Environmental Impact Commission
Regular MeetingDanbury, CT · October 11, 2023
Minutes
Posted in City of Danbury Town Clerk’s office on October 26, 2023 at 3:33 p.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ENVIRONMENTAL IMPACT COMMISSION (203) 797-4525
www.danbury-ct.gov (203) 797-4586 (FAX)
REGULAR MEETING
ENVIRONMENTAL IMPACT COMMISSION
MINUTES
CITY HALL – 155 DEER HILL AVENUE
City Council Chambers
Wednesday, October 11, 2023
7:00 p.m.
ROLL CALL:
Chairman Bernard Gallo called the meeting to order at 7:06 p.m.. Present by roll call:
Matthew Rose, Tom Giegler, Elizabeth Falk, and Mark Massoud. Staff present was Melissa
Llera, Secretary, and Larry Liebman, Environmental Compliance Inspector. Absent were Geoff
Herald, Mary Cronin and Alex Wolk.
PLEDGE OF ALLEGIANCE:
The Pledge of Allegiance was led by Elizabeth Falk.
ACCEPTANCE OF MINUTES: September 27, 2023
Motion to accept the minutes of September 27, 2023 as presented was made by Matthew
Rose; seconded by Tom Giegler. No remarks. All in favor with Ayes from Matthew Rose, Tom
Giegler, Elizabeth Falk, and Bernard Gallo.
Next regular meeting is scheduled for October 25, 2023.
Motion made to add EIC Application No. 1205, City of Danbury, Rehabilitation/
Replacement of Franklin Street Extension bridge over Mercer’s Pond Brook, to tonight’s agenda
was made by Elizabeth Falk; seconded by Mark Massoud. All in favor with Ayes from Matthew
Rose, Tom Giegler, Elizabeth Falk, and Mark Massoud.
EIC Minutes – October 11, 2023
Page 2
NEW BUSINESS:
#1204 4 Lee Mac Ave., J.A.R. Associates, Beecher, Thomas W. Esq., Agent; (K14122),
IL-40 Zone, Construction of two new buildings and site improvements including parking and
storm drainage.
Benjamin Doto, licensed professional engineer, was present to represent the application
for J.A.R. Associates. The application was submitted by Attorney Thomas Beecher. The site is
an existing 2.5 acre completely developed site which currently has a 10,000 sq. ft. industrial
building. It has the Still River to the left, the railroad tracks in the rear, and the DMV to the
right. The site is almost all impervious surface currently.
They are looking to add a 10,000 sq. ft. addition to the left of the front building; along
with the construction of a 12,300 sq. ft. industrial warehouse in the rear of the property. They
have submitted a Special Exception application to Planning & Zoning to allow the warehouse
use.
The site would have very little grading. The site itself doesn’t have any wetlands. The
EIC approval is required since they are within 200 ft. of the Still River per the regulations. The
200 ft. line bisects the site. The Still River does contain a floodplain. The Army Corp improved
this area years ago, so the floodplain is contained within the riverbanks. They do have a flood
plain permit submitted as well since there was a small portion. They aren’t doing anything in the
floodplain.
Mr. Doto presents a plan depicting the site improvements. The 12,300 sq. ft. building in
the rear will go in the current location of the DMV overflow parking area which is no longer
used or required due to the DMV appointment system. They will be installing a fence between
the DMV parking and this site, along with a landscape island to provide a buffer and screening of
the property. The City of Danbury zoning regulations require you put a fence you can’t see
through if you will be storing any construction equipment to trucks. They would also be
widening the main driveway to include a left and right turn lane, and will closing off the second
driveway closest to the intersection.
Also, per the request of Planning, the front of the site will be cleaned up. Currently it is
paved parking. They will be removing the ninety degree parking spaces, and will put plantings,
along with fixing the missing curbing. They will be working with Ellen Hines, a landscape
architect. She will plant the front, plant the islands and remove some invasive species by the
riverbank. There is an area of asphalt in the area of the property line with the City of Danbury
property that will be removed and planted. The City of Danbury needs access to this area
because there is a 24” sewer main (Triangle Street trunk line) that runs along the top bank of the
Still River on the City of Danbury property. This site is served by city water and city sewer.
The rear building will have sprinklers, the front building does not, and the addition will not be
because of the presence of a fire wall.
In terms of storm drainage, there is currently a two catch basin system which drains to the
Still River. Parts of the current system will be kept, and other parts will be modified. A water
quality unit will be added, so all drainage from the paved areas and rear building will drain there.
The roof drains on the front building will continue to drain to the Still River. The flow will be
reduced, as well, based on the reduction of impervious surface by approx. 9,000 sq. ft.
EIC Minutes – October 11, 2023
Page 3
They will be keeping the fence that exists along the Still River, and will be modifying the
fence in the front. There will also be a gate between the front building and rear area for security,
so visitors will be kept to the front parking area.
Mr. Massoud asks what standards they would be using for the water quality system. Mr.
Doto stated they are trying to remove 80% of the solids for the first mark. There is no detention
on the site. The unit would be a 6 ft. diameter unit with an internal bypass. He offered to
provide the spec’s if desired. Mr. Massound stated he would like the spec’s, along with the
maintenance schedule that will be implemented. Mr. Liebman asks what business would be in
the rear warehouse. Mr. Doto said they do not have a tenant yet, but it will be constructed as a
basic warehouse space. They will be installing floor drains in the rear building and addition in
front which will discharge to an oil water separator. The current building doesn’t have floor
drains, and that will remain as-is. Mr. Massoud asked if the oil water separator will follow the
CT DEEP standards. Mr. Doto said they will be 1,000 gal. units based on the low flow. They
will be vented outside. The units will be registered with the City of Danbury Public Works
department whom will inspect and certify them once installed; along with setting forth the
required maintenance schedule.
Elizabeth Falk questioned the protocol that will be followed for the removal of invasive
species. Mr. Doto states based on the plan that they would treat the woody stems with stump
killer and monitor for regrowth. Ms. Falk is concerned about the invasive species or stump killer
getting into the Still River during removal. Mr. Doto said we will get a report from the
Landscape Architect on the protocol and provide to the Commission. Ms. Falk finds a report
acceptable. She would like included the instructions that will be provided to the company doing
the removal. Mr. Doto states they don’t know who the landscape installer will be, as it will be
one of the last things done, but they can certainly provide more information. He said they could
also agree to a condition that they are required to come back towards the end to ensure it is being
done according to EIC’s standards. Mr. Giegler asks why there would need to be trees on the
riverbank. Mr. Doto clarifies that the riverbank is actually City of Danbury property. They
would just be leaving grass along that property line since the City of Danbury requires access to
the area due the sewer main. The riverbanks in this area are grass and rip rap.
Motion to table No. 1204, 4 Lee Mac Ave., for additional information was made by
Matthew Rose, seconded by Mark Massoud. All in favor with Ayes from Matthew Rose, Tom
Giegler, Elizabeth Falk, and Mark Massoud.
#1205 Franklin Street Extension Bridge, City of Danbury; Rehabilitation/ Replacement
of bridge located over Mercer’s Pond Brook
Tom Altermatt, Senior Design Engineer with the City of Danbury, was present to
represent the project. The current bridge has had pieces of the walls breaking off. They
currently have concrete barriers in place to make the bridge safer, but it is restricting the flow of
traffic. The Mayor and Director of Public Works have both expressed the urgency to get this
done due to the safety concerns. The Franklin St Extension bridge in question is located a couple
of hundred feet past the intersection with Gregory St. The current bridge was built in 1920, and
is long overdue for repair. Franklin Street Extension is a heavily traveled road. Since the road is
now restricted, it makes it more difficult for trucks and buses to pass. There was a temporary
repair performed on the bridge about 20 years ago using steel beams.
EIC Minutes – October 11, 2023
Page 4
The project is very involved in terms of permitting. They have been dealing with state
agencies for the historic structure. The City was required to hire a consultant whom has prepared
a report on the historics of the bridge. This report has been reviewed, and the State has accepted
it for replacement of the bridge. The CT DEEP has also reviewed and accepted the dseign. The
Army Corp has been working with the City on the sizing and design, but the City of Danbury is
still working on the official submission to them.
The existing bridge is about 16 ft. wide. The new bridge would expand to 24 ft. wide to
accommodate the 100 year storm events. Excavation of the channel would be performed to
install the footings. During this excavation (2) 42” pipes would be used to divert the water that
runs under the bridge. The bridge will be a precast, three-sided box culvert that will be set using
cranes and heavy machinery. There will be no loss of wetlands with this project because the
channel under the bridge is mostly ledge and very rocky. The application is because of the
impact on a watercourse. They will ensure sediment and erosion controls are in place as well.
The City is currently working on obtaining easements, which involved having surveys and
appraisals completed, from four homeowners to allow this bridge replacement.
Mr. Gallo asked if this bridge is located by the nursing home in that area. Mr. Altermatt
said it was. Mr. Gallo said some of the members have noticed work currently being done on the
bridge. Mr. Altermatt clarified that the current work is just to put the safety barriers due to the
safety concerns. Mr. Liebman asked if it would be a one-piece box. Mr. Altermatt said there
would be multiple pieces that would be set because it is a 24 ft. span. In order to achieve that,
overhead utilities would need to be moved, so they are also working with the utility companies.
They will also have to have a gas main moved. They are hopeful this would be done in the
spring. Mr. Altermatt also said that the new bridge would have sidewalks one each side for
pedestrian traffic which is a huge increase in safety from the current situation. Mr. Giegler asked
for clarification on the use of the 42” pipes. Mr. Altermatt said they are only temporary to divert
the water during the work. Mr. Liebman asked about the length of the road closure. Mr.
Altermatt said the contractor would be given a tight time line due to the length of the detour, but
an exact timeline is not know now. Mr. Massound asks for verification that Connecticut
Fisheries had approved the plan; Mr. Altermatt confirmed. Mr. Massound also asked for
clarification that the bottom of the bridge will be open, and will be restored to natural conditions
after the project; Mr. Altermatt confirmed. He also asked about a possible damn in Mercer’s
Pond and if the pond still existed. Mr. Altermatt said the pond is still there and believes there is
also a privately owned damn.
Motion to table No. 1205, Franklin Street Extension Bridge, until the next regular
scheduled meeting was made by Elizabeth Falk; seconded by Mark Massoud. All in favor with
Ayes from Matthew Rose, Tom Giegler, Elizabeth Falk, and Mark Massoud.
OLD BUSINESS:
#1202 28 Driftwood Rd., Maffini, Alex, (J03018), RA-20 Zone, Removal of existing
deck(s) & Construct new deck
Alex Maffini was present and acknowledged receipt of staff report. He accepted the
conditions of the report as presented.
EIC Minutes – October 11, 2023
Page 5
Motion to approve No. 1202, 28 Driftwood Rd., with a summary ruling and 5 conditions
as presented in staff report was made by Matthew Rose; seconded by Elizabeth Falk. All in
favor with Ayes from Matthew Rose, Tom Giegler, Elizabeth Falk, and Mark Massoud.
______________________________________________________________________________
#1188 1 Mariana Farms Dr., Piacente, Devin & Josemary, (B13048), RA-80, Feasibility
of Subdivision
Mr. Gallo informed the Commission that he has reached out to Ralph Gallagher regarding
this application. He is hopeful to speak with him so the board can receive a status update.
Motion to table to No. 1188, 1 Mariana Farms Dr, for more information was made by
Matthew Rose, seconded by Mark Massoud. All in favor with Ayes from Matthew Rose, Tom
Giegler, Elizabeth Falk, and Mark Massoud.
______________________________________________________________________________
VIOLATIONS: Barnum Road, Danbury, CT- Cease & Desist
Mr. Gallo informed the Commission that he is meeting with Corporation Counsel on
October 12, 2023, and will have a report at the next meeting.
ADJOURNMENT:
Motion to adjourn was made by Mark Massound; seconded by Elizabeth Falk. All in
favor with Ayes from Matthew Rose, Tom Giegler, Elizabeth Falk, and Mark Massoud.
Meeting adjourned at 7:45 p.m.
Respectfully submitted,
Melissa Llera
Recording Secretary
Agenda
Posted in City of Danbury Town Clerk’s office on October 5, 2023 at 4:34 p.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ENVIRONMENTAL IMPACT COMMISSION (203) 797-4525
www.danbury-ct.gov (203) 797-4586 (FAX)
REGULAR MEETING
ENVIRONMENTAL IMPACT COMMISSION
AGENDA
CITY HALL – 155 DEER HILL AVENUE
City Council Chambers
Wednesday, October 11, 2023
7:00 p.m.
ROLL CALL:
PLEDGE OF ALLEGIANCE:
ACCEPTANCE OF MINUTES: September 27, 2023
Click here for: Minutes, September 27, 2023
Next regular meeting is scheduled for October 25, 2023
NEW BUSINESS:
#1204 4 Lee Mac Ave., J.A.R. Associates, Beecher, Thomas W. Esq., Agent; (K14122),
IL-40 Zone, Construction of two new buildings and site improvements including parking and
storm drainage.
Click here for: Application Materials
OLD BUSINESS:
#1202 28 Driftwood Rd., Maffini, Alex, (J03018), RA-20 Zone, Removal of existing
deck(s) & Construct new deck
Click here for: Application Materials
EIC AGENDA – October 11, 2023
Page 2
#1188 1 Mariana Farms Dr., Piacente, Devin & Josemary, (B13048), RA-80, Feasibility
of Subdivision
Click here for: Application Materials
APPLICATION FOR ADMINISTRATIVE APPROVAL: None
ADMINISTRATIVE STAFF ACTIONS: None
VIOLATIONS: Barnum Road, Danbury, CT - Cease & Desist
OTHER MATTERS: None
CORRESPONDENCE:
ADJOURNMENT: