff will provide an update on the decisions from the
General Assembly that impact the UDO. At that time, Staff requests that the Commission be
prepared to initiate an amendment to the UDO regarding those changes.
Planning Commissioner Discussion
Mr. Fitzsimmons expressed his pleasure working with his fellow Commissioners.
Mr. Clements raised the potential of revisiting the church properties that were given the “NX-
Neighborhood Mixed Use” designation to determine if that designation is still fitting.
Mr. Clements inquired about the deadline to express a desire to attend the VA APA Conference
this summer. Mr. Hopewell noted that registration is not yet open, however if a Commissioner
wishes to attend, they can tell Staff at any time.
Adjournment - The meeting adjourned at 11:11 am
_______________________ ______________________________
Date Chairman
Planning Commission Work Session 3
Minutes – February 26, 2026
Page 7 of 28
Capital Improvements Program
Town of Culpeper
FY 2027-2031
May __, 2026
1
Page 8 of 28
2
Page 9 of 28
Contents
Acknowledgements................................................................................................................................................................. 4
Introduction ............................................................................................................................................................................. 5
Projects ................................................................................................................................................................................... 7
Funding Sources ...................................................................................................................................................................... 7
Individual Project Details ........................................................................................................................................................ 8
Police Building ..................................................................................................................................................................... 8
Madison Road Connector Trail ........................................................................................................................................... 9
Yowell Meadow Park Multipurpose Courts ...................................................................................................................... 10
Lakeview Park ................................................................................................................................................................... 11
Salt & Abrasives Storage Building ..................................................................................................................................... 12
Proffered Cash Payments Received ...................................................................................................................................... 13
3
Page 10 of 28
Acknowledgements
Planning Commission
James Clements, Chairman
John Cerio
Ian Fitzsimmons
John Flanagan
N. Janie Schmidt
Town Council
Frank Reaves, Jr., Mayor
Joe M. Short, Vice Mayor
Jamie Dyke
Michael Olinger
Pranas A. Rimeikis
Jon Russell
N. Janie Schmidt
Max Sternberg
William M. Yowell
The development of the Capital Improvements Program is a function of the Planning Commission and the Department of
Planning & Community Development, with the valuable assistance of the following senior staff:
Christopher D. Hively, Town Manager
Jim Hoy, Director of Public Services
Howard Kartel, Director of Finance/Treasurer
Mike Stover, Director of Light & Power
Tonya Estes, Director of Information Technology
Paige Read, Director of Tourism & Economic Development
4
Page 11 of 28
Introduction
Purpose of the Capital Improvements Program
The Capital Improvements Program (CIP) is a formal means by which to recognize the need for capital projects in the
community and to provide a realistic means to pay for these projects. A good capital improvements program will
maintain and improve our living and working environments and the quality of life that is so important to the Culpeper
community.
Pursuant to § 15.2-2239 of the Code of Virginia, the planning commission is tasked with annually preparing a CIP based
on the Town’s Comprehensive Plan for a period not to exceed five years. The capital improvement program shall include
the commission's recommendations, and estimates of cost of the facilities and life cycle costs, including any road
improvement and any transportation improvement the locality chooses to include in its capital improvement program
and as provided for in the comprehensive plan, and the means of financing them, to be undertaken in the ensuing fiscal
year and in a period not to exceed the next four years, as the basis of the capital budget for the locality. The CIP is
intended to improve and expand the Town’s stock of public facilities such as roads, bridges, parks, water and sewer
facilities, and electric utility systems. It provides a mechanism for:
Estimating capital requirements;
Planning, scheduling, and implementing projects during a fixed period;
Developing revenue policy for proposed improvements;
Budgeting high-priority projects;
Coordinating the activities of various departments in meeting project schedules;
Monitoring and evaluating the progress of capital projects; and
Informing the public of projected capital improvements.
The Capital Budget
The first year of the CIP is called the capital budget. The capital budget may be incorporated into the community’s overall
annual operating budget. In this case, the capital budget serves as the link between the CIP, the annual budget, and
appropriations process. Following review by the Planning Commission, Town Council has historically incorporated Year
One of the capital budget into the annual budget.
Annual CIP Review and Update
The CIP should be reviewed and updated every year to reflect changing priorities, unexpected events, unique
opportunities, cost changes, or alternative financing strategies. Existing CIP projects should be reevaluated in the event
of Comprehensive Plan updates and amendments.
Proffers
Section 15.2-2298 of the Code of Virginia requires that “No proffer shall be accepted by a locality unless it has adopted
a capital improvement program.” The Statute also prevents the transfer of property or acceptance of cash for a specific
project until the subject project is included in the CIP. Culpeper County rather than the Town of Culpeper provide certain
public facilities. In instances related to proffers for these facilities, the Town would serve as a pass through. As it would
be inappropriate for the Town to incorporate County projects within its CIP, it is assumed that for the purpose of
determination of “reasonable conditions”, the most recently adopted County CIP would be utilized in conjunction with
the Town’s CIP.
Financing Capital Projects
The Town of Culpeper provides funding for capital projects through a combination of long-term borrowing and the use
5
Page 12 of 28
of annual operating funds (or reserves). The operating budgets in the General Fund (a non-capital fund typically used
to finance operations and maintenance functions) and Utility Fund (Water Fund, Wastewater Fund, and Light and Power
Fund) annually include funding for the replacement of equipment and purchase of new equipment. These are used by
Town functions (Light and Power, Water, and Wastewater) which operate as enterprise funds (which utilize user fees
and are largely self-sustaining). In the utility operations budget, funding is also annually provided for recurring repairs
and minor replacement projects. However, for larger non-recurring projects, the capital budget and the 5-Year CIP are
the means used to identify project needs, establish priorities, and earmark funding for needed capital improvements.
6
Page 13 of 28
Projects
2027 2028 2029 2030 2031 Project Total
Police Building 0 0 1,000,000 0 0 1,000,000
Madison Road Connector Trail 0 0 0 325,000 1,050,000 1,375,000
Yowell Meadow Park Multipurpose Courts 0 0 0 87,500 360,000 447,500
Lakeview Park 0 0 0 0 2,100,000 2,100,000
Salt and Abrasives Storage Building Replacement 0 0 0 0 750,000 750,000
Annual Totals: 0 0 1,000,000 412,500 4,260,000 TOTAL:
5,672,500
Funding Sources
Category
2027 2028 2029 2030 2031 Total
General Fund 0 0 0 27,500 0 27,500
State and/or Federal Funding 0 0 0 0 0 0
Private Grants/Proffers 0 0 0 50,000 25,000 75,000
To Be Determined 0 0 1,000,000 335,000 4,235,000 5,570,000
Annual Totals: 0 0 1,000,000 412,500 4,260,000 TOTAL:
5,672,500
7
Page 14 of 28
Individual Project Details
Police Building
Type: Improvement
Department: Police
Contact: Police Chief
Useful Life: 25 years
Project Description:
Well-designed and properly sized police facilities enable staff to perform their duties efficiently, effectively, and securely.
As a facility ages, it may no longer meet the needs of an evolving department, thus, negatively affecting morale,
efficiency, safety, security, technology, and overall delivery of police services. When inadequate conditions occur,
agencies search for alternatives. Typical remedies include expanding or renovating the existing facility, adaptively
repurposing an existing non-police facility, or building an entirely new facility.
As the Town has grown in recent years, the operational staff of the Town’s Police Department (PD) has grown, however,
the physical space housing them has not. Additionally, calls for service are anticipated to continue to grow for the
foreseeable future as the population in the Town and more significantly Town environs increases. This anticipated
increase in calls for service are anticipated to require additional staff and resources to meet the need. In order to ensure
that PD is able to continue to provide the utmost safety and service to the community, it is necessary to ensure that their
space has the capacity to support their various functions for the Town.
The Town contracted with a consultant to assess the existing challenges experienced by the PD at their current facility
and provide potential future options for additions, renovations and/or a replacement building on Town owned property.
This report is anticipated to be released in the latter part of FY26, and will allow the Town to determine the optimal
course forward to accommodate PD’s growing space needs. Design is tentatively scheduled for FY29 with construction
to come thereafter. Costs will be added in subsequent CIPs as better estimates are known.
Comprehensive Plan Conformity:
The Comprehensive Plan’s Goals specifically identify the need to increase police protection as the population grows (pg.
16). This public service goal is reiterated in the Transportation & Public Facilities Chapter (pgs. 94 & 104).
Expenditures 2027 2028 2029 2030 2031 Total
Planning/Design 0 0 1,000,000 0 0 1,000,000
Construction 0 0 0 0 0 0
Annual Totals: 0 0 1,000,000 0 0 1,000,000
Funding Sources 2026 2027 2028 2029 2030 Total
To Be Determined 0 0 1,000,000 0 0 1,000,000
0 0 1,000,000 0 0 1,000,000
Operating costs will depend upon the specifics of the facility proposed.
8
Page 15 of 28
Madison Road Connector Trail
Type: Improvement
Department: Planning
Contact: Planning Director
Useful Life: 25 years
Project Description:
The MRC Trail will serve as a connector trail, linking the Town’s two
largest open space parks: Rockwater and Yowell Meadow. The 19.867
acres plus trail easement have been deeded as open space, in an effort
to preserve the urban forest environment, naturally afforded by the
existing landscape.
FY25
- For Planning and Engineering the ADA Path for the property and
easement, both Phase 1 and Phase 2
- For construction of the MRC Trail Path Phase 1, including the safety
structure to be constructed over the trail easement portion of the
path.
Comprehensive Plan Conformity:
The Sidewalks, Bikeways, and Trails Master Plan was adopted in 2007. The plan identifies locations for future sidewalks,
bike lanes, and trails throughout the town. In 2012, staff developed a Culpeper Greenway Network Plan along with design
guidelines for implementing a comprehensive multi-use trail system throughout the Town.
Comprehensive Plan Consistency:
Page 96 - Pursue opportunities to acquire funds, grants or other resources for the completion of local projects.
Page 104 - Support new growth with adequate increases in public services and facilities including police protection, sewer,
and water.
Expenditures 2027 2028 2029 2030 2031 Total
Planning/Design 0 0 0 325,000 0 325,000
Construction 0 0 0 0 1,050,000 1,050,000
Annual Totals: 0 0 0 325,000 1,050,000 1,375,000
Funding Sources 2027 2028 2029 2030 2031 Total
State and/or
Federal 0 0 0 0 0 0
Private
Grants/Proffers 0 0 0 50,000 25,000 75,000
General Fund 0 0 0 0 0 0
To Be Determined 0 0 0 275,000 1,025,000 1,300,000
0 0 0 325,000 1,050,000 1,375,000
Operating costs are estimated to be approximately $8,000 per year.
9
Page 16 of 28
Yowell Meadow Park Multipurpose Courts
Type: Improvement
Department: Planning
Contact: Planning Director
Useful Life: 25 years
Project Description:
The Town of Culpeper is committed to expanding
recreational opportunities that meet the evolving interests
of its residents. This project proposes the construction of
two multipurpose courts in Yowell Meadow Park,
strategically located adjacent to the existing basketball
courts. These versatile courts will support a variety of fast-
growing and inclusive sports such as futsal, pickleball, and small-sided basketball.
Futsal, a fast-paced, five-a-side form of soccer, is one of the nation’s fastest-growing sports and provides a dynamic,
space-efficient activity for all ages. Pickleball, a paddle sport that blends elements of tennis, badminton, and ping pong,
has rapidly become one of the most popular recreational activities across all age groups.
The courts will be designed with sport-specific lining to accommodate multiple uses, allowing for seamless transitions
between futsal, pickleball, and other court-based activities. Located in the heart of Culpeper, Yowell Meadow Park offers
ample existing parking and pedestrian access, making it an ideal and accessible site for this new recreational amenity.
This investment not only promotes active lifestyles but also enhances the park’s role as a vibrant gathering place for the
community.
FY27
- Preliminary engineering and permitting
- Public works site preparation
FY28
- Installation by a national futsal construction firm
Comprehensive Plan Conformity:
The Comprehensive Plan recognizes the need for more recreational opportunities within Town, as demonstrated
through the following Parks & Recreation Recommendations (page 130):
#3 – “…provide coordinated and diverse recreation opportunities for Town citizens…”
#5 – “Encourage both passive and active recreation within each park for the overall enjoyment of our residents.”
Expenditures 2027 2028 2029 2030 2031 Total
Planning/Design 0 0 0 27,500 0 27,500
Construction 0 0 0 60,000 360,000 420,000
Annual Totals: 0 0 0 87,500 360,000 447,500
Funding Sources 2027 2028 2029 2030 2031 Total
General Fund 0 0 0 27,500 0 0
To Be Determined 0 0 0 60,000 360,000 447,500
0 0 0 87,500 360,000 447,500
Operating costs estimated at approximately $4,500 per year.
10
Page 17 of 28
Lakeview Park
Type: Improvement
Department: Planning
Contact: Planning Director
Useful Life: 25 years
Project Description:
Potential recreation space has been created with the
completed construction of Lake Pelham Dam. The
property is Town owned near the boat access to Lake
Pelham that adjoins the Lakeview Subdivision.
Additionally, the Lakeview Connector Trail connects
this property to Yowell Meadow Park. These factors
present an opportunity to construct a public park on
this property. The Parks and Recreation Commission
will continue conceptual planning for the park in FY
2026. FY 2027 funding is identified for professional
engineering services to design and engineer a park site plan. FY 2028 funding is proposed for the construction of a park
at this location.
Comprehensive Plan Conformity:
The Comprehensive Plan recognizes the need for more public parks throughout town, particularly community and
neighborhood type parks. This size park fits the category of a neighborhood or community park. The park would tie into
the trail from the Redwood Lakes subdivision. Additionally, adding this park to one side of the Lakeview Connector Trail
will reinforce trail network by connecting two parks.
Additional references can be found on:
Page 126 - Provide quality parks.
Page 126 - Protect natural resources including air and water quality.
Page 126 - Encourage connectivity in new and existing developments.
Expenditures 2027 2028 2029 2030 2031 Total
Planning/Design 0 0 0 0 510,000 510,000
Construction 0 0 0 0 1,590,000 1,590,000
Annual Totals: 0 0 0 0 0 2,100,000
Funding Sources 2027 2028 2029 2030 2031 Total
To Be Determined 0 0 0 0 2,100,000 2,100,000
0 0 0 0 2,100,000 2,100,000
Operating costs are estimated at approximately $21,000 per year.
11
Page 18 of 28
Salt & Abrasives Storage Building
Type: Improvement
Department: Public Works
Contact: Public Works Director
Useful Life: 25 years
Project Description:
The existing salt and abrasives storage building has deteriorated and is need of replacement. However, the Town is using
a Culpeper County storage facility in the meantime before the existing building can be replaced. The current structure is
constructed with block with a wooden roofing system. The chemicals stored in the structure have corroded and
deteriorated the mortar and reinforcing steel holding the walls together. This deterioration has caused the wall to fracture
horizontally allowing the internal weight of the chemicals to push the walls outward. The integrity of the blocks has been
compromised so severely that repair of the structure would be more costly than replacement.
Comprehensive Plan Conformity:
The Comprehensive Plan has the following references:
Page 106 - Continue to operate its utilities in a timely and efficient manner, and offer competitive rates with the industry
standards.
Page 106 - Lead by example in provisions of high-quality well maintained green spaces and public facilities.
Expenditures 2027 2028 2029 2030 2031 Total
Construction 0 0 0 0 750,000 750,000
Annual Totals: 0 0 0 0 750,000 750,000
Funding Sources 2027 2028 2029 2030 2031 Total
General Fund 0 0 0 0 750,000 750,000
0 0 0 0 750,000 750,000
Operating costs are estimated at approximately $7,500 per year.
12
Page 19 of 28
Proffered Cash Payments Received
Fiscal Year 2025 Proffered Cash Payments Received (as required by VA Code § 15.2-2303.2.B):
Culpeper County Public Schools $244,305.65
Culpeper County Volunteer Fire Company $18,461.79
Culpeper County Rescue Company $12,308.01
Culpeper County Library $12,308.01
Town of Culpeper Parks, Recreation & Open Space $27,915.42
Town of Culpeper Police $18,461.79
Total Dollar Amount Received $333,760.67
13
Page 20 of 28
Page 21 of 28
Page 22 of 28
Page 23 of 28
Page 24 of 28
Page 25 of 28
Page 26 of 28
Page 27 of 28
WORKING DRAFT VISION STATEMENT
Rooted in a rich past and distinctive character, the Town of Culpeper thoughtfully
promotes opportunity, creativity, and a diverse local economy while serving vibrant,
walkable neighborhoods – the heart of the region’s educational, cultural and
environmental resources.
We request that you review the draft statement, identify any words or phrases that you
have concern with, along with a synonym or replacement phrase for us to discuss at the
March Planning Commission work session.
Page 28 of 28