Zoning Board of Appeals
Regular MeetingDanbury, CT · August 22, 2024
Minutes
Posted in City of Danbury Town Clerk’s office on September 16, 2024 at 10:51 a.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ZONING BOARD OF APPEALS (203) 797-4525
www.danbury-ct.gov (203) 797-4586 FAX)
ZONING BOARD OF APPEALS
MINUTES
August 22, 2024
7:00 p.m.
ROLL CALL:
Vice Chair Juan Rivas called the meeting to order at 7:02 p.m. Present by roll call were:
William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas. Vice Chair Juan Rivas seated
alternate William Trotta for Brandon Botelho. Absent were Brandon Botelho, Joseph Hanna, and Rick
Roos. Staff present were Zoning Enforcement Officer Sean Hearty and Secretary Melissa Llera.
ACCEPTANCE OF MINUTES: July 11, 2024
Motion to table acceptance of the minutes to the September 12th meeting due to lack of an
eligible quorum was made by Peter DeLucia; seconded by Anthony Rebeiro. Motion passed
unanimously with AYES from: William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas.
The next regular meeting is scheduled for September 12, 2024
PUBLIC HEARING:
Vice Chair Juan Rivas informs Attorney Beecher that he will be presenting to a four-man board
which will require a unanimous vote for approval. Attorney Beecher acknowledges and agrees to
proceed.
Motion to open Public Hearing for Application No. 24-11, 160-162 Deer Hill Ave., was made
by Peter DeLucia; seconded by Anthony Rebeiro. Motion passed unanimously with AYES from:
William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas.
Zoning Board of Appeals Minutes
August 22, 2024
Page 2
#24-11: 160-162 Deer Hill Avenue, First Congregational Church & Ecclesiastical Society,
Beecher, Thomas, Esq., Agent; (I14104 & I14105), RH-3 Zone. Sec 4.D.2.a.(2) & 4.D.4.b.(1)
eliminate parking screening on West St. and front yard landscaping req. for church, Sec. 4.D.3.a &
3.H.2 allow max. building coverage from 30% to 36.13%, Sec. 4.D.3.a. & 3.I allow usable open space
in front yards and eliminate “exclusive use” req., Sec. 4.D.3.a. reduce front yard setback from 20’ to
12.28’, Sec. 4.G.1, 4.G.3.b.(1), 4.G.4.b.(1) & 8.C.1.c.(2) allow front yard parking between street and
building on West St. side, Sec. 4.G.3.a.(2) eliminate full screening of parking on sides of property, Sec.
4.G.3.a.(3) & 4.G.4.a.(2) eliminate front yard landscaping on West St., Sec. 4.G.4.c. eliminate full
compliance with landscaping req. resulting from expansion of existing building, Sec. 8.A.2.c. allow
grading within 5’ of property line, Sec. 8.C.3.a. & 8.C.3.b.(1) eliminate landscape islands adjacent to
sidewalk and in parking rows for construction of elderly apartment building
Attorney Tom Beecher of Collins Hannifan was present to represent the application, along with
Bob Botelho of Victorian Associates and Dainius Virbickus, professional engineer. Attorney Beecher
presented information on the application. The First Congregational Church owns the two properties.
Mr. Botelho has been working to improve the church’s building and grounds, and he is the prospective
purchaser of the properties. There would be a perpetual lease back to the church for the church
building. The two properties would also be merged. The proposal is for 30 deed restricted apartments
for residents 55 and older. The church building would remain tax exempt, but the apartment building
would be taxable. Mr. Botelho has other projects in the City that have affordable housing, but he can’t
promise for this project until he gets further along with pricing of the project. He intends to try and
have affordable housing. Mr. Botelho also assisted the Baptist Church on Granville Avenue which
was granted variances four years ago. He added an early childhood learning center which is leased to
the City. There are also buildings on Osborne and Cleveland Street that have affordable units in them.
The church tower and spire would be clearly visible with the proposed project. The apartment
building would be brick which would match the church, City Hall, and nearby building on West Street.
The church and apartment building would be connected in the rear. The rear elevator would be
accessible for both buildings to allow the church handicap accessibility as well. This would also allow
the residents access to the church without worrying about inclement weather. The access would be
secure so only the residents could access the apartment building. The current church building was
built in 1909, but the congregation was started in 1696. A petition in favor of the application was
signed by church members and presented with the application. Attorney Beecher also acknowledges a
letter by Farley Santos, which was provided to the Board prior to the meeting, in full support of the
application. Attorney Beecher reads portions of the letter by Mr. Santos into the record.
The project would allow historical preservation of the church, along with the construction of
elderly housing. The property is 1.4 acres located on the corner of West Street and Deer Hill Avenue.
The property has two front yards as far as zoning. It is located in the RH-3 zone which allows
buildings up to 75 ft. tall. Attorney Beecher informs the Board that he and Mr. Botelho had met with
Sharon Calitro, Jennifer Emminger and Allie Smith in the Planning Department about a year ago
regarding the project. They were also supportive as a whole of the project.
Attorney Beecher then provides a review of the variances required. He acknowledged a lot of
sections are included, but many are related to the same relief. In terms of the parking screening, the
church is currently a valid non-conforming property, and they are asking for relief on the front yard
landscaping. Improvements have been made already to the landscaping, and pictures of those
improvements are submitted for the record. There will be further landscaping in the future as well.
Zoning Board of Appeals Minutes
August 22, 2024
Page 3
The variance request for the maximum building coverage would allow the project to have sufficient
parking and the connection between the church and apartment building. The request is for about 3,000
sq. ft., and it would not make sense to demo a portion of the church to alleviate this. The front yard
setback variance is to allow for the front entrance/ portico and handicap ramp. The building itself
would be farther than the required 20 ft., but the other aspects would not be. The variances for useable
open space in the front yard and elimination of the “exclusive use” would allow the whole grounds,
including the lawn area by West Street, to be used by both residents and the church. The don’t want to
segregate areas. Also in order for them to meet the open space requirements, the front yard green
space would need to qualify. They are also looking to increase from 3 to 5 parking spaces off the
existing West Street driveway which triggers the grading within 5 ft. of the property line. In addition
to two front yards, the property has two side yards for zoning. They are not able to accommodate the
required screening along the border between the church and Armory properties due to the driveway.
There will be plantings along the south side where feasible. There is also a variance for the
elimination of landscape islands which they see as a safety and convenience factor. It also allows them
to have enough parking on the site, and it is consistent with the non-conforming areas currently on the
site.
Attorney Beecher then acknowledges the concerns contained in the letter of opposition from
Mr. Silva that the Board received. He sees Mr. Silva has concerns over drainage issues. He clarifies
that the project engineer will be required to submit a storm water management plan as part of the
Planning & Zoning Department’s site plan review process.
Dainius Virbickus, professional engineer with Artel Engineering, was also present for the
applicant, and shared information about the preliminary site plan he prepared. It would also be
submitted for site plan review. He reiterates that the properties are 1.4 acres, and the two lots will be
merged in the future. He presents a plan of existing conditions to the Board which shows the current
green areas on the property. In addition, there are currently two curb cuts on Deer Hill Avenue and
one off of West St. The proposed site plan is then presented notating the lawn areas in green and
proposed addition in tan. The proposed addition would be 7 stories with grade level parking. There
will be 15 parking spaces under the building and an additional 50 surface parking spaces for a total of
65 parking spaces, including 3 handicap spaces. They had to increase the impervious coverage to
accommodate the parking, so it took away from the potential open space. The open space requirement
is 500 sq. ft. per unit, and they proposed 30 units, which is a total of 15,000 sq. ft. Open space is not
allowed in side yard setbacks, so this is a challenge with the property’s two front and two side yards.
Mr. Virbickus then begins to review some of the variances. In regards to the landscaping and
parking along West Street, they would be required to have a 20 ft. wide landscape strip on the front,
but since they are adding parking and have the driveway they are seeking a variance. Also this would
require a variance to allow parking in the front yard; they will be including a handicap space in this
area. They are also asking for grading within 5 ft. of the property line due to this as well. The plan
only has 1 driveway entrance on Deer Hill Avenue versus the current 2 curb cuts. For the front yard
setback request, that would be for the front entryway to the building. For the open space, it is usually
not allowed in the front yard either, but with the existing church location and lawn area on West Street,
they are hoping for this to be included. They are proposing an open space area in the rear within the
side yard setback that may contain a fountain and seating area. They need about 15,000 sq. ft. of open
space, and the West Street lawn area and rear sitting area gives them about 6,500 sq. ft. The rest of the
open space would be the deck for the units, meeting rooms, craft rooms, and open rooftop area.
Zoning Board of Appeals Minutes
August 22, 2024
Page 4
Attorney Beecher clarifies for the record that during the Planning meeting, these ideas were discussed
in detail and would qualify for the open space requirement.
Bob Botelho of Victorian Associates then spoke. He is a Danbury resident. He also disclosed
he is a member of the Zoning Commission, but is able to speak since he is a principle of Victorian
Associates. He was approached 3 years ago by Mayor Esposito about the church’s problem, and the
Mayor stated the City of Danbury couldn’t keep the church alive. The Mayor asked Mr. Botelho if he
could help since he had helped the church on Granville Avenue. Mr. Botelho said he went and visited
the church and Pastor Pat about 3 years ago, along with meeting other members of the congregation
and doing walk-throughs alone of the grounds. There was a good chemistry between them. This
church was the first church in Danbury and were involved with the division of church and state. The
church has documents from the President back then. The church has acted as a backup shelter over the
years, so it is an important part of the community. He explored a lot of ideas, including a performing
arts center, and ended up with the idea of senior housing. He formed a three-point plan so the church,
the City, and himself all would have an agreement. Mayor Esposito was in favor of the senior housing.
Mr. Botelho has been working with the church to reduce their costs like insurance. He has
taken over the maintenance of the church with the use of his staff. He had his architect create
renderings which he presents. The church’s steeple will be higher than everything still. The apartment
building would have the same brick look with the Georgian Colonial style that fits in with Deer Hill.
The floor plans show 30 one-bedroom units ranging from 888-1,0888 sq. ft. There will be 3 units on
the bottom floor with a workout room, movie theater room, and other amenities. There will be 3
penthouse apartments on the top floor with the open space area. The other 4 floors will have 6 units
each. The units will have an accessory room which could be a TV room or a room for an aide to have
their own space. Aides can become a need for elderly people. There will be 2 elevators: 1 in the lobby
and an oversized one in the rear for the church and apartments. The rear elevator will also
accommodate a gurney as needed.
Mr. Rivas asks if the apartment building will be attached to the church. Mr. Botelho responds
that residents will be able to walk from the Victorian Regency to the church through a secure
connection. A passcode will prevent church members from accessing the apartment building. Mr.
Rivas asks for clarification about the intention to have affordable housing. Mr. Botelho said the
project hasn’t gone out to bid yet, so he doesn’t know what his costs will be. He will work to make
affordable units, but can’t promise yet. He has been in business for 55 years and will work to keep
costs down through the use of his connections. He does need to cover his costs and the church’s
expenses as part of this project though. He is working on a business model for the church to increase
their income through the thrift shop, antennae in the steeple, and income from other aspects within the
congregation, so hopefully they could support themselves in the future. Mr. Rivas asks about the need
for the grading variance. Mr. Botelho clarifies that would be expanding the parking spaces on West
Street from 3 to 5 spaces, including an ADA space. Attorney Beecher also adds that the space between
the church and boundary line is very tight in that area, so any work almost falls within the 5 ft. Mr.
Rivas understands they can’t have hedges in certain areas, but asks what landscaping would be done.
Mr. Botelho said they can’t do landscaping between them and Harombee because of the driveway. On
the rest of the property, if there is room for trees and plants, he will have them such as cypress trees.
He aims to be a good neighbor at all of his properties. Mr. Rivas asks about the drainage plan for the
parking area since they are asking for the island variance. Attorney Beecher said, if the variances are
approved, they would go to site plan review. This would require their storm water management plans
and calculations to be vetted by the City Planning and Engineering staff. It will likely be better than it
Zoning Board of Appeals Minutes
August 22, 2024
Page 5
is now. Mr. Botelho adds that they will be required to have silt fence and other controls during
construction as well.
Mr. Rivas asks Mr. Hearty about the parking requirement since they show 65 spaces. Mr.
Hearty points out the parking table shown on the site plan. Mr. Hearty asked Attorney Beecher for
confirmation that the parking requirements are being met; Attorney Beecher confirms.
Mr. DeLucia asks for confirmation that the front yard setback request is only for the portico;
Attorney Beecher confirms. Mr. Botelho adds that the portico helps make the building look better.
Mr. DeLucia asks for confirmation that will have the required open space; Mr. Botelho confirms if
they can use the front and side yards then they would be well over the 15,000 sq. ft.
Mr. Rivas asks for more details regarding the proposed sitting garden shown on the plan on the
West Street side. Mr. Botelho said he likes to have a flag somewhere, so he imagined a flag with a
sitting area around. He would get input from the church as well for the final design. Attorney Beecher
says there will also be a sitting garden in the back off West Street with a possible gazebo. Mr Botelho
adds they currently expanded the Belgian block and removed 3 rotted maple trees. He also is looking
to change some windows for the church and other projects, so the landscaping and sitting garden
would be last to allow access for equipment.
Pastor Pat of First Congregational Church, pastor of 13 years, then spoke regarding the
application. She said the response was overwhelming from the public when they heard the church
needed help. She then provided a detailed history of the church/ congregation. She said the church
needs a leader with a vision to help them keep going and be able to share their building with other
faiths and cultural groups.
Vice Chair Rivas asked if anyone was in favor of the application. Multiple people in the
audience raised their hands. Mr. Rivas asked if anyone would like to speak in favor; no one rose.
Vice Chair Rivas asked if anyone was in opposition to the application.
Larry MooreMouning, executive director of The Armory/ Harombee Center, stated his
concerns about how they will be affected because no one has approached them while planning this
project. He is in favor of helping seniors. He is concerned how the project would affect their use of
the driveway and their use of their space such as their fundraising parties. He requests they keep the
hearing open to allow the Harombee Center the chance to get more information about the project. Mr.
Rivas clarifies that they are just ruling on the variances, and the project has many more steps of
approval after them.
Ernesto Rodriguez of 23 Thorpe St spoke in opposition to the project. He has safety concerns
about flooding of the neighborhood during and after construction. He understands it may be improved,
but that is not a guarantee. He also has concerns about the increase in traffic, and feels the driveway
will make it like a 4-way intersection with the driveway of City Hall. He believes the 7 story building
doesn’t fit in with the street. He states the Board denied Dorothy Day and Pacific House variances
who were asking way less than this application. He also submitted photos of flooding into the record.
Vice Chair Rivas asked for anyone else in opposition; no one rose.
Attorney Beecher provided a rebuttal to the concerns shared. He reiterates that traffic and
stormwater concerns will be reviewed during site plan review. Mr. Botelho adds that the church has
been benevolent to allow parking in the driveway, etc., but the alley is intended for transport and not
parking. He recommends the Harombee Center talk to the City and explore their options. In regards to
the look, Mr. Botelho said he went with the Georgian Colonial look to match the aesthetics, and the
height is allowed in the RH-3 zone. Attorney Beecher then clarifies that the Harombee Center did
Zoning Board of Appeals Minutes
August 22, 2024
Page 6
receive notice about the application prior. He also says it is within the general intent of the RH-3 zone
and won’t adversely affect the health, safety and welfare. He is hopeful a decision is reached tonight.
Mr. Trotta shares that he had previously been involved with the Harombee Center, and agrees
that parking in the rear is tough. He feels it is a large building. He asked for clarification on the
arrangement and if it will be senior housing. Mr. Botelho said he will be the landlord. The housing
will be for 55 and older per the CT senior housing regulations. Mr. Trotta feels it is commendable to
help the church, but he was still surprised by the size of the building compared to the rest of Deer Hill
even though the height is allowed. He also acknowledges the building will be additional tax revenue
for the City. Mr. Botelho responds that the church steeple will be 65 ft. taller than the building. In
addition, with the new City Planning Director’s vision for downtown, there will be more buildings like
this. Since it is senior housing, they don’t believe all the residents will have cars which will alleviate
traffic concerns. Mr. Trotta said that 55-65 will likely still have cars and be working. Mr. Botelho
clarifies that the State of Connecticut sets the age for senior housing as 55 and older.
Pastor Pat then shares her thoughts on the benefits of the programs that would be possible and
would assist with the loneliness of seniors.
Mr. Hearty clarifies that typically ZBA procedures include a presentation by the applicant/
representative, then people in favor or opposition, and then a rebuttal by the applicant/ representative.
He understands that additional people want to speak from the public after the rebuttal, and it would be
up to the attorney and Board to allow them. Attorney Beecher clarifies that himself, Mr. Botelho, and
Pastor Pat had a collective rebuttal. Vice Chair Rivas asked the Board if they are open to allowing the
public to speak in favor or opposition again; they agree.
Vice Chair Rivas asks for anyone in favor of the application.
Greg Pings of 97 Park Avenue spoke in favor of the application. He is responsible for the
digital outreach for the church. He shared a story about how the community comes together to provide
a cooler of water for people in need. He sees this application as a way to help the congregation survive
and be a positive force in the community.
Patricia Moriarty of 35 Wooster Heights spoke in favor of the application. She runs the thrift
store for the church. She said in two years they won’t exist if this doesn’t pass. If they aren’t there,
there is no way to know what a developer will put in the church’s place.
Ben Chianese, Councilman for the 5th Ward, spoke in favor. He has been advocating for the
lack of senior housing. This proposal would allow seniors to age in place (at home), especially with
the second room for the aides. He would prefer 65 and older because most 55 year olds have cars and
drive which will lead to additional traffic. He would also like clarification on the traffic patterns and
driveway dimensions to allow proper access for emergency vehicles. He has concerns over the
additional traffic. He also hopes that the 75 ft. height could be worked on. Mr. Chianese states that 10
variances is a lot and their hardships can’t be self-created. He questions whether the zone is adequate
to support the project. Overall he feels it is good for the City.
Vice Chair Rivas asks for others in favor; no one else requested to speak. Vice Chair Rivas
then asks for anyone else in opposition of the application.
Andrea Gartner of 112 Deer Hill spoke in opposition. She believes the weight of the building is
a lot for the neighborhood. She also feels they should integrate the diversity of the neighborhood
more, and recommends painting a mural to help soften the building. She then questions the ZBA’s
reclusion clause in terms of having a conflict of interest as she feels two of the members have had past
dealings with the applicant. She is unsure if they should have disclosed that prior as Mr. Bothelho
disclosed himself being on the Zoning Commission.
Zoning Board of Appeals Minutes
August 22, 2024
Page 7
Larry MooreMouning of the Harombee Center spoke again in opposition. He reiterates their
desire to have time to get more information on the project. He knows parking has always been an
issue, and they do use the City parking lots after hours. He states the alleyway has always been used
for parking and things, such as when the church uses it for their flea market.
Vice Chair Rivas asked if anyone else was in opposition; no one else requested to speak. He
then offers Attorney Beecher the opportunity for rebuttal.
Attorney Beecher reiterates that traffic and emergency vehicle access will be reviewed by the
Planning & Zoning Department. In addition, it is a two-way driveway from Deer Hill, so access for
emergency vehicles will not be a problem.
Mr. Rebeiro agrees with Attorney Beecher that the Fire Marshall will be included in the review
for emergency vehicle access, along with the Engineering Department reviewing and conditioning the
storm water management.
Vice Chair Rivas asks Mr. Hearty to clarify the reclusion concerns that had been brought up.
Mr. Hearty replies that the Board has the proper background for any sort of ethical decisions they have
in front of them, and feels it is a moot point.
Motion to close Public Hearing for Application No. 24-11, 160-162 Deer Hill Avenue, was
made by Peter DeLucia; seconded by Anthony Rebeiro. Motion passed unanimously with AYES
from: William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas.
Motion to open Application No. 24-11, 160-162 Deer Hill Avenue, for voting session and
discussion was made by Peter DeLucia; seconded by Anthony Rebeiro. Motion passed unanimously
with AYES from: William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas.
Mr. Rebeiro acknowledges he works in the construction industry and is aware of all the new
regulations and rules. He is confident that because of the new regulations, handling of the water runoff
would be improved with this project. In addition, he knows the City of Danbury will require certain
conditions during construction that at times are costly for the contractor. Prior to this application, Mr.
Rebeiro wasn’t aware there was a river in this area. In addition, he also knows the fire department will
be involved in the review and will address the concerns for egress.
Mr. Rivas states he had a lot of questions prior to the presentations this evening, but feels more
comfortable after the information provided by Attorney Beecher and Mr. Botelho. He also sees the
deed restriction for senior housing as a safe guard in the application.
Mr. Rebeiro asks Mr. Hearty, since variances are typically approved per plans submitted,
would the variances still go with the land? Mr. Hearty responds that “per plans submitted” has a lot of
pull, so any major modification would trigger the project to come back to the Board.
Mr. Trotta expresses concern of the size and height of the proposed building and how it affects
the area. Mr. DeLucia clarifies they are not asking for a height variance, and the height is allowed via
the zoning regulations. Mr. Trotta understands that, but feels that what can be done and what is done
can be two different things.
Motion to approve Application No. 24-11, 160-162 Deer Hill Avenue, per plans submitted was
made by Peter DeLucia; seconded by Anthony Rebeiro. Sean Hearty asked Mr. DeLucia for
confirmation that he read the variance requests during his approval motion from the public hearing
docket; Mr. DeLucia confirmed. Mr. Hearty asked Mr. DeLucia to clarify his reasoning for the
approval. Mr. DeLucia acknowledges the need for senior housing and creation of the required open
spaces on the plans. He notes the properties two front yards which creates the need for some of the
variances. In addition, the project won’t adversely affect the public health, safety, and welfare. A
Zoning Board of Appeals Minutes
August 22, 2024
Page 8
second roll call vote was called for by Vice Chair Rivas after Mr. DeLucia clarified his reasons for
approval.
Motion passed unanimously with AYES via roll call vote: William Trotta, Peter DeLucia,
Anthony Rebeiro, and Juan Rivas.
ADJOURNMENT:
Motion to adjourn was made by Anthony Rebeiro; seconded by Peter DeLucia. Motion passed
unanimously with AYES from: William Trotta, Peter DeLucia, Anthony Rebeiro, and Juan Rivas.
Meeting adjourned at 9:08 p.m.
Respectfully submitted,
Melissa Llera
Recording Secretary
Agenda
Posted in City of Danbury Town Clerk’s office on August 15, 2024 at 3:58 p.m.
CITY OF DANBURY
155 DEER HILL AVENUE
DANBURY, CONNECTICUT 06810
ZONING BOARD OF APPEALS (203) 797-4525
www.danbury-ct.gov (203) 797-4586 FAX)
REGULAR MEETING
Zoning Board of Appeals
AGENDA
CITY HALL – 155 DEER HILL AVENUE
City Council Chambers
Thursday, August 22, 2024
7:00 p.m.
ROLL CALL:
ACCEPTANCE OF MINUTES: July 11, 2024
Click here for: Minutes of July 11, 2024
The next regular meeting is scheduled for September 12, 2024
PUBLIC HEARINGS:
#24-11: 160-162 Deer Hill Avenue, First Congregational Church & Ecclesiastical Society,
Beecher, Thomas, Esq., Agent; (I14104 & I14105), RH-3 Zone. Sec 4.D.2.a.(2) & 4.D.4.b.(1)
eliminate parking screening on West St. and front yard landscaping req. for church, Sec. 4.D.3.a &
3.H.2 allow max. building coverage from 30% to 36.13%, Sec. 4.D.3.a. & 3.I allow usable open space
in front yards and eliminate “exclusive use” req., Sec. 4.D.3.a. reduce front yard setback from 20’ to
12.28’, Sec. 4.G.1, 4.G.3.b.(1), 4.G.4.b.(1) & 8.C.1.c.(2) allow front yard parking between street and
building on West St. side, Sec. 4.G.3.a.(2) eliminate full screening of parking on sides of property, Sec.
4.G.3.a.(3) & 4.G.4.a.(2) eliminate front yard landscaping on West St., Sec. 4.G.4.c. eliminate full
compliance with landscaping req. resulting from expansion of existing building, Sec. 8.A.2.c. allow
grading within 5’ of property line, Sec. 8.C.3.a. & 8.C.3.b.(1) eliminate landscape islands adjacent to
sidewalk and in parking rows for construction of elderly apartment building
Click here for: Application Materials
CONTINUED PUBLIC HEARINGS: None
Zoning Board of Appeals Agenda
August 22, 2024
Page 2
OLD BUSINESS: None
NEW BUSINESS: None
CORRESPONDENCE: None
OTHER MATTERS: None
ADJOURNMENT: