City Council
Regular MeetingDanbury, CT · October 2, 2018
Minutes
CITY COUNCIL MEETING
October 2, 2018
Honorable Mayor, Mark D. Boughton, called the meeting to order at 7:33 p.m. in the Council Chambers.
PLEDGE OF ALLEGIANCE & PRAYER
The Pledge of Allegiance was led by Sean Hatch. Councilman DiGilio led all in prayer.
ROLL CALL:
COUNCIL MEMBERS PRESENT: Philip Curran, Mike Esposito, Warren Levy, Robert Taborsak,
Andrew Wetmore, Irving Fox, John Priola, Vinny DiGilio, Joseph Cavo, Thomas Saadi, Elmer Palma,
John Arconti, John Esposito, Duane Perkins, Ben Chianese, Paul Rotello, and Nancy Cammisa.
COUNCIL MEMBERS ABSENT: Councilman Bennett is away on a family matter; Councilwoman Stanley
is attending a business function; Councilman Visconti is on vacation; and Councilman Scozzafava is at a
Birthday function.
PRESENT: 17, ABSENT: 4
ALSO PRESENT: Robert J. Yamin, Corporation Counsel; Les Pinter, Deputy Corporation Counsel;
David St. Hilaire, Director of Finance; and Jean Natale, Legislative Assistant.
PUBLIC SPEAKING
Andrea Gartner, 112 Deerhill Avenue, Danbury, recommended Sidney Almeida for Zoning Commissioner
Alternate, Agenda Item 4.
ANNOUNCEMENTS
Mayor Boughton made the announcements for the month of October.
MINUTES - Minutes of the Council Meeting held September 5, 2018
A motion was made by Councilman Cavo, and was seconded by Councilman Perkins, to waive the reading
and accept the minutes, as all members have copies and copies are available for review in the office of the
Legislative Assistant. The motion carried unanimously.
CONSENT CALENDAR:
2. COMMUNICATION – Appointment to the Richter Park Authority
Receive the communication and confirm the appointment of Judith Griemsmann to serve as a member of
the Richter Park Authority with a term to expire July 1, 2021.
3. COMMUNICATION – Danbury Train Station Lease Proposed Budget
Receive the communication and adopt the proposed 2018-2019 Danbury Train Station Lease Proposed
Budget as presented.
6. RESOLUTION – State Opioid Grant
Receive the communication and adopt the Resolution authorizing Mayor Mark D. Boughton, or
Lisa Morrissey, Director of Health, as his designee, to apply for and accept grant funding from the State
of Connecticut Department of Mental Health and Addiction Services through its "Connecticut State
Opioid Response Grant Program in an amount not to exceed $150,000 over a two-year period, no local
match is required.
7. RESOLUTION – AFDO (Association of Food and Drug Officials) Grant
Receive the communication and adopt the Resolution authorizing Mayor Mark D. Boughton, or Lisa
Morrissey, Director of Health, as his designee, to apply for and accept grant funding from the Association
of Food and Drug Officials through the Food and Drug Administration to assist with Retail Food
Regulatory Programs, this funding request not to exceed $20,000.00 requires no local match.
8. RESOLUTION – Lead Poisoning Prevention
Receive the communication and adopt the Resolution authorizing Mayor Mark D. Boughton, or
Lisa Morrissey, Director of Health, as his designee, to apply for and accept grant funding from the State
of Connecticut Department of Public Health through its "Lead, Radon, and Healthy Homes Program" in
an amount not to exceed $24,999 to be expended between 9/30/18- 9/29/19, no local match is required.
9. REPORT – Sidewalk Easement – 40 Old Ridgebury Road
Receive the Report and accept the Sidewalk Easement request for 40 Old Ridgebury Road for portions of
the sidewalk along Old Ridgebury Road not located within the City of Danbury road right-of-way,
subject to the legal documents being acceptable in form and content to the Office of Corporation
Counsel.
10. REPORTS - Extension of Water and Sewer - Great Plain Road and Great Meadow Road
Receive the Report and approve the time extensions for the request of Sanitary Sewer and Water
Extensions for Great Plain Road and Great Meadow Road subject to meeting all of the conditions in the
original documents approved by the City Council on June 6, 2017.
11. REPORTS – Sewer Extension – 48 East Gate Road
Receive the Report and approve the request for Sewer Extension for 48 East Gate Road (Tax Assessor’s
Lot No. F08071), subject to the City’s standard eight (8) steps/conditions.
12. REPORTS – Water Extension – 120 & 128 Osborne Street and 9 & 17A Cleveland Street
Receive the Report and approve the request for water main extension for 120 & 128 Osborne Street, 9 &
17 A Cleveland Street (Tax Assessor’s Lots No. J12093, J12093-1, J12115, J12237), subject to the City’s
standard eight (8), steps/conditions.
A motion was made by Mayor Boughton, to accept the Consent Calendar. The motion carried
unanimously.
1. COMMUNICATION – Collective Bargaining Agreement – City of Danbury and Police Union, July 1,
2017 to June 30, 2020
Director of Finance St. Hilaire and Mayor Boughton responded to Councilman Rotello's questions regarding
increases borne by employees and the control of the pension by the Pension Board.
A motion was made by Councilman Wetmore, and was seconded, to receive the communication and
approve the extension of the collective bargaining agreement between the City and the Police Union for July
1, 2017 through June 30, 2021 as presented. (Note Director of Finance St. Hilaire has provided an
accompanying Memorandum of Certification.) The motion carried unanimously.
2. COMMUNICATION – Appointment to the Richter Park Authority
*CONSENTED - as received.
3. COMMUNICATION – Danbury Train Station Lease Proposed Budget
*CONSENTED - as received.
4. COMMUNICATION – Appointment - Zoning Commission Alternate
A motion was made by Councilman Cavo, and was seconded by Councilman Saadi, to confirm the
appointment of Sidney Almeida to serve as an Alternate on the Zoning Commission, for a position previously
held by Zachary Eriquez to fill out the remainder of his term. The motion carried unanimously.
5. COMMUNICATION – Application for Sewer and Water – 1 & 2 Kevin Drive – Traditional Homes
A motion was made by Councilman Arconti, to receive the communication and refer to the City Engineer
and Planning Commission for reports. Hearing no objections, Mayor Boughton so ordered.
6. RESOLUTION – State Opioid Grant
*CONSENTED - as received.
7. RESOLUTION – AFDO (Association of Good and Drug Officials) Grant
*CONSENTED - as received.
8. RESOLUTION – Lead Poisoning Prevention
*CONSENTED - as received.
9. REPORT – Sidewalk Easement – 40 Old Ridgebury Road
*CONSENTED - as received.
10. REPORTS - Extension of Water and Sewer - Great Plain Road and Great Meadow Road
*CONSENTED - as received.
11. REPORTS – Sewer Extension – 48 East Gate Road
*CONSENTED - as received.
12. REPORTS – Water Extension – 120 & 128 Osborne Street and 9 & 17A Cleveland St.
*CONSENTED - as received.
A motion was made by Councilman Cavo, and was seconded by Councilman Rotello, to add Item 14.
Resolution for Local Bridge Funding Applications, to tonight's agenda. The motion carried unanimously.
14. RESOLUTION - Local Bridge Funding Applications
Mayor Boughton responded to Councilman Rotello with regard to Kennedy Bridge, that the Army Corps. is
responsible for the initial design, construction and engineering but the funding source for repair and
maintenance is the State.
A motion was made by Councilman Levy, and was seconded by Councilman Mike Esposito, to adopt the
Resolution for the City of Danbury to submit a preliminary application for repair and rehabilitation of the
Crosby Street Connector Bridge No. 6183, Kennedy Avenue Bridge No. 04716, Triangle Street Bridge No.
04073, and authorize the Mayor to sign all documents to effectuate same. The motion carried unanimously.
13. DEPARTMENT REPORTS – Police, Fire, Health-Housing & Welfare, Public Works, UNIT, Elderly,
Library, Dream Homes, Permit Center
Mayor Boughton responded to Councilman Curran inquired regarding the house on Lake Avenue that dumped
sewage, plans to get funds from the homeowners policy, and possible arrest warrants.
Councilman Perkins thanked Construction Services Superintendent Hughes for work on Jefferson Avenue
Bridge and Superintendent of Public Services Nolan for work on Mountainville Road. Mayor Boughton noted
compliments were received on the paving program and the work on N. Hat and Driftway.
Construction Services Superintendent Hughes responded to Councilman DiGilio regarding updates regarding
FEMA reimbursement for the storm, noting approximately a half million dollars has been spent to date.
Motion was made by Councilman Cavo, and was seconded by Councilman Perkins, to waive the reading
of the Departmental Reports as all members have copies and copies are on file for review in the Office of the
Legislative Assistant for review. No objections, so ordered.
15. ADJOURNMENT Copies of Agenda Items are available in the Legislative Assistant’s Office
Mayor Boughton thanked attendees for being present despite the storm. He announced a Go Fund Me Page to
go get Uncle Sam and bring him home, and urged participation. He would like it to be unveiled on the Fourth
of July. Councilman Perkins suggested placement at or near the fairgrounds.
There being no further business to come before the Council, Mayor Boughton extended all committees.
A motion was made by Councilman Perkins, and was seconded by Councilman Arconti, to adjourn the
City Council Meeting. Motion carried unanimously. The meeting adjourned at 8:06 p.m.
Respectfully Submitted,
Lori Goor
Recording Secretary
Attest,
Mark D. Boughton, Mayor
Agenda
CITY OF DANBURY
DANBURY, CONNECTICUT 06810
DEPARTMENT OF POLICE PATRICK A. RIDENHOUR, CHIEF
375 MAIN STREET SHAUN J. MCCOLGAN, DEPUTY CHIEF
(203) 797-4614
September 24, 2018
MEMORANDUM
To: Mayor Mark D. Boughton
Members of the City Council
From: Patrick A. Ridenhour, Chief of Police
Subject: Police Department Monthly Report
September 2018
I submit this report of the activities of the Danbury Police Department for the month of September.
Personnel
Department Strength:
Sworn Personnel 144
Injury/Extended Leave 2
Restricted Duty 1
Field Training Program 8
Police Academy 1
Effective strength (as of 09-24-18) 132
*0 pending retirements
Community Services (See attached)
Training
9/10-14 FTO Class – P.Os. Howley, Weber, Michael, Hilderbrand, Meade, Stable & Marino
9/10-14 CIT Training – P.Os. Tibbits & Russotti
9/13 & 20 John M. Bailey Legal Updates – Det. Capt. Weston, Capt. Myles, Lt. Lobraico & Sgt. Scocozza
Fridays Leadership Development – Det. Lt. Sturdevant, Lt. Gantert
9/17-21 Internal Affairs School – Det. Lt. Sturdevant
9/18 Tragedy at Sandy Hook: a LE Perspective, Lessons Learned – Det. Sgt. Marcus
1
9/19 Finding Hidden Compartments in Motor Vehicles – Sgt. Antonelli, Det. Anderson, P.Os. Pooler,
Relyea, Morrill & Zalenski
9/20 CT Animal Control Training – ACO Mortara
Chief’s Significant Meetings
8/27 DHS Freshman Academy Ribbon Cutting
8/28 States Attorney Legal Updates – POSTC
8/28 CPCA Board Meeting
8/29 Board of Awards – Purchasing
8/29 Equity Project Meeting
8/29 Torrington Chief’s Process
8/30 CT Hospice Seminar
8/31 Condolence Visit – Ridgefield PD
9/4 IXP/CAD Patrol Dispatch Meeting
9/4 Danbury NAACP Meeting
9/5 Youth Violence Prevention
9/5 Danbury Works Trust Group Meeting
9/5 City Council Meeting
9/6, 7 Wake & Funeral – Chief Roche, Ridgefield PD
9/9 Diocese of Bridgeport Blue Mass – St. Joseph’s Church
9/10 CREDCJS Meeting
9/11 9/11 Memorial Ceremony
9/11 Citizens Police Academy Opening Night
9/13 POSTC Meeting
9/13 411th Commander Meet & Greet
9/14 Pathways
9/16 NOBLE Fundraiser
9/17 IXP Oversight Board Meeting
9/18 DPD Staff Meeting
9/19 Danbury Works Trust Core Team Meeting
E-Commerce Trading Location – no issues reported this month
Respectfully submitted,
Patrick A. Ridenhour
Chief of Police
PAR:mrl
Attach.
2
CITY OF DANBURY
DANBURY, CONNECTICUT 06810
Patrick A. Ridenhour, Chief Lt. Vincent P. Daniello
Department of Police Community Services Division
375 Main Street (203) 797-4577
To: Patrick A. Ridenhour – Chief of Police
From: Vincent P. Daniello – Lieutenant
Re: Community Services Division - Activity Reports & Staffing Levels
August 15 – September 15, 2018
Date: August 20, 2018
Community Conditions Unit:
(Sgt. Antonelli, Officers T. Zalenski, S. Cameron, M. Morrill,)
(-1 Officer)
-See attached report - Sensitive Information -
Community Affairs Unit: No officer assigned
(-1 Officer)
-No report attached
GTF/UNIT:
(P.O. K. Utter)
See attached report - Sensitive Information
City Center Liaison: No officer assigned
(-1 Officer)
-No report attached
Police Activities League:
(No police personnel assigned)
No Report
School Based Officers:
(P.O. S. O’Brien, P.O. M. Martinez, P.O. B. Hayes, P.O. R. Morlock)
-See attached report(s)
***Current Staffing Levels***
1 Lieutenant
1 Sergeant
8 Patrol Officers (-3)
3
CITY OF DANBURY
DANBURY, CONNECTICUT 06810
Department of Police Matthew McNally, Lieutenant
375 Main Street Patrol Division
September 16, 2018
MEMORANDUM
To: Chief Patrick Ridenhour
From: Lt. Matthew McNally
Subject: Police Explorer Monthly Activity Report – August 2018
This August was a busy one, as the Cadet Police Academy was held in the beginning of the month, for the first time in over a
decade.
On Saturday August 11th, thirty-six Danbury Police Explorers graduated from the Northeast Regional Law Enforcement
Education Association’s (NERLEEA) 9th annual Cadet Police Academy. The 2018 academy was held at the University of
Hartford from August 5th through the 11th.
The Basic Program is year 1 for attendees and is heavy in the “basic training” style philosophy of the police academy.
This is the largest of the programs with the most explorer cadets in attendance.
The Advanced Program is the year 2 and expands on what is learned in year one. The cadets in Advanced get further
classroom instruction and this is known as the competition year. Competitions are held in areas of Crime Scene
Investigation, Building Search, Accident Investigation, Physical Agility and Shooting, just to name a few.
The third year for cadets is called the Practical Skills Program, where the cadets are exposed to training in the use of
batons, proper handcuffing, weapon retention, more advanced criminal investigation, forensics, preparing warrants, both
arrest and search type.
Typically the 4th and 5th years are spent staffing the cadet run Mock Police Department, from top to bottom, with first
year attendees being the patrol division and second year attendees testing for administrative and supervisory positions;
detectives; Special Operations (Dignitary Protection, VICE, and Human Trafficking investigations, et.al.) and Special
Response Team (SWAT). The MPD is the field training portion of the Cadet Police Academy where the explorers get
practical “hands-on” experience responding to the hundreds of scenarios conducted during shifts, throughout the week by
Field Training Officers and role players.
The Career Development Program is for those aged 18 and older who are seriously aspiring for careers in law
enforcement. It is the most intense and mentally grueling program that the CPA offers. Here the cadets will get experience
in the hiring process, along with team building and other activities associated with attending the “real” Connecticut State
Police Academy. This program can be described as the “Hell” week of the CPA, extending the “shock and awe”
philosophies of police recruit training.
The final program that the CPA offers is the Police Mountain Bike Program, the most physically demanding program.
This can be taken anytime by the explorer cadet any time after the successful completion of the Basic and Advanced
Programs. Mountain Bikes is the actual International Police Mountain Bike Association’s training course for police
officers.
All explorer cadets are afforded opportunity to go to the firing range, after successful completion of the firearms safety
course, and participate in the Shooting Program throughout the week at academy. All training and instruction is provided
by either POST certified instructors or nationally recognized subject matter experts.
4
The Academy ran from August 4th for the adult staff; the 5th for the explorer cadets to arrive and who were graduated on
August 11th, and the adult staff secured on August 12th. We ran the administrative executive staff operations required for
the week long in-residence academy that caters to approximately 450 cadets and staff, as well as integral parts of the firing
range (Shooting Program) and the IPMBA Police Mountain Bike Program. I also instructed the Advanced Program in CT
Based Anti- Terrorism for Patrol Officers and the Mock Police Department’s Special Operations squad in dealing with a
Sovereign Citizen contact scenario (Assisting Special Agent Brianna McNally of the Diplomatic Security Service and
Field Training Officer of the SpecOps squad, as well as a Danbury Police Explorer alumni/associate advisor) and another
scenario investigating a late-night fatal motor vehicle collision of a car and a pedestrian with an intoxicated operator.
This is no small feat, as we also had 37 explorer cadets of our own program in attendance at the academy for the week in
the various different programs. PO David Antedomenico was the Assistant Academy Director, and PO Stephan Cameron,
returned back to the Mountain Bike Program as it’s Assistant/Co-Director. Sergeant John Krupinsky came to the academy
for several days to assist with the Shooting Program as a swat/tactical firearms instructor at the Glastonbury Department
of Energy and Environmental Protection Range. I continued assisting the current Academy Director and Assistant
Director, filling the role as the senior most Executive Board Director, Human Resources coordinator; an instructor in the
Advanced Program and Mock Police Department; Dignitary Day coordinator and also assisted at the Shooting Range as a
firearms instructor during competition and the SpecOps of Mock PD and Career Development shooting programs with
more advanced tactical pistol and rifle courses of fire. We also had several civilian associate advisors who attended the
academy for the week. They were Sienna Ratigan who assisted with the operation of the Shooting Programs at the firing
range; Rayniel Brito and Henry Peralta, who assisted with the training and testing of the Mountain Bike Program. All
three were in-residence and assisted with other academy nightly operations; keeping our explorer cadets on track both
academically and physically, and any other duties that needed to be addressed.
As in the past, we had many explorers win awards this year and or receive honors upon graduation. Their efforts were
stellar, as usual and expected herein the Danbury program, and several of our explorers were in competition for the
coveted awards against other explorers from our post. Also, many of our explorers were put in leadership positions for
their various programs throughout the week. Needless to say, we are very proud that all of our explorers successfully
graduated. This was the largest group we ever had attend.
In the Basic Program, there are 4 squads of approximately 35 cadets. Each squad is led by a squad leader/guidon, chosen
by the Drill Instructors assigned to that squad. The squads are identified as Alpha, Bravo, Charlie and Delta squads.
Several of the Danbury explorers were assigned as their squads Guidon or as squad leader, throughout the week. Explorer
Thalia Garcia was Guidon for Alpha Squad. Kim Macancela was in Bravo Squad. She was chosen as Squad Leader and
Guidon. Valeria Macas was the squad leader for Charlie Squad.
Also, in the Basic Program, Danbury explorer Denise Pagan was a squad leader and also won the 2nd Place award for
Female Physical Agility.
Delta Squad won the Drill competition and it contained a majority of our explorers to include Erica Yunga, who was a
squad leader, Thomas “Howie” Cisewski, Jasmine Salinas, Jason Pulla, Amanda Guzman, Michele Posadas and Carolina
Morocho
In the Advanced Program, which is known as the competition year, we had many explorers win awards. Explorer cadet
Nancy Aldana got 2nd Place in Crime Scene Investigation. Eric Cameron took 1st place in Building Search while Karol
Granda finished in 3rd place.
We had several explorer cadets in the Police Mountain Bike Program. Explorer Juan Peralta received the coveted
Director’s Award, unanimously, for his hard work, determination, and “can do” attitude. All of our explorer cadets
successfully completed this very physically demanding program even though one of them had a bad fall and ended up
with a trip to the hospital for an injury.
We also had explorers in the Practical Skills Program, the Mock Police Department and in the Career Development
Program (often called Phase IV). In the Mock Police Department, explorer cadet Edisson Yunga was promoted to
Sergeant in the 2nd Year level, and Felix Escobar was a member of the Special Operations squad. Explorers Matthew
Cisewski and Josh Hibbard both completed the Career Development Program, which has repeatedly been called tougher
than military basic training by those who have done both.
The highest honor that an explorer cadet can receive at the Cadet Police Academy is the Academy Director’s Award. This
year, explorer cadet Katy Guaman, was in the Mountain Bike Program and was learning dismounts with a run and suspect
tackle. When her turn came to demonstrate her new skill, Katy fell during the dismount onto her left wrist injuring it
5
severely. She got up, continued the chase and made the tackle with her hand dangling limply and un-useful. Only after she
completed the suspect tackle part, did she make a complaint of pain to her wrist and hand. After initial treatment by the
on-site medical staff nurse, Theresa Breary, RN (a former Danbury Police Explorer alumni who had completed the Mt.
Bike Phase herself in the past), she was transported to St. Francis hospital for treatment.
After treatment, she was released back to the CPA with her arm in a brace and sling, and told that although not broken as
originally thought, she was injured enough to preclude her from any further Mt. Bike training. She was given an
opportunity to be transferred to the Advanced Program to finish her week out, but steadfastly refused. She pleaded to stay
with the Bike Program and continued her training. She never gave up on her goal. She passed the final testing, while
injured, not once, but twice to get a better score although having passed initially. With her tenacity and drive, she became
a role model for all the other cadets in her training program and in the Cadet Police Academy. For her efforts, the Cadet
Police Academy Director, Officer Tim Fedor of the Trumbull Police Department, bestowed the CPA Director’s Award to
Katy Guaman.
Officer David Antedomenico, also a former Danbury Police Explorer, was also recognized with the NERLEEA Director’s
Award this year for all of his work with the NERLEEA reorganization.
To get a glimpse into life at the 2018 Cadet Police Academy, please go on Facebook by liking Cadet Police Academy.
There is an excellent video presentation, bios of the executive staff, and photo’s of the activities throughout the week. You
will surely be impressed!
Some images from graduation…
Danbury Associate Advisor, Special Agent Brianna McNally, Diplomatic Security Services, singing the National Anthem
at the opening of the graduation ceremony.
Danbury PO David Antedomenico being presented the NERLEEA Director’s Award, from PO Tim Fedor of the Trumbull
Police Department.
Danbury Explorers (l to r) Amanda Guzman, Nancy Aldana, and Katy Guaman after graduation.
6
Katy Guaman, Academy Director’s Award recipient
Mountain Bike Director’s Award winner Juan Peralta (R) with Mt. Bike Director NYPD Officer
Dustin Levi
Matthew Cisewski and Josh Hibbard upon successful completion of Career Development Program
Eric Cameron with his First Place Award for Building Search
7
The 2018 graduates, as listed below-
Basic Program- Thomas “Howie” Cisewski, Thalia Garcia**, Amanda Guzman,
Maribel Guaman, Cesar Lazaro*, Jeison Juanacio, Valeria Macas*, Kim Macancela**,
Carolina Morocho, Denise Pagan*, Jason Pulla, Michele Posadas, Jasmine Salinas,
Erika Yunga*
Advanced Program- Nancy Aldana, Eric Cameron*, Milena Caetano, Britney Guachun,
Carol Granda, Kiandry Marte, Leonardo Marin, Bryan Quinde
(One * is a squad leader; two ** is a guidon)
Practical Skills Program- Devin Alward, Emily Mead, James O’Donnell and Samantha Lassen
Mock Police Department- Dayana Pillcorema (1st year); Edison Yunga (Sergeant, 2nd year) and
Felix Escobar (Special Operations, 3rd year)
Career Development- Josh Hibbard and Matthew Cisewski
Mountain Bike Program- Richard Bessel, McCarthy Oliveira, Katy Guaman, Matthew Regalado
and Juan Peralta
August 28th saw the explorers assisting with the Holy Trinity 5k in the Joe’s Hill Road/Aunt Hack Road area where 13
explorers were deployed to assist.
8
Explorers at the Holy Trinity 5k to “Feed the people” aka the Pierogi 5k
As the summer wound down, on Wednesday, August 22nd, approximately 41 explorers and 5 advisors made the trek
down to the world-famous Bronx Zoo in New York City. It was free entry day, but each attendee donated $5 to the zoo
for a total of $230 towards their conservation efforts. We leased a school bus and each member got a special All Access
Pass for the visit. The weather was great with only a passing rain shower. But everyone had a great time and the explorers
found it very educational and informative. On the way home, we also took the youth to the East Fordham Road, Bronx,
and White Castle hamburger restaurant. Most of our explorers had never had a White Castle slider, and many were
purchased and brought back to their homes to enjoy.
We ended the month with 138 registered Explorer Cadets. With the start of a new school year upon us, we will most likely
have more youth apply to be in the post. Open House/First night is scheduled for September 27th and we are beginning
our in-house Basic Explorer Skills Training program for new explorers on October 4th. In 9 weeks we will have new
9
explorers to replace the ones we have lost to age, graduation, school and military service. We hope to have everyone up to
speed by December 6th.
Respectfully submitted,
Lt. Matthew McNally
Lt. Matthew McNally
Post Advisor/Program Coordinator
I. Membership Enrolled Amount
# of Explorers Enrolled 138
# of Advisors Enrolled 18
II. Hours-Explorer Hours
Total Job Hours 63.25
Total Training Hours 6800.25
Total Explorer Hours 6863.50
III. Hours-Advisor Hours
Total Job Hours 56.50
Total Training Hours 1117.00
Total Advisor Hours 1173.50
10
2018 UNIFORM CRIME REPORT
CITY OF DANBURY
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Homicide 0 0 0 0 0 0 0 0 0
Forcible Rape 2 2 0 1 1 1 2 1 10
Robbery 2 2 3 1 5 0 6 4 23
Assault 7 1 5 5 1 4 8 3 34
Burglary 12 6 3 15 9 9 6 11 71
Theft 79 65 81 51 85 66 79 70 576
Motor Vehicle Theft 3 2 10 3 9 18 13 11 69
Arson 0 0 0 0 1 0 0 0 1
Totals 105 78 102 76 111 98 114 100 784
2017 UNIFORM CRIME REPORT
CITY OF DANBURY
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Homicide 0 0 0 0 0 0 0 1 1
Forcible Rape 0 1 0 1 0 1 3 3 9
Robbery 5 5 3 3 1 3 5 5 30
Assault 5 4 5 6 7 6 10 1 44
Burglary 4 6 2 3 4 2 9 10 40
Theft 63 80 73 55 60 62 78 93 564
Motor Vehicle Theft 4 6 10 3 6 2 5 10 46
Arson 0 0 0 0 0 0 0 0 0
Totals 81 102 93 71 78 76 110 123 734
*Please Note: UCR Stats are subject to change due to monthly crime modifications
11
2018 DANBURY POLICE DEPARTMENT STATISTICS
CITY OF DANBURY
CALLS FOR SERVICE
2018
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Calls for Service 3,929 3,635 4,463 4,904 5,253 5,124 5,426 5,133 37,867
2017
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Calls for Service 4,198 3,678 3,912 4,854 4,379 4,579 5,041 4,933 35,574
TRAFFIC ACCIDENTS
2018
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Property Damage 330 317 327 295 379 319 328 290 2,585
Personal Injury 47 39 35 23 49 47 34 41 315
Total Traffic Accidents 377 356 362 318 428 366 362 331 2,900
2017
Jan Feb March April May June July Aug Sept Oct Nov Dec. YTD
Property Damage 338 314 296 291 345 325 307 335 2,551
Personal Injury 46 31 21 44 49 43 52 42 328
Total Traffic Accidents 384 345 317 335 394 368 359 377 2,879
TRAFFIC ENFORCEMENT
2018
Jan Feb March April* May June July* Aug* Sept Oct Nov Dec. YTD
Verbal Warning 154 186 191 204 165 133 194 201 1,428
Written Warning 21 23 13 3 11 9 8 11 99
Moving Violation 332 340 328 802 318 246 689 628 3,783
Total Enforcement Action 507 549 532 1,009 494 388 891 840 5,310
2017
Jan Feb March April* May June July* Aug* Sept Oct Nov Dec. YTD
Verbal Warning 147 141 148 218 141 161 155 180 1,291
Written Warning 17 6 8 34 14 14 6 12 111
Moving Violation 291 173 193 1,015 265 203 575 646 3,361
Total Enforcement Action 455 320 349 1,267 420 378 736 838 4,763
*Traffic Enforcement Grant(s)
12
September 24, 2018
Dear Mayor Boughton and Members of the City Council:
I am pleased to present the monthly report for the Health & Human Services Department (DHHS).
The Connecticut State Department of Public Health has requested that local health departments begin
outreach and provide free vaccination services for Hepatitis A. Danbury has agreed to begin providing
free Hepatitis A vaccination services to at risk persons, including homeless individuals and people with
liver disease. Starting on September 26th, we will be providing the vaccine at the local homeless shelters,
Apex Community Care, as well as other community sites as requested.
We will be co-sponsoring this year’s Mission Health Day at Western Connecticut State University on
Saturday October 13, 2018 from 9 a.m. – 3 p.m. The event is designed for local individuals and families
in need of health services, housing support, veterans services and employment counseling.
Our program planning team, has been diligently working to increase our capacity to apply for and receive
grant funding. This potential funding will be used to address local public health concerns, especially in
the areas of community health needs, opioid addiction outreach, environmental health, youth violence and
childhood obesity. We are looking forward to presenting council with new funding opportunities over the
coming months.
The following pages contains the reports from each division; providing details concerning ongoing
activities. Should you have any questions regarding any of the submitted reports, please call me at (203)
797-4625.
Sincerely,
Grant Status Update
(July 1, 2017 - June 30, 2019)
Grant Agency Program Supported Award Amount Award dates Project Status
FDA Voluntary National Retail Food Food Protection
Regulatory Program Standards Program $2,500 1/2/18 – 12/31/18 Awarded
CT DPH Preventative Health $67,701 10/15/18 - 9/30/19 Active
United Way FEMA (EFSP) Shelter Operation $2,400 10/31/17 - 1/31/18 Completed
CT Department of Housing (CT DOH) Shelter Operations $40,000 7/1/16 - 9/30/17 Completed
CT DPH All $99,895 7/1/17 - 6/30/18 Completed
Peter and Carmen Lucia-Buck Foundation Shelter Operations $25,000 7/1/17 - 6/30/18 Awarded
CT Dept. of Public Health (CTDPH) TB Prevention $125,000 7/1/17 - 6/30/22 Active
Peter and Carmen Lucia Buck Foundation Shelter Operations $25,000 7/1/18 - 6/30/18 Awarded
CT DPH All $89,409 7/1/18 - 6/30/19 Active
Public Health
NACCHO Vulnerable Population Emergency 7/01/17 - 06/30/18
Technical Assistance Preparedness - Completed
Association of Food and Drug Officials Food Protection
7/1/18 - 6/30/19
Managed Retail Program Standards Grant Program $20,000 Pending
Connecticut State Opioid Response Grant 2 years, at the discretion of
Program Preventative Health $150,000 the Department Active
State of Connecticut Lead, Radon, and
9/30/18 - 9/29/19
Healthy Homes Program Child Lead Poisoning $24,999 In Process
Department of Housing Emergency
10/1/18 - 6/30/19
Shelter Grant Shelter Operations $69,132 Awarded
Youth Violence Prevention Program Community Health $140,000 7/1/18 - 6/30/19 Awarded
TD Bank Charitable Foundation Housing Program $5,000 - Pending
KeyBank Foundation Affordable Housing $3,000 - Pending
Oriental Trading Child Lead Poisoning $5,000 - Pending
Consumer Product Safety Commission
Grant Environmental Health $250,000 - Not Awarded
Olde Crabs Hockey Club Donation Shelter Operation $4,000 - Awarded
Aetna Community Medicine $100,000 - Not awarded
Home Depot Foundation Community
-
Impact grant Shelter Operations $5,000 Not Awarded
Food Protection
-
NACCHO FDA Mentorship Program $9,400 Not Awarded
Newtown Savings Bank Shelter Operations $7,500 - Not awarded
Savings Bank of Danbury Foundation Shelter Operations $10,000 - Not awarded
Union Savings Bank Shelter Operations $10,000 - Not awarded
Wells Fargo Shelter Operations $25,000 - Not awarded
Walmart Community Grant Program Child Lead Poisoning $2,500 - Not awarded
2 of 8
Environmental Health Division
The Environmental Health Division provides a multitude of services, which include but are not
limited to the following:
● Land use plan review and inspection
● Food service establishment plan review and inspection
● Septic plan review and related inspections
● Well water testing for potability (through the CT DPH Laboratory)
● Public swimming pool code compliance and inspection
● Housing Code enforcement
● Recreational water sampling
● Hazardous material storage inspection & code enforcement
● Staff support for Environmental Impact Commission.
● Numerous community level projects including the maintenance of the Lake Kenosia
Garden Buffer and the maintenance of the Still River Trail.
August 2018 Activity:
The environmental division has had a very busy month. There has been an increased amount of
Certificate of Apartment Occupancy inspections due to the mailers sent out to qualifying homes.
Housing inspectors have had some difficult cases this month: no utilities/heat and a severe
hoarding case.
The department has also seen steady enrollment numbers in the Certified Food Protection
Manager and Food Handler courses, additional course dates and classes instructed in Spanish
have aided in enrollment.
Our certified food inspectors worked diligently at the Taste of Danbury, the Ives Concert Series
and the many festival events throughout the city.
Our certified lead inspectors attended the Lead and Radon Semi Annual meeting this month,
which focused the cultural issues we can encounter during inspections. Shortly after we received
a report of a child with an extremely high blood lead level requiring chelation therapy. The lead
inspectors conducted several comprehensive lead inspections, taking dust, soil, and water
samples, and using a XRF analyzer for testing at all three locations.
1. Potable Water
Private Well - Sample Collected 1
Well Permits 1
Well Application Review 0
2. Environmental
Grading Permit Review 3
3 of 8
EIC 2
HazMat 0
Erosion Inspections 10
Complaint Investigation 4
Odor Complaints 0
Misc: (Describe) 0
3. Sewage Disposal
Plan Review 0
Inspections 70
New, Replace, Fail, Plan Review 7
100% Replacement Plan Review 2
Soil Testing (List by apt. only) 9
Additions 11
Dye Tests (initial) 2
Septic Permits (to construct) 10
4. Solid Waste
Garbage Complaint 0
Misc.: 0
5. Pest and animal Control
Rodent Complaint 0
Insect Complaint 0
Domestic Animal Complaint 0
Misc.: 0
6. Housing
Rooming House Inspection 1
4 of 8
Housing Complaints Inspection 30
CAO's 92
Healthy Homes 2
Lead Inspection 0
Lead Abatement Plan Review 0
Lead Clearance Inspection 0
7. Establishments
Hotel Inspections 0
School Inspection / Complaint 0
Child Day Care Inspection 2
Child Day Care Re-Inspection 0
Child Day Care Plan Review 0
Body Care Inspections 0
Body Care Re-Inspections 0
Body Care Plan Review 0
Massage Establishment Inspections 0
Massage Establishment Re-Inspections 0
Massage Establishment Plan Review 0
8. Food
Food Service Establishment Inspection 79
Pre-Operational Inspection 0
Food Service Walk through Inspections /(Construction
Visit) 3
Itinerant Vendor Inspections 1
Complaints 0
5 of 8
Re-inspection (voluntary) 0
Re-inspection (involuntary) 3
Plan Review 5
Plan Revisions 0
Foodborne Illness # People Complaints 0
Temporary Food Services - Application Review 16
Temporary Food Service Inspection 2
CPFM Courses 3
Food Handler Courses 1
8. Seasonal
Indoor Pool Inspections 0
Outdoor Pool Inspections 1
Indoor Public Pool Water: # Samples Collected 0
Outdoor Public Pool Water: # Samples Collected 0
Public Beaches: # Samples Collected 7
Drinking: # Samples Collected 0
Marine Dock Facilities Inspected 0
9. Orders Issued
Health Order 0
Letter Order 1
Community Medicine Section
This division provides information and guidance on the prevention of communicable diseases.
We also provide direct patient care to individuals that require further evaluation and those that
are diagnosed with Mycobacterium Tuberculosis. The Public Health Nurse has the responsibility
of implementing the discharge/treatment plans and providing assurance of patients care and
6 of 8
treatment, such as patient education, directly observed therapy, continued treatment adherence
and contact investigations. We work in cooperation with all community health care partners in
need of our services and the State Health Department
Patients Seen August 2018
TB patients 63
Ppd testing /read 0
QTF/TSpot 5
Home Visits 0
Hospital visits 0
E-DOT 1
Total Services: 69
The following are highlights from the Office of Community activities for August 2018
1. A total of 20 new persons were evaluated in the TB clinic, these referrals came
from:
4 Medical 3 Employment
5 School Physical 3 Contact Investigation
3 Immigration 1 Military (Active)
1 Active/Hospital Discharge
2. Continuing case management of approximately 71 cases of Latent TB & 3 Active
TB (1 extra pulmonary TB, 2 pulmonary M.TB).
3. Initiated contact investigation for 2 pulmonary cases (xxBKFLD & xxDANBRC)
4. Ongoing surveillance and epidemiologic review of individuals reported with
positive Acid Fast Bacilli; suspected or confirmed TB.
5. Ongoing communication with health care providers, school nurses, WCHC, and
various state public health agencies.
Public Health Emergency Preparedness
The Public Health Emergency Preparedness Division is continually building preparedness
capabilities to deal with emergency situations. The Division serves as an educational resource for
personal and community preparedness.
Trainings/Meetings:
● Director Morrissey presented at the Yankee FDA conference about the Health
Department’s response to Norovirus and Water Main Break from April 2018.
● Attended and participated in the seasonal influenza training with information and
predictions about the upcoming flu season.
7 of 8
● Attended the subcontractor kick off webinar about the 2018-2019 Public Health
Emergency Preparedness grant hosted by Yale.
Grants
● Received the Public Health Emergency Preparedness grant for 2018-2019.
● Attended the Region 5 ESF 8 Health Care Coalition meeting 9/7/18.
8 of 8
CITY OF DANBURY
DEPARTMENT OF PUBLIC WORKS
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
(203) 797-4537 FAX (203) 796-1586
MAYOR PUBLIC WORKS DIRECTOR/
Honorable Mark D. Boughton CITY ENGINEER
Antonio Iadarola, P.E.
September 24, 2018
Honorable Mayor Mark D. Boughton
Honorable Members of the Danbury City Council
155 Deer Hill Avenue
Danbury, CT 06810
RE: Monthly Report for August 2018
Dear Mayor Boughton and Members of the City Council:
I am pleased to present the Public Works Department report for the month of August.
August 28, 2018 was a momentous day for the City of Danbury. A Ribbon Cutting Celebration was held in front
of the newly built Black Box Theater marking the completion of the Freshman Academy and theater at Danbury
High School. The various improvements, addition and main entrance improvements are complete with the
exception of some punch list items. Certificates of Occupancy have been acquired for all phases of this project.
Many residents have expressed their appreciation for the outstanding paving work achieved by the Highway
Division. There is a team effort involved in the paving program. The Forestry Division performs cut-backs and
removals prior to the start of the paving. The Parks Maintenance Division assists with traffic control. I appreciate
their effort and coordination to ensure successful completion of the paving work.
Our capital projects summer work is in full force and we are making good progress. All of the Public Works
Divisions have planned summer projects which are well underway. These projects are executed on top of their
regularly scheduled work activities.
As you will see in the Division reports, we are heavily involved in managing design meetings for a considerable
amount of capital work expected to be executed during the summer and into early fall.
Please take a few moments to review the Division reports for a full scope of the many activities and projects in
which the Public Works Department are engaged.
Should you have any questions regarding any of the separately submitted division reports, please call me at 203-
797-4537.
Construction Services Report submitted by Thomas Hughes III, Superintendent:
Danbury High School Addition & Alteration Project: Construction Services worked with the design team and
the Construction Manager to develop the project designs and bid packages.
Phase I, roofing is complete. Certificate of Acceptance issued.
Phase II, generators complete. Phase 3.1, The cafeteria addition is complete: Certificate of Acceptance issued.
Phase IV, Freshman Academy: The Architect of Record Friar Associates has issued the Statement of Substantial
Completion. The punch list has been issued to Rizzo Corporation; we completed the Freshman Academy within
budget with a minimal change order percentage. Certificate of Occupancy & Zoning Compliance have been
issued.
Phase V, The Black Box Theatre: The Architect of Record Fuller & D’Angelo has issued the Statement of
Substantial Completion for the Black Box Theatre. The punch list was issued by the Architect to Rizzo
Corporation. The Black Box Theatre was completed on schedule, within budget and with a minimal change order
percentage. Certificate of Occupancy & Zoning Compliance have been issued. We are completing the punch list
and entering the closeout phase.
Phase V Main Entry: The new entry storefront has been completed. The new security main entrance is online and
functioning as designed. The rooftop screening has been completed. We are in the process of designing / installing
a split unit HVAC unit for year round climate control of the security office / booth.
Phase VI FFE, State Office of School Grants has approved purchasing the technology. All additional FFE
presented to the OSG has been approved. The FFE has been procured and we have completed placing the
furniture, fixtures and equipment as per design within budget.
Triangle Street Bridge Over the Still River: Working with the Engineering Department, we have hired a
structural engineering firm, RHS Consultants, from our City Engineering On-Call Bid list to evaluate the bridge
and design necessary structure repair methods. The repair design has been completed and is presently being
reviewed by the Engineering Department. We are in the process of reviewing the final specifications and the bid
documents.
Middle River Road Bridge Replacement: Working with the City Engineer and Engineering staff the designer,
Stantec Engineering, has submitted the plans and specifications for our review and comment. This project will be
bid for a spring 2019 start.
Reservoir Road Bridge: The contractor completed the project 60 days ahead of schedule within budget with a
minimal change order percentage. Completing the closeout presently.
Jefferson Avenue Bridge: Nagy Brothers the Notice to Proceed was issued the contractor has completed the
project we are at Substantial Completion as of 8/24/18. We completed the project a week early and within budget.
Jefferson Avenue was opened to traffic on Friday 8/24/18.
We are presently in the closeout phase of this project.
Crosby Street Bridge over the Still River: We have been working with the Engineering Department and the
Designer RHS. The design is proceeding from preliminary into the final design plans and specifications. We have
met with adjacent property owners and have finalized our construction sequencing. We expect this project to go
out to bid shortly for a spring start.
Golden Hill Bridge Repair: ConnDot notified the City of Danbury that this structure was in need of repair. The
City using our in house resources completed the bridge repairs. Within budget and with minimal disruption to
traffic.
Still River Sediment Removal: The contract was awarded to EnviroConsultants & Recyclers; the contractor has
mobilized and started the sediment removal operation. The project is on schedule and within budget. The
contractor has completed the segment north of the Casper Street Bridge both East & West sides of the Still River.
The contractor completed removing river sediment from the river bank on the west side of the Still River between
Casper Street and Metro North Bridge 300 feet east to the project limits. This project was completed on schedule,
and within budget. We are in the closeout phase of this project.
Octagon House Emergency Repairs: Construction Services has been working with the City Engineer & Planner
in a Construction Administration capacity for this project.
Tarrywile Parks Pond Dam Repairs & Fencing: CT DEEP has issued a directive for fencing to be installed
along the dam crest and spillway training walls. There is also some concrete patching to take place on the vertical
and crest horizontal faces of the dam. Construction Services using our in house resources is in the process of
mobilizing and scheduling this work. We will be working along with the Tarrywile Park Authority to complete
this work with the least possible disruption to the parks operation.
Construction Services is presently working with the City Engineer / Director of Public Works and Engineering
Division in developing our upcoming Capital Projects bridge rehabilitation / repairs and infrastructure projects
Engineering Report Submitted by Antonio Iadarola, P.E./ City Engineer:
Expansion of Danbury High School:
During 2016 the proposed improvements authorized by the City Council and Danbury voters were designed by
the two architects hired by the City. The Rizzo Corporation was hired as the Construction Manager for the project.
Phases 1, 2, 3, 4 and 5 of the project (roof replacement; electric service and new generator; new parking lot, oil
tank replacement; fats/oils/grease separator, sprinkler system; new fire alarm for the entire building, classroom
addition, Black Box Theater, cafeteria addition, front entrance improvements and auto shop improvements) were
designed, received state approval and bid. The new parking lot, sprinkler system, fire alarm and fats/oils/grease
separator work, roof replacement work, the cafeteria expansion, the new bus loop and the auto shop improvements
are complete, the classroom addition, the main entrance improvements and Black Box Theater are complete with
the exception of some punch list items. Certificates of Occupancy have been acquired for all phases of this
project.
Various Bridges:
The Jefferson Avenue Bridge project was bid and awarded to Nagy Brothers Construction. Inc. Repairs to the
Golden Hill Road Bridge and the Jefferson Avenue Bridge work has been completed. Designs of the Triangle
Street Bridge improvements and Crosby Street Connector are near completion. The City hired on-call consultants
to design the repairs for Middle River Road over unnamed brook Bridges as well as to inspect and evaluate
Kennedy Avenue Bridge over the Still River. At its August 7, 2018 meeting, the City authorized the submission
of applications for State Local Bridge Program partial funding for the Kennedy Avenue, Crosby Street Connector
and Triangle Street Bridges.
Still River Channel from Patriot Drive to Jansen Street:
Our office has been working with our on-call consultant and have secured the necessary approvals from the Army
Corp of Engineers, City of Danbury Environmental Impact Commission and the CT State DEEP to start Phase II
of the maintenance to the Still River Channel. The plans and specifications are complete. The City Council
approved a mutual easement agreement with an adjacent property owner at its September 2017 meeting. Work
involves the removal of approximately 12,800 tons of sediment that has accumulated in the river channel over
years. The project was bid in December 2017 with a bid opening on February 8, 2018. The contract was awarded
to EnviroConsultants and Recyclers. Vegetation removal has been completed. Sediment removal work is
underway.
Danbury High School and Rogers Park
Our office has surveyed, designed and put out to bid the replacement of six tennis courts at Danbury High School
and eight tennis courts at Rogers Park. We await signed contracts.
DEEP MS4 General Stormwater Permit:
The City’s Consultant led a number of workshop meetings with various pertinent city personnel and offices to
begin the process of meeting the multitude of ordinance revisions, land use regulation revisions, mapping, web-
site creation, inspection, testing, reporting and other requirements of the State DEEP permit. The final 2017
Annual Report is posted on the City website. Requirements of the permit take affect over the next several years.
The Consultant will continue to work with City departments on an “as needed” basis going forward.
Balmforth Avenue Sidewalk Replacement:
The City has applied for CDBG funding to begin in phase one of the Balmforth Avenue Sidewalk Replacement
project. Upon receipt of CDBG environmental approval, Phase I will be put out to bid. The Engineering Division
prepared and submitted an application for CDBG funding for 2018 to continue the sidewalk improvement work
for Phase 2. At its August 7, 2018 meeting, the City council approved the Action Plan for program year 44 which
plan includes Phase 2.
Still River Channel at the West Street Bridge:
The City hired a consultant to prepare the necessary plans and submit the required permits to reduce the flooding
on West Street near the existing overhead railroad bridge on West Street. The project will involve removing
sediment from the channel and under the bridge and looking into protecting the channel embankment from further
deterioration. The City’s consultant is working on securing the permits warranted for the project and design for
the embankment.
Richter House Expansion:
The Engineering Division surveyed and prepared mapping for the proposed modifications for the building
expansion. Engineering Division is in the process of drafting a Request for Proposals for architectural design
services.
New Animal Shelter:
The City has hired one of its on-call architects to prepare 30% plans and specifications for this facility. When
30% of plans and specifications are completed, the shelter will be bid as a Design/Build project. Environmental
Impact Commission approval and Planning Department site plan approval have been granted.
The RESERVE/RIVINGTON by Toll Brothers: (550 Acre Development with a total of 2150+ Units)
The Mews and The Ridge at Rivington: Progress continues with utility extensions and inspections.
The Village at Rivington: Progress continues with utility extensions and inspections.
The Enclave at Rivington: Progress continues with utility connections and inspections.
Woodland Avenue Bridge: The Bridge rehabilitation by Toll Brothers at Woodland Avenue is nearly
completed.
Reserve Road, Milestone Road, Woodland Road: Progress continues on the completion of these roads.
Phase 11 Planning and utility reviews are completed.
The Woodlands Phase 4C Planning and utility reviews are completed. Construction has begun.
Assessment Projects:
The following assessment projects have been the only projects pending on the list based on residents’ petitions.
Our office will evaluate these projects and will notify benefitted property owners.
1. Butternut Lane, Bayberry Lane and Boxwood Lane Sanitary Sewer Extension: Working on
preliminary design and cost estimate.
2. Hawley Road Extension Sanitary Sewer Extension: Working on preliminary design and cost
estimate.
Traffic Engineer and his Technicians: are reviewing several road improvement projects with the State of
Connecticut D.O.T. and are working on various land-use development plans. They are also handling public
complaints and routine repairs and maintenance of traffic control signal devices and pavement markings.
Staff Engineers: are reviewing various site plans, water and sewer applications, special exception applications,
and subdivision applications for various land-use approvals of on-going development projects throughout the
City. Field inspections of sanitary sewer, water mains and new roads are performed regularly on various
developments including the large Reserve Development by Toll Brothers. The Staff Engineers also review various
drainage problems which may include site visits, analysis and design.
Survey Crew: Our survey crew verifies various R.O.W., and prepares surveys and easements for in-house design
of City Projects, and assists other divisions in locating utilities in the field.
Should you have any questions regarding this report or any other issues related to our Engineering Division,
please do not hesitate to contact me at (203) 797-4641.
Highway Division Report submitted by Tim Nolan, Superintendent of Public Services:
This was a very busy month for the Highway Division. Construction crews, with the assistance of a city contractor,
continued repairing and improving drainage on some of the roads undergoing extensive work prior to paving on
Old Ridgebury Rd., Advocate Pl., Driftway Rd., Lake Crest Dr., Birchcrest Dr. and Aunt Hack Rd. City crews
paved Mountainville Ave. and Mountain Rd.
Crews have been performing various tasks as weather permits. A pothole crew was dispatched daily to fill
potholes. The street sweeping was performed at the construction sites and washouts. A crew was deployed to
repair broken curbing and driveway aprons. Multiple washouts were repaired after the occurrence of some
significate rain storms throughout the month. Previously paved roads were backfilled with topsoil and seeded.
Roadside mowing continues at various locations to improve sightlines Several days were devoted to clearing
catch basins and collecting litter along city streets.
The city garbage truck is deployed daily to empty trash cans, collect litter and clean up illegal dumping. The
recycle truck continues to be out at multiple locations receiving the recyclables from our residents.
Maintenance
Emergency Call Outs: 1
Catch Basins Replaced: 45
Guardrail Repairs: 2
Dredging: 2
Catch Basin Cleaning: 130
Roads Paved: 2
Signage
New installs: 4
Replacements: 8
Repairs: 28
Personnel
Total: 37
Injury: 0
Restricted Duty: 1
Retirement: 0
Seasonal: 0
Vacancy: 2
Parks Maintenance Report submitted by Tim Nolan, Superintendent of Public Services:
The Parks Maintenance Division continued the grounds maintenance of all the City owned municipal properties,
parks, schools and greens. Candlewood beach is raked every morning and the park is mowed weekly for the
enjoyment of the residents. The Spray Parks at Roger’s Park, Highland Avenue and Kenosia Park are open and
in full operation. All of the other parks are also maintained weekly for the many other recreational activities
throughout the summer season. Several days were devoted prepping the school grounds for the opening of the
new school year.
Field maintenance continues with the cleanup, mowing and line painting. The City Center Green and Kennedy
Park are cleaned and prepared each week for the many scheduled activities. Litter was picked up and garbage
cans were emptied in various areas throughout the city. Maintenance of the mowing and summer seasonal
equipment continued through the month.
Maintenance
Parks: 22
Schools: 17
Sports Fields: 25
Personnel
Total: 13
Injury: 1
Restricted Duty: 0
Seasonal: 4
Vacancy: 3
Forestry Division Report submitted by Tim Nolan, Superintendent of Public Services:
The Forestry Division continues to maintain, prune and remove dead trees in the city’s right of ways. Several
days were spend pruning trees in preparation for paving projects. In many locations, trees had to be removed and
areas cleaned due to the after effects of the May 15th natural disaster.
The Division responded to several dozen tree call including inspections, clean-ups, and emergency take-downs.
City tree contractors assisted with several tree removals, pruning. Staff continues to monitor and remove beaver
dams. The American flags in the city’s parks were also maintained by the Forestry Division.
Maintenance
Removals: 41
Pruning: 60
Brush: 19
Plantings: 0
Emergency Call Outs: 6
Personnel
Total: 2
Injury: 0
Restricted Duty: 0
Seasonal: 0
Vacancy: 2
Public Buildings Report submitted by Sean Hanley, Superintendent of Public Buildings Division:
Public Buildings:
Currently exploring updated work order system for department per new State requirements.
City Hall:
In process of exploring design quotes for roof replacement.
In process of exploring replacement quotes for front entrance door
Scheduling Health Dept. counter door and permit center counter replacement.
Danbury Public Schools:
MRP roof replacement and wall panel 85% complete.
In process of having new heating system designed and quoted for DHS auto shop.
In process of drawing up design specs for KSI and KSP oil tanks to take to State for approval.
In process of quoting elevator replacements for DHS D and C wings/BMS old elevator.
Public Works Complex.
In process of scheduling roof review for complex buildings.
Parks:
Split systems for upstairs Veterans Affairs offices completed.
General: The majority of time the Maintenance Mechanics spent this month was associated with school building
repairs, lighting / electrical, life safety and plumbing/heating/HVAC repairs.
Requests for Maintenance Service: Attached please find the statistical report of repairs and maintenance work
that the Public Buildings Mechanics engaged in during the month of August 2018.
In the month of August we received 207 new work requests and completed 204 work requests. In reviewing this
report, you will find the repair time that was expended in major work categories. Also listed is the total number
of work order hours completed.
Public Building mechanics were engaged in plumbing repairs with a total of 235.00 person-hours dedicated to
this service. The next largest area of concentration was in electrical repair work, utilizing 90.00 person-hours of
labor. HVAC work came as the third highest category with 87.00 person-hours.
Should you have any questions regarding this report, please do not hesitate to contact Sean Hanley at 203-797-4584.
Public Utilities Report submitted by David Day, PE, Superintendent of Public Utilities:
Enclosed is the monthly report to the City Council for activities that took place in August 2018. Also attached
is the Public Utilities Vehicle Maintenance Report.
As of September 14, 2018 there are 43 hydrants out of service. I will be happy to review the information with
you.
Antonio Iadarola, P.E.,
Director of Public Works/ City Engineer
M E M O R A N D U M
DATE: August 14, 2018
TO: City of Danbury, City Council
FROM: David M. Day, P.E., Superintendent
RE: Sanitary Sewer Collection System Maintenance–
AUGUST 2018
Complaints: 0 Bypasses 9 Slow Running
4 Loose Manholes 2 Odor Calls
Number Received: 15
Number Completed: 15
Pipe Cleaned: 4,500 LFT
Gallons of Water Used: 15,000 Gal
Pipe Inspected: 4,500 LFT
COMMENTS:
CITY OF DANBURY
PUBLIC BUILDINGS DIVISION
WORK REQUEST REPORT FOR AUGUST 2018
Work Requests received this month 207
Work Requests Completed this month 204
Category Total Labor Hours
Alarms 0.00
Carpentry 26.00
Electrical 90.00
HVAC 87.00
Locksmith 0.0
Maintenance 51.00
Mechanical 50.50
Plumbing 235.00
Roofing 8.50
Snow Plowing 0.00
Labor Hours City Buildings 136.00
Labor Hours School Buildings 412.00
TO : City Council - City of Danbury
FROM : David Day, Superintendent of Public Utilities
DATE : September 11, 2018
RE : WATER DEPARTMENT REPORT: AUGUST 2018
*****************************************************************************************
I. WATER PRODUCTION :
A) Margerie Water Treatment Facility : 97.5 MG.
B) West Lake Water Treatment Facility : 94.9 MG.
C) Kenosia Well Field : 0 MG.
D) Osborne Street Well Field : 0 MG.
E) Other
: 0 MG.
( MG. = Million Gallons )
II. RAINFALL :
A) Month : 9.8 inches
B) Past 12 Months (running total) : 49.6 inches
C) Current Year (Jan.- Current Mo.) : 44.6 inches
III. WATER STORAGE : date: 8/6/18
Current Reading Historical Average
A) East Lake Reservoir : 100.0 % 82.7 %
B) Margerie Lake Reservoir : 92.3 % 86.9 %
C) West Lake Reservoir : 96.3 % 85.7 %
D) Total
: 95.2 % 85.8 %
IV. WATER PUMPED :
A) Park Avenue Pump Station : 0 MG.
B) Padanaram(High School) Pump Station : 4.79 MG.
C) Shelter Rock Pump Station : 2.67 MG.
D) WestConn Pump Station : 1.38 MG.
E) Margerie Pump Station : 1.22 MG.
F) Pleasant Acres: 2.13 MG.
G) Nabby Road: 0.96 MG.
H) Harvest Hill: 1.30 MG.
I) Woodland Road (Reserve): 5.59 MG.
J) West Lake High Service : 55.5 MG.
K) Total Water Pumped (A-K) : 75.5 MG.
( MG. = Million Gallons )
V. WATER TRANSFERRED :
A) East Lake to Margerie Reservoir : 0.0 MG.
B) Padanaram to Margerie Reservoir : 0.0 MG.
C) Kohanza to West Lake Reservoir : 0.0 MG.
D) Kenosia Diversion to West Lake
Reservoir : 0.0 MG.
E) Kenosia Wells to West Lake Reservoir : 0.0 MG.
F) Total Water Transferred (A-E): 0.0 MG.
( MG. = Million Gallons )
VI. ALGAE CONTROL :
A) None
B)
VII. SURVEY OF WATER SOURCES :
A) Daily testing of treated and untreated water by water quality laboratory
B)
VIII. SUPERINTENDENTS NOTES :
To: David Day, P.E., Supt. of Public Utilities, City of Danbury
From: Ralph Azzarito, Project Manager Ralph Azzarito
Subject: WPCP Report For Month of: Aug '18
Date: 9/10/2018
I. Wastewater Treatment:
A) Sewage Processed: 11.3 MGD (Daily Avg) 349.3 Million Gallons Total
B) Septic Waste Processed: 1,191,200 Gallons Total
C) Sludge Pumped To Digesters: 696,045 Pounds Total
II. Wastewater Quality Influent Effluent % Removal Effluent Limit
A) BOD (mg/l) 121 4 97 30 mg/l and 85%
B) Total Suspended Solids (mg/l): 261 3 98.9 30 mg/l and 85%
C) Total Phosphorus (mg/l): 3.9 0.5 87 1.0 mg/l
D) Ammonia (mg/l): 20.2 0.17 99 1.5 mg/l
E) Total Nitrogen (lbs/Day): 2,809 505 82 442 lbs/day
Note: Phosphorus limits apply April - Nitrogen limit for credit
October. trading only.
III. Pump Station Operation:
A) Beaver Brook: 740.2 Hours Run
B) Southfield: 55.6 Hours Run
C) Mill Plain: 28.3 Hours Run
D) Backus: 159.0 Hours Run
E) Tarrywile 68.7 Hours Run
F) Turner Road: 46.2 Hours Run
G) Ford Avenue: 28.8 Hours Run
H) Indian Glen: 138.5 Hours Run
I) Delay Street: 37.2 Hours Run
J) Hayestown Road: 67.3 Hours Run
K) Kenosia Avenue: 25.6 Hours Run
L) Larson Drive: 65.1 Hours Run
M) Landfill: 339.8 Hours Run
N) Thrope Street 19.5 Hours Run
O) Poets Landing 16.8 Hours Run
P) Rogers Park 30.4 Hours Run
P) West Side 104.7 Hours Run
Q) East Franklin Street 37.0 Hours Run
Total Station Alarms: 5
MAINTENANCE REPORT - BUILDING # 6
GENERAL FUND
August-2018
INTAKE MANIFOLD A/C ACCUMULATOR ORFACE TUBE PCM REPAIR
8/1/2018 33DA POLICE WIRE HARNESS
352DA POLICE FLAT R/C
DET POLICE SERVICE BRAKES TIRES A/C CONDENSIOR DRYER FLUID FILM
INTAKE MANIFOLD A/C ACCUMULATOR ORFACE TUBE PCM REPAIR
8/2/2018 33DA POLICE WIRE HARNESS
8/3/2018 10DA POLICE MOTOR MOUNTS SWAY BAR LINKS
8/6/2018 DET POLICE FUEL PUMP
352DA POLICE A/C
8/7/2018 222DA POLICE A/C COMPRESSIOR DRYER EVAPORATOR BATTERY
257DA POLICE COOLING FAN TEMP SENSIOR THEMOSTAT A/C DRYER
DET POLICE SERVICE
8/8/2018 352DA POLICE PCM
DET POLICE A FRAMES
8/9/2018 DET POLICE A FRAMES
8/10/2018 11DA POLICE ALTERNATOR
18DA POLICE WINDOW REGULATOR
255DA POLICE ALTERNATOR
8/13/2018 DET POLICE A/C CONDENSIOR
MOTOR MOUNT AXEL SWAY BAR LINKS WIPER ARMS SERVICE
8/14/2018 243DA POLICE RESEAL TIMING COVER
DET POLICE A/C CONDENSIOR
MOTOR MOUNT AXEL SWAY BAR LINKS WIPER ARMS SERVICE
8/15/2018 243DA POLICE RESEAL TIMING COVER
8/16/2018 395DA POLICE SERVICE TIRES CONTROL ARMS
MOTOR MOUNT AXEL SWAY BAR LINKS WIPER ARMS SERVICE
243DA POLICE RESEAL TIMING COVER
8/17/2018 395DA POLICE SERVICE TIRES CONTROL ARMS
222DA POLICE EXHAUST
8/20/2018 DET POLICE SERVICE
DET POLICE EXHAUST
8/21/2018 DET POLICE A/C
8/22/2018 18DA POLICE COOLING FAN
186DA POLICE SERVICE CABIN AIR FILTER
DET POLICE SERVICE
8/23/2018 DET POLICE FLUID FILM
333DA POLICE A/C
8/24/2018 384DA POLICE SERVICE TIRES SPOT LIGHT
110DA POLICE PINOION SEAL REAR CONTROL ARMS INSTIMENT CLUSTER
205DA HEALTH BALL JOINTS SWAY BAR LINKS MASTER CYL
8/27/2018 12DA POLICE INTAKE MANIFOLD SERVICE
8/28/2018 2DA POLICE SHIFT CABLE
375DA POLICE DRIVERS SEAT MOTOR MOUNTS
DET POLICE A/C
8/29/2018 6DA POLICE SERVICE
13DA POLICE SERVICE
8/30/2018 262DA POLICE SERVICE
76DA ASSIOR SERVICE TIRES
93DA POOL A/C DRYER SERVICE
8/31/2018 332DA POLICE BATTERY WINDSHEID
352DA POLICE A/C DRAYER CONTROL ARM TRAILING ARM
DET POLICE A/C
WATER FUND
August-18
8/2/2018 143DA WATER TIRES
170DA WATER TIRES
303DA WATER AIR FILTERS
8/3/2018 283DA WATER STEERING SHAFT
MOWER WATER BELT BLADES PULLY
8/6/2018 227DA WATER TENSIONER BELT SERVICE
8/8/2018 MOWER WATER HYD LEAK
8/9/2018 283DA WATER TAIL GATE BUSHINGS
MOWER WATER HYD LEAK
8/13/2018 102DA WATER TIRES
249DA WATER TIRES
8/14/2018 132DA WATER ALTERNATOR BATTERY FUEL PUMP HARNESS SERVICE
8/15/2018 132DA WATER ALTERNATOR BATTERY FUEL PUMP HARNESS SERVICE
MOWER WATER REPAIR DECK
8/16/2018 MOWER WATER RESEAL FRONT DRIVE MOTOR HOSE SERVICE
8/17/2018 MOWER WATER RESEAL FRONT DRIVE MOTOR HOSE SERVICE
8/20/2018 MOWER WATER RESEAL FRONT DRIVE MOTOR HOSE SERVICE
8/21/2018 139DA WATER COOANT HOSE
101DA WATER REAR BRAKES SERVICE
8/23/2018 238DA WATER STARTER SERVICE
8/27/2018 321DA WATER BATTERY R/C
MOWER WATER BELTS
8/29/2018 276DA WATER NO START
EQUIPMENT MAINTENACE
AUGUST 2018
Date Vehicle Repair Provided Department
8/1/2018 90 Service Highway
38 Batteries Highway
39 No start/ brakes Highway
8/2/2018 39 Batteries/ rear brakes Highway
8/3/2018 39 Rear Brakes Highway
212 Hyd Leak Highway
8/4/2018 39 Rear Brakes Highway
212 Hyd Leak Highway
8/6/2018 39 Rear Brakes Highway
212 Hyd Leak Highway
105DA Trans Highway
293DA Service Highway
8/7/2018 105DA Trans Highway
39 Rear Brakes Highway
18 Noise in drive train Highway
8/8/2018 105DA Trans Highway
18 Differential Highway
393DA Air tires Highway
349DA Brake line Highway
8/9/2018 18 Differential Highway
105DA Trans Highway
90 Rodder hose Highway
106 Service Highway
28DA brake light Highway
44 Service Highway
8/10/2018 18 Differential Highway
105DA Trans Highway
111DA Check engine light Highway
44 Service Highway
8/11/2018 18 Differential Highway
8/13/2018 18 Differential Highway
111DA MTR Highway
24 Repair tarp Highway
44 Service Highway
8/14/2018 18 Brakes Highway
111DA Lower MTR Highway
29 Prep trucks for spreaders Highway
8/15/2018 18 Brakes Highway
111DA Lower MTR Highway
8/17/2018 Spreaders Seasonal Highway
8/20/2018 252DA Brakes Building Maintenance
Spreaders Seasonal Highway
8/21/2018 TW4 Noise in drive train Highway
30DA Brakes/service Highway
8/22/2018 268DA Service Tree
210DA Front tires Highway
50 Batteries Highway
8 Service Highway
8/23/2018 210DA Front end Building Maintenance
57 No start/ batteries Highway
18 Brakes Highway
8 Service Highway
29 Prep trucks for spreaders Highway
8/24/2018 210DA Front end Building Maintenance
18 Brakes Highway
8 U Joints Highway
Spreaders Seasonal Highway
8/25/2018 18 Brakes Highway
8/27/2018 TW4 U Joints Highway
18 Brakes Highway
210DA Front end Building Maintenance
8 U Joints Highway
8/28/2018 50DA Front end Highway
64DA Belts Highway
198DA Wipers Highway
106DA Service Highway
18 Brakes Highway
8/29/2018 64DA AC Highway
50DA Fuel Filter Highway
106DA Service Highway
18 Brake Highway
8/30/2018 64DA Alternator Highway
83 MB Drag board Highway
3 Brakes Highway
8/31/2018 50DA Tires Highway
83 Main Broom Highway
121DA Service Highway
3 Brakes Highway
1
1
1
4
CITY OF DANBURY
OFFICE OF NEIGHBORHOOD ASSISTANCE
Shawn Stillman 203-796-8026
UNIT Coordinator
s.stillman@danbury-ct.gov
Livable Neighborhoods 2018
“Building a Better Danbury”
September 2018
September 24, 2018, 2018
Honorable Mayor Boughton and City Council Members:
Below is a table highlighting UNIT activity from the time of last month’s City Council report.
This does not include any UNIT activity regarding follow up and re-inspection work from
previously noted issues. The UNIT works to ensure that each and every issue is resolved as
quickly as possible.
Time Period August 27 – September 24, 2018
Number of Quality of Life Issues 90
Year to Date - 2018 850
The top issues addressed by the UNIT were:
Blight/Miscellaneous (31)
Garbage/Debris (25)
Unregistered and abandoned vehicles (11)
Unpermitted living and construction (7)
Front Lawn Parking/Parking violations (8)
WELCOME EDWIN DURAN:
For the last few years, our department has been operating without a dedicated downtown UNIT
staff member. While Jeff and I would balance the needs of the entire community, along with the
demands of the downtown, it is critical to have a primary individual focused exclusively to the
quality of life issues downtown. With that, we welcome Edwin Duran to our team. Edwin had
been responsible for the noise enforcement at our city parks, primarily Rogers Park, and has
partnered with the police department while doing so. He has already hit the ground running,
meeting with various departments and downtown property and business owners. Additionally, he
continues to get exposed and trained on the daily challenges of multi-tasking through all of the
various issues that come up each day. In addition to the day to day UNIT enforcement of city
2
ordinances, Edwin will provide a continual presence downtown. He will be responsible for
ensuring that the conditions of the downtown are clean, and that businesses are held accountable
for following applicable downtown property maintenance and zoning regulations. Additionally,
he will be a liaison for business and property owners to help spearhead any ideas/projects that
can help enhance the quality of life downtown.
TRAIN STATION CLEANUP:
Last week, the UNIT spent a couple of days working on the grounds of the train station. Picking
up garbage/litter, weedwacking overgrown grass and weeds, and power-washing the entry ways
are just some of the many things we did. Additionally, we noted some areas of the station that
need some attention and/or repairs. Most of the work was completed by all of the members of
our department. Our department also coordinated workers from Clean Start to paint the pillars
and fire hydrant in front of the station. The UNIT recognizes that the train station is one of the
many gateways into our downtown and we aim to do whatever we can to help keep it clean,
address any safety concerns and to routinely patrol the grounds to prevent unpermitted loitering.
3
3
3
4
STORM DAMAGE: May 15th
It has been over four months since the macroburst that our area got hit with that caused much
property damage, especially in the north eastern part of Danbury. Many trees were taken down,
causing damage to vehicles, homes and other property damage. Initially, our office obviously did
not receive any complaints about the damage, but now we are seeing a very slight increase in
resident calls due to property owners slowly responding to repair efforts. This storm caused
much destruction and our department understands the recovery from it may take time, with some
properties needing more time. We will inspect each complaint as they come in and will handle
each one appropriately. While it has been four months, some property owners are still waiting for
insurance claims to get approved, etc.
EXTERIOR AND STRUCTURAL BLIGHT CITATIONS:
As our department sends out orders to property owners seeking remediation for various issues, in
most cases, the property owners respond right away with corrective action. In some cases, very
few, action is slow to be taken and our department needs to spend additional time reinspecting
and following up to ensure that action is taken. In cases where there is no action being taken,
fines accrue and the UNIT submits for the those fines to be assessed as a judgement against the
property.
4
Orders written by UNIT (YTD): 46 (Includes Notice of Violations)
87 Balmforth Ave: issued order for the removal of unregistered vehicle, also parked on the front
lawn, in addition to garbage around the property. Multiple warnings have not improved the
property.
1 Cedar Street: issued order for the removal of unregistered vehicles, as well as accumulation
of debris scattered around the property.
52 Driftway Road: issued order to remove log delivery and splitting business from the backyard
of the property. Resident was warned in a few months ago and was given a deadline to remove
all of the wood, but it was not done.
We continue to provide the community with innovative, efficient and responsive service in order
to address quality of life issues in Danbury. Our department makes itself as accessible to our
residents as much as possible. We are contacted by phone, email, text and even Facebook. For
those of you not following the UNIT on Facebook, please LIKE us at UNIT City of
Danbury.
If we can be of any assistance to you or residents in your ward please contact us at 796-8026 or
311.
Sincerely,
Shawn Stillman
Coordinator, Office of Neighborhood Assistance
CITY OF DANBURY
DANBURY, CONNECTICUT 06810
DEPARTMENT OF ELDERLY SERVICES
COMMISSION ON AGING
ELMWOOD HALL
10 Elmwood Place
(203) 797-4686
DATE: September 24, 2018
TO: Honorable Mayor Mark D. Boughton
Members of the City Council
FROM: Susan M. Tomanio, LCSW
Director of Elderly Services
RE: Report City Council Meeting
Reporting Period: (8/20/18 – 9/14/18)
Municipal Agent (Benefit and Support Appointments / Resource and Referral): 104 seniors /
123 services provided
Services by Category: CHOICES (Medicare A, B, D, Advantage, Medigap, Medicare Savings) – 14,
Housing – 11, Rent Rebate – 85, Supportive Services - 5, Transportation – 1, Other - 6
Protective Services for the Elderly: 0
“911” Emergency Calls: 1
Elmwood Hall Senior Center: 299 senior members attended, 1,745 regular visits by those
members
Special Events: (These special events are offered in addition to our 31 regularly scheduled
programs and activities.) Animal Assisted Therapy Dog visits in Partnership with Pet Partners,
Eat Smart Live Strong Nutrition Program, Farm Market on the Move, Open Wii Bowling, Fall
Prevention in partnership with RVNA, End of Summer Dance in partnership with Hancock Hall /
Filosa Health Care Centers, Movie Club: Lady Bird, Book Club
Senior Nutrition Hot Lunches Served: 560
Front Desk Calls: 592
Front Desk In-Person Services: 54
New members this month: 16
Sunshine Smile Care Calls (Friendly Visitor Over the Phone): 8
Van Transportation Program: 319 one way rides
AARP Tax Assistance Program (Program Year 2017): 495 returns completed
Rent Rebate Program 2018, runs April 1 – October 1 (Program Year 2017): 726 applications
processed to date
Community Outreach – 11
State of CT Department of Agriculture Farm Market Checks Distributed: 74
The Prime Timers, Inc., Friends of Danbury Seniors, a 501c3, continues to accept monetary
and non-monetary donations in support of the Elmwood Hall Senior Center.
Please refer to our website for all the latest news, information and community events for
Danbury seniors – www.danburyseniors.org
DANBURY LIBRARY STATISTICS
CIRCULATION, PROGRAMS, SERVICES
2018-2019
July-18 Aug-18 YTD 18-19 YTD 17-18 +/- % Comments:
NUMBER OF PEOPLE ENTERING LIBRARY 33,496 24,946 58,442 63,638 -5,196 -8% Gate counters down for 2 weeks in August
AVERAGE NUMBER OF PEOPLE PER DAY OPEN 1,288 924 2,212 2,448 -235 -10%
REGISTERED PATRONS WITH ACTIVE LIBRARY CARDS * 25,633 25,891 51,524 53,789 -2,265 -4%
USE OF LIBRARY MATERIALS & SERVICES - IN LIBRARY
Total print circulation 26,941 26,077 53,018 57,694 -4,676 -8%
Total Inter-library loan 2,068 2,028 4,096 4,177 -81 -2%
Total program number 202 148 350 275 75 27%
Total program attendance 2,482 1,764 4,246 3,794 452 12%
Meeting room use by outside agencies 42 32 74 25 49 196%
USE OF LIBRARY MATERIALS & SERVICES - REMOTE & ELECTRONIC
Computer usage 8,340 7,736 16,076 20,128 -4,052 -20%
Ebook and audiobook circulation from Overdrive 869 928 1,797 1,339 458 34%
iConn ebook and audiobook downloads 51 99 150 107 43 40%
Downloadable content (eSebco, Freegal, Hoopla, Kanopy, Tumblebooks) 4,059 5,339 9,398 7,233 2,165 30%
* An active card is one that has been used in the past 18 months or owes money.
* Please see separate sheet for Library grant applications and statuses
DANBURY LIBRARY STATISTICS
Grant Applications and Statuses
2018-2019
Grant Agency Program Supported Grant Amount Award Amount Application Due Date Award Dates Project Status
Applied - Awaiting notification in
CT State Library Construction Grant Junior Floor / Children's Programming $100,000 8/31/18 November
Doug Flutie, Jr. Foundation Junior Floor / Children's Programming $9,999 10/5/18 Approved to Apply
Dream Homes Community Center
24 Delay Street
Danbury, CT 06810
203-792-9450
To: Mayor Mark Boughton
From: Judy Coco, Program Advisor
Subject: Monthly Report - September 2018
CC: Rev. P.J. Leopold, ARC Executive Director
Program Synopsis
Dream Homes Community Center (DHCC) is certified by City policy as the City’s “Homeless
Point of Entry” per a collaborative between ARC and the City, as initiated by Mayor Boughton
and by vote of the City Council. DHCC serves people who are homeless or low-income
renters and facilitates first-time home ownership for people with hard-to-serve backgrounds.
ARC is a licensed user of the State database (HMIS). Program affiliates include: Danbury
Housing Partnership, Danbury Continuum of Care, Danbury Housing Placement, Fairfield
County Coordinated Access Network, CT “Rapid Rehousing,” and Vouchers 1 and Vouchers 2
Programs through HUD. Four years ago, ARC’s Executive Director was appointed by Mayor
Boughton to Chair the Danbury Housing Partnership.
August Highlights
• Housing First: ARC has received a grant for part-time position for Housing First Coordina-
tor. The new position will help end chronic homelessness for individuals and families.
• Rapid Re-Housing (RRH): Provides case management, security deposit and rental
assistance. Each month, ARC’s Case Manager acquires new clients, works with Landlords
to identify appropriate housing, completes inspections and provides budget, job search
and child care guidance. Since July 1st, ARC has provided $16,586 in rental and security
deposit assistance.
• Security Deposit Program: ARC actively provides information on available affordable
apartment options, budget and housing stability guidance. Once a client finds a place to
live, and ARC confirms that based on the Client’s income, the rent is reasonable, ARC will
then provide assistance towards the required security deposit. ARC also works with other
local agencies who may be able to assist with the security deposit. This month, ARC have
received several dozen inquires, completed 6 intakes and provided security deposit assis-
tance for 1 family. Since July 1st, ARC has provided $350 in security deposit assistance.
• Vouchers 1 Program: Provides rent for chronically homeless where one member of the
household has a disability. ARC provides budget and housing stability guidance and
advocates with potential landlords. ARC’s Case Manager checks in with the Client weekly;
once a month the Case Manager conducts a home visit. ARC is providing assistance for 2
families (2 people). Since July 1st, ARC has provided $11,140 in security deposit and rental
assistance.
Association of Religious Communities Monthly City Grant Report September 2018
• Vouchers 2 Program: Provides case management for veterans who were chronically
homeless. This includes providing budget and housing stability guidance. ARC’s Case
Manager checks in weekly with the 4 clients.
Community Kindness/Connections
• KIDS program: ARC will continue the KIDS program started over 5 years ago in Dan-
bury Public School’s Title 1 Schools. Volunteers read to Kindergarten Students at 5
schools. On Wednesday, September 26, at 3:30, there will be a 1-hour info-session at
24 Delay Street.
• Domestic Violence Prevention Program: ARC has a position opening for a Group Facili-
tator. Contact Kim at ARC for more info: 203-792-9450 Ext. 105.
• Comida: Thank you to Savers Thrift Store for donations of over 1,000 personal hygiene
products to give to people in need.
Association of Religious Communities Monthly City Grant Report September 2018